CN205677361U - Full prefabricated assembling construction guard fender - Google Patents

Full prefabricated assembling construction guard fender Download PDF

Info

Publication number
CN205677361U
CN205677361U CN201620352814.6U CN201620352814U CN205677361U CN 205677361 U CN205677361 U CN 205677361U CN 201620352814 U CN201620352814 U CN 201620352814U CN 205677361 U CN205677361 U CN 205677361U
Authority
CN
China
Prior art keywords
connector
barricade
column
pedestal
guard fender
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620352814.6U
Other languages
Chinese (zh)
Inventor
吕豪
易万
杨俊亮
于雷
苑旺
梁新利
张敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Original Assignee
No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No7 Building Engineering Co Ltd Beijing Urban Construction Group filed Critical No7 Building Engineering Co Ltd Beijing Urban Construction Group
Priority to CN201620352814.6U priority Critical patent/CN205677361U/en
Application granted granted Critical
Publication of CN205677361U publication Critical patent/CN205677361U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of full prefabricated assembling construction guard fender, the column bases of this enclosing and barricade pedestal interval are arranged and are mutually blocked by reserved groove and flange and be solidly connected, and form enclosing basis;The hole to be provided of column bottom insertion column bases is interior and fixes;With projection bottom barricade, in projection bottom barricade is downwardly into the barricade draw-in groove at barricade pedestal top and fix, the side of adjacent barricade is fixed by the first connector and the 4th connector, is fixed by the 3rd connector, the 5th connector and the 6th connector between upside and the column of adjacent barricade;3rd connector of surrounding baffle both sides is relative with the second connector of column both sides, and is bolted.This utility model uses factory's canalization to make, easy for installation, and quality is easy to control, without casting concrete at the scene, civilized construction standard is higher, short construction period, being not required to weld at the scene, material and human resources that construction period needs are less, it is simple to organizing construction.

Description

Full prefabricated assembling construction guard fender
Technical field
This utility model relates to a kind of construction enclosing.
Background technology
Construction guard fender is exactly the provisional body of wall needing to set up during building structure construction.At building engineering construction Time, construction guard fender by construction scene keep apart with external environment condition, make job site become the space of a relative closure, Including using maintenance body etc. that various building material is built by laying bricks or stones, concreting molding, that use various sheet forming to constitute.
Now widely used construction guard fender is field fabrication enclosing, and scheme is constructed as shown in figure 21, and producing principle is for executing Lateral retaining wall under work cast-in-place concrete, arranges column in barricade, welds cross bar, metal material baffle plate self tapping on column Screw is fixed with back cord.
Field fabrication enclosing is more complicated in construction period, and concrete construction operation is more, long construction period, and cost increases Add;Needing to transfer substantial amounts of material and human resources during preparation of construction, it is the most passive to control material and artificial price;? Concrete structure construction needs to carry out electric welding field after completing, construction safety hidden danger is more, and management difficulty is big.
Utility model content
This utility model provides a kind of full prefabricated assembling construction guard fender, will solve existing construction guard fender working procedure many, Material and human resources expend many, the technical problem that long construction period, cost are high.
This utility model solves its technical problem and be the technical scheme is that
This full prefabricated assembling construction guard fender, including column bases, barricade pedestal, barricade, column and surrounding baffle;
Described column bases and barricade pedestal interval are arranged and are mutually blocked by reserved groove and flange and be solidly connected, and form enclosing Basis;The middle part of described column bases is provided with hole to be provided, and both sides, top have reserved groove;Described barricade pedestal top is along length Direction has barricade draw-in groove, and both sides, barricade pedestal top are with the flange with reserved groove fit;
The hole to be provided of described column bottom insertion column bases is interior and fixes;
With projection bottom described barricade, the projection bottom barricade is downwardly in the barricade draw-in groove at barricade pedestal top also Fixing, the side of adjacent barricade is fixed by the first connector and the 4th connector, by the between upside and the column of adjacent barricade Three connectors, the 5th connector and the 6th connector are fixed;
3rd connector of described surrounding baffle both sides is relative with the second connector of column both sides, and is bolted.
Described second connector and the 3rd connector are L-shaped angle steel, and the second connector has slotted hole, and the 3rd connects Circular hole is had on part.
Described first connector is the channel-section steel of strip, angle steel or steel plate, and the first connector two ends are with horizontal oval Hole, the 4th connector is through-wall bolt;Described first connector the most relatively transverse leap column both sides, the 4th connector passes Slotted hole on first connector and the perforation on barricade are also fixed.
Described 5th connector and the 6th connector are the U-shaped round steel of TBE (threaded both ends), and described 3rd connector is L-shaped Angle steel, the 3rd connector has circular hole;Described 5th connector and the 6th connector opening encircle column relatively, and two ends are respectively On the upside of adjacent barricade welding the 3rd connector and fixed by nut.
Two side levers of described 6th connector are longer than two side levers of the 5th connector.
The end face of described column bases, barricade pedestal and barricade is all with suspension ring.
All external corners of described column bases, barricade pedestal and barricade are surrounded by angle steel.
Described column bottom is welded with fixing reinforcing bar.
The beneficial effects of the utility model are as follows:
Full prefabricated assembling construction guard fender uses the mode broken the whole up into parts, and concrete component and hardware is resolved into not With size and the unit member of specification, utilize concrete to reserve groove and metal connecting piece carries out assembling and fixes, form globality Construction guard fender.
Basis is divided into multiple cell block, column bases and barricade base unit block gap arrange, utilizes reserved groove Fixing and the deadweight of concrete be attached, job site only needs cell block splicing is got final product basis of formation, convenient and swift, Substantially reduce the foundation construction cycle.
Barricade is divided into the retaining wall units block of fixed dimension according to the spacing of column, utilizes the preformed groove of barricade pedestal to carry out Fixing, adjacent barricade is fixed by connector, on-the-spot without welding, quick and easy for installation.
Surrounding baffle unit utilizes bolt to be attached with the connector on surrounding baffle unit by the connector on column, Complete surrounding baffle to connect, on-the-spot without welding, quick and easy for installation.
Stud connector design of the present utility model is ingenious, stable connection, and round steel and the Steel section member of employing are common materials, Easy to process.
Full prefabricated assembling construction guard fender uses factory's canalization to make, easy for installation, and quality is easy to control, it is not necessary to existing Field casting concrete, civilized construction standard is higher, short construction period, is not required to weld at the scene, the material that construction period needs Material and human resources are less, it is simple to organizing construction.
Accompanying drawing explanation
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
Fig. 1 is positive facade structural representation of the present utility model.
Fig. 2 is plan structure schematic diagram of the present utility model.
Fig. 3 is the plane graph of barricade pedestal.
Fig. 4 is the structural representation of 1-1 section in Fig. 3.
Fig. 5 is the structural representation of 3-3 section in Fig. 3.
Fig. 6 is the structural representation of column bases.
Fig. 7 is the structural representation of 1-1 section in Fig. 6.
Fig. 8 is the structural representation of barricade.
Fig. 9 is the structural representation of 1-1 section in Fig. 8.
Figure 10 is the connection figure of column and adjacent barricade.
Figure 11 is the connection figure of column and surrounding baffle.
Figure 12 is the plane graph of the first connector.
Figure 13 is the side view of the first connector.
Figure 14 is the structural representation of the 4th connector.
Figure 15 is the plane graph of the second connector.
Figure 16 is the side view of the second connector.
Figure 17 is the plane graph of the 3rd connector.
Figure 18 is the side view of the 3rd connector.
Figure 19 is the structural representation of the 5th connector.
Figure 20 is the structural representation of the 6th connector.
Figure 21 is the structural representation of field fabrication enclosing.
Reference: 1-column bases, 1.1-hole to be provided, 1.2-reserve groove, 2-barricade pedestal, 2.1-barricade card Groove, 2.2-flange, 3-barricade, 3.1-projection, 4-column, 5-surrounding baffle, 6-the first connector, 7-the second connector, 8-the 3rd connector, 9-the 4th connector, 10-the 5th connector, 11-the 6th connector, 12-suspension ring.
Detailed description of the invention
Embodiment sees shown in Fig. 1, Fig. 2, and this full prefabricated assembling construction guard fender, including column bases 1, barricade pedestal 2, barricade 3, column 4 and surrounding baffle 5.
Seeing shown in Fig. 1, Fig. 3-7, described column bases 1 and barricade pedestal 2 interval are arranged and by reserved groove 1.2 and convex Edge 2.2 mutually blocks and is solidly connected, and forms enclosing basis;The middle part of described column bases 1 is provided with hole to be provided 1.1, and both sides, top have Reserved groove 1.2;Described barricade pedestal 2 top has barricade draw-in groove 2.1 along its length, both sides, barricade pedestal 2 top with The flange 2.2 coordinated with reserved groove 1.2.
Seeing shown in Fig. 1, Fig. 6, Fig. 7, bottom described column 4, the hole to be provided 1.1 of insertion column bases 1 is interior and fixes.Institute State column 4 bottom welding and have fixing reinforcing bar.
See shown in Fig. 1, Fig. 3, Fig. 4, Fig. 8, with projection 3.1 bottom described barricade 3, the projection 3.1 bottom barricade 3 to The barricade draw-in groove 2.1 at lower insertion barricade pedestal 2 top is interior and fixes.
Seeing shown in Fig. 1, Figure 12-14, the side of adjacent barricade 3 is fixed by the first connector 6 and the 4th connector 9.The A connection piece 6 is the channel-section steel of strip, angle steel or steel plate, and the first connector 6 two ends are with horizontal slotted hole.4th connector 9 is through-wall bolt.First connector 6 the most relatively transverse leap column 4 both sides, the 4th connector 9 passes on the first connector 6 Slotted hole and barricade 3 on perforation and fix.
See shown in Fig. 1, Figure 10, Figure 17-20, by the 3rd connector the 8, the 5th between upside and the column 4 of adjacent barricade 3 Connector 10 and the 6th connector 11 are fixed.5th connector 10 and the 6th connector 11 are the U-shaped round steel of TBE (threaded both ends), Two side levers of the 6th connector 11 are longer than two side levers of the 5th connector 10.Described 3rd connector 8 is L-shaped angle steel, and the 3rd even Circular hole is had on fitting 8.5th connector 10 and the 6th relative column 4 of encircling of connector 11 opening, two ends are each passed through adjacent On the upside of barricade 3 welding the 3rd connector 8 and fixed by nut.
See shown in Fig. 1, Figure 11, Figure 15-18, the of the 3rd connector 8 of described surrounding baffle 5 both sides and column 4 both sides Two connectors 7 relatively, and are bolted.Second connector 7 and the 3rd connector 8 are L-shaped angle steel, on the second connector 7 Have slotted hole, the 3rd connector 8 has circular hole.
Seeing shown in Fig. 3-9, the end face of column bases 1, barricade pedestal 2 and barricade 3 is all with suspension ring 12.Column bases 1, All external corners of barricade pedestal 2 and barricade 3 are surrounded by angle steel.
The construction method of this full prefabricated assembling construction guard fender, construction procedure is as follows:
Step one, before enclosing is installed, the smooth basic foundation of bracing wire, uniformly to tamp, flatness along the line is not more than 10mm;? After ground is smooth, pave medium-fine sand bed course, and thickness requirement is at 10 ~ 20mm;The unit member of concrete and metal is all in factory Carry out prefabricated, be transported to job site;
Step 2, is spaced column bases 1 and barricade pedestal 2 layout and is mutually fixed by reserved groove 1.2 and flange 2.2 Connect, form enclosing basis;
Step 3, column 4 inserts in the hole to be provided 1.1 of column bases 1, uses dry mortar to be twisted with the fingers in gap real;
Step 4, in the projection 3.1 bottom barricade 3 is downwardly into the barricade draw-in groove 2.1 at barricade pedestal 2 top and fix, The side of adjacent barricade 3 is fixed by the first connector 6 and the 4th connector 9, by between upside and the column 4 of adjacent barricade 3 Three connector the 8, the 5th connectors 10 and the 6th connector 11 are fixed;
Step 5, is finally connected the 3rd connector 8 assembling complete surrounding baffle 5 both sides with the second of column 4 both sides Part 7 relatively, and is bolted, and completes the installation of surrounding baffle 5.

