CN109238048A - A kind of outdoor limestone mine explosion dust-removing method - Google Patents
A kind of outdoor limestone mine explosion dust-removing method Download PDFInfo
- Publication number
- CN109238048A CN109238048A CN201811052887.3A CN201811052887A CN109238048A CN 109238048 A CN109238048 A CN 109238048A CN 201811052887 A CN201811052887 A CN 201811052887A CN 109238048 A CN109238048 A CN 109238048A
- Authority
- CN
- China
- Prior art keywords
- water bag
- blasthole
- dust
- water
- bag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
- F42D1/08—Tamping methods; Methods for loading boreholes with explosives; Apparatus therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of outdoor limestone mine explosion dust-removing methods, comprising the following steps: (1) drills: according to actual landform condition, being drilled with blasthole on bursting work platform;(2) it fills hole: A, stoppering explosive to blasthole bottom;B, empty bottom water bag is put at the top of explosive and is in close contact with explosive top surface;C, after bottom water bag fills water, tamper is put into blasthole, and being put into empty top water bag is in close contact top water bag bottom surface and tamper top surface;(3) processing is moistened;(4) networking explosion;By the present invention in that being combined with top water bag with bottom water bag, it is exploded the water mist to be formed using top water bag, bottom water bag, the large area dust that absorption, trapping explosion generate, blasting dust is greatly reduced, by improving material, wall thickness, draw ratio used in top water bag, bottom water bag, dust concentration after greatly reducing explosion reduces pollution of the dust to environment, and the present invention is easy to implement, convenient for operation.
Description
Technical field
The present invention relates to engineering explosion technical field, in particular to a kind of outdoor limestone mine explosion dust-removing methods.
Background technique
Blasting technique is used widely in engineering construction, with the rapid development of engineering cause, engineering construction
It is higher and higher to the dependency degree of blasting technique, the powder that is increasingly extensive, but being generated in blasting process of the application range of blasting technique
Dirt has been to be concerned by more and more people the harm of environment and society.Blasting dust mainly includes that atmosphere is dirty first is that environmental hazard
The destruction with the ecosystem is contaminated, the air after dust pollution causes serious shadow by urban air-quality of the atmospheric air circulation to periphery
It rings;Second is that social danger causes pneumoconiosis etc. to human health damage, therefore, blasting dust feature and dust-settling technology are studied,
Establish complete set, efficient and quick explosion dust-settling technology solves the problems, such as that blasting dust is that those skilled in the relevant arts are badly in need of solution
Certainly the problem of.
Summary of the invention
In order to solve the above technical problems, technical solution provided by the invention are as follows: a kind of outdoor limestone mine explosion depositing dust
Method, comprising the following steps:
(1) it drills: according to actual landform condition, being drilled with blasthole on bursting work platform.
(2) it fills hole: A, stoppering explosive to blasthole bottom;
B, empty bottom water bag is put at the top of explosive and is in close contact with explosive top surface, bottom water bag is equipped with and bottom
The water injecting pipeline of water bag connection, fills water into bottom water bag by water injecting pipeline;
C, after bottom water bag fills water, tamper is put into blasthole, tamper bottom surface closely connects with bottom water bag top surface
Touching, tamper top slot milling, and being put into empty top water bag is in close contact top water bag bottom surface and tamper top surface, pushes up
Portion's water bag is equipped with the water injecting pipeline being connected to top water bag, fills water into top water bag by water injecting pipeline.
(3) it moistens processing: before detonation, the drilling rock powder near blasthole mouth and explosion body surface dust will be deposited in water
Wet processing is carried out, prevents it in explosion from forming fugitive dust.
(4) networking explosion: being connected to the network burst region, and quick-fried using the loosening of step medium-length hole msdelayed light emission
Broken, two one section of blastholes, the outer 3 sections of detonators of the built-in 15 sections of detonating capsules of blasthole, blasthole connect network.
Preferably, the top water bag, bottom water bag are tubulose water bag, and the top water bag, bottom water bag use LDP-
Low density polyethylene (LDPE) is blow molded, and the water bag wall thickness is 0.06mm-0.08mm.
Preferably, the blasthole diameter be 120mm, top water bag, bottom water bag length be 1200mm.
Preferably, the blasthole diameter be 140mm, top water bag, bottom water bag length be 1500mm
Preferably, the length of the tamper is 400mm.
Preferably, top water bag, bottom water bag are in close contact to form sealing state after filling water with blasthole inner wall.
The present invention has the advantage that utilizing top water by the present invention in that combined with top water bag with bottom water bag
Bag, bottom water bag explode the water mist to be formed, the large area dust that absorption, trapping explosion generate, and settle under the effect of gravity, with
Blasting dust is greatly reduced, guarantees construction environment and the health and safety of construction personnel, by improving top water bag, bottom water bag
Used material, wall thickness, draw ratio, dust concentration after greatly reducing explosion reduce pollution of the dust to environment, this
Invent it is easy to implement, convenient for operation.
Detailed description of the invention
Fig. 1 is the setting structure schematic diagram of double water bags in a kind of outdoor limestone mine explosion dust-removing method of the present invention.
Fig. 2 is that the setting structure of the single water bag of contrast groups 1 in a kind of outdoor limestone mine explosion dust-removing method of the present invention is shown
It is intended to.
Fig. 3 is the structural schematic diagram of initiation net in a kind of outdoor limestone mine explosion dust-removing method of the present invention.
It is as shown in the figure: 1, explosive, 2, bottom water bag, 3, tamper, 4, top water bag.
Specific embodiment
In conjunction with attached drawing 1~3, a kind of outdoor limestone mine explosion dust-removing method, comprising the following steps:
(1) it drills: according to actual landform condition, being drilled with blasthole on bursting work platform.
(2) it fills hole: A, stoppering explosive 1 to blasthole bottom;
B, empty bottom water bag 2 is put in 1 top of explosive and is in close contact with 1 top surface of explosive, bottom water bag 2 be equipped with
The water injecting pipeline that bottom water bag 2 is connected to, fills water into bottom water bag 2 by water injecting pipeline;
C, after bottom water bag 2 fills water, tamper 3 is put into blasthole, 3 bottom surface of tamper and 2 top surface of bottom water bag are tight
Contiguity touching, 3 top slot milling of tamper, and being put into empty top water bag 4 keeps top 4 bottom surface of water bag and 3 top surface of tamper tight
Contiguity touching, top water bag 4 are equipped with the water injecting pipeline being connected to top water bag 4, are filled by water injecting pipeline into top water bag 4
Water.
(3) it moistens processing: before detonation, the drilling rock powder near blasthole mouth and explosion body surface dust will be deposited in water
Wet processing is carried out, prevents it in explosion from forming fugitive dust.
(4) networking explosion: being connected to the network burst region, and quick-fried using the loosening of step medium-length hole msdelayed light emission
Broken, two one section of blastholes, the outer 3 sections of detonators of the built-in 15 sections of detonating capsules of blasthole, blasthole connect network.
As the present embodiment preferred embodiment, the top water bag 4, bottom water bag 2 are tubulose water bag, the top
Portion's water bag 4, bottom water bag 2 are blow molded using LDP- low density polyethylene (LDPE), and the water bag wall thickness is 0.06mm-0.08mm.
Traditional water bag is to select colourless, tasteless, transparent, soft, environment-friendly materials latexes or vinyon injection molding
It forms, the toxic gases such as carbon monoxide can be generated after burning, unburned residue totally is difficult to be decomposed by edaphon, produces
Raw white pollution.Therefore, present invention top water bag 4, bottom water bag 2 are added using " LDP-low density polyethylene (LDPE) " by blow moulding
Tubular film made of work is as water bag material, environment-friendly high-efficiency, economical and practical water bag material, and its burning is rapidly and water bag
Residue compares traditional water bag can be faster by the microorganism decomposition of soil;
Water bag wall thickness can influence water droplet and spread around, and water bag wall thickness is excessive, do to the scattered water droplet of throwing negative
Function is more, influences the dispersal velocity and radius of water droplet;Water bag wall thickness is small, and resistance to compression and abrasion-resistance are small, be easy water filling,
Leak is ruptured during water bag wall and drilling wall friction and filling, the demolition effect of explosive had not only been influenced but also had lost water bag method water
Mist droplet dust-laying effect.
The wall thickness for the maximum speed and water bag that water droplet is shed, which exists, does negative work relationship, and water mist dispensing radius is because of water bag wall
To the impact force of water when face can offset explosive charge, in a certain range, water bag wall thickness is bigger, and the function and effect of counteracting are got over
Greatly, water mist dispensing radius is smaller, when water bag wall thickness is 0.06mm-0.08mm, water bag not cracky, and the water that water bag is formed after explosion
Mist is ideal, can play effective dust-laying effect.
As the present embodiment preferred embodiment, the blasthole diameter is 120mm, top water bag 4, bottom water bag 2
Length be 1200mm.
As the present embodiment preferred embodiment, the blasthole diameter is 140mm, top water bag 4, bottom water bag 2
Length be 1500mm.
As the present embodiment preferred embodiment, the length of the tamper 3 is 400mm.
As the present embodiment preferred embodiment, top water bag 4, bottom water bag 2 fill tight with blasthole inner wall after water
Contiguity touching forms sealing state.
The size of water is to influence the principal element of dust removing effects, it is considered that water increase can effectively improve dedusting effect
Rate, in the case where other conditions are identical, certain water corresponds to certain maximum except dust quantity, the shadow of the diameter of water bag by bore diameter
It rings, water bag needs to be close to after charging the wall surface that drills, and forms sealing state, water storage diameter i.e. bore diameter, water bag are long
The size of diameter ratio is practical, and reflect is exactly number in certain bore diameter moisture storage capacity.Water in top water bag 4 and bottom water bag 2
It is under by the instant impact effect after explosive charge, so that top water bag 4 and the rupture of 2 moment of bottom water bag form water
Water mist water droplet and shed around, certain water corresponds to certain dustfall content.
Water bag plugging method explosion depositing dust mainly makes the water in water bag form water droplet, water mist mist according to blasthole explosive charge
Drop is all to have a certain size, and water mist water droplet captures and wet grit blasting dust, and water in water bag is made to form water after explosion
The size and its water droplet range of mist mist droplet particle size and its efficiency of seizing dust have much relations;The water droplet that is formed after explosion with
Efficiency of seizing dust is best when grit particle size is suitable, and water droplet is too small, is difficult to keep grit wet grit is collided with it;
Water droplet is too big, and dispensing velocity is low, area is small, can only collide with small-scale dust, cementing, cohesion keeps dust wet.
Water droplet is excessive or too small can all influence to catch dirt ability and influence dust-laying effect.
One, test effect
1, experimental group: double water bag explosions are provided with top water bag and bottom water bag, and after powder charge completion, solid
There is stemming length to consider water bag length ratio, riding position under conditions of 400mm.
Contrast groups 1: single water bag explosion is only arranged top water bag, is in close contact tamper bottom surface and explosive top surface,
Intrinsic stemming length considers water bag length ratio, riding position under conditions of being 400mm.
Contrast groups 2: without water bag explosion.
2, demolition site uses the msdelayed light emission standing of step medium-length hole, and two one section of blastholes, built-in 15 sections of blasthole are risen
Quick-fried detonator and the outer 3 sections of detonator relay networks of blasthole, divide without three kinds of water bag, single water bag and double water bags each explosions of situation three times.
3, experimental result
The fixed point of 1. blasting dust concentration of table measures table
By upper table data it is found that carrying out explosion using the improved double water bags of the present invention, dust concentration can be effectively reduced, solve
Blasting dust problem.
The present invention and its embodiments have been described above, this description is no restricted, shown in the drawings
Only one of embodiments of the present invention, actual structure is not limited to this.All in all if the ordinary skill of this field
Personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution phase
As frame mode and embodiment, be within the scope of protection of the invention.
Claims (6)
1. a kind of outdoor limestone mine explosion dust-removing method, which comprises the following steps:
(1) it drills: according to actual landform condition, being drilled with blasthole on bursting work platform.
(2) it fills hole: A, stoppering explosive to blasthole bottom;
B, empty bottom water bag is put at the top of explosive and is in close contact with explosive top surface, bottom water bag is equipped with and bottom water bag
The water injecting pipeline of connection fills water into bottom water bag by water injecting pipeline;
C, after bottom water bag fills water, tamper is put into blasthole, tamper bottom surface and bottom water bag top surface are in close contact, block up
Slot milling at the top of plug thing, and being put into empty top water bag is in close contact top water bag bottom surface and tamper top surface, top water
Bag is equipped with the water injecting pipeline being connected to top water bag, fills water into top water bag by water injecting pipeline.
(3) it moistens processing: before detonation, being carried out the drilling rock powder being deposited near blasthole mouth and explosion body surface dust with water
Wet processing, prevents it in explosion from forming fugitive dust.
(4) networking explosion: being connected to the network burst region, and uses the msdelayed light emission standing of step medium-length hole, and two
One section of blasthole, the outer 3 sections of detonators of the built-in 15 sections of detonating capsules of blasthole, blasthole connect network.
2. a kind of outdoor limestone mine explosion dust-removing method according to claim 1, it is characterised in that: the top water
Bag, bottom water bag are tubulose water bag, and the top water bag, bottom water bag are blow molded using LDP- low density polyethylene (LDPE), described
Water bag wall thickness is 0.06mm-0.08mm.
3. a kind of outdoor limestone mine explosion dust-removing method according to claim 1, it is characterised in that: the blasthole is straight
Diameter is 120mm, top water bag, bottom water bag length be 1200mm.
4. a kind of outdoor limestone mine explosion dust-removing method according to claim 1, it is characterised in that: the blasthole is straight
Diameter is 140mm, top water bag, bottom water bag length be 1500mm.
5. a kind of outdoor limestone mine explosion dust-removing method according to claim 1, it is characterised in that: the tamper
Length be 400mm.
6. a kind of outdoor limestone mine explosion dust-removing method according to claim 1, it is characterised in that: top water bag,
Bottom water bag is in close contact to form sealing state after filling water with blasthole inner wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811052887.3A CN109238048B (en) | 2018-09-10 | 2018-09-10 | Surface limestone mine blasting dust-settling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811052887.3A CN109238048B (en) | 2018-09-10 | 2018-09-10 | Surface limestone mine blasting dust-settling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109238048A true CN109238048A (en) | 2019-01-18 |
CN109238048B CN109238048B (en) | 2021-06-08 |
Family
ID=65060791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811052887.3A Active CN109238048B (en) | 2018-09-10 | 2018-09-10 | Surface limestone mine blasting dust-settling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109238048B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110715588A (en) * | 2019-10-17 | 2020-01-21 | 北方爆破科技有限公司 | Method for reducing open blasting dust |
CN110779410A (en) * | 2019-11-08 | 2020-02-11 | 中国矿业大学 | Bench blasting dust fall method for opencast coal mine |
CN111207636A (en) * | 2020-01-20 | 2020-05-29 | 芜湖海螺水泥有限公司 | Deep hole large-diameter hydraulic blasting method |
CN111336880A (en) * | 2020-03-03 | 2020-06-26 | 南京安吉特矿山工程有限公司 | Dust settling method for mine blasting |
CN112495091A (en) * | 2020-11-12 | 2021-03-16 | 华能澜沧江水电股份有限公司托巴水电工程建设管理局 | Method for reducing dust generated by blasting by water pressing bag |
CN112746848A (en) * | 2020-12-28 | 2021-05-04 | 邵阳市联合农林建材科技有限公司 | Open-air limestone mining method applied to environmental protection and dust reduction |
CN112945043A (en) * | 2021-01-27 | 2021-06-11 | 兖州中材建设有限公司 | Blasting method for reducing blasting smoke |
CN114109479A (en) * | 2021-11-19 | 2022-03-01 | 神华准格尔能源有限责任公司 | Open pit coal mine step loosening blasting dust fall method |
CN114191905A (en) * | 2022-01-07 | 2022-03-18 | 安徽马钢矿业资源集团南山矿业有限公司 | Water-blasting dust-reducing method for open-air iron ore |
CN115121078A (en) * | 2022-06-30 | 2022-09-30 | 宁夏赛马水泥有限公司 | Strip mine perforation blasting dust-settling method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1243563A (en) * | 1959-02-16 | 1960-10-14 | J C Staton & Co Ltd | Improvements in the mining of mineral deposits |
GB2099117B (en) * | 1981-05-07 | 1985-05-01 | Unilever Plc | Stemming shot holes |
CN86200123U (en) * | 1986-01-18 | 1987-05-13 | 李起山 | Explosive with water-filled stemming beg and the method to separate the bag |
CN205748141U (en) * | 2016-06-21 | 2016-11-30 | 中国水利水电第五工程局有限公司 | A kind of Tunnel Blasting charge constitution |
CN205843499U (en) * | 2016-06-02 | 2016-12-28 | 中铁上海工程局集团有限公司 | Full water pressure blasting hole charge constitution |
CN106288993A (en) * | 2016-08-10 | 2017-01-04 | 鞍钢集团矿业有限公司 | Application process for the environmental protection dynamic dust coalescence agent of surface mine explosion |
CN106969675A (en) * | 2017-03-22 | 2017-07-21 | 山东大学 | A kind of tunnel geological forecast blasthole filling blocking device and method |
-
2018
- 2018-09-10 CN CN201811052887.3A patent/CN109238048B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1243563A (en) * | 1959-02-16 | 1960-10-14 | J C Staton & Co Ltd | Improvements in the mining of mineral deposits |
GB2099117B (en) * | 1981-05-07 | 1985-05-01 | Unilever Plc | Stemming shot holes |
CN86200123U (en) * | 1986-01-18 | 1987-05-13 | 李起山 | Explosive with water-filled stemming beg and the method to separate the bag |
CN205843499U (en) * | 2016-06-02 | 2016-12-28 | 中铁上海工程局集团有限公司 | Full water pressure blasting hole charge constitution |
CN205748141U (en) * | 2016-06-21 | 2016-11-30 | 中国水利水电第五工程局有限公司 | A kind of Tunnel Blasting charge constitution |
CN106288993A (en) * | 2016-08-10 | 2017-01-04 | 鞍钢集团矿业有限公司 | Application process for the environmental protection dynamic dust coalescence agent of surface mine explosion |
CN106969675A (en) * | 2017-03-22 | 2017-07-21 | 山东大学 | A kind of tunnel geological forecast blasthole filling blocking device and method |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110715588A (en) * | 2019-10-17 | 2020-01-21 | 北方爆破科技有限公司 | Method for reducing open blasting dust |
CN110779410A (en) * | 2019-11-08 | 2020-02-11 | 中国矿业大学 | Bench blasting dust fall method for opencast coal mine |
CN111207636A (en) * | 2020-01-20 | 2020-05-29 | 芜湖海螺水泥有限公司 | Deep hole large-diameter hydraulic blasting method |
CN111336880A (en) * | 2020-03-03 | 2020-06-26 | 南京安吉特矿山工程有限公司 | Dust settling method for mine blasting |
CN112495091A (en) * | 2020-11-12 | 2021-03-16 | 华能澜沧江水电股份有限公司托巴水电工程建设管理局 | Method for reducing dust generated by blasting by water pressing bag |
CN112746848A (en) * | 2020-12-28 | 2021-05-04 | 邵阳市联合农林建材科技有限公司 | Open-air limestone mining method applied to environmental protection and dust reduction |
CN112945043A (en) * | 2021-01-27 | 2021-06-11 | 兖州中材建设有限公司 | Blasting method for reducing blasting smoke |
CN112945043B (en) * | 2021-01-27 | 2022-08-02 | 兖州中材建设有限公司 | Blasting method for reducing blasting smoke |
CN114109479A (en) * | 2021-11-19 | 2022-03-01 | 神华准格尔能源有限责任公司 | Open pit coal mine step loosening blasting dust fall method |
CN114191905A (en) * | 2022-01-07 | 2022-03-18 | 安徽马钢矿业资源集团南山矿业有限公司 | Water-blasting dust-reducing method for open-air iron ore |
CN115121078A (en) * | 2022-06-30 | 2022-09-30 | 宁夏赛马水泥有限公司 | Strip mine perforation blasting dust-settling method |
Also Published As
Publication number | Publication date |
---|---|
CN109238048B (en) | 2021-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109238048A (en) | A kind of outdoor limestone mine explosion dust-removing method | |
ES2762623T3 (en) | Composition and method for loading blasting wells | |
CN105874299B (en) | It is provided with the charge tube of air gap and the rock blasting construction method using this charge tube | |
CN103759603B (en) | Hydraulic pressure is from spalling Self-closing lock dust-proof friction and Extrusion type perforation plugging device | |
CN106197178B (en) | A kind of new deep hole water pressure blasting demolition set and blasting method | |
CN102288077A (en) | Water stemming bag and method for sealing coal mine blast hole by utilizing same | |
CN102980452A (en) | De-noising and dust removal blast hole stemming method for drilling blasting of earth and stone in urban and rural areas | |
CN213021263U (en) | Water-in-water type explosive special for hydraulic blasting | |
CN212512752U (en) | Rapid-condensation demolition blasting hole plugging structure | |
CN114279286A (en) | Multistage filling blasting dust-settling method for open-air iron ore | |
CN205332934U (en) | Directional blasting device | |
CN207797905U (en) | A kind of water bag for blasting hole | |
CN107367207B (en) | Joint-cutting explosive package and axial uncoupled explosive-loading step deep hole smooth blasting device | |
CN109186390A (en) | Hole Blasting In Open-pit Mines water spacer-coupling charging blasting method and dedicated water column bag | |
CN112129185B (en) | Water-containing blast hole charging device and charging method | |
CN86200123U (en) | Explosive with water-filled stemming beg and the method to separate the bag | |
CN109458889A (en) | A kind of method of long distance tunnel explosion depositing dust | |
CN207095430U (en) | Segment algorithm is not with axially coupling joint powder charge step Deep-hole Smooth Blasting device | |
CN207816121U (en) | A kind of deep hole standing shot device | |
CN109186388A (en) | A kind of method of quick blocking blasthole | |
CN102749001A (en) | Method for filling blast holes | |
CN115164660B (en) | Blocking bag applied to underwater drilling blasting and using method thereof | |
CN204694175U (en) | A kind of mud-rock flow is speedily carried out rescue work demolition set of getting rid of the danger | |
CN220729052U (en) | Deep hole presplitting blasting charge structure | |
CN219914201U (en) | Dust fall type gathers can pipe water pressure blasting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |