CN205776780U - Integrated assembled type dwelling house system - Google Patents
Integrated assembled type dwelling house system Download PDFInfo
- Publication number
- CN205776780U CN205776780U CN201620681207.4U CN201620681207U CN205776780U CN 205776780 U CN205776780 U CN 205776780U CN 201620681207 U CN201620681207 U CN 201620681207U CN 205776780 U CN205776780 U CN 205776780U
- Authority
- CN
- China
- Prior art keywords
- wall
- integrated
- floor
- cast
- section steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Building Environments (AREA)
Abstract
本实用新型公开了一种集成装配式住宅体系。所述集成装配式住宅体系包括由多面墙合围形成的至少一个房间,每个房间具有至少一个带门洞的墙体;每面墙由至少一块集成墙体构成,每块集成墙体包括竖向布置的骨架和设置在骨架之间的内部填充墙构成,其中骨架包括设置在墙体两端部的端部立柱和位于墙体顶端面或底端面的作为横梁的型钢;相邻两块集成墙体的端部立柱之间固定相连,该型钢与端部立柱之间固定相连;所述型钢侧壁具有凹进部,该凹进部内嵌固有横向布置的楼板或压型底模,所述型钢与楼板之间形成整体结构或所述型钢与现浇在压型底模上的整体现浇混凝土层之间形成整体结构。本实用新型成本低,施工效率高,且重复利用程度高。
The utility model discloses an integrated assembly type housing system. The integrated prefabricated housing system includes at least one room surrounded by multiple walls, each room has at least one wall with a door opening; each wall is composed of at least one integrated wall, and each integrated wall includes vertically arranged The skeleton and the internal filling wall arranged between the skeletons, wherein the skeleton includes end columns arranged at both ends of the wall and section steel as a beam at the top or bottom of the wall; two adjacent integrated walls The end columns are fixedly connected with each other, and the section steel is fixedly connected with the end columns; the side wall of the section steel has a recessed part, and the recess part is embedded with a floor slab or a bottom form that is inherently arranged horizontally, and the section steel An integral structure is formed with the floor slab or an integral structure is formed between the section steel and the integral cast-in-place concrete layer cast on the bottom formwork. The utility model has the advantages of low cost, high construction efficiency and high degree of repeated utilization.
Description
技术领域technical field
本实用新型涉及一种集成装配式住宅体系,属于住宅工业化领域(建筑)。The utility model relates to an integrated assembly type housing system, which belongs to the field of housing industrialization (building).
背景技术Background technique
目前装配式低层住宅领域的体系(以下体系名称均为申请人概括)代表主要有密间距轻钢骨架结构体系——“北新房屋体系”(例如中国专利CN201410738494.3)、型钢骨架内嵌轻质墙板体系——“冀东房屋体系”、木结构体系、集装箱结构体系、薄铝板结构体系、PC结构体系等。这些体系都各有优点,但有一个共同的不足就是成本均很高。At present, the systems in the field of prefabricated low-rise residential buildings (the names of the following systems are summarized by the applicant) mainly include the densely spaced light steel skeleton structure system - "Beixin Housing System" (for example, Chinese patent CN201410738494.3), light-weight steel skeleton embedded Wall panel system - "Jidong housing system", wood structure system, container structure system, thin aluminum plate structure system, PC structure system, etc. These systems all have their own advantages, but they have a common shortcoming that the cost is very high.
以上结构体系存在现场装配工序多、结构施工完内部填充及装饰工作量大、适用范围有一定的局限性等问题。因此,亟待结合以上体系的优势,将型钢、填充墙板、PC外装饰高度集成,楼板内嵌,从而形成一种新的成本较低的集成装配式住宅体系。The above structural system has problems such as many on-site assembly processes, heavy internal filling and decoration workload after structural construction, and certain limitations in the scope of application. Therefore, it is urgent to combine the advantages of the above systems to highly integrate profiled steel, infill wall panels, and PC exterior decoration, and to embed floors to form a new low-cost integrated prefabricated residential system.
实用新型内容Utility model content
本实用新型旨在提供一种集成装配式住宅体系,该集成装配式住宅体系的构件在工厂高度集成,结构骨架层、保温层、装饰层做到连接可靠,能够保证各层间严密不起皮、脱层。各构件连接方式简单,工作量要少,且能保证结构力学性能及防水的要求。现场湿作业要少,各构件连接尽量采用干作业的方式。施工速度要快,安装过程要简便,减少人工作业成本。体系结构要灵活,装饰层、保温层、填充墙层以及型钢骨架能够根据工程的建筑、结构需要及业主要求选择材料,使其能够满足结构层数上的安全性要求和建筑低、中、高档的舒适度要求。The utility model aims to provide an integrated prefabricated residential system. The components of the integrated prefabricated residential system are highly integrated in the factory, and the structural skeleton layer, thermal insulation layer and decorative layer are connected reliably, which can ensure the tightness and no peeling between the layers. , delamination. The connection method of each component is simple, the workload is less, and the structural mechanical properties and waterproof requirements can be guaranteed. There should be less wet work on site, and dry work should be used as far as possible for the connection of various components. The construction speed should be fast, the installation process should be simple, and the labor cost should be reduced. The system structure should be flexible. Materials for decoration layer, insulation layer, infill wall layer and section steel skeleton can be selected according to the construction and structure needs of the project and the requirements of the owner, so that it can meet the safety requirements of the number of structural layers and low, medium and high-grade buildings. comfort requirements.
为了实现上述目的,本实用新型所采用的技术方案是:In order to achieve the above object, the technical solution adopted in the utility model is:
一种集成装配式住宅体系,包括由多面墙合围形成的至少一个房间,每个房间具有至少一个带门洞的墙体;其结构特点是,每面墙由至少一块集成墙体构成,每块集成墙体包括竖向布置的骨架和设置在骨架之间的内部填充墙构成,其中骨架包括设置在墙体两端部的端部立柱和位于墙体顶端面或底端面的作为横梁的型钢;相邻两块集成墙体的端部立柱之间固定相连,该型钢与端部立柱之间固定相连;所述型钢侧壁具有凹进部,该凹进部内嵌固有横向布置的楼板或压型底模,所述型钢与楼板之间形成整体结构或所述型钢与现浇在压型底模上的整体现浇混凝土层之间形成整体结构。An integrated prefabricated residential system, including at least one room surrounded by multiple walls, each room has at least one wall with a door opening; its structural feature is that each wall is composed of at least one integrated wall, and each integrated The wall consists of a vertically arranged skeleton and an internal filling wall arranged between the skeletons, wherein the skeleton includes end columns arranged at both ends of the wall and shaped steel as a beam at the top or bottom of the wall; The end columns of two adjacent integrated walls are fixedly connected, and the section steel is fixedly connected with the end columns; the side wall of the section steel has a recessed part, and the recessed part is embedded with an inherently horizontally arranged floor or profile A bottom form, an integral structure is formed between the profiled steel and the floor slab or an integral structure is formed between the profiled steel and an integral cast-in-situ concrete layer cast on the bottom formwork.
本实用新型的集成墙体的骨架和内部填充墙连接稳固,同时骨架与骨架之间连接方便,便于控制建筑质量。同时,型钢与楼板连接稳固,并且能够实现楼面的整体受力性能。型钢作为楼板边部嵌固端,实现免装模技术。利用型钢的腹板,挡住上层现浇混凝土,现场湿作业环境好,没有胀模、跑模等质量病害,且文明施工投入低。The framework of the integrated wall body of the utility model is firmly connected with the internal filling wall, and at the same time, the connection between the framework and the framework is convenient, which facilitates the control of building quality. At the same time, the section steel is firmly connected to the floor, and can realize the overall mechanical performance of the floor. The section steel is used as the embedded end of the floor slab to realize the formwork-free technology. The web of section steel is used to block the upper cast-in-place concrete, the site has a good wet working environment, there are no quality defects such as mold expansion and runaway, and the investment in civilized construction is low.
由此,本实用新型以具有凹进部的型钢为基本元素,利用其的凹进部优势作为楼板的嵌固端,型钢可以作为集成墙体一部分,同时兼作支撑结构,便于型钢上方作业和楼板作业,显著地提高了平行施工能力。Therefore, the utility model takes the shaped steel with the recessed part as the basic element, and uses the advantages of the recessed part as the embedded end of the floor. The shaped steel can be used as a part of the integrated wall and also serves as a supporting structure, which is convenient for the operation above the shaped steel and the floor. operation, significantly improving the ability of parallel construction.
根据本实用新型的实施例,还可以对本实用新型作进一步的优化,以下为优化后形成的技术方案:According to the embodiments of the present invention, the present invention can also be further optimized, and the following is the technical scheme formed after optimization:
为了方便上下墙板对接,所述端部立柱的底端设有用于与下一层端部立柱顶端对接相连的对接柱腿。In order to facilitate the docking of the upper and lower wallboards, the bottom of the end column is provided with a docking column leg for connecting with the top of the next layer of end column.
根据本实用新型的一种实施例,所述楼板的上方设有现浇混凝土层,该现浇混凝土层将所述型钢和楼板连接成整体结构。优选所述型钢的腹板上固定有剪力钉,该剪力钉部分设置在现浇混凝土层内;所述楼板上设有出筋,该出筋的伸出部分位于现浇混凝土层内;该出筋的端部呈弯钩状,用于勾住现浇混凝土层内的加强筋。由此,型钢作为支撑结构制成上层墙板,同时方便进行楼板施工,利用现浇混凝土层可以将叠合楼板与型钢连接为一个整体,型钢兼做现浇混凝土层的侧模,解决了下层楼板和上层墙板同步施工的问题,进一步地,出筋将现浇混凝土和楼板牢固地连接在一起。According to an embodiment of the present invention, a cast-in-place concrete layer is provided above the floor slab, and the cast-in-place concrete layer connects the section steel and the floor slab to form an integral structure. Preferably, a shear stud is fixed on the web of the section steel, and the shear stud is partially arranged in the cast-in-place concrete layer; a rib is provided on the floor, and the protruding part of the rib is located in the cast-in-place concrete layer; The end of the rib is in the shape of a hook, which is used to hook the reinforcing rib in the cast-in-place concrete layer. As a result, the section steel is used as a supporting structure to make the upper wall panel, and at the same time, it is convenient for floor construction. The laminated floor and section steel can be connected as a whole by using the cast-in-place concrete layer. The problem of synchronous construction of the floor slab and the upper wall slab. Further, the reinforcement is used to firmly connect the cast-in-place concrete and the floor slab.
为了保证楼板安装的可靠性,所述楼板的两端分别设置在相对设置的两面集成墙的相应型钢的凹进部内。In order to ensure the reliability of the floor slab installation, the two ends of the floor slab are respectively arranged in the recessed parts of the corresponding section steels of the two opposite integrated walls.
根据本实用新型的另一种实施例,所述楼板的端部与相应的型钢的凹进部之间设有现浇端部。优选所述楼板为全预制楼板。优选所述楼板为具有板空腔的空心板,该空心板通过预埋在现浇端部内的挡圈与型钢固定相连。According to another embodiment of the present utility model, a cast-in-place end portion is provided between the end portion of the floor slab and the corresponding recessed portion of the section steel. Preferably, the floor is a fully prefabricated floor. Preferably, the floor slab is a hollow slab with a slab cavity, and the hollow slab is fixedly connected with the section steel through a retaining ring pre-embedded in the cast-in-place end.
优选地,对于外墙,所述型钢底端与下层集成墙体之间设有防水条。Preferably, for the external wall, a waterproof strip is provided between the bottom end of the shaped steel and the lower integrated wall.
优选所述型钢为工字钢、H型钢和C型钢中的一种。Preferably, the shaped steel is one of I-shaped steel, H-shaped steel and C-shaped steel.
优选地,每块集成墙体还包括设置在内部填充墙外侧面的保温层和位于保温层外的装饰层;所述保温层和装饰层通过连接筋与内部填充墙固定相连,可以避免保温层和装饰层脱落。Preferably, each integrated wall also includes an insulation layer arranged on the outer side of the inner filling wall and a decorative layer located outside the insulation layer; the insulation layer and the decoration layer are fixedly connected to the inner filling wall through connecting ribs, which can avoid the insulation layer And the decorative layer peeled off.
优选每块集成墙体的保温层和装饰层的顶端相对内部填充墙的顶端下移错开一段距离,每块集成墙体的保温层和装饰层的底端相对内部填充墙的顶端下移错开一段距离。由此,集成墙板的装饰层和保温层在层高范围内与内部填充墙上下错开一定距离,作为水平缝防水的第一道防线。基本墙底部贴有防水胶条作为构件的水平连接的第二道止水防线,可以显著提高防水效果。It is preferable that the top of the thermal insulation layer and the decorative layer of each integrated wall move down and stagger a certain distance relative to the top of the internal filling wall, and the bottom of the thermal insulation layer and decorative layer of each integrated wall move downward and stagger a certain distance relative to the top of the internal filling wall distance. As a result, the decorative layer and thermal insulation layer of the integrated wall panel are staggered by a certain distance from the internal filling wall within the range of floor height, which serves as the first line of defense for the waterproofing of the horizontal joints. The bottom of the basic wall is pasted with waterproof adhesive strips as the second waterproof defense line for the horizontal connection of the components, which can significantly improve the waterproof effect.
优选地,相邻两块集成墙体的端部立柱之间形成的连接节点呈一字型、L型或T型;所述端部立柱朝向内部填充墙的侧壁面上设有多个拉结筋头,拉结筋头可以将端部立柱和内部填充墙牢固地连接在一起;同一面墙由多块集成墙体对接相连,相邻两块集成墙体的端部立柱之间形成一字型节点。在一字型节点处,端部立柱之间填充有石蜡(或者沥青),且在石蜡(或者沥青)外侧设有填充在端部立柱之间的密封胶,石蜡(或者沥青)内侧设有位于端部立柱之间的膨胀止水条。在墙体内侧面,将两个端部立柱之间通过一字型的连接件进行连接。Preferably, the connection nodes formed between the end columns of two adjacent integrated walls are in the shape of a straight line, an L shape or a T shape; the side walls of the end columns facing the inner filling wall are provided with a plurality of tie knots The tendon head and the tie tendon head can firmly connect the end column and the internal filling wall; the same wall is connected by multiple integrated walls, and a word is formed between the end columns of two adjacent integrated walls. type node. At the in-line joints, paraffin (or asphalt) is filled between the end columns, and there is a sealant filled between the end columns on the outside of the paraffin (or asphalt), and there is a sealant on the inside of the paraffin (or asphalt). Expandable waterstop between end columns. On the inner side of the wall, connect the two end columns with a straight connector.
上一层集成墙体的端部立柱与相邻下层集成墙体的端部立柱通过对接柱腿固定连接时,采用焊接方式焊接相连,同时采用紧固件穿过端部立柱和对接柱腿将二者进行二次紧固连接。When the end column of the integrated wall on the upper layer is fixedly connected to the end column of the adjacent lower integrated wall through the butt column leg, it is welded and connected by welding, and at the same time, the fastener is used to pass through the end column and the butt column leg. The two are connected by secondary fastening.
上述集成装配式住宅体系的施工方法包括如下步骤:The construction method of the above-mentioned integrated prefabricated housing system includes the following steps:
S1、在工厂预制集成墙体和楼板,包括集成墙体包括两根竖向布置的端部立柱,两根端部立柱之间为内部填充墙;所述内部填充墙的顶端面或底端面上设有与端部立柱固定相连的作为横梁的型钢;预制集成墙体时,先浇筑装饰层,在混凝土初凝前在装饰层上盖贴保温层,并插入连接筋,该连接筋部分伸入到内部填充墙的浇筑区域,然后固定骨架并对浇筑区域封模,最后浇筑轻质填充墙混凝土。插入的连接筋优选为玄武岩钢筋。S1. Prefabricate the integrated wall and floor in the factory, including the integrated wall including two vertically arranged end columns, and an internal filling wall between the two end columns; the top or bottom surface of the internal filling wall There is a section steel fixedly connected with the end column as a beam; when prefabricating an integrated wall, the decorative layer is poured first, and the insulating layer is covered on the decorative layer before the concrete is initially set, and the connecting rib is inserted, and the connecting rib is partially extended into the Go to the pouring area of the inner infill wall, then fix the skeleton and seal the pouring area, and finally pour the lightweight infill wall concrete. The inserted connecting bars are preferably basalt bars.
S2、在建筑工地现浇基础梁,在基础梁上预留插入杯口。S2. Cast-in-place foundation beams on the construction site, and reserve insertion cup openings on the foundation beams.
S3、吊装预制的集成墙体使集成墙体的下端插入基础梁上的预留插入杯口内,通过连接件将连接柱腿与基础梁连接牢固形成第一楼层。同一层安装完成后,在相应楼层的集成墙体的内侧将两块集成墙体之间的竖向缝用连接件进行连接,并对竖向缝做防水处理。S3. Hoist the prefabricated integrated wall so that the lower end of the integrated wall is inserted into the reserved insertion cup on the foundation beam, and the connecting column leg is firmly connected with the foundation beam through the connecting piece to form the first floor. After the installation on the same floor is completed, connect the vertical joints between the two integrated walls with connectors on the inner side of the integrated walls on the corresponding floor, and do waterproof treatment on the vertical joints.
S4、在下一楼层的集成墙体顶端吊装作为上一楼层的多块集成墙体,上一楼层的集成墙体的端部立柱下端部与下一楼层的集成墙体的端部立柱上端部通过对接柱腿固定相连;同时,吊装楼板或压型底模使其端部嵌固在型钢的凹进部内,所述型钢与楼板之间形成整体结构或所述型钢与现浇在压型底模上的整体现浇混凝土层之间形成整体结构。S4. The top of the integrated wall on the next floor is hoisted as a plurality of integrated walls on the previous floor, and the lower end of the end column of the integrated wall on the previous floor passes through the upper end of the end column of the integrated wall on the next floor. The butt column legs are fixedly connected; at the same time, hoisting the floor slab or the bottom mold to make the end embedded in the concave part of the profiled steel, an integral structure is formed between the profiled steel and the floor, or the profiled steel and the cast-in-place bottom mold are formed. The overall structure is formed between the integral cast-in-place concrete layers above.
S2、重复S4,逐步向上装配各楼层,直至住宅框架施工完成。S2. Repeat S4 to gradually assemble each floor until the construction of the housing frame is completed.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
1.型钢作为基本墙的端部,钢材的制作与拼装较混凝土材料质量和精度都容易控制,且现场对接工作更容易,构件不容易损坏;1. Sectional steel is used as the end of the basic wall. Compared with concrete materials, the quality and precision of steel production and assembly are easier to control, and the on-site docking work is easier, and the components are not easily damaged;
2.骨架通过上下对接及左右连接形成稳固的梁柱结构,钢柱通过柱腿上下对接,左右通过连接件连接,施工速度快,且不需要支撑不需要外架;2. The skeleton forms a stable beam-column structure by connecting up and down and connecting left and right. The steel columns are connected up and down through the column legs, and the left and right are connected through connectors. The construction speed is fast, and no support or outer frame is required;
3.骨架底部的H型钢梁凹进去的构造可以作为楼板的支点,这可以使得楼板作业和上层的墙板作业同时施工,缩短施工工期;3. The recessed structure of the H-shaped steel beam at the bottom of the skeleton can be used as the fulcrum of the floor, which can make the floor work and the upper wall work be carried out at the same time, shortening the construction period;
4.骨架底部的H型钢可以作为楼板的支撑点及后浇混凝土的侧模,简化现场的施工;4. The H-shaped steel at the bottom of the skeleton can be used as the support point of the floor slab and the side form of the post-cast concrete, which simplifies the construction on site;
5.在卫生间或者其它部位需要降板处可以通过上下调节H型钢的位置或者增设一道H型钢可以巧妙的实现任意高度的降板问题;5. In the bathroom or other parts where the board needs to be lowered, the position of the H-shaped steel can be adjusted up and down or an H-shaped steel can be added to cleverly realize the problem of lowering the board at any height;
6. 骨架底部的H型钢在首层部位可以根据需要设计在墙中任意部位,达到实现架空楼板的目的,防潮作用效果明显;6. The H-shaped steel at the bottom of the skeleton can be designed in any part of the wall according to the needs on the first floor, so as to achieve the purpose of realizing the overhead floor, and the moisture-proof effect is obvious;
7.整个体系构件大部分在工厂集成,墙板构件均是通过焊接或者螺栓连接件干式连接,现场工作量小,大大降低了人工成本,湿作业少,社会效益明显;7. Most of the whole system components are integrated in the factory, and the wall panel components are all dry-connected by welding or bolted joints. The on-site workload is small, the labor cost is greatly reduced, the wet work is less, and the social benefits are obvious;
8.本实用新型的结构体系以基本墙的骨架为设计思路,根据结构安全要求及业主建筑功能需求,可以采取将材料进行替换,集成量的控制,使体系满足低、中、高档以及一层、多层的市场供应;8. The structural system of this utility model takes the skeleton of the basic wall as the design idea. According to the structural safety requirements and the building functional requirements of the owner, materials can be replaced and the amount of integration can be controlled so that the system can meet the requirements of low, medium, high-grade and one-story buildings. , multi-tiered market supply;
9.本实用新型的体系通过基本墙、保温板、装饰墙的集成,拥有优越的结构性、保温性及防水性能;9. The system of the utility model has superior structural, thermal insulation and waterproof properties through the integration of basic walls, thermal insulation boards and decorative walls;
10.骨架可以作为填充墙生产浇筑时的模板,生产基本墙部分时只需要做上端模板;10. The skeleton can be used as the formwork for the filling wall production and pouring, and only the upper formwork is required for the production of the basic wall part;
11.由于本结构的墙板都是采用干式连接,墙板构件拆除后能够重复利用,楼板部分由于是内嵌式,合理切割后部分可以重复利用。11. Since the wall panels of this structure are all dry-connected, the wall panel components can be reused after being removed, and the floor part can be reused after reasonable cutting because it is built-in.
附图说明Description of drawings
图1是本实用新型一个实施例的房间拆分示意图;Fig. 1 is a schematic diagram of room splitting according to an embodiment of the present invention;
图2是U型骨架墙体的结构示意图;Fig. 2 is the structural representation of U-shaped skeleton wall;
图3是墙体降板应用的结构示意图;Fig. 3 is a structural schematic diagram of the application of the wall lowering plate;
图4是四块U型骨架墙体对接拼装后的结构示意图;Fig. 4 is a structural schematic diagram of four U-shaped skeleton walls after butt joint assembly;
图5是端部立柱与对接柱腿的连接示意图;Fig. 5 is a schematic diagram of the connection between the end column and the butt column leg;
图6是墙体竖向节点连接示意图;Fig. 6 is a schematic diagram of wall vertical node connections;
图7是图6的俯视图;Figure 7 is a top view of Figure 6;
图8是单块集成墙体的结构示意图;Fig. 8 is a schematic structural view of a single integrated wall;
图9是图8的右视图;Fig. 9 is the right side view of Fig. 8;
图10是本实用新型安装在施工现场基础梁上的示意图;Fig. 10 is a schematic diagram of the utility model installed on the foundation beam of the construction site;
图11是型钢支撑楼板的一种实施例示意图;Fig. 11 is a schematic diagram of an embodiment of a section steel support floor;
图12是型钢支撑楼板的另一种实施例示意图;Fig. 12 is a schematic diagram of another embodiment of the shaped steel support floor;
图13是型钢支撑楼板的又一种实施例示意图。Fig. 13 is a schematic diagram of another embodiment of a section steel supporting floor.
在图中In the picture
1,2-集成墙体;3-现浇楼面; 4-压型底模;5-型钢;6,11-出筋;7-现浇混凝土层;8-凹进部;9-剪力钉;10-叠合楼板;12-防水条;13-现浇端部;14-挡圈;15-板空腔;100-内部填充墙;101-保温层;102-装饰层;103-端部立柱;104-拉结筋头;105-对接柱腿;106-连接筋;107-紧固件;108-螺栓孔;109-密封胶;110-膨胀止水条;111-石蜡;112-连接件;113-基础梁;114-角钢;115-地脚螺栓;116-混凝土;L-保温层和装饰层的顶端相对内部填充墙的顶端下移错开的距离或保温层和装饰层的底端相对内部填充墙的顶端下移错开的距离。1, 2-integrated wall; 3-cast-in-place floor; 4-pressure bottom mold; 5-shaped steel; Nail; 10-laminated floor; 12-waterproof strip; 13-cast-in-place end; 14-retaining ring; 15-board cavity; 100-inner filling wall; 101-insulation layer; 102-decorative layer; Department column; 104- tie tendon head; 105-butt column leg; 106-connecting rib; 107-fastener; 108-bolt hole; 109-sealant; Connecting piece; 113-foundation beam; 114-angle steel; 115-anchor bolt; 116-concrete; L-the distance that the top of the insulation layer and the decoration layer moves downward relative to the top of the inner filling wall or the bottom of the insulation layer and the decoration layer The staggered distance that the end is moved down relative to the top of the interior fill wall.
具体实施方式detailed description
以下将参考附图并结合实施例来详细说明本实用新型。需要说明的是,在不冲突的情况下,本实用新型中的实施例及实施例中的特征可以相互组合。为叙述方便,下文中如出现“上”、“下”、“左”、“右”字样,仅表示与附图本身的上、下、左、右方向一致,并不对结构起限定作用。The utility model will be described in detail below with reference to the accompanying drawings and embodiments. It should be noted that, in the case of no conflict, the embodiments of the present invention and the features in the embodiments can be combined with each other. For the convenience of description, if the words "up", "down", "left" and "right" appear in the following, it only means that the directions of up, down, left and right are consistent with the drawings themselves, and do not limit the structure.
以空心型钢作为U型钢骨架或倒U型钢骨架的端部立柱103、以H型钢5作为骨架的横梁、内部填充墙由轻质混凝土预制,保温层101为挤塑板、装饰层102为仿木混凝土,楼板10为叠合板举例详细阐述本实用新型,一种集成装配式住宅体系,如图1-7所示,主要的结构件为:若干集成墙板、若干叠合楼板10、若干连接件以及止水密封填充物;每块集成墙板由内基本墙、保温板以及仿木纹装饰板组成;基本墙由骨架及内部填充墙组成;骨架由两根端部空心型端部立柱103、下部H型钢梁组成。根据一字型、L型、T型的连接节点,立柱可以相应设计成一字型、L型、T型。端部立柱103的内侧上焊接有钢筋头利于骨架与填充墙连接牢固,端部立柱103的底部设有用于上下对接的连接柱腿。为保证基本墙、保温板以及仿木混凝土牢固连接为整体,在集成板的中间按一定间距插入玄武岩钢筋进行连接。如图8所示,集成墙板的装饰层和保温层在层高范围内与内基本墙上下错开一定距离,作为水平缝防水的第一道防线。基本墙底部贴有防水胶条作为构件的水平连接的第二道止水防线。The end column 103 with hollow section steel as U-shaped steel skeleton or inverted U-shaped steel skeleton, the beam with H-shaped steel 5 as skeleton, and the internal filling wall are prefabricated by lightweight concrete. The insulation layer 101 is extruded board and the decorative layer 102 is imitation wood Concrete, the floor slabs 10 are laminated slabs as an example to illustrate in detail the utility model, an integrated assembly residential system, as shown in Figure 1-7, the main structural components are: several integrated wall panels, several laminated floor slabs 10, and several connectors and water-tight sealing filling; each integrated wall panel is composed of an inner basic wall, a thermal insulation board and an imitation wood grain decorative board; the basic wall is composed of a skeleton and an internal filling wall; The lower part is composed of H-shaped steel beams. According to the connection nodes of the straight, L and T shapes, the column can be designed into the straight, L and T shapes accordingly. The inner side of the end column 103 is welded with a steel bar head to facilitate the connection between the skeleton and the filling wall. The bottom of the end column 103 is provided with connecting column legs for up and down butt joints. In order to ensure that the basic wall, insulation board and wood-like concrete are firmly connected as a whole, basalt steel bars are inserted in the middle of the integrated board at a certain interval for connection. As shown in Figure 8, the decorative layer and thermal insulation layer of the integrated wall panel are staggered by a certain distance from the inner basic wall within the range of floor height, and serve as the first line of defense for horizontal seam waterproofing. The bottom of the basic wall is pasted with waterproof adhesive strips as the second waterproof defense line for the horizontal connection of the components.
型钢拼装成的骨架作为主要受力构件,骨架内嵌入填充墙体,形成内层基本墙。内层基本墙外挂保温层及装饰墙体(装饰层可以是新型仿石、仿木纹混凝土,也可以是砂浆层及涂料等)。楼板(楼板可以是压型钢板做底模上浇混凝土、可以是叠合板上浇混凝土、也可以是全预制局部空心混凝土等)嵌入在骨架的下端钢梁中。墙板构件(包含骨架、填充墙、保温层、装饰层)通工厂的施工顺序及工艺衔接高度集成,现场简单干式连接进行拼装,楼板根据结构类型嵌入,最终在现场形成稳固的结构。The skeleton assembled by section steel is used as the main force-bearing member, and the filler wall is embedded in the skeleton to form the inner basic wall. The inner basic wall is hung with an insulation layer and a decorative wall (the decorative layer can be a new type of imitation stone, imitation wood grain concrete, or a mortar layer and paint, etc.). The floor slab (the floor slab can be made of profiled steel plate for concrete poured on the bottom formwork, it can be concrete poured on a laminated slab, or it can be fully prefabricated partial hollow concrete, etc.) embedded in the steel beam at the lower end of the skeleton. The wall panel components (including skeleton, infill wall, insulation layer, and decorative layer) are highly integrated through the construction sequence and process connection of the factory. The on-site simple dry connection is assembled, and the floor slab is embedded according to the structure type, and finally a stable structure is formed on site.
上述装配式住宅体系的施工方法如下:The construction method of the above prefabricated housing system is as follows:
如图8和9所示,工厂集成化生产墙板部分:步骤一,采用反打工艺浇筑装饰层(以仿木纹混凝土为例),混凝土初凝前在其上盖贴保温板,并按照设计间距插入玄武岩钢筋,留出钢筋头用来连接标准墙混凝土;步骤二,待仿木纹混凝土达到规定强度,在其上固定骨架及上部封模,并浇筑轻质填充墙混凝土;叠合板预制与集成墙板同步。As shown in Figures 8 and 9, the factory integrates the production of wall panels: step 1, adopts the anti-beating process to pour the decorative layer (taking imitation wood-grain concrete as an example), and puts an insulation board on the top of the concrete before the initial setting, and according to Insert the basalt steel bars at the designed interval, and leave the steel bar head to connect the standard wall concrete; step 2, after the imitation wood-grain concrete reaches the specified strength, fix the skeleton and the upper part of the mold on it, and pour the lightweight concrete for the filling wall; the laminated slab is prefabricated Synchronized with integrated wall panels.
现场施工部分:步骤一,如图10所示,现浇基础梁113,基础梁上预留插入杯口及预埋地脚螺栓;步骤二,构件运输到现场后,吊装墙板插入在基础梁的杯口中,并通过连接件将连接柱腿与基础梁连接牢固;步骤三,在墙体的内侧将两面墙的竖向缝用连接件进行连接,并对竖向缝做防水处理;步骤四,吊装叠合楼板(楼板吊装可以在各层墙板全部吊装施工完后);步骤五,浇筑叠合楼板的现浇层;步骤六,一层墙板全部吊装完成连接后,吊装上层墙板与楼板,最终形成稳固的结构体,重复上述步骤,直到所有楼层均施工完毕。On-site construction part: Step 1, as shown in Figure 10, the cast-in-place foundation beam 113, the insertion cup and pre-embedded anchor bolts are reserved on the foundation beam; Step 2, after the components are transported to the site, the hoisting wallboard is inserted into the foundation beam In the mouth of the cup, connect the connecting column leg and the foundation beam firmly through the connecting piece; step 3, connect the vertical joints of the two walls on the inner side of the wall with the connecting piece, and do waterproof treatment for the vertical joint; step 4 , hoisting the laminated floor slab (the floor slab can be hoisted after all the wall panels of each layer are hoisted and constructed); step 5, pouring the cast-in-place layer of the laminated floor slab; step 6, after all the wall panels of the first floor are hoisted and connected, hoist the upper wall panel and floor slabs to finally form a stable structure, repeat the above steps until all floors are constructed.
上述实施例阐明的内容应当理解为这些实施例仅用于更清楚地说明本实用新型,而不用于限制本实用新型的范围,在阅读了本实用新型之后,本领域技术人员对本实用新型的各种等价形式的修改均落入本申请所附权利要求所限定的范围。The above-mentioned embodiments should be understood that these embodiments are only used to illustrate the utility model more clearly, and are not intended to limit the scope of the utility model. After reading the utility model, those skilled in the art will understand each aspect of the utility model Modifications in various equivalent forms all fall within the scope defined by the appended claims of this application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620681207.4U CN205776780U (en) | 2016-06-30 | 2016-06-30 | Integrated assembled type dwelling house system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620681207.4U CN205776780U (en) | 2016-06-30 | 2016-06-30 | Integrated assembled type dwelling house system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205776780U true CN205776780U (en) | 2016-12-07 |
Family
ID=58125786
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620681207.4U Expired - Fee Related CN205776780U (en) | 2016-06-30 | 2016-06-30 | Integrated assembled type dwelling house system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205776780U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105951998A (en) * | 2016-06-30 | 2016-09-21 | 三新房屋制造股份有限公司 | Integrated assembly type residential system and construction method thereof |
| CN110820999A (en) * | 2019-11-01 | 2020-02-21 | 中南林业科技大学 | Construction method of fabricated building concrete cast-in-place framework |
-
2016
- 2016-06-30 CN CN201620681207.4U patent/CN205776780U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105951998A (en) * | 2016-06-30 | 2016-09-21 | 三新房屋制造股份有限公司 | Integrated assembly type residential system and construction method thereof |
| CN110820999A (en) * | 2019-11-01 | 2020-02-21 | 中南林业科技大学 | Construction method of fabricated building concrete cast-in-place framework |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11466445B2 (en) | Integrated steel concrete building and construction method thereof | |
| US5867964A (en) | Prefabricated construction panels and modules for multistory buildings and method for their use | |
| US5526625A (en) | Building panel and buildings using the panel | |
| US9797137B2 (en) | Fully assembled, fully cast-in-place, composite-type house and construction method thereof | |
| CN100402765C (en) | Box-type building model and its construction method | |
| US5737895A (en) | Prefabricated construction panels and modules for multistory buildings and method for their use | |
| WO1997022770A9 (en) | Prefabricated construction panels and modules for multistory buildings and method for their use | |
| WO2007134518A1 (en) | Structure system of concrete buliding for self-heat insulation | |
| US20170191266A1 (en) | A self-bearing prefabricated construction element and a method of erecting external building walls of prefabricated construction elements | |
| CN105951998B (en) | A kind of integrated assembled type dwelling house system and its construction method | |
| CN102561513A (en) | Unit cabin type building system | |
| CN204753811U (en) | Green light steel prefabricated buildings are built in letter | |
| CN110778016B (en) | A kind of outer protection system of prefabricated steel structure house suitable for severe cold area | |
| CN110306655A (en) | A kind of assembled-type house system | |
| CN205242616U (en) | But rapid Assembly's steel construction building system | |
| CN205776780U (en) | Integrated assembled type dwelling house system | |
| CN112523545A (en) | Basic module for building and low and multi-storey modular building structure system | |
| CN204959963U (en) | Compound lightweight wall housing construction of assembled steel frame | |
| CN103993672A (en) | Tenon type connecting joint structure of low-rise fabricated composite wall house | |
| CN205329970U (en) | Precast concrete wallboard and wall panel structure system of dark frame in area of structure thereof | |
| CN218522008U (en) | Evaporate and press light aerated concrete slab outer wall structure | |
| CN116044053B (en) | Concrete frame prefabricated light steel composite truss supporting steel wire mesh mortar-perlite-polystyrene composite enclosure wall and its construction method | |
| CN218933508U (en) | Assembled light steel bearing steel wire net rack mortar-perlite-polyphenyl enclosure wall | |
| CN219327204U (en) | Steel frame assembled light steel wire net rack mortar-perlite-polyphenyl enclosure wall | |
| CN106638978B (en) | The node structure of the prefabricated load-bearing wall panel combination light weight steel frames of assembled PC |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161207 |