Claims (8)

1. a full prefabricated assembling construction guard fender, it is characterised in that: include column bases (1), barricade pedestal (2), barricade (3), column (4) and surrounding baffle (5);
Described column bases (1) and barricade pedestal (2) interval are arranged and are mutually fixed by reserved groove (1.2) and flange (2.2) Connect, form enclosing basis;The middle part of described column bases (1) is provided with hole to be provided (1.1), and both sides, top have reserved groove (1.2);Described barricade pedestal (2) top has barricade draw-in groove (2.1) along its length, barricade pedestal (2) both sides, top with The flange (2.2) coordinated with reserved groove (1.2);
The hole to be provided (1.1) of described column (4) bottom insertion column bases (1) is interior and fixes;
Described barricade (3) bottom is downwardly into barricade pedestal (2) top with projection (3.1), the projection (3.1) of barricade (3) bottom The barricade draw-in groove (2.1) in portion is interior and fixes, and the side of adjacent barricade (3) is solid by the first connector (6) and the 4th connector (9) Fixed, by the 3rd connector (8), the 5th connector (10) and the 6th connector between upside and the column (4) of adjacent barricade (3) (11) fixing;
3rd connector (8) of described surrounding baffle (5) both sides is relative with second connector (7) of column (4) both sides, and by bolt Fixing.
Full prefabricated assembling construction guard fender the most according to claim 1, it is characterised in that: described second connector (7) with 3rd connector (8) is L-shaped angle steel, and the second connector has slotted hole on (7), and the 3rd connector (8) has circular hole.
Full prefabricated assembling construction guard fender the most according to claim 1, it is characterised in that: described first connector (6) is The channel-section steel of strip, angle steel or steel plate, the first connector (6) two ends are with horizontal slotted hole, and the 4th connector (9) is through walls Bolt;
Described first connector (6) the most relatively transverse leap column (4) both sides, the 4th connector (9) passes the first connector (6) slotted hole on and the perforation on barricade (3) are also fixed.
Full prefabricated assembling construction guard fender the most according to claim 1, it is characterised in that: described 5th connector (10) and 6th connector (11) is the U-shaped round steel of TBE (threaded both ends), and described 3rd connector (8) is L-shaped angle steel, the 3rd connector (8) circular hole is had on;
Described 5th connector (10) is relative with the 6th connector (11) opening encircles column (4), and two ends are each passed through adjacent gear Wall (3) upside welding the 3rd connector (8) and fixed by nut.
Full prefabricated assembling construction guard fender the most according to claim 4, it is characterised in that: described 6th connector (11) Two side levers are longer than two side levers of the 5th connector (10).
Full prefabricated assembling construction guard fender the most according to claim 1, it is characterised in that: described column bases (1), barricade The end face of pedestal (2) and barricade (3) is all with suspension ring (12).
Full prefabricated assembling construction guard fender the most according to claim 1, it is characterised in that: described column bases (1), barricade All external corners of pedestal (2) and barricade (3) are surrounded by angle steel.
Full prefabricated assembling construction guard fender the most according to claim 1, it is characterised in that: described column (4) bottom welding There is fixing reinforcing bar.
CN201620352814.6U 2016-04-25 2016-04-25 Full prefabricated assembling construction guard fender Active CN205677361U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620352814.6U CN205677361U (en) 2016-04-25 2016-04-25 Full prefabricated assembling construction guard fender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620352814.6U CN205677361U (en) 2016-04-25 2016-04-25 Full prefabricated assembling construction guard fender

Publications (1)

Publication Number Publication Date
CN205677361U true CN205677361U (en) 2016-11-09

Family

ID=57438035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620352814.6U Active CN205677361U (en) 2016-04-25 2016-04-25 Full prefabricated assembling construction guard fender

Country Status (1)

Country Link
CN (1) CN205677361U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696851A (en) * 2016-04-25 2016-06-22 北京城建七建设工程有限公司 Totally-prefabricated assembly type construction barrier and construction method thereof
CN110206381A (en) * 2019-05-17 2019-09-06 五冶集团上海有限公司 A kind of construction site color steel plate enclosure wall production method being used in turn
CN110206384A (en) * 2019-05-17 2019-09-06 五冶集团上海有限公司 A kind of installation method of the temporary construction fence suitable for soil layer geology
CN111778901A (en) * 2020-08-10 2020-10-16 江苏建筑职业技术学院 Prefabricated anticollision wall and enclose fender system
CN113445816A (en) * 2021-07-14 2021-09-28 辽宁工程技术大学 Recyclable enclosure with expanded end and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696851A (en) * 2016-04-25 2016-06-22 北京城建七建设工程有限公司 Totally-prefabricated assembly type construction barrier and construction method thereof
CN105696851B (en) * 2016-04-25 2017-12-08 北京城建七建设工程有限公司 Full prefabricated assembling construction guard fender and its construction method
CN110206381A (en) * 2019-05-17 2019-09-06 五冶集团上海有限公司 A kind of construction site color steel plate enclosure wall production method being used in turn
CN110206384A (en) * 2019-05-17 2019-09-06 五冶集团上海有限公司 A kind of installation method of the temporary construction fence suitable for soil layer geology
CN111778901A (en) * 2020-08-10 2020-10-16 江苏建筑职业技术学院 Prefabricated anticollision wall and enclose fender system
CN113445816A (en) * 2021-07-14 2021-09-28 辽宁工程技术大学 Recyclable enclosure with expanded end and construction method thereof

Similar Documents

Publication Publication Date Title
CN205677361U (en) Full prefabricated assembling construction guard fender
CN105696851B (en) Full prefabricated assembling construction guard fender and its construction method
CN103255853B (en) Tooth-groove-type connection structure of upper-layer inner wallboard of assembly-type shear wall and lower-layer inner wallboard of assembly-type shear wall
JP5517516B2 (en) Reinforcement structure of building
KR101182536B1 (en) Prefabricated double wall precast concrete pannel having surface material, reinforcing rod according to the purpose
CN203334473U (en) Tooth socket type connecting structure of upper layer interior wall plate and lower layer interior wall plate of assembling type shear wall
CN203320813U (en) Reinforcement connecting piece for prefabricated concrete component
CN105888108A (en) Reinforced concrete shear wall with positioning prefabricated member inside and construction method of reinforced concrete shear wall
CN102995756B (en) Concrete-filled rectangular steel tube column-box girder full-bolt connection node and construction method
CN204590362U (en) The concrete folding plate floor of the band shear key improved
CN103195172B (en) A kind of prefabrication and assembly construction concrete frame beam-column connection structure
CN102661010A (en) Composite shear wall
KR101458434B1 (en) Half precast concrete column manufacturing method using prefabricated PC panels and constructing method using the same
KR101388135B1 (en) Precast Concrete Pier Cap Structure In The Bridge And Manufacturing Method Of Pretension Precast Concrete Pier Cap
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN205712590U (en) A kind of fabricated shear wall and the attachment structure of Prefabricated concrete-filled steel tube post
CN106760036A (en) A kind of prefabricated steel combined concrete shear wall
KR101334071B1 (en) The needless filling structure in the junction of pc beam and vertical member
CN104032861B (en) Mixing coupled wall steel column and non-energy dissipating beam connecting node structure and construction method thereof
CN204645318U (en) A kind of overlaid plate type shear wall
CN104674946A (en) Connecting adjusting member for concrete prefabricated members and application thereof
CN203129369U (en) Connection node of steel plate-concrete combination shear wall and concrete shear wall
KR101458409B1 (en) The precast concrete girder structure for a building
CN205822507U (en) A kind of steel plate combined shear wall
CN204081134U (en) Precast concrete wall component

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant