CN205748141U - A kind of Tunnel Blasting charge constitution - Google Patents
A kind of Tunnel Blasting charge constitution Download PDFInfo
- Publication number
- CN205748141U CN205748141U CN201620615762.7U CN201620615762U CN205748141U CN 205748141 U CN205748141 U CN 205748141U CN 201620615762 U CN201620615762 U CN 201620615762U CN 205748141 U CN205748141 U CN 205748141U
- Authority
- CN
- China
- Prior art keywords
- water bag
- hole
- bag
- rock
- charge constitution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005422 blasting Methods 0.000 title claims abstract description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 68
- 239000011435 rock Substances 0.000 claims abstract description 21
- 239000002360 explosive Substances 0.000 claims abstract description 17
- 238000007789 sealing Methods 0.000 claims abstract description 16
- 239000000839 emulsion Substances 0.000 claims abstract description 14
- 230000000903 blocking effect Effects 0.000 claims abstract description 4
- 230000001804 emulsifying effect Effects 0.000 claims description 4
- 239000004575 stone Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 11
- 238000010276 construction Methods 0.000 abstract description 7
- 239000000428 dust Substances 0.000 abstract description 7
- 238000004880 explosion Methods 0.000 abstract description 4
- 238000009412 basement excavation Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000000843 powder Substances 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 102000016938 Catalase Human genes 0.000 description 1
- 108010053835 Catalase Proteins 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 229940079593 drug Drugs 0.000 description 1
- 239000003814 drug Substances 0.000 description 1
- 238000010304 firing Methods 0.000 description 1
- 239000012528 membrane Substances 0.000 description 1
- -1 perture Species 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000009692 water atomization Methods 0.000 description 1
Landscapes
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Abstract
This utility model relates to a kind of Tunnel Blasting charge constitution, including hole bottom water bag, seals water bag, rock emulsion explosive bag and leads quick-fried parts;Hole bottom water bag is arranged at the bottom, hole in big gun hole, and sealing water bag is arranged at for blocking inside the stemming in aperture, and multiple rock emulsion explosive bags are arranged between hole bottom water bag and sealing water bag;Lead quick-fried parts to be fixedly installed near big gun axially bored line through stemming, sealing water bag and rock emulsion explosive bag.This utility model is applicable to horizontal blasting hole, can be effectively improved blasting efficiency, reduces explosive specific charge, and after explosion, the water in water bag can play atomized dust settling effect, is substantially reduced the dust pollution to environment;But also there is simple in construction, can have strong operability, be not take up Blasting Excavation activity time, improve effect, the advantage such as cheap.
Description
Technical field
This utility model relates to hydraulic pressure demolition technical field, is specially a kind of Tunnel Blasting charge constitution.
Background technology
Energy-conserving and environment-protective tunnel hydraulic pressure demolition technology has started to gradually try out and promote, a certain amount of by injecting in blast hole
Water, and utilize the gas expansion that emulsion produces, promote this stable medium of water to produce secondary attack in blast hole,
Form water wedge and carry out Rock cutting, produce more preferable fractured rock effect, reduce explosive specific charge to a certain extent, reduce fried
Medicine cost;Simultaneously because explosion causes water atomization, form water membrane at rock surface, serve the work reducing Blasting dust
With.But water filling difficulty in horizontal blasting hole is relatively big, complicated construction technique causes efficiency of construction low, and blasting quality is difficult to ensure.
Utility model content
It is to provide one to be applicable to horizontal blasting mouth for the problems referred to above the purpose of this utility model, and simple in construction,
Can have strong operability, can be effectively improved the Tunnel Blasting charge constitution of construction quality and efficiency.Technical scheme is as follows:
A kind of Tunnel Blasting charge constitution, including hole bottom water bag, seals water bag, rock emulsion explosive bag and leads quick-fried parts;
Hole bottom water bag is arranged at the bottom, hole in big gun hole, and sealing water bag is arranged at for blocking inside the stemming in aperture, multiple rock emulsifyings
The blasting charge is arranged between hole bottom water bag and sealing water bag;Lead quick-fried parts through stemming, sealing water bag and rock emulsion explosive bag
It is fixedly installed near big gun axially bored line.
Further, when described big gun hole is periphery hole, each rock emulsion explosive parlor is spaced apart by being spaced water bag.
Further, described interval water bag is the water bag of single round bar shaped.
Further, described in breaking hole, lead the detonator that quick-fried parts are band detonator, periphery hole leads quick-fried parts
For primacord.
Further, described hole bottom water bag is the water bag of single round bar shaped, and sealing water bag is double joint circle bar shaped water bag.
The beneficial effects of the utility model are: this utility model is applicable to horizontal blasting hole, can be effectively improved blasting efficiency,
Reducing explosive specific charge, after explosion, the water in water bag can play atomized dust settling effect, is substantially reduced the dust pollution to environment;And
And also there is simple in construction, can have strong operability, be not take up Blasting Excavation activity time, improve effect, the advantage such as cheap.
Accompanying drawing explanation
Fig. 1 is breaking hole charge constitution schematic diagram.
Fig. 2 is periphery hole charge constitution schematic diagram.
In figure: the bottom water bag of 1-hole;2-leads quick-fried parts;3-rock emulsion explosive bag;4-stemming;5-seals water bag;6-is spaced
Water bag.
Detailed description of the invention
With specific embodiment, this utility model is described further below in conjunction with the accompanying drawings.
Tunnel piercing hydraulic pressure demolition is in sides such as undermining type, borehole layout, quantity, the degree of depth, firing order and time intervals
Face is as tunnel conventional blasting method, except that different in terms of blashole charge amount and charge constitution.The present embodiment
A kind of Tunnel Blasting charge constitution, including hole bottom water bag 1, seals water bag 5, rock emulsion explosive bag 3 and leads quick-fried parts 2;At the bottom of hole
Water bag 1 is arranged at the bottom, hole in big gun hole, and sealing water bag 5 is arranged at for blocking inside the stemming 4 in aperture, and multiple rock emulsifyings are exploded
Medicated bag 3 is arranged between hole bottom water bag 1 and sealing water bag 5;Lead quick-fried parts 2 to explode through stemming 4, sealing water bag 5 and rock emulsifying
Medicated bag 3 is fixedly installed near big gun axially bored line.Owing to energy is in Incoercibility to water of the shock wave of water transmission, make blast
Energy in Water transport to country rock almost without loss, meanwhile, " water wedge " effect that water produces under explosion gas expansion,
Being conducive to catalase, the water in borehole can play atomized dust settling effect, is substantially reduced the dust pollution to environment.
The water bag that hole bottom water bag 1 is single round bar shaped of the present embodiment, sealing water bag 5 is double joint circle bar shaped water bag.Avalanche
Leading, in hole, the detonator that quick-fried parts 2 are band detonator, the quick-fried parts 2 of leading in periphery hole are primacord.
Concrete, breaking hole single hole powder charge process is: the water bag of the round bar shaped of hole bottom plug one, middle part is filled many continuously
Individual rock emulsion explosive bag, orifice position is filled in two round bar shaped water bags the most continuously, is finally carried out aperture envelope with the stemming 4 of column
Stifled.
Periphery hole single hole powder charge process is: use primacord interval to connect explosive, by being spaced by wall scroll circle bar shaped water bag
Explosive colligation in load hole, is spaced apart by interval water bag 6 between the most each rock emulsion explosive bag 3 in bamboo cane, and aperture is with column
Stemming 4 blocks.
This Tunnel Blasting charge constitution have simple in construction, can have strong operability, be not take up Blasting Excavation activity time, improve merit
Effect, the advantage such as cheap.
Claims (5)
1. a Tunnel Blasting charge constitution, it is characterised in that include that hole bottom water bag (1), sealing water bag (5), rock emulsifying are exploded
Medicated bag (3) and lead quick-fried parts (2);Hole bottom water bag (1) is arranged at the bottom, hole in big gun hole, and sealing water bag (5) is arranged at for blocking
Stemming (4) inner side in aperture, multiple rock emulsion explosive bags (3) are arranged between hole bottom water bag (1) and sealing water bag (5);Lead
Quick-fried parts (2) are fixedly installed near big gun axially bored line through stemming (4), sealing water bag (5) and rock emulsion explosive bag (3).
Tunnel Blasting charge constitution the most according to claim 1, it is characterised in that when described big gun hole is periphery hole, each rock
It is spaced apart by interval water bag (6) between stone emulsion bag (3).
Tunnel Blasting charge constitution the most according to claim 2, it is characterised in that described interval water bag (6) is single circle
The water bag of bar shaped.
Tunnel Blasting charge constitution the most according to claim 1, it is characterised in that lead quick-fried parts described in breaking hole
(2) being the detonator of band detonator, the quick-fried parts (2) of leading in periphery hole are primacord.
5. according to the Tunnel Blasting charge constitution described in any one of claim 1-4, it is characterised in that described hole bottom water bag (1)
For the water bag of single round bar shaped, sealing water bag (5) is double joint circle bar shaped water bag.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620615762.7U CN205748141U (en) | 2016-06-21 | 2016-06-21 | A kind of Tunnel Blasting charge constitution |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620615762.7U CN205748141U (en) | 2016-06-21 | 2016-06-21 | A kind of Tunnel Blasting charge constitution |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205748141U true CN205748141U (en) | 2016-11-30 |
Family
ID=57383982
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620615762.7U Expired - Fee Related CN205748141U (en) | 2016-06-21 | 2016-06-21 | A kind of Tunnel Blasting charge constitution |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205748141U (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109029175A (en) * | 2018-08-03 | 2018-12-18 | 中交(广州)建设有限公司 | House slight dynamite construction method and blast hole loading structure are worn under subway tunnel low coverage |
CN109211043A (en) * | 2018-10-31 | 2019-01-15 | 中铁局集团有限公司 | A kind of tunnel photoface exploision periphery hole water spacer loading method |
CN109238048A (en) * | 2018-09-10 | 2019-01-18 | 兖州中材建设有限公司 | A kind of outdoor limestone mine explosion dust-removing method |
CN109373838A (en) * | 2018-12-04 | 2019-02-22 | 山东东山矿业有限责任公司株柏煤矿 | A kind of punching blasting method and device |
CN110243245A (en) * | 2019-07-30 | 2019-09-17 | 湘潭大学 | The method of deep hole blasting |
CN110274528A (en) * | 2019-07-08 | 2019-09-24 | 黑龙江省龙建路桥第三工程有限公司 | A kind of fluidic compartment blasting method |
CN111219190A (en) * | 2019-12-06 | 2020-06-02 | 何满潮 | Method for directional roof cutting by energy-gathered water pressure blasting |
CN111735355A (en) * | 2020-05-25 | 2020-10-02 | 温州大学 | Rapid dust removal structure in tunnel drilling and blasting engineering |
CN111928746A (en) * | 2020-06-09 | 2020-11-13 | 甘肃路桥建设集团有限公司 | Energy-concerving and environment-protective digital detonator water pressure blasting loaded constitution in tunnel |
CN112378299A (en) * | 2020-09-28 | 2021-02-19 | 中铁二局集团有限公司 | Tunnel blasting excavation construction method |
CN112414243A (en) * | 2020-11-11 | 2021-02-26 | 中国人民解放军陆军工程大学 | Charging structure for hydraulic blasting and manufacturing method thereof |
CN112880505A (en) * | 2021-01-27 | 2021-06-01 | 兖州中材建设有限公司 | Mine blasting structure and installation method |
CN113551571A (en) * | 2021-07-26 | 2021-10-26 | 中钢集团马鞍山矿山研究总院股份有限公司 | Underground tunneling blasting advanced wall protection and dust suppression method |
CN114719698A (en) * | 2022-05-13 | 2022-07-08 | 中铁四局集团有限公司 | Ultra-long lower step blasting construction method based on blasting refinement analysis |
CN114963910A (en) * | 2022-07-05 | 2022-08-30 | 中铁建大桥工程局集团第三工程有限公司 | Blasting charge structure and construction method thereof |
-
2016
- 2016-06-21 CN CN201620615762.7U patent/CN205748141U/en not_active Expired - Fee Related
Cited By (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109029175A (en) * | 2018-08-03 | 2018-12-18 | 中交(广州)建设有限公司 | House slight dynamite construction method and blast hole loading structure are worn under subway tunnel low coverage |
CN109238048A (en) * | 2018-09-10 | 2019-01-18 | 兖州中材建设有限公司 | A kind of outdoor limestone mine explosion dust-removing method |
CN109238048B (en) * | 2018-09-10 | 2021-06-08 | 兖州中材建设有限公司 | Surface limestone mine blasting dust-settling method |
CN109211043A (en) * | 2018-10-31 | 2019-01-15 | 中铁局集团有限公司 | A kind of tunnel photoface exploision periphery hole water spacer loading method |
CN109211043B (en) * | 2018-10-31 | 2021-07-13 | 中铁一局集团有限公司 | Water-spaced charging method for peripheral holes of smooth blasting of tunnel |
CN109373838A (en) * | 2018-12-04 | 2019-02-22 | 山东东山矿业有限责任公司株柏煤矿 | A kind of punching blasting method and device |
CN110274528A (en) * | 2019-07-08 | 2019-09-24 | 黑龙江省龙建路桥第三工程有限公司 | A kind of fluidic compartment blasting method |
CN110243245A (en) * | 2019-07-30 | 2019-09-17 | 湘潭大学 | The method of deep hole blasting |
CN110243245B (en) * | 2019-07-30 | 2022-04-01 | 湘潭大学 | Deep hole blasting method |
CN111219190A (en) * | 2019-12-06 | 2020-06-02 | 何满潮 | Method for directional roof cutting by energy-gathered water pressure blasting |
CN111219190B (en) * | 2019-12-06 | 2021-09-24 | 何满潮 | Method for directional roof cutting by energy-gathered water pressure blasting |
CN111735355A (en) * | 2020-05-25 | 2020-10-02 | 温州大学 | Rapid dust removal structure in tunnel drilling and blasting engineering |
CN111928746A (en) * | 2020-06-09 | 2020-11-13 | 甘肃路桥建设集团有限公司 | Energy-concerving and environment-protective digital detonator water pressure blasting loaded constitution in tunnel |
CN112378299A (en) * | 2020-09-28 | 2021-02-19 | 中铁二局集团有限公司 | Tunnel blasting excavation construction method |
CN112414243A (en) * | 2020-11-11 | 2021-02-26 | 中国人民解放军陆军工程大学 | Charging structure for hydraulic blasting and manufacturing method thereof |
CN112880505A (en) * | 2021-01-27 | 2021-06-01 | 兖州中材建设有限公司 | Mine blasting structure and installation method |
CN113551571A (en) * | 2021-07-26 | 2021-10-26 | 中钢集团马鞍山矿山研究总院股份有限公司 | Underground tunneling blasting advanced wall protection and dust suppression method |
WO2023005344A1 (en) * | 2021-07-26 | 2023-02-02 | 中钢集团马鞍山矿山研究总院股份有限公司 | Underground tunneling blasting advanced protection wall dust suppression method |
CN114719698A (en) * | 2022-05-13 | 2022-07-08 | 中铁四局集团有限公司 | Ultra-long lower step blasting construction method based on blasting refinement analysis |
CN114719698B (en) * | 2022-05-13 | 2023-11-03 | 中铁四局集团有限公司 | Ultra-long lower step blasting construction method based on blasting refinement analysis |
CN114963910A (en) * | 2022-07-05 | 2022-08-30 | 中铁建大桥工程局集团第三工程有限公司 | Blasting charge structure and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205748141U (en) | A kind of Tunnel Blasting charge constitution | |
CN103924956B (en) | A kind of lump coal exploitation Advance presplitting method | |
CN204988049U (en) | Box -like gathering of tunnel universal set can charging means | |
CN102168543B (en) | Method and apparatus of improving recovery efficiency of shale gas through a blast mode | |
CN106197178B (en) | A kind of new deep hole water pressure blasting demolition set and blasting method | |
CN101738148B (en) | Tunnel medium-length hole smooth blasting method | |
CN109209472A (en) | The coal seam pressure relief anti-burst method that a kind of punching, explosion, water filling intercouple | |
CN112393654B (en) | Two-way energy-gathering blasting charge structure of joint-cutting pipe | |
CN204188084U (en) | Directed presplit blasting device | |
CN103953339B (en) | A kind of lump coal exploitation coal-winning machine and seam mining method | |
CN104500068A (en) | Dry ice blasting method and dry ice blasting device | |
CN102692164B (en) | Stress unloading, water injecting and drilling and blasting method for longitudinal structure surface structural strong rockburst regions | |
CN108253849A (en) | Coal petrography explosion pre-splitting method and device based on liquid explosives envelope note detonation in deep hole | |
CN111521069A (en) | Carbon dioxide phase change directional pressure relief fracturing device for tunneling and use method thereof | |
CN203837604U (en) | Full-face hole bottom air-spaced loading mechanism for underground roadway tunneling | |
CN201531259U (en) | Perforating bullet of high perforation density deep penetration perforator for oil and gas well | |
CN106643355B (en) | A kind of overhead caving method of the huge thick tight roof of deep coalmine | |
CN205909747U (en) | Novel blasting of deep hole water pressure device | |
CN210289738U (en) | Coal seam hydraulic fracturing and hydraulic blasting coupling permeability increasing device | |
CN109186390B (en) | Open-air deep hole blasting water interval-coupled charging blasting method and special water column bag | |
CN105649625B (en) | A kind of high-low pressure subregion fracturing anatonosis formula coal-bed flooding method | |
CN2929645Y (en) | Rock oriented break blasting device | |
CN102980453B (en) | Water injection drilling and blasting method for unloading stress of structural strong rock burst area of horizontal structural surface | |
CN109827484A (en) | A kind of huge thick tight roof orientation presplitting of highly gassy mine loosens method | |
CN103307941B (en) | A kind of method improving road driving Cut Blasting effect |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161130 |