CN205822605U - A kind of assembled pitched roof - Google Patents
A kind of assembled pitched roof Download PDFInfo
- Publication number
- CN205822605U CN205822605U CN201620620787.6U CN201620620787U CN205822605U CN 205822605 U CN205822605 U CN 205822605U CN 201620620787 U CN201620620787 U CN 201620620787U CN 205822605 U CN205822605 U CN 205822605U
- Authority
- CN
- China
- Prior art keywords
- top board
- built
- fitting
- supporting member
- prefabricated top
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
The utility model discloses a kind of assembled pitched roof, including supporting member and prefabricated top board, supporting member is provided with some built-in fittings, prefabricated top board is provided with the pin key hole mated with built-in fitting, supporting member is fixing in being fixed on pin key hole with prefabricated top board by built-in fitting to be connected, tiling sheet above prefabricated top board, pitched roof top paving ridge tiles, it is provided with support between ridge tiles and tile.This utility model can carry out lifting assembling construction and carry prestressing force effect without supporting at the bottom of plate, and fixed form uses pin key hole, built-in fitting to be fixed, and mode is simply firm, lift can directly carry out the later stage build way without after water convenient and swift.
Description
Technical field
The present invention relates to Roof system, be specifically related to a kind of assembled pitched roof.
Background technology
In assembled architecture, domatic top still uses cast-in-place construction technique, working procedure very complicated to take artificial quantity
More, site operation environment is mixed and disorderly.During fabricated construction, end face is cast-in-place still occupies a large amount of template area, significantly drops
Low fabricated energy-conserving and environment-protective rate.
Summary of the invention
For making up the deficiencies in the prior art, the present invention provides a kind of easy construction, the assembled pitched roof of stabilized structure.
The present invention is achieved through the following technical solutions:
A kind of assembled pitched roof, it is characterized in that and includes supporting member and prefabricated top board, on described supporting member
Being provided with some built-in fittings, prefabricated top board is provided with the pin key hole mated with built-in fitting, and described supporting member passes through with prefabricated top board
Built-in fitting is fixing in being fixed on pin key hole to be connected;Tiling sheet above described prefabricated top board, pitched roof top paving ridge tiles, ridge tiles with watt
Support it is provided with between sheet.
The assembled pitched roof of the present invention, described supporting member is xoncrete structure or steel construction, when supporting member is mixed
During Xtah Crude Clay structure, built-in fitting pours and is fixed on supporting member;When supporting member is steel construction, built-in fitting passes through bolted-on
It is fixed on supporting member.
The assembled pitched roof of the present invention, described prefabricated top board is reinforced concrete structure or steel construction, when prefabricated top board
During for reinforced concrete structure, poured fixing behind the pin key hole of the built-in fitting prefabricated top board of insertion by cement mortar;When prefabricated top
When plate is steel construction, behind the pin key hole of the built-in fitting prefabricated top board of insertion, bolt is fixing, and interface surrounding is welded and fixed.
The invention has the beneficial effects as follows: the present invention can carry out lifting assembling construction and carry prestressing force effect without propping up at the bottom of plate
Support, fixed form uses pin key hole, built-in fitting to be fixed, and mode is simply firm, has lifted and can directly carry out later stage building
Way without after water convenient and swift.
Accompanying drawing explanation
Accompanying drawing 1 is the structural representation of the present invention.
Accompanying drawing 2 is the enlarged diagram of part A in accompanying drawing 1.
Accompanying drawing 3 is the structural representation of the first embodiment of the present invention.
Accompanying drawing 4 is the structural representation of the second embodiment of the present invention.
Accompanying drawing 5 is the structural representation of the third embodiment of the present invention.
In figure, 1 supporting member, 2 prefabricated top boards, 3 built-in fittings, 4 pin key holes, 5 tiles, 6 ridge tiles, 7 supports, 8 bolts.
Detailed description of the invention
The present invention is further detailed explanation with detailed description of the invention below in conjunction with the accompanying drawings.
The assembled pitched roof of the present invention, including supporting member 1 and prefabricated top board 2, described supporting member 1 is provided with some
Built-in fitting 3, prefabricated top board 2 is provided with the pin key hole 4 mated with built-in fitting 3, and described supporting member 1 and prefabricated top board 2 are by pre-
Embedded part 3 is fixing in being fixed on pin key hole 4 to be connected;Closure weather-resistant glue in the ribbet of prefabricated top board 2;Above described prefabricated top board 2
Tiling sheet 5, pitched roof top paving ridge tiles 6, it is provided with support 7 between ridge tiles 5 and tile 5, support 7 makes to protect between ridge tiles 5 and tile 5
Hold ventilation voids, it is simple to ventilate.
The construction method of the assembled pitched roof of the present invention, comprises the following steps:
(1) in factory, carry out the Prefabrication of prefabricated top board, inside set suspension ring, pin key hole and according to design requirement carry out right
Roofing is pre-buried carries out location formula placement for roofing flue, ventilation, water pipe etc.;
(2) at the top layer of building body, edge supporting member and secondary beam top to gable or building body carry out pre-buried
Part location is pre-buried, and according to the design that splits of roofing board, the steel construction secondary beam in the standard width of a room in an old-style house is carried out the reserved peace of perforate and built-in fitting
Dress;
(3) prefabricated top board is lifted, built-in fitting is injected in pin key hole, if supporting member xoncrete structure answers thing
First follow and lay the thick cement mortar screeding bed course of 10-20mm at contact surface;
(4) the prefabricated top board to xoncrete structure, enters pouring high-strength cement mortar at pin key hole after having lifted
Row anchoring, the prefabricated top board to steel construction, after having lifted, pin key hole is carried out bolt and fixes, weld after fixation;
(5) prefabricated top board ribbet is blocked weather-resistant glue, then carry out waterproof and roof decorations construction.
Accompanying drawing 3 is the first embodiment of the present invention, and supporting member 1 is xoncrete structure, and built-in fitting 3 pours solid in advance
Being scheduled on supporting member 1, built-in fitting 3 is L-shaped reinforcing bar, and prefabricated top board 2 is prefabricated in the factory in advance for reinforced concrete structure and forms,
Laying the thick cement mortar screeding bed course of 10-20mm at supporting member 1 contact surface before lifting, built-in fitting 3 inserts prefabricated top board 2
Pin key hole 4 lifts, and then pours pin key hole 4 by cement mortar and fixes.
Accompanying drawing 4 is the second embodiment of the present invention, and supporting member 1 is steel construction, and built-in fitting 3 is bolted by bolt 8
Being fixed on supporting member 1, prefabricated top board 2 is reinforced concrete structure, and during lifting, built-in fitting 3 inserts the pin key of prefabricated top board 2
Pour pin key hole 4 by cement mortar behind hole 4 to fix.
Accompanying drawing 5 is the second embodiment of the present invention, and supporting member 1 is steel construction, and built-in fitting 3 is bolted by bolt 8
Being fixed on supporting member 1, prefabricated top board 2 is steel construction, bolts after during lifting, built-in fitting 3 inserts the pin key hole 4 of prefabricated top board 2
Fixing, interface surrounding is welded and fixed.
Claims (6)
1. an assembled pitched roof, it is characterised in that: include supporting member (1) and prefabricated top board (2), described supporting member
(1) being provided with some built-in fittings (3), prefabricated top board (2) is provided with the pin key hole (4) mated with built-in fitting (3), described load-bearing structure
Part (1) is fixing in being fixed on pin key hole (4) with prefabricated top board (2) by built-in fitting (3) to be connected;Described prefabricated top board (2) top
Tiling sheet (5), pitched roof top paving ridge tiles (6), it is provided with support (7) between ridge tiles (6) and tile (5).
A kind of assembled pitched roof the most according to claim 1, it is characterised in that: described supporting member (1) is concrete
Structure, built-in fitting (3) pours and is fixed on supporting member (1).
A kind of assembled pitched roof the most according to claim 1, it is characterised in that: described supporting member (1) is steel construction,
Built-in fitting (3) is fixed on supporting member (1) by bolt (8) bolt.
4. according to a kind of assembled pitched roof described in Claims 2 or 3, it is characterised in that: described prefabricated top board (2) is reinforcing bar
Xoncrete structure, built-in fitting (3) is inserted the pin key hole (4) of prefabricated top board (2) and is poured by cement mortar fixing afterwards.
A kind of assembled pitched roof the most according to claim 3, it is characterised in that: described prefabricated top board (2) is steel construction,
Built-in fitting (3) inserts the pin key hole (4) of prefabricated top board (2) and bolts fixing afterwards, and interface surrounding is welded and fixed.
A kind of assembled pitched roof the most according to claim 1, it is characterised in that: the ribbet of described prefabricated top board (2)
Interior closure weather-resistant glue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620620787.6U CN205822605U (en) | 2016-06-22 | 2016-06-22 | A kind of assembled pitched roof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620620787.6U CN205822605U (en) | 2016-06-22 | 2016-06-22 | A kind of assembled pitched roof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205822605U true CN205822605U (en) | 2016-12-21 |
Family
ID=58146849
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620620787.6U Active CN205822605U (en) | 2016-06-22 | 2016-06-22 | A kind of assembled pitched roof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205822605U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971201A (en) * | 2016-06-22 | 2016-09-28 | 山东明达建筑科技有限公司 | Assembly pitched roof and construction method thereof |
-
2016
- 2016-06-22 CN CN201620620787.6U patent/CN205822605U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105971201A (en) * | 2016-06-22 | 2016-09-28 | 山东明达建筑科技有限公司 | Assembly pitched roof and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013811A (en) | Mounting method of prefabricated building | |
CN206070835U (en) | A kind of assembled architecture bottom composite floor | |
CN108005387B (en) | Synchronous construction method for cast-in-place main body of assembled wallboard and short-limb shear wall | |
CN107386512A (en) | A kind of new fabrication and installation method of Prefabricated superposed beam plate | |
CN206667459U (en) | A kind of pre-splicing Standard formula building of prefabrication type reinforced concrete shear wall | |
CN105971201A (en) | Assembly pitched roof and construction method thereof | |
CN107761947A (en) | Assembled beam-column connecting node and its construction method | |
CN110295700A (en) | Assembled Sloping roof construction method | |
CN110005104A (en) | A kind of fabricated heat preservation decoration integrative laminated floor slab and its construction method | |
CN105672664A (en) | Integral heat insulation wallboard building system | |
CN103615076B (en) | The oblique roofing concrete construction method of a kind of heavy grade | |
CN103306497B (en) | Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure | |
CN109914644A (en) | A kind of assembled heat insulation masonry wall and preparation method thereof | |
CN209194697U (en) | A kind of prefabricated balcony of assembled architecture | |
CN104975614A (en) | Structural steel combined unilateral formwork reinforcement construction method | |
CN205822605U (en) | A kind of assembled pitched roof | |
CN206352348U (en) | A kind of attachment structure of steel reinforced concrete board wall and steel reinforced concrete laminated floor slab | |
CN211421637U (en) | Connecting structure of prefabricated gutter | |
US10988910B2 (en) | Pre-cast concrete wall structures, and methods for manufacturing and installing the same | |
CN101886470B (en) | Construction method of exposed concrete ribbed beams | |
CN106320569A (en) | Assembly-type shear wall embedded steel bar connection process | |
CN109779009A (en) | Assembled architecture ecological house and construction method | |
CN109706970A (en) | A kind of prefabricated square cable active well | |
CN210342219U (en) | Building with prefabricated bathroom | |
CN105421780B (en) | A kind of construction method of prefabricated concrete structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |