CN205558237U - Encorbelment board position and encorbelment scaffold frame and exempt from back a structure - Google Patents

Encorbelment board position and encorbelment scaffold frame and exempt from back a structure Download PDF

Info

Publication number
CN205558237U
CN205558237U CN201620390932.6U CN201620390932U CN205558237U CN 205558237 U CN205558237 U CN 205558237U CN 201620390932 U CN201620390932 U CN 201620390932U CN 205558237 U CN205558237 U CN 205558237U
Authority
CN
China
Prior art keywords
steel
encorbelment
flooring
builder
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620390932.6U
Other languages
Chinese (zh)
Inventor
刘启家
边守江
文孝安
张文华
孔涛
赵杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201620390932.6U priority Critical patent/CN205558237U/en
Application granted granted Critical
Publication of CN205558237U publication Critical patent/CN205558237U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a construction technical field, in particular to encorbelment board position and encorbelment scaffold frame and exempt from back a structure. This encorbelment board position and encorbelment scaffold frame and exempt from back a structure includes first structure floor and second structure floor, establishes the frame roof beam at first structure floor and second structure floor bottom, establishes the board of encorbelmenting outside the frame roof beam, establish the I -steel above first structure floor, establish the steel sheet cushion between I -steel and first structure floor, the board outer end of encorbelmenting of first structure floor is stretched out to the I -steel outer end, establish the scaffold frame of encorbelmenting on the I -steel top, with the scaffold frame of encorbelmenting in stand in a line to establish on the corresponding second structure floor of pole and reserve the hole, be connected wire rope within a definite time at I -steel right -hand member and second structure floor frame roof beam. This encorbelment board position and encorbelment scaffold frame and exempt from back a structure set up the mode rational in infrastructure, need not to encorbelment the sheet layer layer to the floor and go back to the top, avoid a large amount of turnover instruments to overstock, reduce the removal cost, eliminate the subsequent handling and insert the difficult problem of construction.

Description

A kind of cantilevered plate position builder's jack exempts from the structure that returns back to top
(1) technical field
This utility model relates to technical field of building construction, particularly to a kind of cantilevered plate position builder's jack Exempt from the structure that returns back to top.
(2) background technology
Installing mode according to common builder's jack, running at cantilevered plate, scaffold body is still arranged on The outside of structure cantilevered plate, the pressure spot of structure is cantilevered plate edge, and the edge bearing capacity of cantilevered plate is limited. For ensureing that forcing checking passes through, following all floor cantilevered plates need to be returned back to top layer by layer, so will result in a large amount of Turnover tool overstock, return back to top and the generation of removal cost, and seriously constrain subsequent handling insertion construction.
Therefore, it is possible to reasonably select to set up mode, solve that following all floor cantilevered plates return back to top layer by layer asks Topic, it is to avoid substantial amounts of turnover tool overstocks and the generation of removal cost, eliminates subsequent handling and inserts constructional difficulties Problem, become the problem that the realm of building construction technical staff is in the urgent need to address.
(3) summary of the invention
This utility model is in order to make up the deficiencies in the prior art, it is provided that one sets up that mode is rational in infrastructure, nothing Floor cantilevered plate need to be returned back to top layer by layer, avoid substantial amounts of turnover tool to overstock, reduce removal cost, eliminate Subsequent handling is inserted the cantilevered plate position builder's jack of constructional difficulties problem and is exempted from the structure that returns back to top, and solves existing Problem present in technology.
This utility model is achieved by the following technical solution:
A kind of cantilevered plate position builder's jack exempts from the structure that returns back to top, including the first structure flooring be located at the first knot The second structure flooring above structure flooring, is equipped with a frame at the first structure flooring and the second structure flooring bottom Set a roof beam in place, outside the first structure flooring outside Vierendeel girder and the second structure flooring, be equipped with a cantilevered plate;? First structure flooring is arranged over an I-steel, is provided with steel plate cushion block between I-steel and the first structure flooring, Described I-steel is supported by steel plate cushion block to be located at above the first structure flooring, and described I-steel is pre-by round steel Embedded part is fixing with steel plate cushion block and the first structure flooring to be connected, and the first structure flooring is stretched out in the outer end of I-steel Cantilevered plate outer end is arranged;I-steel top above the cantilevered plate of the first structure flooring is provided with one and encorbelments foot hands Frame, is provided with hole to be provided, foot of encorbelmenting on the second structure flooring corresponding with interior row's vertical rod of builder's jack The top of interior row's vertical rod of hand cradle is through hole to be provided and is located at above the second structure flooring;Right-hand member at I-steel And it is connected a steel wire rope between the Vierendeel girder of the second structure flooring.
The quantity of steel plate cushion block is 2, and two steel plate cushion blocks are located on the first structure flooring on the left of cantilevered plate.
The size of hole to be provided is more than the vertical rod external diameter of builder's jack.
The size of hole to be provided is the hole of 100mm*150mm.
The beneficial effects of the utility model are: this cantilevered plate position builder's jack exempts to return back to top structure by encorbelmenting The cantilever steel girder I-steel of scaffold Vierendeel girder within cantilevered plate and within pave, make builder's jack work Word steel and encorbelment and have a rational girder steel amount of deflection gap between floor, fundamentally eliminates the stress of cantilevered plate, Return back to top layer by layer without the pressurized for floor of encorbelmenting.Take tier pole through-flooring in double-pole scaffold Scheme, solves large scale builder's jack I-steel at floor of encorbelmenting and encorbelments long shortcoming.Thus from Fundamentally solve that large scale encorbelments builder's jack at floor sets up problem, has saved circulation material, joint About human resources, the green construction that response national energy-saving reduces discharging is called.
(4) accompanying drawing explanation
Below in conjunction with the accompanying drawings this utility model is further described.
Fig. 1 is structural representation of the present utility model.
In figure, 1 first structure flooring, 2 second structure floorings, 3 Vierendeel girders, 4 cantilevered plates, 5 I-steel, 6 steel plate cushion blocks, 7 round steel built-in fittings, 8 builder's jacks, 9 hole to be provideds, 10 steel wire ropes.
(5) detailed description of the invention
For the technical characterstic of this programme can be clearly described, below by detailed description of the invention, and combine its accompanying drawing, The utility model is elaborated.
As shown in Figure 1, this cantilevered plate position builder's jack structure of exempting to return back to top includes the first structure flooring 1 With the second structure flooring 2 being located at above the first structure flooring 1, in the first structure flooring 1 and the second structure building Bottom, face 2 is equipped with a Vierendeel girder 3, the first structure flooring 1 and the second structure flooring outside Vierendeel girder 3 A cantilevered plate 4 it is equipped with outside 2;It is arranged over an I-steel 5, at I-steel 5 at the first structure flooring 1 And being provided with steel plate cushion block 6 between the first structure flooring 1, described I-steel 5 is stayed at by steel plate cushion block 6 Above first structure flooring 1, described I-steel 5 is by round steel built-in fitting 7 and steel plate cushion block 6 and the first knot Structure flooring 1 is fixing to be connected, and the outer end of I-steel 5 is stretched out the cantilevered plate outer end of the first structure flooring 1 and arranged; I-steel 5 top above outside the cantilevered plate of the first structure flooring 1 is provided with a builder's jack 8, with The second structure flooring 2 that interior row's vertical rod of builder's jack 8 is corresponding is provided with hole to be provided 9, builder's jack The top of interior row's vertical rod of 8 is through hole to be provided 9 and is located at above the second structure flooring 2;The right side at I-steel 5 It is connected a steel wire rope 10 between end and the Vierendeel girder of the second structure flooring 2.
The quantity of steel plate cushion block 6 is 2, and two steel plate cushion blocks 6 are located at the first structure building on the left of cantilevered plate 4 On face 1.
The size of hole to be provided 9 is more than the vertical rod external diameter of builder's jack 9.
The size of hole to be provided 9 is the hole of 100mm*150mm.
Specific construction process: the first step: by the I-steel 5 of builder's jack 8 within cantilevered plate 4 Paved by steel plate cushion block 6 within one structure flooring 1 Vierendeel girder 3 and Vierendeel girder, make builder's jack 8 work Word steel 5 and the first structure flooring 1 produce a fixed gap, and this space must is fulfilled for builder's jack 8 fullcharging and carries Time the amount of deflection size of I-steel 5, to ensure that the I-steel 5 cantilevered plate not with the first structure flooring 1 contacts, Thus the pressure eliminating builder's jack 8 sends the cantilevered plate of the first structure flooring 1 to, solve from root Cantilevered plate of having determined need to return back to top layer by layer because of the pressure by builder's jack 8.Steel plate cushion block 6 selects rigidity as far as possible Big steel plate, and the pressurized of I-steel 5 all needs to pave with tension point.
Second step: take tier pole in double-pole scaffold to wear the scheme of the second structure flooring 2, solve large scale Builder's jack I-steel 5 at floor of encorbelmenting is encorbelmented long shortcoming.In structure construction, scaffold acts primarily as safety Protective action, sets up double-pole scaffold and is intended merely to increase the globality of support body and can go up people's operability, therefore As long as the scaffold for this region meets the protection having row's vertical rod can meet floor in the outside of cantilevered plate Require to operate requirement with the upper people of construction, therefore, the interior tier pole of double-pole scaffold used the mode of through-flooring, To solve because the cantilevered plate builder's jack I-steel 5 that size causes of encorbelmenting is encorbelmented the big problem of size, wear building Plate principle is: when floor cantilevered plate casting concrete reserving hole (depending on bore hole size is according to story height, Can conveniently remove vertical rod is principle, based on this engineering, then and the unified hole for 100mm*150mm), foot of encorbelmenting Interior row's vertical rod of hand cradle passes in hole to be provided 9.
For closure hole to be provided 9, on-the-spot prefabricated end opening 95mm*145mm, 105mm*155mm suitable for reading, thickness in advance The wedge type concrete block of 10mms more than floor, after builder's jack is removed, passes through wedge type block with handbarrow Construction elevator is transported to each floor beyond the Great Wall, and on wedge, cap portion can be included in the pea gravel concreten ground of floor Inside face, do not affect subsequent decorations way.
This utility model does not describes part in detail, is the known technology of those skilled in the art of the present technique.Finally illustrate , above example is only in order to illustrate the technical solution of the utility model and unrestricted, although with reference to preferably This utility model has been described in detail by embodiment, it will be understood by those within the art that, permissible The technical solution of the utility model is modified or equivalent, without deviating from this utility model technical side The objective of case and scope, it all should be contained in the middle of right of the present utility model.

Claims (4)

1. cantilevered plate position builder's jack exempts from the structure that returns back to top, and it is characterized in that: include the first structure flooring With the second structure flooring being located at above the first structure flooring, at the bottom of the first structure flooring and the second structure flooring End is equipped with a Vierendeel girder, is equipped with outside the first structure flooring outside Vierendeel girder and the second structure flooring One cantilevered plate;It is arranged over an I-steel, between I-steel and the first structure flooring at the first structure flooring Being provided with steel plate cushion block, described I-steel is supported by steel plate cushion block to be located at above the first structure flooring, described work Word steel is connected by round steel built-in fitting is fixing with steel plate cushion block and the first structure flooring, and the outer end of I-steel is stretched out The cantilevered plate outer end of the first structure flooring is arranged;I-steel above outside the cantilevered plate of the first structure flooring Top is provided with builder's jack, sets on the second structure flooring corresponding with interior row's vertical rod of builder's jack Having hole to be provided, the top of interior row's vertical rod of builder's jack is through hole to be provided and is located at above the second structure flooring; A steel wire rope is connected between the right-hand member and the Vierendeel girder of the second structure flooring of I-steel.
A kind of cantilevered plate position the most according to claim 1 builder's jack exempts from the structure that returns back to top, its feature It is: the quantity of steel plate cushion block is 2 that two steel plate cushion blocks are located on the first structure flooring on the left of cantilevered plate.
A kind of cantilevered plate position the most according to claim 1 builder's jack exempts from the structure that returns back to top, its feature It is: the size of hole to be provided is more than the vertical rod external diameter of builder's jack.
A kind of cantilevered plate position the most according to claim 3 builder's jack exempts from the structure that returns back to top, its feature It is: the size of hole to be provided is the hole of 100mm*150mm.
CN201620390932.6U 2016-05-03 2016-05-03 Encorbelment board position and encorbelment scaffold frame and exempt from back a structure Expired - Fee Related CN205558237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620390932.6U CN205558237U (en) 2016-05-03 2016-05-03 Encorbelment board position and encorbelment scaffold frame and exempt from back a structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620390932.6U CN205558237U (en) 2016-05-03 2016-05-03 Encorbelment board position and encorbelment scaffold frame and exempt from back a structure

Publications (1)

Publication Number Publication Date
CN205558237U true CN205558237U (en) 2016-09-07

Family

ID=56805825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620390932.6U Expired - Fee Related CN205558237U (en) 2016-05-03 2016-05-03 Encorbelment board position and encorbelment scaffold frame and exempt from back a structure

Country Status (1)

Country Link
CN (1) CN205558237U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816204A (en) * 2017-09-25 2018-03-20 中国五冶集团有限公司 The outer protective frame of skyscraper staggered floor balcony also serves as operating platform erection method
CN107842192A (en) * 2017-11-23 2018-03-27 安徽同济建设集团有限责任公司 A kind of making of the outer builder's jack closed cover of architectural engineering and installation method
CN109629810A (en) * 2018-12-29 2019-04-16 杭州江润科技有限公司 Closed builder's jack system and construction method
CN110409792A (en) * 2019-07-19 2019-11-05 中铁建工集团有限公司 A kind of detachable drawknot node device of builder's jack head step

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107816204A (en) * 2017-09-25 2018-03-20 中国五冶集团有限公司 The outer protective frame of skyscraper staggered floor balcony also serves as operating platform erection method
CN107842192A (en) * 2017-11-23 2018-03-27 安徽同济建设集团有限责任公司 A kind of making of the outer builder's jack closed cover of architectural engineering and installation method
CN109629810A (en) * 2018-12-29 2019-04-16 杭州江润科技有限公司 Closed builder's jack system and construction method
CN109629810B (en) * 2018-12-29 2021-02-09 浙江恒鸿建设有限公司 Closed type overhanging scaffold and construction method
CN110409792A (en) * 2019-07-19 2019-11-05 中铁建工集团有限公司 A kind of detachable drawknot node device of builder's jack head step

Similar Documents

Publication Publication Date Title
CN205558237U (en) Encorbelment board position and encorbelment scaffold frame and exempt from back a structure
CN104389419B (en) Encorbelment and prop up mould structure for mounting platform and a constructional method
CN101649604B (en) Construction bracket of 1# block of inclined pull bridge and constructing method thereof
CN103195256A (en) Hanging column type steel structure jig frame construction method
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN106758846A (en) Cast-in-place box beam bracket and construction method
CN205223871U (en) Suspension bridge bridge tower overarm brace pre -compaction device
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN108643207A (en) Exempt from bottom concrete steel lifted trunk side plate and bottom board connector and its construction method
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN203213019U (en) Cast-in-situ construction bracket system of long cantilever bent cap
CN110043035B (en) Post-cast strip construction supporting method
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN106836773A (en) The support meanss and construction method of a kind of builder's jack
CN203755173U (en) Formwork device used for hydraulic climbing of bridge high pier
CN105370027A (en) Construction method for integrally lifted and supported steel platform structure in high-rise suspended structure
CN103821360A (en) Construction method for high-altitude long-span cantilever formwork
CN207749859U (en) A kind of trestle support system for structure floor operation in Large-scale Hoisting equipment
CN203320922U (en) Supporting device for forming of elevator shaft template
CN206591803U (en) A kind of overhanging scaffold supporting construction
TW201437457A (en) Jack stand for bridge lifting
CN208586895U (en) A kind of hydraulic climbing platform wall-attaching equipment
CN206616843U (en) A kind of support meanss of builder's jack
CN112854702A (en) Large-span silo roof construction platform and erection method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

CF01 Termination of patent right due to non-payment of annual fee