CN205776318U - Transmission line of electricity cross cantilever beam only post self-balancing basis - Google Patents
Transmission line of electricity cross cantilever beam only post self-balancing basis Download PDFInfo
- Publication number
- CN205776318U CN205776318U CN201620638956.9U CN201620638956U CN205776318U CN 205776318 U CN205776318 U CN 205776318U CN 201620638956 U CN201620638956 U CN 201620638956U CN 205776318 U CN205776318 U CN 205776318U
- Authority
- CN
- China
- Prior art keywords
- cantilever beam
- principal post
- basis
- post
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
This utility model discloses a kind of transmission line of electricity cross cantilever beam only post self-balancing basis, it is positioned at the lower section of transmission of electricity tower leg (7), it is characterized in that: cross cantilever beam (1) is arranged on the upper end of the rounded basic principal post (2) of upper surface, the outward flange on each described cross cantilever beam (1) and basis principal post (2) is provided with guardrail (6), is provided with tapered pole (4) on described cross cantilever beam (1);Described basic principal post (2) is disposed vertically, and lower end extend into below ground and passes through together with concreting with enlarged footing (3);Described cat ladder (5) is arranged on the side of described basic principal post (2), and along ground to the top on basis principal post (2);Which overcoming basis of the prior art diameter little, construction space is little, the shortcoming that construction risk is big, has and is prevented effectively from the advantage that tower material is corroded and floods.
Description
Technical field
This utility model relates to the technical field of transmission line foundation, is more specifically transmission line of electricity cross cantilever
Beam only post self-balancing basis.
Background technology
As one of work transmission line important component part, transmission line foundation investment account for engineering totle drilling cost 30% with
On, its Main Function is to support transmission tower;Transmission line of electricity often will be through corrosivity area or flooding area, the bar of conventional design
Tower, owing to tower leg is close to ground, is easily corroded or floods;4 bases that transmission line of electricity is traditional, owing to basis diameter is little, construction
Space is little, and construction risk is big.Deep-etching area, raw fly ash cannot be implemented the brushing of anticorrosion boundary material, typically use and open
Dig basis, in order to brushing anti-corrosion material.For 4 traditional independent excavation foundations, earth volume is big, not environmentally, and basis ratio
Surface area is big, anticorrosion costly conventional transmission lines road four foundation pattern, and floor space is big, and expropriation of land difficulty, when transmission line of electricity is across height
When speed highway or overpass, often limited by road travel, thus cause transmission line of electricity to detour, increased cost.
When needs cross a river is needed to be arranged on by power transmission tower in the middle of river course, four traditional foundation pattern, constructional difficulties journey
Degree is big;Account for water surface area big, affect navigation channel and pass through.
Summary of the invention
The purpose of this utility model is to overcome the weak point of above-mentioned background technology, and proposes transmission line of electricity cross cantilever
Beam only post self-balancing basis, it is prevented effectively from tower material and is corroded and the rough sledding flooded occurs.
This utility model transmission line of electricity cross cantilever beam only post self-balancing is basic, and it is positioned at the lower section of transmission of electricity tower leg, and it is special
Levy and be: it includes cross cantilever beam, basis principal post, enlarged footing, tapered pole, cat ladder and guardrail;At described cross cantilever beam
Being arranged on the upper end of the rounded basic principal post of upper surface, the outward flange of each described cross cantilever beam and basis principal post is all provided with
Being equipped with guardrail, be equidistantly provided with tapered pole on described cross cantilever beam, described basic principal post is disposed vertically, and under
End extend into below ground to be passed through together with concreting with enlarged footing;Described cat ladder is arranged on described basic principal post
Side, and along ground to the top of basis principal post.
In technique scheme: described transmission of electricity tower leg is connected by the foundation bolt bolt arranged in tapered pole, and
Form hinged column base structure.
In technique scheme: the center of described basic principal post and power transmission tower are centrally located on same plumb line;Institute
A diameter of 1.6 meters-2.6 meters of the basic principal post stated;Described foundation main column section is that uiform section is solid or hollow structure, described
The outline of basic principal post be hollow square or hollow ring cross section.
In technique scheme: described basic principal post to 1.5 meters of top, is provided with cat ladder along ground.
In technique scheme: when ground is soft foundation, there is pile foundation or micro-in described enlarged footing arranged beneath
Pilework.
In technique scheme: described cross cantilever beam is variable cross-section xoncrete structure, and described cross cantilever
Beam free end cross-sectional area is little, and the root section area that described cross cantilever beam is connected with basis principal post is big.
This utility model has the advantage that 1, power transmission tower frame stands in distance ground has on the cantilever beam of certain altitude, can
Corroded and the rough sledding flooded occurs being prevented effectively from tower material, also reduced the overhead transmission line occupation of land on ground empty
Between, make transmission tower not limited by place, from without hindering production activity around and traffic circulation.
2, only post brace type basis has certain altitude, while satisfied design span, can reduce the system of angle steel tower
Make height, or do not change original shaft tower height, improve the hanging point height of shaft tower.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the longitudinal sectional drawing of the basic principal post in this utility model.
Fig. 3 is the top view on the basis in this utility model.
Fig. 4 is the profile of A-A in Fig. 1.
Fig. 5 is the attachment structure schematic diagram of the tapered pole in this utility model and power transmission tower.
The structural representation of enlarged footing part when Fig. 6 is soft foundation.
In figure: cross cantilever beam 1, basis principal post 2, enlarged footing 3, pile foundation or micro-pilework 3.1, tapered pole 4, foundation bolt
4.1, cat ladder 5, guardrail 6, transmission of electricity tower leg 7.
Detailed description of the invention
Describe performance of the present utility model below in conjunction with the accompanying drawings in detail, but they are not intended that this utility model
Restriction, the most for example, simultaneously by illustrate advantage of the present utility model will become clearer from easy to understand.
With reference to shown in Fig. 1-6: this utility model transmission line of electricity cross cantilever beam only post self-balancing basis, it is positioned at power transmission tower
The lower section of tower leg 7, it is characterised in that: it includes cross cantilever beam 1, basis principal post 2, enlarged footing 3, tapered pole 4, cat ladder 5 and protects
Hurdle 6;The upper end of the rounded basic principal post 2 of upper surface, each described cross cantilever it is arranged at described cross cantilever beam 1
The outward flange of beam 1 and basis principal post 2 is provided with guardrail 6, is provided with tapered pole 4 on described cross cantilever beam 1;Described
Basis principal post 2 is disposed vertically, and lower end extend into below ground and enlarged footing 3 and passes through together with concreting;Described climbs
Ladder 5 is arranged on the side of described basic principal post 2, and along ground to the top of basis principal post 2.
Described transmission of electricity tower leg 7 is connected by the foundation bolt 4.1 arranged in tapered pole 4, and forms hinged column base structure;
Foundation bolt 4.1 herein can also substitute with steel pipe.
Tapered pole 4 is the height reducing cross cantilever beam 1 further, saves concrete square amount;The size of tapered pole 4 to expire
Foot built-in fitting anchorage length requirement;Basis principal post 2 is the conical surface or the round table surface of variable cross-section, can reduce area of section further,
Reduce concrete and quantity of reinforcement;For Frozen Ground Area, cone-shaped footing 4 can effectively reduce outside specific surface area, thus reduce and cut
To frost-heave force, be conducive to offsetting the adverse effect of Frozen Ground Area cold season.
The center of described basic principal post 2 and power transmission tower are centrally located on same plumb line;Described basic principal post 2 straight
Footpath is 1.6 meters-2.6 meters;Described basic principal post 2 cross section is that uiform section is solid or hollow structure, outside described basic principal post 2
Profile is hollow square or hollow ring cross section.Described basic principal post 2 is positioned at the height on 1.5 meters of more than ground every half
Rice, is evenly arranged cat ladder 5.
When ground is soft foundation, there are pile foundation or micro-pilework 3.1 in described enlarged footing 3 arranged beneath.Described
Cross cantilever beam 1 is variable cross-section xoncrete structure, and the cross-sectional length of the one end poured with described basic principal post 2 is more than cross
The cross-sectional length of cantilever beam 1 afterbody.
Cross cantilever beam 1 carries out two-way reinforcement calculating according to steel tower active force;Basis principal post 2, according to steel tower active force, enters
Row pressure down and horizontal antidumping calculate, and calculate the configuration of principal post reinforcing bar.
Basic principal post 2 in this utility model can use common cast-in-place concrete or commerical ready-mixed concrete;When basis is closed on
Near city or highway, when basis is had aesthetic, can use Shimizu concrete building construction, elegant in appearance, quality has guarantor
Card.
Above-mentioned unspecified part is prior art.
Claims (6)
1. transmission line of electricity cross cantilever beam only post self-balancing basis, it is positioned at the lower section of transmission of electricity tower leg (7), it is characterised in that: it
Including cross cantilever beam (1), basis principal post (2), enlarged footing (3), tapered pole (4), cat ladder (5) and guardrail (6);Described ten
Word cantilever beam (1) is arranged on the upper end of the rounded basic principal post (2) of upper surface, each described cross cantilever beam (1) and base
The outward flange of plinth principal post (2) is provided with guardrail (6), is provided with tapered pole (4) on described cross cantilever beam (1), described
Basic principal post (2) be disposed vertically, and lower end extend into below ground and enlarged footing (3) by together with concreting;Institute
The cat ladder (5) stated is arranged on the side of described basic principal post (2), and is evenly arranged the top on basis principal post (2) along ground.
Transmission line of electricity cross cantilever beam the most according to claim 1 only post self-balancing basis, it is characterised in that: described is defeated
Electricity tower leg (7) is connected by foundation bolt (4.1) bolt arranged in tapered pole (4), and forms hinged column base structure.
Transmission line of electricity cross cantilever beam the most according to claim 1 and 2 only post self-balancing basis, it is characterised in that: described
Center and the power transmission tower of basic principal post (2) be centrally located on same plumb line;A diameter of the 1.6 of described basic principal post (2)
-2.6 meters of rice;Described basic principal post (2) cross section is that uiform section is solid or hollow structure, the foreign steamer of described basic principal post (2)
Exterior feature is hollow square or hollow ring cross section.
Transmission line of electricity cross cantilever beam the most according to claim 3 only post self-balancing basis, it is characterised in that: described base
Plinth principal post (2), along ground to 1.5 meters of top, is provided with cat ladder (5).
Transmission line of electricity cross cantilever beam the most according to claim 4 only post self-balancing basis, it is characterised in that: work as ground
During for soft foundation, there are pile foundation or micro-pilework (3.1) in described enlarged footing (3) arranged beneath.
6. according to the transmission line of electricity cross cantilever beam only post self-balancing basis described in claim 4 or 5, it is characterised in that: described
Cross cantilever beam (1) be variable cross-section xoncrete structure, and described cross cantilever beam (1) free end cross-sectional area is little, described
Cross cantilever beam (1) big with basis principal post (2) the root section area that is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620638956.9U CN205776318U (en) | 2016-06-23 | 2016-06-23 | Transmission line of electricity cross cantilever beam only post self-balancing basis |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620638956.9U CN205776318U (en) | 2016-06-23 | 2016-06-23 | Transmission line of electricity cross cantilever beam only post self-balancing basis |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205776318U true CN205776318U (en) | 2016-12-07 |
Family
ID=58130432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620638956.9U Active CN205776318U (en) | 2016-06-23 | 2016-06-23 | Transmission line of electricity cross cantilever beam only post self-balancing basis |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205776318U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049521A (en) * | 2016-06-23 | 2016-10-26 | 中国电力工程顾问集团中南电力设计院有限公司 | Cross cantilever beam single-column self-balance foundation of power transmission line and construction method thereof |
-
2016
- 2016-06-23 CN CN201620638956.9U patent/CN205776318U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049521A (en) * | 2016-06-23 | 2016-10-26 | 中国电力工程顾问集团中南电力设计院有限公司 | Cross cantilever beam single-column self-balance foundation of power transmission line and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204370431U (en) | A kind of occlusion long-short pile space enclosing structure | |
CN107246006A (en) | Concrete-pile reinforcement cage structure and pile-filling method | |
CN101560770A (en) | Novel deep building foundation pit supporting system | |
CN106930191B (en) | A kind of cast-in-situ box girder hoop bracket system and its construction method | |
CN105133484B (en) | A kind of part earth anchor higher-lower tower cable-stayed bridge structure | |
CN100516378C (en) | Method for supporting and protecting building foundation pit by employing transverse-diaphragm prestressing concrete pipe pile | |
CN104652475A (en) | Truss type retaining wall | |
CN109184699B (en) | Construction method for passing existing river channel under open trench tunnel | |
CN110468849B (en) | Method for treating surface height difference of support supporting system in ultra-deep foundation pit in mountain urban area | |
CN204125872U (en) | A kind of highway barrier bracing means | |
CN205776318U (en) | Transmission line of electricity cross cantilever beam only post self-balancing basis | |
CN205894089U (en) | Native supporting construction of environmental fender of prefabricated assembled | |
CN104499501A (en) | Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line | |
CN205077499U (en) | Double row pile supporting construction with transverse connection component | |
CN104005368B (en) | The retaining of egg type cavity type concrete keeps off native facility | |
CN106049521A (en) | Cross cantilever beam single-column self-balance foundation of power transmission line and construction method thereof | |
CN210104765U (en) | High and large retaining structure of soft geological side slope | |
CN106245668A (en) | A kind of truss-like pile foundation and construction method thereof | |
CN207295462U (en) | A kind of cast-in-situ box girder hoop bracket system | |
CN206289628U (en) | Pile foundation casing set | |
CN205115988U (en) | Part earth anchor height tower cable -stay bridge structure | |
CN204475368U (en) | A kind of cantilevered steel reinforced concrete prestressed combined structure for reinforcement of retaining wall | |
CN209412983U (en) | A kind of assembled interlayer arrangement concrete truss overhanging construction | |
CN206189440U (en) | Based on encircleing bridge type leap -type pile foundation bearing platform structure | |
CN106436551B (en) | Anchor suspension bridge in inclined shaft transmission tower |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |