CN208430851U - A kind of steel tube concrete column feet node - Google Patents

A kind of steel tube concrete column feet node Download PDF

Info

Publication number
CN208430851U
CN208430851U CN201821086387.7U CN201821086387U CN208430851U CN 208430851 U CN208430851 U CN 208430851U CN 201821086387 U CN201821086387 U CN 201821086387U CN 208430851 U CN208430851 U CN 208430851U
Authority
CN
China
Prior art keywords
flange
steel pipe
foundation
concrete column
outer ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821086387.7U
Other languages
Chinese (zh)
Inventor
徐巍峰
朱培红
季伟
王灿灿
吴建灵
初金良
叶吉超
吴振齐
王文军
潘明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lishui Zhengyang Electric Power Construction Co Ltd
State Grid Corp of China SGCC
Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Lishui Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201821086387.7U priority Critical patent/CN208430851U/en
Application granted granted Critical
Publication of CN208430851U publication Critical patent/CN208430851U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to the realm of building construction more particularly to a kind of steel tube concrete column feet nodes.It includes steel core concrete column, concrete foundation and Ifold flange, steel core concrete column includes interior steel pipe, outer steel pipe and the core concrete layer being cast between interior steel pipe and outer steel pipe, Ifold flange is connected and composed by inner ring flexibility forged flange and outer ring rigid flange, inner ring flexibility forged flange is welded on the bottom of interior steel pipe, outer ring rigid flange is welded on the bottom of outer steel pipe, the outer ring rigid flange is fixed in concrete foundation by several foundation bolts, foundation bolt is located at the outside of core concrete layer, core concrete layer is fixed in concrete foundation by several anchor poles.The utility model construction is convenient, manpower consumption is small and bonding strength is high.

Description

A kind of steel tube concrete column feet node
Technical field
The utility model relates to the realm of building construction more particularly to a kind of steel tube concrete column feet nodes.
Background technique
With China city, the fast development of the implementation of the upgrading of rural power grids and power grid, the construction of line is sent out to big line footpath, multiloop Exhibition, the load of tower structure also constantly increase.Traditional endless reinforced concrete pole, annular prestressed electric pole from it is great, carrying Power is low, and transports, lifting, assembling difficulty.It is common mixed particularly with vehicle, the inaccessiable land locked region of agricultural machinery Solidifying soil large bending moment electrical pole can not be installed.Although tubular pole bearing capacity is higher, steel using amount is big, and rigidity is relatively small, cost compared with It is high.
Occur a kind of Novel steel pipe concrete pole in recent years, by interior steel pipe, outer steel pipe and is cast in interior steel pipe and outer steel Core concrete layer between pipe is constituted, and has bearing capacity high, steel using amount is small, and rigidity is big, and from heavy and light, cost is relatively low excellent Point, is gradually applied in engineering.Currently, the type of attachment that steel tube concrete column feet generallys use inside and outside double flanges is fixed on In concrete foundation, wherein inner flange needs construction personnel to enter to tighten bolt in steel core concrete column, need in interior steel pipe Portion is arranged ladder and passes in and out for construction personnel, and difficulty of construction and manpower consumption are larger, there are potential security risk, while steel pipe The bonding strength of concrete foot joint is also difficult to ensure.
Utility model content
The purpose of this utility model is to overcome need to construct when steel tube concrete column feet node construction in the prior art Personnel enter in steel core concrete column, cause difficulty of construction, manpower consumption and security risk larger, while bonding strength is difficult to The deficiency of guarantee provides a kind of steel tube concrete column feet node that convenient, manpower consumption is small and bonding strength is high of constructing.
To achieve the goals above, the utility model uses following technical scheme:
A kind of steel tube concrete column feet node, including
Steel core concrete column, concrete foundation and Ifold flange, steel core concrete column include interior steel pipe, outer steel pipe and pour Core concrete layer between interior steel pipe and outer steel pipe, Ifold flange are connected by inner ring flexibility forged flange and outer ring rigid flange Composition is connect, inner ring flexibility forged flange is welded on the bottom of interior steel pipe, and outer ring rigid flange is welded on the bottom of outer steel pipe;It is described Outer ring rigid flange is fixed in concrete foundation by several foundation bolts, and foundation bolt is located at the outer of core concrete layer Side, core concrete layer are fixed in concrete foundation by several anchor poles.
Foundation bolt and anchor pole are preset in concrete foundation, and core concrete layer does not pour first, by interior steel pipe and outside It on steel-pipe welding to Ifold flange, is then lifted into concrete foundation, foundation bolt is tightened on the outside of steel core concrete column, most After-pouring core concrete layer completes construction, enters inside steel core concrete column without construction personnel.
Preferably, the middle part of the inner ring flexibility forged flange is equipped with welding hole, the side wall of welding hole upwardly extends shape At for the welding neck with the welding of the inner sidewall of interior steel pipe.Convenient for welding operation, welding neck is covered to be welded welding hole in interior steel pipe Mode it is stronger, be not subject to destroy by impact force.
Preferably, the Ifold flange is equipped with several and one-to-one relief hole of anchor pole, anchor pole passes through corresponding The upper end of relief hole, anchor pole is located in core concrete layer, and the lower end of anchor pole is located in concrete foundation.Anchor pole is directly anchored to In core concrete layer and concrete foundation, connection is more firm, and shock resistance is stronger.
Preferably, the relief hole is located on the rigid flange of outer ring, each relief hole is along the circumferential equal of outer ring rigid flange Cloth.Anchor pole and resigning bolt are arranged in outer ring rigidity by the characteristics of outer ring rigid flange has bolt without prying force, high reliablity It is conducive to guarantee the stability of anchor pole and resigning working bolt on flange.
Preferably, the Ifold flange is equipped with several triangle stiffeners, triangle stiffener is fixed on the outer of outer steel pipe On side wall.Improve the stability of steel core concrete column.
Preferably, the lower end of the triangle stiffener is fixed on the rigid flange of outer ring, triangle stiffener and lower margin spiral shell Bolt is alternately distributed along the circumferential direction of outer ring rigid flange.Triangle stiffener shares the stress on foundation bolt, reduces on foundation bolt Stress concentrate, improve the stability and service life of foundation bolt.
The beneficial effects of the utility model are: (1) inner ring flexibility forged flange welding workload is small, it is easy to factory's metaplasia It produces, and there is deformability, good buffer effect improves anti-seismic performance, and outer ring rigid flange guarantees bonding strength, meets rigidity and want It asks;(2) only needing to tighten foundation bolt on the outside of steel core concrete column can fix, and avoid in existing node and need constructor Member enters the problem of tightening inner flange bolt in steel core concrete column, improves the convenience and safety of construction;(3) it first pours Concrete foundation, the mode of after-pouring core concrete layer enable anchor pole firmly to connect concrete foundation and core are mixed Solidifying soil layer is not in the phenomenon that concrete loosens.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the schematic diagram of internal structure of the utility model;
Fig. 3 is the structural schematic diagram in the utility model at anchor pole;
Fig. 4 is the structural schematic diagram in the utility model at Ifold flange;
Fig. 5 is the structural schematic diagram that flange is formed in the utility model.
In figure: steel core concrete column 1, interior steel pipe 11, outer steel pipe 12, core concrete layer 13, concrete foundation 2, combination Flange 3, inner ring flexibility forged flange 31, outer ring rigid flange 32, welding hole 33, welding neck 34, foundation bolt 35, anchor pole 36, Relief hole 37, triangle stiffener 38.
Specific embodiment
The utility model is further described in the following with reference to the drawings and specific embodiments.
As shown in Fig. 1 to Fig. 5, a kind of steel tube concrete column feet node, including
Steel core concrete column 1, concrete foundation 2 and Ifold flange 3, steel core concrete column include interior steel pipe 11, outer steel pipe 12 and the core concrete layer 13 that is cast between interior steel pipe and outer steel pipe, Ifold flange is by inner ring flexibility forged flange 31 and outer Circle rigid flange 32 connects and composes.Inner ring flexibility forged flange is welded on the bottom of interior steel pipe, in inner ring flexibility forged flange Portion is equipped with welding hole 33, and the side wall of welding hole upwardly extends the welding neck 34 to be formed for the welding of the inner sidewall of interior steel pipe, weldering Hole is connect convenient for welding operation, it is stronger that welding neck covers the mode welded in interior steel pipe, is not subject to destroy by impact force.Outside Circle rigid flange is welded on the bottom of outer steel pipe.
The outer ring rigid flange is fixed in concrete foundation by several foundation bolts 35, and foundation bolt is located at core The outside of concrete layer.Core concrete layer is fixed in concrete foundation by several anchor poles 36, if Ifold flange is equipped with The dry and one-to-one relief hole 37 of anchor pole, anchor pole pass through corresponding relief hole, and relief hole is located on the rigid flange of outer ring, respectively allows The characteristics of position hole is uniformly distributed along the circumferential direction of outer ring rigid flange, and outer ring rigid flange has bolt without prying force, high reliablity, by anchor pole It is arranged in resigning bolt and is conducive to guarantee the stability of anchor pole and resigning working bolt on the rigid flange of outer ring.Anchor pole it is upper End be located at core concrete layer in, the lower end of anchor pole is located in concrete foundation, anchor pole be directly anchored to core concrete layer with In concrete foundation, connection is more firm, and shock resistance is stronger.Ifold flange is equipped with several triangle stiffeners 38, and triangle adds Strength plate is fixed on the lateral wall of outer steel pipe, improves the stability of steel core concrete column.The lower end of triangle stiffener is fixed on outer It encloses on rigid flange, triangle stiffener and foundation bolt are alternately distributed along the circumferential direction of outer ring rigid flange, and triangle stiffener is shared Stress on foundation bolt, the stress reduced on foundation bolt are concentrated, and the stability and service life of foundation bolt are improved.
Specific step is as follows for the utility model construction:
Inner ring flexibility forged flange is welded on interior steel pipe, the bottom of outer steel pipe is welded on the rigid flange of outer ring, will Triangle stiffener is respectively welded in outer steel pipe and outer ring rigid flange, this part welding can be completed in factory, then transport It send to construction site;Casting concrete basis, requirement need to be reached, prevent anchor pole by being embedded to foundation bolt and anchor pole, concrete strength It is loosened in concrete foundation with foundation bolt, lifts steel core concrete column, so that foundation bolt and the equal accurate positioning of anchor pole, Foundation bolt is tightened on the outside of steel core concrete column;Core concrete layer is poured between inside steel pipe and outer steel pipe.
The beneficial effects of the utility model are: inner ring flexibility forged flange welding workload is small, it is easy to the factorial production, and With deformability, good buffer effect improves anti-seismic performance, and outer ring rigid flange guarantees bonding strength, meets rigidity requirement;Only Needing to tighten foundation bolt on the outside of steel core concrete column can fix, and avoid in existing node and construction personnel is needed to enter steel The problem of inner flange bolt is tightened in pipe concrete column improves the convenience and safety of construction;First casting concrete basis, The mode of after-pouring core concrete layer, enables anchor pole firmly to connect concrete foundation and core concrete layer, will not There is the phenomenon that concrete loosens.

Claims (6)

1. a kind of steel tube concrete column feet node, characterized in that including
Steel core concrete column, concrete foundation and Ifold flange, steel core concrete column include interior steel pipe, outer steel pipe and are cast in interior Core concrete layer between steel pipe and outer steel pipe, Ifold flange connect structure by inner ring flexibility forged flange and outer ring rigid flange At inner ring flexibility forged flange is welded on the bottom of interior steel pipe, and outer ring rigid flange is welded on the bottom of outer steel pipe;
The outer ring rigid flange is fixed in concrete foundation by several foundation bolts, and foundation bolt is located at core concrete The outside of layer, core concrete layer are fixed in concrete foundation by several anchor poles.
2. a kind of steel tube concrete column feet node according to claim 1, characterized in that the inner ring flexibility forged flange Middle part be equipped with welding hole, the side wall of welding hole upwardly extends the welding neck to be formed for the welding of the inner sidewall of interior steel pipe.
3. a kind of steel tube concrete column feet node according to claim 1 or 2, characterized in that set on the Ifold flange There is several and one-to-one relief hole of anchor pole, anchor pole passes through corresponding relief hole, and the upper end of anchor pole is located at core concrete layer In, the lower end of anchor pole is located in concrete foundation.
4. a kind of steel tube concrete column feet node according to claim 3, characterized in that it is rigid that the relief hole is located at outer ring Property flange on, each relief hole is uniformly distributed along the circumferential direction of outer ring rigid flange.
5. a kind of steel tube concrete column feet node according to claim 1 or 2, characterized in that set on the Ifold flange There are several triangle stiffeners, triangle stiffener is fixed on the lateral wall of outer steel pipe.
6. a kind of steel tube concrete column feet node according to claim 5, characterized in that the lower end of the triangle stiffener It is fixed on the rigid flange of outer ring, triangle stiffener and foundation bolt are alternately distributed along the circumferential direction of outer ring rigid flange.
CN201821086387.7U 2018-07-10 2018-07-10 A kind of steel tube concrete column feet node Active CN208430851U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821086387.7U CN208430851U (en) 2018-07-10 2018-07-10 A kind of steel tube concrete column feet node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821086387.7U CN208430851U (en) 2018-07-10 2018-07-10 A kind of steel tube concrete column feet node

Publications (1)

Publication Number Publication Date
CN208430851U true CN208430851U (en) 2019-01-25

Family

ID=65098972

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821086387.7U Active CN208430851U (en) 2018-07-10 2018-07-10 A kind of steel tube concrete column feet node

Country Status (1)

Country Link
CN (1) CN208430851U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457868A (en) * 2018-07-10 2019-03-12 国网浙江省电力有限公司丽水供电公司 A kind of steel tube concrete column feet node and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109457868A (en) * 2018-07-10 2019-03-12 国网浙江省电力有限公司丽水供电公司 A kind of steel tube concrete column feet node and its construction method

Similar Documents

Publication Publication Date Title
CN208534163U (en) A kind of hollow sandwich high tensile steel tube concurrent
CN109555151A (en) Precast concrete column combines connecting structure and construction method with the steel reinforced concrete of cushion cap
CN109736438A (en) A kind of concrete filled steel tube connects with steel tube device and its construction method
CN108412128A (en) A kind of connection structure of steel core concrete column
CN102720207A (en) Tower foundation and tower of wind-driven generator
CN208430851U (en) A kind of steel tube concrete column feet node
CN109457868A (en) A kind of steel tube concrete column feet node and its construction method
CN109024661A (en) Foundation of wind-driven generator unit hardened system
CN109441198A (en) A kind of high tensile steel tube concurrent
CN209195137U (en) A kind of concrete-filled double skin steel tube mixing splicing node
CN111197319A (en) Multidirectional prestress prefabricated assembled beam slab foundation of wind power generation tower
CN111119413A (en) Hollow interlayer steel pipe joint
CN206815533U (en) A kind of prefabricated component and the connecting node on basis
CN212742169U (en) Steel stand and concrete cushion cap connection structure
CN209585099U (en) A kind of substation truss assembled pile foundation using flanged joint
CN112211219A (en) Novel thin-wall large-diameter single pile-barrel composite pile foundation and installation method thereof
CN208792364U (en) Foundation of wind-driven generator unit hardened system
CN208202343U (en) A kind of steel core concrete column
CN207161264U (en) A kind of bindiny mechanism for combining pylon
CN105735338A (en) Prestress assembled-type fan foundation
CN202031370U (en) Concrete-steel structure composite wind power tower
CN216041288U (en) Spiral anchor foundation
CN216999819U (en) Building pile foundation convenient to composite erection
CN207813176U (en) A kind of communication iron tower anchor bolt
CN209779668U (en) Two unification pile foundations of heliostat stand and basis

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190614

Address after: 323000 Zhongdong Road 699, Liandu District, Lishui City, Zhejiang Province

Co-patentee after: State Grid Corporation of China

Patentee after: State Grid Zhejiang Electric Power Co., Ltd. Lishui power supply company

Co-patentee after: Lishui Zhengyang Electric Power Construction Co., Ltd.

Address before: 323000 Zhongdong Road 699, Liandu District, Lishui City, Zhejiang Province

Co-patentee before: State Grid Corporation of China

Patentee before: State Grid Zhejiang Electric Power Co., Ltd. Lishui power supply company