CN205836834U - A kind of split type axle box - Google Patents

A kind of split type axle box Download PDF

Info

Publication number
CN205836834U
CN205836834U CN201620576023.1U CN201620576023U CN205836834U CN 205836834 U CN205836834 U CN 205836834U CN 201620576023 U CN201620576023 U CN 201620576023U CN 205836834 U CN205836834 U CN 205836834U
Authority
CN
China
Prior art keywords
bearing
installing hole
box
hole
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620576023.1U
Other languages
Chinese (zh)
Inventor
周新鹏
李冠军
黄明高
罗彦云
王寒煜
何清和
蒲全卫
刘晖霞
周立秋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Intercity Railway Co Ltd
CRRC Zhuzhou Locomotive Co Ltd
Original Assignee
CRRC Zhuzhou Locomotive Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Zhuzhou Locomotive Co Ltd filed Critical CRRC Zhuzhou Locomotive Co Ltd
Priority to CN201620576023.1U priority Critical patent/CN205836834U/en
Application granted granted Critical
Publication of CN205836834U publication Critical patent/CN205836834U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of split type axle box, including upper box and and lower box, upper box one end is provided with installing hole on the bearing of circular arc, lower box is provided with installing hole under the bearing of circular arc, on bearing, installing hole collectively forms a complete bearing mounting hole with installing hole under bearing, under bearing on installing hole, extend according to the radius of curvature identical with bearing mounting hole along its edge and be provided with limit, location;On bearing, the inwall of installing hole is respectively provided on two sides with ladder platform;Limit, location is inserted on bearing installing hole and fits with ladder platform surface, and under bearing, the inwall of installing hole is connected with the interior walls be smooth of installing hole on bearing;After insertion, location limit top sides along and on bearing the two of installing hole inwall at junction, at least leave gap at one.This axle box essentially eliminates the internal stress that assembling produces, and is not susceptible to fatigue fracture, has assembly precision high, and beneficially driver understands the advantages such as traffic safety in time.

Description

A kind of split type axle box
Technical field
This utility model belongs to field of track traffic, is specifically related to a kind of split type axle box.
Background technology
Bogie is the direct recipient of tractive force of train, brake force, car load and track external force, the operation to vehicle Quality and passenger traffic safety are most important.Bogie by framework, suspension arrangement, wheel to, axle box, traction apparatus, basis system The dynamic parts such as device, driving means are constituted, and wherein axle box is to ensure that the vitals that vehicle safety runs, its effect be by Take turns to and framework be linked together, make wheel that the rolling along rail to be converted into the vehicle translation along circuit, it bears the weight of vehicle Amount, the active force of transmission each side, and ensure good greasy property, make axletree that hot axle will not be occurred existing when running up As.So the bearing capacity of axle box has strong influence to the service life of bearing.
The axle box of prior art is all-in-one-piece due to the overwhelming majority, can not meet and realize in the case of not unwheeling Dismounting and installation wheel are right.Also having only a few is split type axle box, but the split type axle box of prior art in use exists Following defect:
1. upper box and lower box are during assembling, owing to the two is connected by needs securing member, need certain pretension Power, this pretightning force can cause bearing mounting hole position that deformation greatly occurs so that bearing mounting hole produces great planted agent Power becomes oval, but axle box inherently bears huge external force, adds the effect of internal stress, easily occurs fatigue disconnected Split.
2. can not make axle box upper and lower part accurate alignment after mould assembling.
3. axletree is when running up, and can cause bearing heating, the most bearing is not carried out monitoring temperature in prior art Facility, be unfavorable for that driver understands traffic safety in time.
The most upper and lower casing is in unloading process, owing to pivoted arm is connected with rubber arthrosis hole, causes the upper box can be another around it The rubber arthrosis hole of one end rotates and falls to the ground, and the safety of quality own to part and operator all can bring bad Impact.
Utility model content
For the problems referred to above, this utility model aims to provide and a kind of assembles the split type axle box that deformation is little, precision is high.
This utility model solves the technical scheme of problem: a kind of split type axle box, including upper box and and upper box The lower box removably connected, described upper box one end is provided with installing hole on the bearing of circular arc, and lower box is provided with circular arc Bearing under installing hole, on described bearing, under installing hole and bearing, installing hole collectively forms a complete bearing mounting hole, It is characterized in that: under bearing on installing hole, extend to be provided with according to the radius of curvature identical with bearing mounting hole along its edge and determine Limit, position;
On bearing, the inwall of installing hole is respectively provided on two sides with ladder platform;
Limit, described location is inserted on bearing installing hole and fits with ladder platform surface, and the inwall of installing hole and axle under bearing Hold the interior walls be smooth linking of installing hole;
After insertion, location limit top sides along and on bearing the two of installing hole inwall at junction, between at least leaving at one Gap.
In such scheme, the purpose of certain interval is stayed to be contemplated to when upper and lower casing being carried out pretension with securing member, energy Enough there is certain elastic space, it is ensured that bearing mounting hole forms a circle as far as possible, thus eliminates internal stress, it is thus achieved that as far as possible Big fatigue life.
Limit, location can guarantee that upper and lower casing no-float during assembling, and position is accurate.
Further, on upper box both lateral sides each extend over be provided with for be connected with lower box first connection convex Platform;On lower box, both lateral sides each extends over and is provided with the second connection boss;
First connects boss and second connects on boss and is equipped with dowel hole, and alignment pin is through the first connection boss and the Two connect the dowel hole on boss, it is achieved the location of upper and lower casing.
This further improved plan makes, and upper and lower casing, during assembling, is beneficial to location, it is thus achieved that higher Assembly precision.
Preferably, described upper box is provided with the temperature sensor for measuring bearing temperature.The mode used can be Upper box arranges counterbore, temperature sensor is placed in counterbore.
Further, the described upper box other end is provided with pivoted arm rubber arthrosis hole, and this pivoted arm rubber arthrosis hole connects structure Pivoted arm joint mounting seat on frame curb girder;
On upper box, the top, one end near pivoted arm rubber arthrosis hole is transversely provided with stop block, the transverse width of this stop block Transverse width more than pivoted arm joint mounting seat.
Owing to upper and lower casing is in unloading process, cause upper box can rotate around the rubber arthrosis axially bored line of its other end And fall to the ground, the safety of quality own to part and operator all can bring deleterious effect.The design of stop block, can So that upper box is when rotated, stop block withstands pivoted arm joint mounting seat, thus prevents upper box from rotating and come off.
Remarkable result of the present utility model is:
1. the design in gap, essentially eliminates the internal stress that assembling produces, is not susceptible to fatigue fracture.
2. limit, location and the design of dowel hole, enables axle box upper and lower part accurate alignment, and assembly precision is high.
3. pair bearing carries out monitoring temperature, beneficially driver and understands traffic safety in time.
4. stop block makes upper box when rotated, and stop block withstands pivoted arm joint mounting seat, thus prevents upper box from revolving Turn and come off.
Accompanying drawing explanation
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is this utility model axle box exploded view.
Fig. 2 is another angle schematic diagram of this utility model axle box.
Fig. 3 is axle box and framework connection diagram.
In figure: 1-upper box, 2-lower box, 3-counterbore, 4-primary spring seat, installing hole on 5-bearing, the vertical damping of 6- Device mounting seat, installing hole under 7-bearing, 8-dowel hole, 9-positions limit, 10-bearing mounting hole, 11-bearing backstop, 12-ladder Platform, 13-first connects boss, 14-pivoted arm rubber arthrosis hole, and 15-second connects boss, 16-stop block, 17-reinforcement, 18- Loss of weight chamber, 19-pivoted arm joint mounting seat.
Detailed description of the invention
As shown in Figures 1 to 3, a kind of split type axle box, including upper box 1 and the nowel that removably connects with upper box 1 Body 2.Described upper box 1 one end is provided with installing hole 5 on the bearing of circular arc, and lower box 2 is provided with under the bearing of circular arc and installs Hole 7.On described bearing, installing hole 5 collectively forms a complete bearing mounting hole 10 with installing hole 7 under bearing.
Upper box 1 top is provided with primary spring seat 4, and on upper box 1, the one end near bearing mounting hole 10 is provided with vertical subtracting Shake device mounting seat 6, upper box is provided with loss of weight chamber 18, reinforcement 17, pivoted arm rubber arthrosis hole 14, bearing backstop when casting 11。
Under bearing on installing hole 7, extend to be provided with according to the radius of curvature identical with bearing mounting hole 10 along its edge and determine Limit 9, position.On bearing, the inwall both sides of installing hole 5 are provided with ladder platform 12 respectively in the way of removing material.Limit, described location 9 is inserted Enter on bearing installing hole 5 and fit with ladder platform 12 surface, and the inwall of installing hole 7 and installing hole on bearing 5 interior under bearing Wall links up smoothly.After insertion, location limit 9 top sides along and the two of installing hole on bearing 5 inwall at junction, at least stay at one There is gap.
On upper box 1, both lateral sides each extends over the first connection boss 13 being provided with for being connected with lower box.Under On casing 2, both lateral sides each extends over and is provided with the second connection boss 15.On first connection boss 13 and the second connection boss 15 all It is provided with dowel hole 8.Alignment pin connects the dowel hole 8 on boss 15 through the first connection boss 13 and second, it is achieved upper and lower The location of casing.
At bearing mounting hole 10, have counterbore 3 on described upper box 1, be provided with for measuring bearing temperature in counterbore 3 Temperature sensor.
Described pivoted arm rubber arthrosis hole 14 connects the pivoted arm joint mounting seat 19 on truck side sill.Near turning on upper box 1 The top, one end in arm rubber arthrosis hole 14 is transversely provided with stop block 16, and the transverse width of this stop block 16 is installed more than pivoted arm joint The transverse width of seat 19.When rotated, stop block 16 withstands pivoted arm joint mounting seat 19 to upper box 1, prevents upper box 1 from rotating de- Fall.

Claims (4)

1. a split type axle box, including upper box (1) and the lower box (2) that removably connects with upper box (1), described on Casing (1) one end is provided with installing hole on the bearing of circular arc (5), and lower box (2) is provided with installing hole under the bearing of circular arc (7), on described bearing, installing hole (5) collectively forms a complete bearing mounting hole (10) with installing hole (7) under bearing, its It is characterised by: under bearing on installing hole (7), extends according to the radius of curvature identical with bearing mounting hole (10) along its edge and set There is limit, location (9);
On bearing, the inwall of installing hole (5) is respectively provided on two sides with ladder platform (12);
Limit, described location (9) is inserted on bearing installing hole (5) and fits with ladder platform (12) surface, and installing hole (7) under bearing Inwall be connected with the interior walls be smooth of installing hole on bearing (5);
After insertion, location limit (9) top sides along and the two of installing hole on bearing (5) inwall at junction, at least leave at one Gap.
Split type axle box the most according to claim 1, it is characterised in that: prolong respectively in the upper both lateral sides of upper box (1) Stretch the first connection boss (13) being provided with for being connected with lower box;Each extend in the upper both lateral sides of lower box (2) and be provided with the Two connect boss (15);
Being equipped with dowel hole (8) in first connection boss (13) and the second connection boss (15), alignment pin is through the first connection Boss (13) and second connects the dowel hole (8) on boss (15), it is achieved the location of upper and lower casing.
Split type axle box the most according to claim 1, it is characterised in that: described upper box (1) is provided with for measuring The temperature sensor of bearing temperature.
Split type axle box the most according to claim 1, it is characterised in that: described upper box (1) other end is provided with pivoted arm Rubber arthrosis hole (14), this pivoted arm rubber arthrosis hole (14) connects pivoted arm joint mounting seat (19) on truck side sill;
The upper top, one end near pivoted arm rubber arthrosis hole (14) of upper box (1) is transversely provided with stop block (16), this stop block (16) transverse width is more than the transverse width in pivoted arm joint mounting seat (19).
CN201620576023.1U 2016-06-14 2016-06-14 A kind of split type axle box Active CN205836834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620576023.1U CN205836834U (en) 2016-06-14 2016-06-14 A kind of split type axle box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620576023.1U CN205836834U (en) 2016-06-14 2016-06-14 A kind of split type axle box

Publications (1)

Publication Number Publication Date
CN205836834U true CN205836834U (en) 2016-12-28

Family

ID=58153196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620576023.1U Active CN205836834U (en) 2016-06-14 2016-06-14 A kind of split type axle box

Country Status (1)

Country Link
CN (1) CN205836834U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110733527A (en) * 2019-10-15 2020-01-31 南京金正奇交通设备有限责任公司 application in bogie axle box of high-speed passenger train, aluminum alloy material and processing technology thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110733527A (en) * 2019-10-15 2020-01-31 南京金正奇交通设备有限责任公司 application in bogie axle box of high-speed passenger train, aluminum alloy material and processing technology thereof
CN110733527B (en) * 2019-10-15 2021-07-13 南京金正奇交通设备有限责任公司 Bogie axle box applied to high-speed passenger train, aluminum alloy material and processing technology of aluminum alloy material

Similar Documents

Publication Publication Date Title
WO2017000547A1 (en) Framework, low-position traction device , steering frame driven by a propeller shaft and railway vehicle
CN102019940B (en) Traction device and rail car
KR20100131393A (en) Railway vehicle power bogie comprising a semi-suspended motor
CN104802820A (en) Novel high-speed motor train unit power bogie
CN104627196A (en) Bogie of high-speed railway vehicle
CN105774834A (en) Swing-bolster-free city express railway vehicle bogie
CN104554321A (en) Bogie for A-type broad-gauge metro vehicle
CN204605835U (en) A kind of high speed railway car bogie truck
CN103625493A (en) Large-axle-load railway vehicle bogie
CN203372249U (en) Large-axle-load railway vehicle bogie
CN108639089A (en) A kind of bogie of rail vehicle
CN104554324A (en) Integrated framework and bogie
CN105216821A (en) A kind of passenger car bogie
CN108297891A (en) Bogie frame
CN105151067A (en) Hinged non-power bogie
CN205601849U (en) Non - power truck
USRE22558E (en) Railroad cab truck
CN103832447B (en) A kind of low-floor train bogie
CN205836834U (en) A kind of split type axle box
CN104648433B (en) High-speed rail vehicle bogie
CN203005448U (en) Non-bolster bogie of intercity railway vehicle
CN204605834U (en) A kind of high speed railway car bogie truck
CN204368175U (en) A molded breadth rail subway vehicle steering rack
CN208376773U (en) A kind of bogie of rail vehicle
CN203727405U (en) Locomotive axle box device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190202

Address after: 412001 Tianxin garden in Shi Feng District, Zhuzhou, Hunan

Co-patentee after: Hunan Intercity Railway Co., Ltd.

Patentee after: CRRC ZHUZHOU LOCOMOTIVE CO., LTD.

Address before: 412001 Tianxin garden in Shi Feng District, Zhuzhou, Hunan

Patentee before: CRRC ZHUZHOU LOCOMOTIVE CO., LTD.