CN205637537U - A auto -lock draw bridge frame for climbing frame - Google Patents
A auto -lock draw bridge frame for climbing frame Download PDFInfo
- Publication number
- CN205637537U CN205637537U CN201620383677.2U CN201620383677U CN205637537U CN 205637537 U CN205637537 U CN 205637537U CN 201620383677 U CN201620383677 U CN 201620383677U CN 205637537 U CN205637537 U CN 205637537U
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- frame
- suspension bridge
- bridge frame
- walkway board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses an auto -lock draw bridge frame for climbing frame, two and half draw bridge framves including symmetrical arrangement, guidance tape, hinge, two pole settings, two first connecting rods and two second connecting rods are walked including pavement fixing base, rotation to half draw bridge frame. The utility model discloses use convenient, safety, high efficiency, simultaneously, the equipment of being convenient for, convenient, the easy operation of dismantlement can use repeatedly, have greatly saved manual work and material cost.
Description
Technical field
This utility model belongs to attachment type raise scaffold technical field.It is specifically related to a kind of for climbing frame
Self-locking suspension bridge frame.
Background technology
Along with the high speed development of building trade, high-rise, high-rise building gets more and more, wide in construction
General employing integral elevating scaffold, is called for short climbing frame.As the outer protection of building periphery, rising or
Support body is needed to pass through tower crane attached wall position during decline.Traditional processing method is: attached at tower crane by climbing frame
Wall displacement disconnects, and sets up with steel pipe and forms, when support body runs, and need to be by manual operation by complete for steel pipe herein
Portion removes, and after lifting completes, then will set up by steel pipe herein.Time required for support body lifting increases
Adding, also increase the labor intensity of workman simultaneously, this processing method adds operation danger under support body high-altitude
Danger coefficient is high, there is the biggest potential safety hazard.
Utility model content
The purpose of this utility model is to overcome a kind of self-locking suspension bridge for climbing frame of above-mentioned not enough offer
Frame.
This utility model includes that the two and half suspension bridge framves being arranged symmetrically with, described half suspension bridge frame include that aisle is fixed
Seat 7, rotation walkway board 4, hinge 6, two first connecting rods 1 of 5, two vertical rods and two second
Connecting rod 2, one end of described two vertical rods 6 is symmetrically mounted on the both sides of fixing seat 7, described rotation aisle
Plate 4 is positioned at inside fixing seat 7, and the one side of described hinge 5 is arranged on the inner side of vertical rod 6 one end, institute
The another side stating hinge 5 is arranged on the inner side rotating walkway board 4 one end, the other end of described vertical rod 6
Hinged with one end of first connecting rod 1, the other end of described first connecting rod 1 and one end of second connecting rod 2
Hinged, the other end of described rotation walkway board 4 is hinged with the other end of second connecting rod 2, and described first
The inner side of connecting rod 1 is provided with hanging hole 9, and described hanging hole 9 is installed with tightrope 10, said two half suspension bridge
The other end rotating walkway board 4 in frame is provided with gap 11 of stepping down.
This utility model is easy to use, safe efficient;Simultaneously, it is simple to assembling, convenient disassembly, behaviour
Make simple, can Reusability, be greatly saved artificial and material cost.
Accompanying drawing explanation
Fig. 1 is this utility model side view.
Fig. 2 is utility model works view.
Fig. 3 is this utility model open mode schematic diagram.
Fig. 4 is this utility model top view.
Detailed description of the invention
Below in conjunction with specific embodiment, this utility model is further described:
A kind of self-locking suspension bridge frame for climbing frame, including the two and half suspension bridge framves being arranged symmetrically with, described half
Suspension bridge frame includes that aisle is fixed seat 7, rotated walkway board 4,5, two vertical rods of hinge 6, two first
Connecting rod 1 and two second connecting rods 2, one end of described two vertical rods 6 is symmetrically mounted on fixing seat 7
Both sides, described rotation walkway board 4 is positioned at inside fixing seat 7, and the one side of described hinge 5 is arranged on vertical
The inner side of bar 6 one end, the another side of described hinge 5 is arranged on the inner side rotating walkway board 4 one end,
The other end of described vertical rod 6 is hinged with one end of first connecting rod 1, the other end of described first connecting rod 1
Hinged with one end of second connecting rod 2, the other end of described rotation walkway board 4 is another with second connecting rod 2
One end is hinged, and the inner side of described first connecting rod 1 is provided with hanging hole 9, and described hanging hole 9 is installed with tightrope
10, the other end rotating walkway board 4 in said two half suspension bridge frame is provided with gap 11 of stepping down.Described
Aisle is fixed and is provided with bracket angle steel 8 bottom seat 7.Also include the activity grafting set 12 of two-way opening, institute
State the other end of first connecting rod 1 and one end of second connecting rod 2 respectively from two-way opening insertion activity grafting
Set 12 is interior and hinged by bolt 3.
Bracket angle steel 8 plays anti-fall effect, when self-locking suspension bridge frame closes, and two first connecting rods 1 and two
Root second connecting rod 2 is in drawknot state, rotates walkway board 4 front end and is connected with second connecting rod 2 bolt i.e.
Can, for safety, this monolateral suspension bridge frame uses totally 4,2 groups of pull bars, only need to be during in-site installation
Each junction screwing bolts, use can singly be organized by suspension bridge frame, it is also possible to double groups are used together.
Making first connecting rod 1 drive second connecting rod 2 by pulling of tightrope 10, second connecting rod 2 drives rotation
Transfer guidance tape 4 to rotate, make rotation walkway board 4 open;When opening and closing type suspension bridge frame closes, boost
Rotate walkway board 4 and slowly put down tightrope 10, rotate walkway board 4 and slowly put down Guan Bi.First connecting rod 1,
Second connecting rod 2, rotation walkway board 4 and vertical rod 6 latching characteristics ensure that the safety and stability of suspension bridge;?
Only each several part bolt need to be connected during installation;
This utility model opening and closing type suspension bridge frame, can repeatedly dismantle, has enough to meet the need, reuse, save
Artificial and material.It is made without during by tower crane wall-attaching equipment removing, only need to open self-locking suspension bridge frame,
The lift work of support body can be completed, lifted and the most only need to close this suspension bridge frame, easy to use,
Safe efficient;Simultaneously, it is simple to assembling, convenient disassembly, simple to operate, can Reusability, greatly
Save artificial and material cost.
Claims (3)
1., for a self-locking suspension bridge frame for climbing frame, including the two and half suspension bridge framves being arranged symmetrically with, it is special
Levy and be: described half suspension bridge frame include aisle fix seat (7), rotate walkway board (4), hinge (5),
Two vertical rods (6), two first connecting rods (1) and two second connecting rods (2), described two are stood
One end of bar (6) is symmetrically mounted on the both sides of fixing seat (7), and described rotation walkway board (4) is positioned at
Fixing seat (7) inner side, the one side of described hinge (5) is arranged on the inner side of vertical rod (6) one end, institute
The another side stating hinge (5) is arranged on the inner side rotating walkway board (4) one end, described vertical rod (6)
The other end hinged with one end of first connecting rod (1), the other end of described first connecting rod (1) and
One end of two connecting rods (2) is hinged, the other end of described rotation walkway board (4) and second connecting rod (2)
The other end hinged, the inner side of described first connecting rod (1) is provided with hanging hole (9), described hanging hole (9)
On be installed with tightrope (10), the other end of the rotation walkway board (4) in said two half suspension bridge frame is provided with
Step down gap (11).
Self-locking suspension bridge frame for climbing frame the most according to claim 1, it is characterised in that: described
Aisle is fixed seat (7) bottom and is provided with bracket angle steel (8).
Self-locking suspension bridge frame for climbing frame the most according to claim 1 or claim 2, it is characterised in that: also
Including activity grafting set (12) of two-way opening, the other end of described first connecting rod (1) and second connecting rod
(2) one end respectively in two-way opening insertion activity grafting set (12) and by bolt (3) hinged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620383677.2U CN205637537U (en) | 2016-04-29 | 2016-04-29 | A auto -lock draw bridge frame for climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620383677.2U CN205637537U (en) | 2016-04-29 | 2016-04-29 | A auto -lock draw bridge frame for climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205637537U true CN205637537U (en) | 2016-10-12 |
Family
ID=57059931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620383677.2U Expired - Fee Related CN205637537U (en) | 2016-04-29 | 2016-04-29 | A auto -lock draw bridge frame for climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205637537U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316632A (en) * | 2018-01-26 | 2018-07-24 | 上海建工四建集团有限公司 | The outer safeguard structure and its application method of integral hoisting scaffold |
-
2016
- 2016-04-29 CN CN201620383677.2U patent/CN205637537U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108316632A (en) * | 2018-01-26 | 2018-07-24 | 上海建工四建集团有限公司 | The outer safeguard structure and its application method of integral hoisting scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2020052291A1 (en) | Construction elevator wall-attaching frame mounting platform attached to steel platform formwork and method therefor | |
CN104743451A (en) | Traction attached type fan maintenance hoisting platform | |
CN106395643A (en) | High-rise building fabricated interlayer hoisting machine and construction method | |
CN104420640A (en) | Heterosexual chimney construction platform | |
CN205637537U (en) | A auto -lock draw bridge frame for climbing frame | |
CN205591624U (en) | Communication tower is solely managed to over -and -under type with self -locking function | |
CN205100531U (en) | Lift scaffold support body assembly | |
CN107575032A (en) | A kind of bolt-ball net frame roofing installation method | |
CN204474085U (en) | A kind of elevator high-altitude maintenance job platform | |
CN104343342B (en) | A kind of universal window of replaceable sash and its building method | |
CN204676865U (en) | A kind of building scaffold | |
CN203475797U (en) | Special-shaped chimney construction platform | |
CN202718381U (en) | Transfer-free lifting device | |
CN206646836U (en) | A kind of exterior wall, inner partition plate movement lifting frame | |
CN203319589U (en) | Hoisting machine for installing air hose | |
CN204282796U (en) | Collapsible hanging basket | |
CN114809426A (en) | Integral hoisting structure and hoisting method for ceiling framework | |
CN210798251U (en) | But scaffold of automatically regulated height | |
CN203545501U (en) | Auxiliary lifting device of inner crawl type tower crane in small space | |
CN103470166B (en) | A kind of antitheft escape window | |
CN207932896U (en) | Ring beam and ring rail integral hoisting tool | |
CN104234402A (en) | Openable/closeable suspension bridge frame | |
CN212531991U (en) | High-altitude suspension safety traction device for building construction | |
CN206466912U (en) | A kind of three-dimensional module hanging apparatus | |
CN203639006U (en) | Construction device of large-span special net rack roof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161012 Termination date: 20200429 |