CN205638802U - Formula precast concrete pylon structure is made up in segmentation - Google Patents

Formula precast concrete pylon structure is made up in segmentation Download PDF

Info

Publication number
CN205638802U
CN205638802U CN201620333509.2U CN201620333509U CN205638802U CN 205638802 U CN205638802 U CN 205638802U CN 201620333509 U CN201620333509 U CN 201620333509U CN 205638802 U CN205638802 U CN 205638802U
Authority
CN
China
Prior art keywords
embedded
precast concrete
annular groove
bar
muscle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620333509.2U
Other languages
Chinese (zh)
Inventor
李剑波
李学旺
王诚辉
闫威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Mingyang Wind Turbine Rotor Blade Technology Co., Ltd.
Original Assignee
Guangdong Mingyang Wind Power Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Mingyang Wind Power Group Co Ltd filed Critical Guangdong Mingyang Wind Power Group Co Ltd
Priority to CN201620333509.2U priority Critical patent/CN205638802U/en
Application granted granted Critical
Publication of CN205638802U publication Critical patent/CN205638802U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a formula precast concrete pylon structure is made up in segmentation, it forms to adopt flange bolt to connect gradually by a plurality of rings section, and carry out the pretension through internal prestressing tendons, every ring duan jun is including annular precast concrete unit, the embedded bar, embedded ring flange, the both ends of precast concrete unit are equipped with first annular groove, embedded ring flange is pre -buried to be arrived in the first annular groove at precast concrete unit both ends, be equipped with the second annular groove on the embedded ring flange, be equipped with on the tank bottom of second annular groove that the muscle hole is worn to the embedded bar and internal prestressing tendons wears the muscle hole, the embedded bar is worn the muscle hole and is worn muscle hole staggered arrangement with internal prestressing tendons, the embedded ring flange at the both ends follow precast concrete unit both ends of embedded bar is worn out, through being one wholly with the nut cooperation with embedded ring flange and the fastening of precast concrete unit. The utility model provides a current precast concrete pylon ring section to connect a construction cycle long, operate inconvenient problem.

Description

A kind of sectionally assembled precast concrete tower structure
Technical field
This utility model relates to the technical field of blower fan pylon, refers in particular to a kind of sectionally assembled concrete Soil pylon structure.
Background technology
The most known, for improving the generating efficiency of low wind speed area wind power generating set, reduce wind shear, must The hub centre height of Wind turbines must be improved.Conventional steel pylon is along with the raising of tower height, and it manufactures Cost steeply rises, and tower bottom diameter is increasing, causes transport difficult.And use upper steel tower This problem can well be solved with the combined tower of bottom concrete tower.Concrete tower is by some Ring segment is spliced, and assembly carries out prestressed stretch-draw after completing, and forms a unified entirety.
In prior art, the connected mode between ring segment with ring segment is in ring segment joint the most corresponding reserved hole Hole, during splicing, inserts between hole and connects reinforcing bar, toward concrete perfusion slurry in hole after docking, treat After slurry solidification, two ring segment are just linked together by reinforcing bar.But, this connected mode quality of connection is not allowed Easily ensure, inconvenient operation, and long construction period.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of sectionally assembled prefabricated mixed Solidifying soil pylon structure, on the premise of ensureing pylon ring segment quality of connection, solves existing prefabricated concrete towers The frame ring segment connection construction cycle is long, the problem of inconvenient operation.
For achieving the above object, technical scheme provided by the utility model is: a kind of sectionally assembled prefabricated Concrete towers shelf structure, is used flange bolt to be connected in sequence by multiple ring segment, and passes through prestressing with bond Muscle carries out pretension, makes concrete be in pressured state;Wherein, each ring segment all includes ring-type prefabricated mixed Solidifying soil unit, embedded bar, embedded flange dish, the two ends of described precast concrete unit are provided with same with it The first annular groove of the heart, described embedded flange dish is embedded into the first annular of precast concrete unit two ends In groove, embedded flange dish is provided with the second concentric annular groove, the bottom land of the second annular groove It is provided with the embedded bar passed for embedded bar and wears muscle hole and the prestressing with bond passed for internal presstressed reinforcing steel Muscle wears muscle hole, and embedded bar is worn muscle hole and worn muscle hole interlaced arrangement with prestressing with bond muscle, described embedded bar The two ends embedded flange dish from precast concrete unit two ends passes, by with nut screw connection by embedded method Blue dish tightens together with precast concrete unit and is integrally formed.
Described embedded flange dish is provided with bolt hole, uses flange bolt to carry out ring segment connection by bolt hole, And described flange bolt is arranged on inside pylon.
Described embedded flange dish is provided with the anchor bar that a row extend in concrete, described anchor bar Circumferentially it is evenly arranged.
Described nut coordinate with embedded bar tighten after be contained in the second annular groove of embedded flange dish.
This utility model compared with prior art, has the advantage that and beneficial effect:
The ring segment of existing precast concrete tower and ring segment be connected by ring segment joint reserve multiple mutually Corresponding hole, during docking, inserts between hole and connects reinforcing bar, toward concrete perfusion in hole after docking Slurry, after slurry solidifies, two ring segment are just linked together by reinforcing bar.And the technical program uses flange spiral shell Tether connection mechanism and carry out the connection between ring segment and ring segment, it is not necessary to carry out concrete grouting, the most significantly carry High concrete tower efficiency of assembling, therefore construction period can be shortened, save time cost and hoisting cost.
Accompanying drawing explanation
Fig. 1 is single ring segment structural representation.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is two ring segment assembling schematic diagrams.
Fig. 4 is the precast concrete tower schematic diagram that multiple ring segment is formed by connecting.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in further detail.
As shown in Figures 1 to 4, the sectionally assembled precast concrete tower structure described in the present embodiment, by Multiple ring segment use flange bolt 9 to be connected in sequence, and carry out pretension by prestressing with bond muscle, make to mix Solidifying soil is in pressured state;Wherein, each ring segment all includes ring-type precast concrete unit 1, pre-buried steel Muscle 3, embedded flange dish 5, the two ends of described precast concrete unit 1 are provided with concentric first annular Groove 4, described embedded flange dish 5 is embedded in the first annular groove 4 at precast concrete unit 1 two ends, Embedded flange dish 5 is provided with the second concentric annular groove 6 and bolt hole 8, is adopted by bolt hole 8 Carry out ring segment connection with flange bolt 9, it is achieved quick assembling, in order to extend service life of connecting bolt with And convenient for installation and maintenance, described flange bolt 9 is arranged on inside pylon, and this design can be avoided outside tower The erosion to flange bolt of portion's adverse weather condition;The bottom land of described second annular groove 6 is provided with for pre-buried Muscle hole 2 worn by the embedded bar that reinforcing bar 3 passes and the prestressing with bond muscle that passes for internal presstressed reinforcing steel wears muscle hole 10, embedded bar is worn muscle hole 2 and is worn muscle hole 10 interlaced arrangement with prestressing with bond muscle, described embedded bar 3 The two ends embedded flange dish 5 from precast concrete unit 1 two ends passes, by coordinating embedding with nut 11 Enter formula ring flange 5 to tighten together with precast concrete unit 1 and be integrally formed.
In order to improve the globality of embedded flange dish 5 and precast concrete unit 1, described embedded flange Dish is provided with the anchor bar 7 that a row extend in concrete, and described anchor bar 7 is circumferentially evenly arranged.
Described nut 11 coordinate with embedded bar 3 tighten after be contained in embedded flange dish 5 second annular recessed In groove 6, ring segment will not be linked and packed and adversely affect.
Embodiment described above is only the preferred embodiment of this utility model, not limits this utility model with this Practical range, therefore the change that all shapes according to this utility model, principle are made, all should contain in this practicality In novel protection domain.

Claims (4)

1. a sectionally assembled precast concrete tower structure, it is characterised in that: used method by multiple ring segment Blue bolt is connected in sequence, and carries out pretension by prestressing with bond muscle, makes concrete be in pressured state; Wherein, each ring segment all includes ring-type precast concrete unit, embedded bar, embedded flange dish, The two ends of described precast concrete unit are provided with concentric first annular groove, described embedded flange dish Being embedded in the first annular groove at precast concrete unit two ends, embedded flange dish is provided with concentric The second annular groove, the bottom land of the second annular groove is provided with the embedded bar passed for embedded bar and wears muscle Hole and the prestressing with bond muscle passed for internal presstressed reinforcing steel wear muscle hole, embedded bar wear muscle hole with internal pre-should Power muscle wears muscle hole interlaced arrangement, and the two ends of described embedded bar are from the embedded method at precast concrete unit two ends Blue dish passes, by the formation that tightened together with precast concrete unit by embedded flange dish with nut screw connection It is an entirety.
One the most according to claim 1 sectionally assembled precast concrete tower structure, its feature exists In: described embedded flange dish is provided with bolt hole, uses flange bolt to carry out ring segment connection by bolt hole, And described flange bolt is arranged on inside pylon.
One the most according to claim 1 sectionally assembled precast concrete tower structure, its feature exists In: described embedded flange dish is provided with the anchor bar that a row extend in concrete, described anchor bar Circumferentially it is evenly arranged.
One the most according to claim 1 sectionally assembled precast concrete tower structure, its feature exists It is contained in the second annular groove of embedded flange dish after: described nut coordinates with embedded bar and to tighten.
CN201620333509.2U 2016-04-20 2016-04-20 Formula precast concrete pylon structure is made up in segmentation Active CN205638802U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620333509.2U CN205638802U (en) 2016-04-20 2016-04-20 Formula precast concrete pylon structure is made up in segmentation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620333509.2U CN205638802U (en) 2016-04-20 2016-04-20 Formula precast concrete pylon structure is made up in segmentation

Publications (1)

Publication Number Publication Date
CN205638802U true CN205638802U (en) 2016-10-12

Family

ID=57062499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620333509.2U Active CN205638802U (en) 2016-04-20 2016-04-20 Formula precast concrete pylon structure is made up in segmentation

Country Status (1)

Country Link
CN (1) CN205638802U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254925A (en) * 2017-07-21 2017-10-17 天津城建大学 Vertical prestressing loam wall and its construction method
DE102017011046A1 (en) * 2017-11-29 2019-05-29 Senvion Gmbh Tower segment for a wind turbine and method for making a tower segment
CN111520289A (en) * 2020-05-12 2020-08-11 上海电气研砼(木垒)建筑科技有限公司 Connecting node of segmented prefabricated assembled combined tower cylinder and mounting method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107254925A (en) * 2017-07-21 2017-10-17 天津城建大学 Vertical prestressing loam wall and its construction method
DE102017011046A1 (en) * 2017-11-29 2019-05-29 Senvion Gmbh Tower segment for a wind turbine and method for making a tower segment
EP3502378A1 (en) * 2017-11-29 2019-06-26 Senvion GmbH Tower segment for a wind turbine and method for producing a tower segment
CN111520289A (en) * 2020-05-12 2020-08-11 上海电气研砼(木垒)建筑科技有限公司 Connecting node of segmented prefabricated assembled combined tower cylinder and mounting method thereof

Similar Documents

Publication Publication Date Title
CN205638802U (en) Formula precast concrete pylon structure is made up in segmentation
CN104018724B (en) Connecting device of prestress concrete tower section and steel tower section of combination wind power tower
CN206190456U (en) Draw prestressing force steel concrete combination formula tower frame of draught fan to one side
CN108824475A (en) A kind of transmission line of electricity equilateral triangle cushion cap stake assembling type base
CN105909477B (en) A kind of transition section structure of connection steel tower tube and prestressed concrete tower cylinder
CN207297239U (en) A kind of foundation ring of wind generating set
CN201531143U (en) Anchoring ring of partial prestress electric rod connecting flange and connecting structure of electric rod and flange
CN208252281U (en) A kind of wind power generating set steel reinforced concrete pylon
CN209671141U (en) A kind of mixing tower adapter ring based on composite structure technology
CN208701735U (en) A kind of foundation ring of wind generating set
CN108755739B (en) Wind generating set foundation ring
CN203098165U (en) Concrete filled steel tube fan tower
CN205638803U (en) Changeover portion structure of connecting a steel tower section of thick bamboo and a prestressed concrete tower section of thick bamboo
CN109457868A (en) A kind of steel tube concrete column feet node and its construction method
CN206737271U (en) A kind of a chain of bar connecting of bolt is buckled
CN205976532U (en) Sleeve grout connection structure and wall body
CN103147538B (en) A kind of anchor head sealing structural component
CN203924863U (en) A kind of combination wind power tower prestressed-concrete tower segment and steel tower segment linkage
CN204531571U (en) The segmented cement electric pole of the pre-buried flange of a kind of cement electric pole and application thereof
CN211036968U (en) Quick anchor stake
CN208430851U (en) A kind of steel tube concrete column feet node
CN207161264U (en) A kind of bindiny mechanism for combining pylon
CN208251085U (en) A kind of building engineering construction prestress pulling resistant pilework
CN202745458U (en) Connection inner flange of large-top-diameter high-intensity partially prestressed electric pole
CN201963021U (en) Post-tensioning prestressing-force multi-section concrete wind-power generation tower frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 528437 Guangdong torch hi tech Industrial Development Zone, Torch Road, No. 22, Ming Yang Industrial Park, Zhongshan

Patentee after: Ming Yang wisdom Energy Group AG

Address before: 528437 Guangdong torch hi tech Industrial Development Zone, Torch Road, No. 22, Ming Yang Industrial Park, Zhongshan

Patentee before: Guangdong Mingyang Wind Power Group Co., Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20191125

Address after: 300450 Building 1, No. 526, Gaoxin 6th Road, Binhai Science Park, Binhai high tech Zone, No. 13888, Jinhan Road, Binhai New Area, Tianjin

Patentee after: Tianjin Mingyang Wind Turbine Rotor Blade Technology Co., Ltd.

Address before: 528437 Guangdong torch hi tech Industrial Development Zone, Torch Road, No. 22, Ming Yang Industrial Park, Zhongshan

Patentee before: Ming Yang wisdom Energy Group AG

TR01 Transfer of patent right