CN206616843U - A kind of support meanss of builder's jack - Google Patents

A kind of support meanss of builder's jack Download PDF

Info

Publication number
CN206616843U
CN206616843U CN201720191039.5U CN201720191039U CN206616843U CN 206616843 U CN206616843 U CN 206616843U CN 201720191039 U CN201720191039 U CN 201720191039U CN 206616843 U CN206616843 U CN 206616843U
Authority
CN
China
Prior art keywords
steel
cantilever beams
long
short
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720191039.5U
Other languages
Chinese (zh)
Inventor
章曾平
方怡
邓穗
王水良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 5 Group Co Ltd
Original Assignee
Shanghai Construction No 5 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 5 Group Co Ltd filed Critical Shanghai Construction No 5 Group Co Ltd
Priority to CN201720191039.5U priority Critical patent/CN206616843U/en
Application granted granted Critical
Publication of CN206616843U publication Critical patent/CN206616843U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型涉及一种悬挑脚手架的支撑装置,包括多个楼层,还包括布置在楼层上的数根短工字钢悬挑梁和长工字钢悬挑梁,所述短工字钢悬挑梁固接在楼板缺失处正对的边框梁上,所述长工字钢悬挑梁的固定段分别与楼板及边框梁固接,所有工字钢悬挑梁的悬挑端都焊接在方钢上,所有工字钢悬挑梁的悬挑端和上方楼层的边框梁之间连接钢丝绳,所述短工字钢悬挑梁的悬挑端与下方楼层之间设置有斜撑。本实用新型的悬挑脚手架的支撑装置能够有效利用已建成项目结构悬空处的空间,相比现有技术扇形布置悬挑工字钢的情况,节约了型钢数量,提高脚手架的整体抗倾覆性,降低了施工难度,减少了施工成本。

The utility model relates to a supporting device for a cantilevered scaffold, which includes a plurality of floors, and several short I-shaped steel cantilevered beams and long I-shaped steel cantilevered beams arranged on the floors. The short I-shaped steel cantilevered beams are fixed Connected to the frame beam facing the missing part of the floor slab, the fixed sections of the long I-steel cantilever beams are fixedly connected to the floor slab and the frame beam respectively, and the cantilevered ends of all I-steel cantilever beams are welded to the square steel. Wire ropes are connected between the cantilevered ends of all I-steel cantilevered beams and the frame beams of the upper floors, and diagonal braces are arranged between the cantilevered ends of the short I-steel cantilevered beams and the lower floors. The supporting device of the cantilevered scaffolding of the utility model can effectively utilize the space in the suspended part of the completed project structure. Compared with the fan-shaped arrangement of the cantilevered I-beam in the prior art, the number of section steels is saved, and the overall overturning resistance of the scaffold is improved. The difficulty of construction is reduced, and the construction cost is reduced.

Description

一种悬挑脚手架的支撑装置A support device for cantilevered scaffolding

技术领域technical field

本实用新型涉及一种悬挑脚手架的支撑装置,具体是指,针对已建成项目的大跨度悬空处,在搭设悬挑脚手架时所提供的支撑装置,属于建筑施工技术领域。The utility model relates to a supporting device for a cantilevered scaffold, in particular to a supporting device provided when erecting a cantilevered scaffold for a large-span suspended part of a completed project, and belongs to the technical field of building construction.

背景技术Background technique

建筑施工中,由于装修工程的作业及其安全防护需要,在项目主体已完工的情况下,要对主体进行悬挑式脚手架搭设。按照JGJ130-2011《建筑施工扣件式钢管脚手架安全技术规范》(以下简称规范)的规定,悬挑钢梁的固定段长度不应该小于悬挑段长度的1.25倍。During the building construction, due to the operation of the decoration project and the need for safety protection, when the main body of the project has been completed, a cantilevered scaffold should be erected for the main body. According to the provisions of JGJ130-2011 "Safety Technical Specifications for Fastener Type Steel Pipe Scaffolding in Building Construction" (hereinafter referred to as the specification), the length of the fixed section of the cantilevered steel beam should not be less than 1.25 times the length of the cantilevered section.

在楼梯口等结构悬空处,由于该处没有楼板,因此悬挑脚手架工字钢无基础可依、难以定位,在现有技术中,建筑结构的角部悬挑脚手架的搭设大都采用扇形布置工字钢悬挑梁,在工字钢悬挑梁上架设联系型钢,而后在联系型钢上搭设立杆的做法。采用扇形布置工字钢悬挑梁存在一定的弊端和缺陷,主要是联接点结构复杂,施工难度高,支撑强度也难以达到要求。特别是针对阳台与阳台之间大跨度的悬空部位,由于工字钢悬挑梁只能固定在悬空部位对应的边梁上,因此固定段的长度无法达到1.25倍的锚固长度的规范要求。另外,采用扇形布置工字钢悬挑梁,所需材料数量大,施工成本高,而且搭设、拆卸比较繁琐。In the suspended places such as the stairway, because there is no floor, the I-beam of the cantilevered scaffolding has no foundation to rely on and is difficult to locate. In the prior art, the erection of the cantilevered scaffolding at the corner of the building structure mostly adopts fan-shaped layout. I-steel cantilever beams, erecting connection section steel on the I-steel cantilever beam, and then erecting poles on the connection section steel. There are certain disadvantages and defects in adopting fan-shaped arrangement of I-beam cantilever beams, mainly because the joint structure is complex, the construction is difficult, and the support strength is difficult to meet the requirements. Especially for the large-span suspended part between balconies, since the I-beam cantilever beam can only be fixed on the side beam corresponding to the suspended part, the length of the fixed section cannot meet the specification requirement of 1.25 times the anchorage length. In addition, the use of fan-shaped layout of I-beam cantilever beams requires a large amount of materials, high construction costs, and cumbersome erection and disassembly.

实用新型内容Utility model content

本实用新型所要解决的技术问题在于提供一种悬挑脚手架的支撑装置,能够充分利用楼板缺失处周围的空间,支撑强度高满足并满足规范的要求。The technical problem to be solved by the utility model is to provide a support device for a cantilevered scaffold, which can make full use of the space around the missing part of the floor, and has high support strength to meet and meet the requirements of the specification.

为了解决上述问题,本实用新型所采用的技术方案如下:In order to solve the above problems, the technical scheme adopted in the utility model is as follows:

一种悬挑脚手架的支撑装置,包括由上至下布设的多个楼层,它还包括:A supporting device for a cantilevered scaffolding, which includes a plurality of floors arranged from top to bottom, and also includes:

数根平行布置在所述楼层上的短工字钢悬挑梁,所述短工字钢悬挑梁的一端固接在楼板缺失处正对的边框梁上,Several short I-steel cantilevered beams arranged in parallel on the floor, one end of the short I-steel cantilevered beams is fixedly connected to the frame beam facing the missing part of the floor,

至少两根布置在同一楼层的长工字钢悬挑梁,所述长工字钢悬挑梁分布在所述短工字钢悬挑梁的外围并与其平行,所述长工字钢悬挑梁的固定段的一端与楼板缺失处旁边的楼板固接,固定段的另一端与边框梁固接,所述长工字钢悬挑梁的固定段的长度至少是悬挑段长度的1.25倍,At least two long I-steel cantilever beams arranged on the same floor, the long I-steel cantilever beams are distributed on the periphery of the short I-steel cantilever beams and parallel to it, the fixed section of the long I-steel cantilever beams One end of the fixed section is fixed to the floor next to the missing part of the floor, and the other end of the fixed section is fixed to the frame beam. The length of the fixed section of the long I-beam cantilever beam is at least 1.25 times the length of the cantilever section.

一根方钢,所述方钢固接在所述长、短工字钢悬挑梁的悬挑端上,A square steel, the square steel is fixed on the cantilever end of the long and short I-beam cantilever beams,

数个吊环,所述吊环与所述长、短工字钢悬挑梁的位置一一相对,固接在上方楼层的边框梁的底部,每个吊环与相对应的长、短工字钢悬挑梁的悬挑端之间连接有钢丝绳,Several suspension rings, the suspension rings are opposite to the positions of the long and short I-steel cantilever beams one by one, fixedly connected to the bottom of the frame beam on the upper floor, each suspension ring is connected to the corresponding long and short I-steel cantilever beams A wire rope is connected between the cantilevered ends of the

数个斜撑,所述斜撑固接在所述短工字钢悬挑梁的悬挑端与下方楼层的边框梁之间。Several diagonal braces are fixedly connected between the cantilever end of the short I-shaped steel cantilever beam and the frame beam of the lower floor.

作为优选,所述长工字钢悬挑梁的固定段的长度为1700mm,悬挑段的长度为1300mm。Preferably, the length of the fixed section of the long I-shaped steel cantilever beam is 1700 mm, and the length of the cantilevered section is 1300 mm.

进一步,所述短工字钢悬挑梁之间以及短工字钢悬挑梁与长工字钢悬挑梁之间的间距相等。Further, the distances between the short I-shaped steel cantilever beams and between the short I-shaped steel cantilever beams and the long I-shaped steel cantilever beams are equal.

再进一步,所述间距大小为1800mm。Still further, the distance is 1800mm.

进一步,所述长工字钢悬挑梁与所述楼板的连接节点包括两个安装在楼板上的套管和两根穿过所述套管的双头螺杆,所述长工字钢悬挑梁放置在两根双头螺杆之间,其两侧与双头螺杆之间塞有木楔,所述长工字钢悬挑梁的顶面以及楼板的底部分别压设有钢板,所述螺杆的两端穿出所述钢板并由双螺帽紧固。采用这种结构,双头螺杆及钢板能够重复利用,节省材料和成本。Further, the connection node between the long I-shaped steel cantilever beam and the floor slab includes two sleeves installed on the floor and two double-ended screws passing through the sleeves, and the long I-beam cantilever beam is placed Between the two double-ended screws, wooden wedges are plugged between the two sides and the double-ended screws. The top surface of the long I-shaped steel cantilever beam and the bottom of the floor are respectively pressed with steel plates. Threaded out of said steel plate and secured by double nuts. With this structure, the double-ended screw and the steel plate can be reused, saving materials and costs.

进一步,所述长、短工字钢悬挑梁与所述边框梁的连接节点包括两根一端埋植在边框梁中的螺杆,所述长、短工字钢悬挑梁放置在两根螺杆之间,其两侧与螺杆之间塞有木楔,所述长、短工字钢悬挑梁的顶面压设有钢板,所述螺杆的另一端穿出所述钢板并由双螺帽紧固。Further, the connection node between the long and short I-shaped steel cantilever beams and the frame beam includes two screw rods with one end embedded in the frame beam, and the long and short I-beam cantilever beams are placed between the two screw rods A wooden wedge is plugged between the two sides of the screw rod, the top surface of the long and short I-shaped steel cantilever beams is pressed with a steel plate, and the other end of the screw rod passes through the steel plate and is fastened by a double nut.

进一步,所述斜撑与下方楼层的边框梁的连接节点包括两根一端埋植在边框梁中的螺杆和压在边框梁上的钢板,所述螺杆穿过所述钢板并由双螺帽紧固,所述斜撑焊接在钢板上。Further, the connection node between the diagonal brace and the frame beam of the lower floor includes two screw rods with one end embedded in the frame beam and a steel plate pressed on the frame beam, the screw rods pass through the steel plates and are tightened by double nuts. Solid, the diagonal brace is welded on the steel plate.

作为优选,所述螺杆的植入深度为150mm。Preferably, the implantation depth of the screw is 150mm.

作为优选,所述斜撑采用12.6号槽钢制成。Preferably, the diagonal brace is made of No. 12.6 channel steel.

本实用新型悬挑脚手架的支撑装置的工作原理是,根据楼板缺失处及周围空间的特点,平行搭设长工字钢悬挑梁和短工字钢悬挑梁,并用方钢将所有工字钢悬挑梁连接为一个整体。短工字钢悬挑梁位于长工字钢悬挑梁之间,短工字钢悬挑梁的悬挑端通过钢丝绳斜拉和底部斜撑的支撑,是整个支撑装置结构重心平稳,结构稳固,为已建成项目的楼板缺失处搭设悬挑脚手架提供了坚固的支撑基础。同时,使长工字钢悬挑梁的搭设符合规范的要求。The working principle of the supporting device of the utility model cantilevered scaffolding is that according to the characteristics of the missing part of the floor and the surrounding space, a long I-steel cantilevered beam and a short I-steel cantilevered beam are erected in parallel, and all the I-steel cantilevered beams are suspended with square steel. The beams are connected as a whole. The short I-steel cantilever beams are located between the long I-steel cantilever beams, and the cantilevered end of the short I-steel cantilever beams is supported by wire rope cable-stays and bottom braces, so that the center of gravity of the entire support device is stable and the structure is stable. The cantilevered scaffolding provided by the lack of floor slabs in the completed project provides a solid support foundation. At the same time, the erection of the long I-beam cantilever beam meets the requirements of the code.

与现有技术相比,本实用新型的有益效果在于:Compared with the prior art, the utility model has the beneficial effects of:

1、本实用新型的支撑强度高,提高了悬挑脚手架的整体抗倾覆性,很好地满足了脚手架的安全性。1. The supporting strength of the utility model is high, which improves the overall overturning resistance of the cantilevered scaffolding, and satisfies the safety of the scaffolding well.

2、相比现有技术的扇形布置结构更容易安装和拆卸,降低了施工难度。2. Compared with the fan-shaped arrangement structure in the prior art, it is easier to install and disassemble, and reduces the difficulty of construction.

3、相比现有技术的扇形布置结构节省了材料,降低了施工成本。3. Compared with the fan-shaped arrangement structure in the prior art, the material is saved and the construction cost is reduced.

附图说明Description of drawings

图1为本实用新型悬挑脚手架的支撑装置一优选实施例的平面图。Fig. 1 is a plan view of a preferred embodiment of the supporting device of the utility model cantilevered scaffolding.

图2为本实用新型悬挑脚手架的支撑装置一优选实施例的侧面图。Fig. 2 is a side view of a preferred embodiment of the supporting device of the cantilevered scaffolding of the present invention.

图3为本实用新型悬挑脚手架的支撑装置一优选实施例的立面图。Fig. 3 is an elevation view of a preferred embodiment of the supporting device of the cantilevered scaffolding of the present invention.

图4为本实用新型一优选实施例中长工字钢悬挑梁与楼板的连接节点A的示意图。Fig. 4 is a schematic diagram of a connection node A between a long I-shaped steel cantilever beam and a floor slab in a preferred embodiment of the present invention.

图5为本实用新型中一优选实施例中边框梁与长、短工字钢悬挑梁的连接节点B的示意图。Fig. 5 is a schematic diagram of the connection node B between the frame frame beam and the long and short I-beam cantilever beams in a preferred embodiment of the present invention.

图6为本实用新型中一优选实施例中斜撑与边框梁的连接节点C的示意图。Fig. 6 is a schematic diagram of a connection node C between a brace and a frame beam in a preferred embodiment of the present invention.

图中:1、楼层;101、楼板缺失处;102、边框梁;103、楼板;2、短工字钢悬挑梁;3、长工字钢悬挑梁;4、方钢;5、吊环;6、钢丝绳;7、斜撑;8、悬挑脚手架;9、套管;10、双头螺杆;11、木楔;12、钢板;13、双螺帽;14、螺杆。In the figure: 1. Floor; 101. Missing floor; 102. Frame beam; 103. Floor; 2. Short I-beam cantilever beam; 3. Long I-beam cantilever beam; 4. Square steel; 5. Hanging ring; 6 , steel wire rope; 7, diagonal brace; 8, cantilevered scaffolding; 9, casing; 10, double-ended screw; 11, wooden wedge; 12, steel plate; 13, double nut; 14, screw.

具体实施方式detailed description

以下结合附图和具体实施例对本实用新型做进一步的详细说明。根据下面的说明,本实用新型的目的、技术方案和优点将更加清楚。需要说明的是,所描述的实施例是本实用新型的优选实施例,而不是全部的实施例。Below in conjunction with accompanying drawing and specific embodiment the utility model is described in further detail. According to the following description, the purpose, technical solution and advantages of the utility model will be more clear. It should be noted that the described embodiments are preferred embodiments of the present utility model, but not all embodiments.

结合图1至图3所示,一种悬挑脚手架的支撑装置,包括由上至下布设的具有楼板缺失处101(图中的楼板缺失处为楼梯口)的多个楼层1,它还包括:数根平行布置在所述楼层上的短工字钢悬挑梁2、至少两根布置在同一楼层的长工字钢悬挑梁3、一根方钢4、数个吊环5和数个斜撑7。所述长、短工字钢悬挑梁的材料选用16号工字钢。As shown in FIGS. 1 to 3 , a support device for a cantilevered scaffold includes a plurality of floors 1 arranged from top to bottom with a missing floor 101 (the missing floor in the figure is the stairway), and it also includes : several short I-steel cantilever beams 2 arranged in parallel on the floor, at least two long I-steel cantilever beams 3 arranged on the same floor, a square steel 4, several suspension rings 5 and several diagonal braces 7. The material of the long and short I-beam cantilever beams is No. 16 I-beam.

所述短工字钢悬挑梁的一端固接在楼板缺失处101正对的边框梁102上,所述边框梁为200mm*500mm的钢筋混凝土梁。One end of the short I-steel cantilever beam is fixedly connected to the frame beam 102 facing the missing part 101 of the floor, and the frame beam is a reinforced concrete beam of 200mm*500mm.

所述长工字钢悬挑梁3分布在所述短工字钢悬挑梁的外围并与其平行,作为优选,所述短工字钢悬挑梁之间以及短工字钢悬挑梁与长工字钢悬挑梁之间的间距大小为1800mm。所述长工字钢悬挑梁的固定段的一端与楼板缺失处旁边的楼板103固接,固定段的另一端与边框梁102固接,所述长工字钢悬挑梁的固定段的长度至少是悬挑段长度的1.25倍,作为优选,所述长工字钢悬挑梁的长度为3000mm,其固定段的长度为1700mm,悬挑段的长度为1300mm。The long I-shaped steel cantilevered beams 3 are distributed on the periphery of the short I-shaped steel cantilevered beams and are parallel to it. Preferably, between the short I-shaped steel cantilevered beams and the short I-shaped steel cantilevered beams The spacing between the cantilever beams is 1800mm. One end of the fixed section of the long I-shaped steel cantilever beam is fixedly connected to the floor 103 next to the missing place of the floor slab, and the other end of the fixed section is fixedly connected to the frame beam 102, and the length of the fixed section of the long I-shaped steel cantilever beam is at least It is 1.25 times the length of the cantilever section. As a preference, the length of the long I-beam cantilever beam is 3000mm, the length of its fixed section is 1700mm, and the length of the cantilever section is 1300mm.

所述方钢焊接在所述长、短工字钢悬挑梁的悬挑端上,使长、短工字钢悬挑梁与方钢连接为一个整体。The square steel is welded on the cantilever ends of the long and short I-steel cantilever beams, so that the long and short I-steel cantilever beams are connected with the square steel as a whole.

所述吊环固接在上方楼层的边框梁的底部,吊环的位置与所述长、短工字钢悬挑梁的位置一一相对,每个吊环与相对应的长、短工字钢悬挑梁的悬挑端之间连接有钢丝绳6,所述钢丝绳选用Φ16的钢丝绳。The suspension rings are affixed to the bottom of the frame beam on the upper floor, the positions of the suspension rings are opposite to the positions of the long and short I-steel cantilever beams one by one, and each suspension ring is connected to the corresponding long and short I-steel cantilever beams. A steel wire rope 6 is connected between the cantilevered ends, and the steel wire rope is a Φ16 steel wire rope.

所述斜撑优选采用12.6号槽钢,斜撑的一端与所述短工字钢悬挑梁的悬挑端焊接,另一端固接在下方楼层的边框梁上。The diagonal brace is preferably No. 12.6 channel steel, one end of the diagonal brace is welded to the cantilever end of the short I-steel cantilever beam, and the other end is fixedly connected to the frame beam of the lower floor.

结合图4所示,所述长工字钢悬挑梁3与所述楼板103的连接节点A的结构包括两个安装在楼板上的套管9和两根穿过所述套管的双头螺杆10,所述长工字钢悬挑梁3放置在两根双头螺杆之间,其两侧与双头螺杆之间塞有木楔11,所述长工字钢悬挑梁的顶面以及楼板的底部分别压设有规格为200*100*10的钢板12,所述螺杆的两端穿出所述钢板并由双螺帽13紧固。As shown in FIG. 4 , the structure of the connection node A between the long I-beam cantilever beam 3 and the floor 103 includes two sleeves 9 installed on the floor and two double-ended screws passing through the sleeves. 10. The long I-shaped steel cantilever beam 3 is placed between two double-ended screws, and wooden wedges 11 are plugged between the two sides of the double-ended screw. The top surface of the long I-shaped steel cantilever beam and the floor Steel plates 12 with specifications of 200*100*10 are respectively pressed on the bottom, and the two ends of the screw go through the steel plates and are fastened by double nuts 13 .

结合图5所示,所述边框梁102与长、短工字钢悬挑梁的连接节点B的结构,包括两根一端植入边框梁中的螺杆14,所述螺杆的植入深度优选为150mm,所述长、短工字钢悬挑梁放置在两根螺杆之间,其两侧与螺杆之间塞有木楔11,所述长、短工字钢悬挑梁的顶面压设有规格为200*100*10钢板12,所述螺杆的另一端穿出所述钢板并由双螺帽13紧固。As shown in FIG. 5 , the structure of the connection node B between the frame beam 102 and the long and short I-shaped steel cantilever beams includes two screws 14 with one end implanted in the frame beam, and the implantation depth of the screws is preferably 150 mm. , the long and short I-shaped steel cantilever beams are placed between two screw rods, wooden wedges 11 are plugged between the two sides and the screw rods, and the top surface of the long and short I-shaped steel cantilever beams is pressed with a specification of 200*100*10 steel plate 12, the other end of the screw rod passes through the steel plate and is fastened by double nuts 13.

请继续参考图6所示,所述斜撑与边框梁102的连接节点C包括两根一端埋植在边框梁中的螺杆14和压在边框梁上的钢板12,所述螺杆穿过所述钢板并由双螺帽13紧固,所述斜撑的一端7焊接在钢板上。Please continue to refer to FIG. 6, the connection node C between the brace and the frame beam 102 includes two screw rods 14 with one end embedded in the frame beam and a steel plate 12 pressed on the frame beam, and the screw rods pass through the frame beam. The steel plate is fastened by double nuts 13, and one end 7 of the diagonal brace is welded on the steel plate.

本实用新型的悬挑脚手架的支撑装置能够有效利用已建成项目大跨度悬空处(即楼板缺失处)的空间,为悬挑脚手架的支撑搭设提供了一种新的思路。相比现有施工中悬挑脚手架惯用扇形布置悬挑工字钢的情况,节约了型钢数量,提高脚手架的整体抗倾覆性,降低了施工难度,减少了施工成本。The supporting device of the cantilevered scaffold of the utility model can effectively utilize the space of the large-span suspended part (that is, the missing part of the floor) of the completed project, and provides a new idea for the supporting erection of the cantilevered scaffold. Compared with the conventional fan-shaped arrangement of cantilevered I-beams in the existing construction, it saves the amount of section steel, improves the overall overturning resistance of the scaffold, reduces the difficulty of construction, and reduces the construction cost.

以上所述,仅是本实用新型优选实施例的描述说明,并非对本实用新型保护范围的限定,显然,任何熟悉本领域的技术人员基于上述实施例,可轻易想到替换或变化以获得其他实施例,这些均应涵盖在本实用新型的保护范围之内。The above is only a description of the preferred embodiments of the present invention, and is not a limitation of the protection scope of the present invention. Obviously, any person skilled in the art can easily think of replacements or changes based on the above embodiments to obtain other embodiments. , these should be covered within the protection scope of the present utility model.

Claims (9)

1. a kind of support meanss of builder's jack, including the multiple floors (1) from top to bottom laid, it is characterised in that it is also Including:
The short I-steel Cantilever Beams (2) of several parallel arrangements on the floor, one end of the short I-steel Cantilever Beams is affixed At floor missing (101) just to frame beam (102) on,
At least two be arranged in same floor long I-steel Cantilever Beams (3), the long I-steel Cantilever Beams (3) are distributed in described Short I-steel Cantilever Beams it is peripheral and in parallel, one end of the canned paragraph of the long I-steel Cantilever Beams with floor missing by The floor (103) on side is affixed, and the other end and frame beam (102) of canned paragraph are affixed, the canned paragraph of the long I-steel Cantilever Beams Length be at least encorbelmenting 1.25 times of segment length,
A piece square steel (4), the square steel is fixed in the encorbelmenting on end of the long and short I-steel Cantilever Beams,
Several suspension ring (5), the suspension ring are relative one by one with the position of the long and short I-steel Cantilever Beams, are fixed in top floor Frame beam bottom, be connected with steel wire rope between the end of encorbelmenting of each suspension ring and corresponding long and short I-steel Cantilever Beams (6),
Several diagonal braces (7), the diagonal brace be fixed in the short I-steel Cantilever Beams encorbelment end and the frame beam of floor below it Between.
2. the support meanss of builder's jack according to claim 1, it is characterised in that:
The length of the canned paragraph of the long I-steel Cantilever Beams is 1700mm, and the length for section of encorbelmenting is 1300mm.
3. the support meanss of builder's jack according to claim 1, it is characterised in that:
Spacing between the short I-steel Cantilever Beams and between short I-steel Cantilever Beams and long I-steel Cantilever Beams is equal.
4. the support meanss of builder's jack according to claim 3, it is characterised in that:
The spacing size is 1800mm.
5. the support meanss of builder's jack according to claim 1, it is characterised in that:
The connecting node (A) of the long I-steel Cantilever Beams (3) and the floor (103) includes two sets being arranged on floor (9) and two double threaded screws (10) through described sleeve pipe are managed, the long I-steel Cantilever Beams (3) are placed on two double threaded screws Between, timber wedge (11), the top surface of the long I-steel Cantilever Beams and the bottom of floor are plugged between its both sides and double threaded screw Pressure is provided with steel plate (12) respectively, and the two ends of the screw rod pass the steel plate and fastened by double nut (13).
6. the support meanss of builder's jack according to claim 1, it is characterised in that:
The connecting node (B) of the long and short I-steel Cantilever Beams and the frame beam (102) includes two one end heeling-ins in frame Screw rod (14) in beam, the long and short I-steel Cantilever Beams are placed between two screw rods, and wood is plugged between its both sides and screw rod Wedge (11), the top surface pressure of the long and short I-steel Cantilever Beams is provided with steel plate (12), and the other end of the screw rod passes the steel plate And fastened by double nut (13).
7. the support meanss of builder's jack according to claim 1, it is characterised in that:
The connecting node (C) of the diagonal brace and the frame beam (102) of floor below includes two one end heeling-ins in frame beam Screw rod (14) and the steel plate (12) being pressed on frame beam, the screw rod are fastened through the steel plate and by double nut (13), described Diagonal brace (7) is welded on steel plate.
8. the support meanss of the builder's jack according to claim 6 or 7, it is characterised in that:
The implantation depth of the screw rod is 150mm.
9. the support meanss of builder's jack according to claim 1, it is characterised in that:
The diagonal brace is made of No. 12.6 channel-section steels.
CN201720191039.5U 2017-03-01 2017-03-01 A kind of support meanss of builder's jack Expired - Fee Related CN206616843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720191039.5U CN206616843U (en) 2017-03-01 2017-03-01 A kind of support meanss of builder's jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720191039.5U CN206616843U (en) 2017-03-01 2017-03-01 A kind of support meanss of builder's jack

Publications (1)

Publication Number Publication Date
CN206616843U true CN206616843U (en) 2017-11-07

Family

ID=60231546

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720191039.5U Expired - Fee Related CN206616843U (en) 2017-03-01 2017-03-01 A kind of support meanss of builder's jack

Country Status (1)

Country Link
CN (1) CN206616843U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836773A (en) * 2017-03-01 2017-06-13 上海建工五建集团有限公司 The support meanss and construction method of a kind of builder's jack
CN118327269A (en) * 2024-04-29 2024-07-12 上海建工七建集团有限公司 A straddle-type double-sided cantilever support frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836773A (en) * 2017-03-01 2017-06-13 上海建工五建集团有限公司 The support meanss and construction method of a kind of builder's jack
CN118327269A (en) * 2024-04-29 2024-07-12 上海建工七建集团有限公司 A straddle-type double-sided cantilever support frame

Similar Documents

Publication Publication Date Title
CN203867216U (en) Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN103452311B (en) A kind of erection method of shaped steel suspended structural support frame
CN205476401U (en) Elevator well type steel protection construction platform
CN111779248A (en) High-support formwork system and its construction method
CN109138431B (en) Super high-rise pump pipe bridge crossing device and construction method thereof
CN107217836A (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN111691300A (en) A concrete placement support device for steel-concrete composite beam
CN204662929U (en) A kind of cross-line walking fence operation device
CN206319597U (en) A kind of cantilever steel girder erecting device
CN208009863U (en) A kind of tool-type pier stud construction operation platform device
CN205224649U (en) Liftable formula composite floor slab support system
CN205875740U (en) Standardized batter brace system of structure of encorbelmenting greatly construction die carrier
CN106836773A (en) The support meanss and construction method of a kind of builder's jack
CN201991226U (en) Flange template support structure
CN108035546A (en) A kind of shear wall formwork for placing fixing device for building
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN203160116U (en) Overturning prevention bridge pier mechanism
CN206616564U (en) A kind of supporting construction for being used to remove internal support of foundation pit beam
CN212247894U (en) A concrete placement support device for steel-concrete composite beam
CN205421023U (en) Public road bridge roof beam strutting arrangement
CN105113542B (en) Underground station construction overhanging system and underground station construction method
CN218714838U (en) Self-lifting heavy-load construction platform
CN206616840U (en) A kind of portable construction operation platform
CN207314793U (en) Operating platform between a kind of regularization precast stair

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171107