CN205557564U - Prestressing force is to adding serial single storehouse drainage type underground pipe gallery - Google Patents

Prestressing force is to adding serial single storehouse drainage type underground pipe gallery Download PDF

Info

Publication number
CN205557564U
CN205557564U CN201620090235.9U CN201620090235U CN205557564U CN 205557564 U CN205557564 U CN 205557564U CN 201620090235 U CN201620090235 U CN 201620090235U CN 205557564 U CN205557564 U CN 205557564U
Authority
CN
China
Prior art keywords
storehouse
prestressing force
piping lane
pipe
lane body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620090235.9U
Other languages
Chinese (zh)
Inventor
张楸长
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620090235.9U priority Critical patent/CN205557564U/en
Application granted granted Critical
Publication of CN205557564U publication Critical patent/CN205557564U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a prestressing force is to adding serial single storehouse drainage type underground pipe gallery, it is provided with two piece at least compartment backup pads in the internal hole in stress tube corridor in advance, is provided with the drain box in the below of the stress tube corridor body in advance, is provided with in the top outside of the stress tube corridor body in advance and reserves the wiring notch, is provided with the connecting box at the tip of the stress tube corridor body in advance. The utility model discloses the corridor of stress tube in advance body opening in set up the compartment backup pad, can the condition of sinking according to the worker of locality, position and the specification that sets up still can be optimized with requiring according to the characteristics of various special pipelines to preferred underground pipe gallery's reasonable section, set up automatic control device in the piping lane, can improve underground pipe gallery's automatic level.

Description

Prestressing force is to adding series single storehouse drainage type underground pipe gallery
Technical field
This utility model relates to a kind of prestressing force to adding series single storehouse drainage type underground pipe gallery.
Background technology
The underground pipe gallery that developed countries is built, it is all single storehouse or 3 storehouses mostly, seldom there is the underground pipe gallery in more than 3 storehouses, development and the raising of urban construction level along with science and technology, metropolitan underground pipe gallery develops towards the aspect of " big cross section, multi-chamber, big system ", and studying prestressing force is the most in good time for this to the underground pipe gallery adding series structure.
The construction in China sponge city is most with water suction at present, water-retention, draining, it is target with water, concave green belt is only paid attention in terms of engineering design, pervious surface, trench digging digs the ground engineering in river, seldom configuration aspects carry out deeper into research, construction for this underground pipe gallery is most based on common dedicated pipeline, the not sustainable draining of deeper research, principles and policies according to our country, and the construction that row's storm sewer and gas pipeline are arranged in underground pipe gallery that relevant department proposes, the single storehouse draining of research and single storehouse arrange the large-sized prestress underground pipe gallery of gas pipeline, it is necessary especially, also it is to have very much scientific value, have and realize meaning.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of prestressing force to adding series single storehouse drainage type underground pipe gallery, can fundamentally solve " bad phenomenon " of " pipeline confusion, slide fastener road, stagnant in stream pollution, city ".Use prestressing force to adding the new technology of series structure, new technique, the target of " raising standard, the cost that reduces, prolongation life-span, value preserving increase income " can be reached.
This utility model adopts the following technical scheme that
A kind of prestressing force is to adding series single storehouse drainage type underground pipe gallery, the outer layer skeleton including prestressing force piping lane body and being arranged in prestressing force piping lane body and nexine skeleton, in described prestressing force piping lane body, hole is provided with at least two pieces of compartment gripper shoes, the lower section of prestressing force piping lane body is provided with discharge casing, top outer at prestressing force piping lane body is provided with reserved wiring recess, and the end of prestressing force piping lane body is provided with connecting box.
Described outer layer skeleton is indulged muscle by outer layer and outer layer ring muscle is constituted, described nexine skeleton is indulged muscle by nexine ring muscle and nexine and is constituted, indulge the both sides of muscle crossing at outer layer ring muscle and outer layer and be provided with the positioning bar of band concave port, hoop correspondence bobbin it is provided with in concave port, it is provided with longitudinal bobbin between hoop correspondence bobbin and nexine skeleton, it is provided with steel strand wires in hoop correspondence bobbin and longitudinal bobbin, it is anchored in external two middle side parts of prestressing force piping lane with anchorage after stretch-draw produces prestressing force, anchorage external anchor plate is fixed, it is provided with adapter in reserved wiring recess, the connection of steel strand wires in hoop correspondence bobbin.
Endoporus at prestressing force piping lane body is vertically installed with block compartment gripper shoe, piping lane hole is divided into the most successively storehouse, the left side, storehouse, left side, piping lane Zhong Cang, row rainwater storehouse and storehouse, the right, in storehouse, the left side and storehouse, the right, bottom is provided with orientation angle, is respectively arranged with rhone in the bottom in piping lane Zhong Cang, row rainwater storehouse, storehouse, left side and storehouse, the right.
Feed pipe, regeneration water pipe, thermal pipe, communication pipe and cable tube it is provided with in storehouse in described piping lane, it is provided with ventilation duct in row rainwater storehouse, in storehouse, left side, it is provided with regeneration water pipe and refuse conveying pipe, in storehouse, the left side, is provided with Gas Pipe, is provided with power pipe in storehouse on the right.
Be provided with discharge casing in the bottom of prestressing force piping lane body, the bottom of prestressing force piping lane body is connected with discharge casing by osculum, and connecting in the bottom of discharge casing has drain pipe, and discharge casing is connected with Gas Pipe, special drain pipe, drain pipe and regulation boiled water room.
The end of prestressing force piping lane body is provided with connecting box, and being connected by passage in the both sides of connecting box has function room, special self-control room, Surveillance center, ventilating house, underground parking and ecommerce supermarket.
Be provided with row's rain pipe in the both sides of prestressing force piping lane body, row's rain pipe is connected with row's rainwater storehouse by lower row's raintank and discharge casing, and row rainwater storehouse is connected with water flowing room, water storehouse and purification sump by drain pipe.
Good effect of the present utility model is as follows:
This utility model uses the prestressing force new model to adding series structure, belong to mechanics innovation, two avris at prestressing force piping lane body arrange anchor plate, on, the steel strand wires of lower correspondence carry out again opposing stretch-draw after relatively intersecting in anchor plate, anchor with anchorage after prestressing force to be formed, present at prestressing force piping lane body, shape flat under the shape of lower correspondence or epirelief can increase compressive resistance at double, big cross section can be solved, especially big " technical barrier " of multi-chamber underground pipe gallery, not only can improve the construction standard of piping lane, and can also significantly reduce the construction standard of underground pipe gallery.
This utility model uses the structural models of single storehouse row's rainwater, the ability of the row's of adding rainwater, can reach a-hundred-year standard according to effective drain discharge in urban area optimization row rainwater storehouse.This utility model arranges discharge casing at the lower bottom part of prestressing force piping lane body, the rainwater of initial strip silt can be discharged to drain sump, clean rainwater after precipitation can be transferred to recycled water pipe and supplement municipal water use, the silt water of drain sump precipitation can pressurize and be discharged to sewage pipe, can reach the target of " shunting of removing contamination, comprehensive utilization ".This utility model arranges ventilation duct in row rainwater storehouse, the gas in row rainwater storehouse can be delivered to common public place by conversion, economize on electricity, the target of joint money can be reached, it is respectively provided with ventilation duct substantial amounts of gas resource to be carried out utilizing too reach environmental protection, energy-conservation, the target of increasing both production and income in storehouse, the left side and storehouse, the right, construction underground parking, both sides, ecommerce supermarket at prestressing force piping lane body, can reasonably develop the underground space, the advantage of underground pipe gallery can be utilized, build up the demonstration project of wisdom.
Accompanying drawing explanation
Accompanying drawing 1 is this utility model agent structure schematic diagram;
Accompanying drawing 2 is this utility model section structure schematic diagram;
Accompanying drawing 3 is this utility model planar structure schematic diagram;
Accompanying drawing 4 is this utility model side elevation structural representation;
Accompanying drawing 5 is this utility model function room structural representation;
Accompanying drawing 6 is this utility model ventilating house structural representation;
Accompanying drawing 7 is this utility model water flowing room structural representation;
Accompanying drawing 8 is this utility model special self-control room structural representation.
nullIn fig. 1: 1 prestressing force piping lane body、2 outer layer skeletons、3 nexine skeletons、4 outer layer ring muscle、5 outer layers indulge muscle、6 positioning bars、7 hoop correspondence bobbins、8 longitudinal bobbins、9 nexine ring muscle、10 nexines indulge muscle、11 steel strand wires、12 anchor plates、13 strut angles、14 orientation angles、15 reserve wiring recess、16 compartment gripper shoes、Storehouse in 17 piping lanes、18 rhones、19 row's rainwater storehouses、Storehouse on the left of in the of 20、21 storehouse, the left sides、Storehouse on the right of in the of 22、23 bed courses、24 anchorages、25 adapters、26 osculums、27 discharge casings、28 drain pipies、29 feed pipes、30 bracing frames、31 regeneration water pipes、32 thermal pipes、33 Gas Pipe、34 power pipes、35 sewage pipes、36 refuse conveying pipes、37 communication pipes、38 cable tubes、39 ventilation ducts、40 dilatation seams、41 connecting boxs、42 passages、43 function rooms、44 special self-control rooms、45 Surveillance center、46 ventilating houses、47 rainwater imports、48 row's rain pipes、49 times row's raintank、50 water flowing rooms、51 water storehouses、52 purify sump、53 repair and maintenance centers、54 special drain pipies、55 regulation boiled water rooms、56 drain sumps、57 underground parkings、58 ecommerce supermarkets、59 rubber fastening bands、60 road surface, cities、61 greenery patches planes.
Detailed description of the invention
nullAs shown in Figure 1,This utility model includes concrete pre-stress piping lane body 1 and the outer layer skeleton 2 being arranged in prestressing force piping lane body 1 and nexine skeleton 3,Outer layer skeleton 2 is indulged muscle 5 by outer layer ring muscle 4 and outer layer and is constituted,Indulge, at outer layer ring muscle 4 and outer layer, the both sides that muscle 5 carries out intersecting and be provided with the positioning bar 6 of the band band concave port in equal distribution,Hoop correspondence bobbin 7 it is provided with in concave port,Two outer middle side parts at prestressing force piping lane body 1 are respectively arranged with anchor plate 12,In two bottom sides, strut angle 13 is set,The outside, upper top of prestressing force piping lane body 1 is provided with reserved wiring recess 15,It is provided with 4 pieces of compartment gripper shoes 16 in prestressing force piping lane body 1 hole,Piping lane hole is divided into storehouse, the left side 21 the most successively、Storehouse 20, left side、Storehouse 17 in piping lane、Row rainwater storehouse 19 and storehouse, the right 22,,The bottom in storehouse, the left side 21 and storehouse, the right 22 is provided with orientation angle 14,The bottom of prestressing force piping lane body 1 is provided with bed course 23,Described prestressing force piping lane body is set to oblateness,May also set up and become oval or special-shaped.
nullAs shown in Figure 2,This utility model concrete pre-stress piping lane body 1 and the anchor plate 12 being arranged on the sidepiece setting of prestressing force piping lane body 1 both sides,It is provided with in anchor plate 12 and carries out, through stretch-draw anchorage 24, the steel strand wires 11 that anchor,Steel strand wires 11 intersect in anchor plate 12 relatively,Prestressing force is formed after carrying out opposing stretch-draw,Sealing off and covering anchorage is carried out with concrete fill after up to standard,The outside, upper top of described prestressing force piping lane body 1 is provided with reserved wiring recess 15,It is provided with adapter 25 in reserved wiring recess 15,The bottom of the prestressing force piping lane body 1 told is provided with discharge casing 27,The bottom of prestressing force piping lane body 1 is connected with discharge casing 27 by osculum 26,Connect in the bottom of discharge casing 27 and have drain pipe 28,Feed pipe 29 it is provided with in storehouse 17 in piping lane、Regeneration water pipe 31、Thermal pipe 32、Communication pipe 37 and cable tube 38,Storehouse 17 in piping lane、Row rainwater storehouse 19、Storehouse 20, left side、The inwall in storehouse, the left side 21 and storehouse, the right 22 is provided with bracing frame 30,Blow-off pipe 35 and refuse conveying pipe 36 it is provided with in storehouse, left side 20,It is provided with ventilation duct 39 in row rainwater storehouse 19,Gas Pipe 33 it is provided with in storehouse, the left side 21,It is provided with power pipe 34 on the right in storehouse 22,In piping lane, on the left of storehouse 17, on the right side of storehouse 20, storehouse 19 is respectively arranged with rhone 18,Longitudinal bobbin 8 and steel strand wires 11 are set in the compartment gripper shoe 16 told.
nullAs shown in Figure 3,This utility model is provided with connecting box 41 in the end of described prestressing force piping lane body,Dilatation seam 40 is set between prestressing force piping lane body 1 and connecting box 41,Dilatation seam 40 may also be arranged on the junction of adjacent prestressing force piping lane body 1,The function room 43 that passage 42 communicates therewith it is provided with respectively in the both sides of connecting box 41、Special self-control room 44、Surveillance center 45 and ventilating house 46,Upper lateral part at prestressing force piping lane body 1 is provided with row's rain pipe 48、Rainwater import 47 and lower row's raintank 49,The middle and lower part of prestressing force piping lane body 1 is provided with water flowing room 50、Water storehouse 51、Purify sump 52、Underground parking 57 and ecommerce supermarket 58,Described sewage pipe 35 connects with community,Described special drain pipe 54 connects with drainage arrangement,Described drain pipe 28 and regulation boiled water room 55、Drain sump 56 connects,Described drain sump 56 connects with sewage pipe 35.
As shown in Figure 4, it is provided with rubber fastening band 59 in described dilatation seam 40, it is provided with the anchorage 24 for anchoring steel strand wires in described dilatation seam 40, described lower row's raintank 49 is connected with discharge casing 27, described drain pipe 28 is provided with drop, has from row, the function of self-cleaning.
As shown in Figure 5, described function room 43 is arranged on top or the bottom of greenery patches plane 61, is connected with connecting box 41 by passage 42, and the described inlet for stom water 47 that enters is arranged on the avris portion on road surface, city 60, described row's rain pipe 48 is by lower row's raintank 49, and discharge casing 27 enters row rainwater storehouse 19.
As shown in Figure 6, it is provided with into air exhausting device in described ventilating house 46, connected with ventilation duct 39 by passage 42, utilize advantage cool in summer and warm in winter, the gas in prestressing force piping lane body 1 can be delivered to underground parking 57, ecommerce supermarket 58 and other common public place by conversion equipment.
As shown in Figure 7, in described water flowing room 50, it is provided with rainwater circulating device, the rainwater of water storehouse 51 is discharged to purify after precipitation sump 52, be discharged to after treatment regenerate water pipe 31, purify for gardens, wash away street and Special punching car supermarket.
As shown in Figure 8, described special self-control room 44 is arranged on the sidepiece of prestressing force piping lane body 1, the feed pipe 31, regeneration water pipe 31, thermal pipe 32, Gas Pipe 33 and the power pipe 34 that arrange in prestressing force piping lane body are docked and connected by special self-control room 44 and community-specific pipeline, and described passage 42 can carry out longitudinally connected.
This utility model arranges orientation angle in described storehouse, the left side and storehouse, the right, in orientation angle, reserved pore falls within structure innovation, also can act on ventilation duct also can be as special extinguishing pipe, the outside setting that the be evenly distributed reserved wiring recess being connected with hoop bobbin, beneficially steel strand wires are set in upper top and construction at prestressing force piping lane body.
This utility model arranges compartment gripper shoe in described prestressing force piping lane body opening, condition can be sunk according to local work, the preferably rational cross section of underground pipe gallery, also can be according to the feature of various dedicated pipelines and the orientation and the specification that require optimal design-aside, automaton is set in piping lane, the automatization level of underground pipe gallery can be improved, this utility model has carried out " structure innovation " and function innovation and " system innovation " solves big city and set up " technical barrier " of Large Underground piping lane in newly built city district, facilitation will necessarily be played in extension process from now on, as wanted to be used for demonstration project, also can play the positive role fanned out from point to area, Large Underground piping lane can be brought up to a new height.

Claims (7)

1. a prestressing force is to adding series single storehouse drainage type underground pipe gallery, it is characterised by altogether: include prestressing force piping lane body (1) and the outer layer skeleton (2) being arranged in prestressing force piping lane body (1) and nexine skeleton (3), described prestressing force piping lane body (1) endoporus is provided with at least two pieces of compartment gripper shoes (16), the lower section of prestressing force piping lane body (1) is provided with discharge casing (27), top outer at prestressing force piping lane body (1) is provided with reserved wiring recess (15), and the end of prestressing force piping lane body (1) is provided with connecting box (41).
nullPrestressing force the most according to claim 1 is to adding series single storehouse drainage type underground pipe gallery,It is characterized in that: described outer layer skeleton (2) is indulged muscle (5) by outer layer and outer layer ring muscle (4) is constituted,Described nexine skeleton (3) is indulged muscle (10) by nexine ring muscle (9) and nexine and is constituted,Indulge the both sides of muscle (5) crossing at outer layer ring muscle (4) and outer layer and be provided with the positioning bar (6) of band concave port,Hoop correspondence bobbin (7) it is provided with in concave port,Longitudinal bobbin (8) it is provided with between hoop correspondence bobbin (7) and nexine skeleton (3),It is provided with steel strand wires (11) in hoop correspondence bobbin (7) and longitudinal bobbin (8),It is anchored in prestressing force piping lane body (1) two middle side part outward with anchorage (24) after stretch-draw produces prestressing force,Anchorage (24) external anchor plate (12) is fixed,It is provided with adapter in reserved wiring recess (15),The connection of steel strand wires in hoop correspondence bobbin (7).
Prestressing force the most according to claim 1 and 2 is to adding series single storehouse drainage type underground pipe gallery, it is characterized in that: the endoporus at prestressing force piping lane body (1) is vertically installed with 4 pieces of compartment gripper shoes (16), piping lane hole is divided into the most successively storehouse, the left side (21), storehouse, left side (20), storehouse (17) in piping lane, row rainwater storehouse (19) and storehouse, the right (22), in storehouse, the left side (21) and storehouse, the right (22), bottom is provided with orientation angle (14), storehouse (17) in piping lane, row rainwater storehouse (19), the bottom in storehouse, left side (20) and storehouse, the right (22) is respectively arranged with rhone (18).
Prestressing force the most according to claim 3 is to adding series single storehouse drainage type underground pipe gallery, it is characterized in that: in described piping lane, in storehouse (17), be provided with feed pipe (29), regeneration water pipe (31), thermal pipe (32), communication pipe (37) and cable tube (38), it is provided with ventilation duct (39) in row rainwater storehouse (19), regeneration water pipe (31) and refuse conveying pipe (36) it is provided with in storehouse, left side (20), in storehouse, the left side (21), it is provided with Gas Pipe (33), is provided with power pipe (34) in storehouse (22) on the right.
Prestressing force the most according to claim 3 is to adding series single storehouse drainage type underground pipe gallery, it is characterized in that: the bottom of prestressing force piping lane body (1) is provided with discharge casing (27), the bottom of prestressing force piping lane body (1) is connected with discharge casing (27) by osculum (26), connecting in the bottom of discharge casing (27) and have drain pipe (28), discharge casing (27) is connected with Gas Pipe (33), special drain pipe (54), drain pipe (28) and regulation boiled water room (55).
Prestressing force the most according to claim 3 is to adding series single storehouse drainage type underground pipe gallery, it is characterised in that: connected by passage (42) in the both sides of connecting box (41) and have function room (43), special self-control room (44), Surveillance center (45), ventilating house (46), underground parking (57) and ecommerce supermarket (58).
Prestressing force the most according to claim 3 is to adding series single storehouse drainage type underground pipe gallery, it is characterized in that: be provided with row's rain pipe (48) in the both sides of prestressing force piping lane body (1), row's rain pipe (48) is connected with row rainwater storehouse (19) by lower row's raintank (49) and discharge casing (27), and row rainwater storehouse (19) is connected with water flowing room (50), water storehouse (51) and purification sump (52) by drain pipe (28).
CN201620090235.9U 2016-01-29 2016-01-29 Prestressing force is to adding serial single storehouse drainage type underground pipe gallery Expired - Fee Related CN205557564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620090235.9U CN205557564U (en) 2016-01-29 2016-01-29 Prestressing force is to adding serial single storehouse drainage type underground pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620090235.9U CN205557564U (en) 2016-01-29 2016-01-29 Prestressing force is to adding serial single storehouse drainage type underground pipe gallery

Publications (1)

Publication Number Publication Date
CN205557564U true CN205557564U (en) 2016-09-07

Family

ID=56820392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620090235.9U Expired - Fee Related CN205557564U (en) 2016-01-29 2016-01-29 Prestressing force is to adding serial single storehouse drainage type underground pipe gallery

Country Status (1)

Country Link
CN (1) CN205557564U (en)

Similar Documents

Publication Publication Date Title
CN102995660B (en) Multifunctional arched combined prestress underground pipe gallery for cisty and preparation process thereof
CN203256772U (en) Multifunctional arched combination pre-stress urban underground pipe gallery
CN205296229U (en) Sewer manhole in utility tunnel
CN203007978U (en) Multifunctional net-shaped combined prestressed underground pipe gallery
CN202324155U (en) Adjustable corrugated prestress anti-pollution drainage culvert
CN205557564U (en) Prestressing force is to adding serial single storehouse drainage type underground pipe gallery
CN205557561U (en) Formula underground pipe gallery is chooseed for use to adding serial many storehouses to prestressing force
CN205557579U (en) Well controllable formula underground pipe gallery in storehouse is assembled to adding to prestressing force
CN205557574U (en) Underground pipe gallery with adjustable prestressing force divides to add assembles well storehouse
CN205742466U (en) Prestressing force is to adding series rain dirt shunting underground pipe gallery
CN205557563U (en) Prestressing force list adds series pipe storehouse and share formula underground pipe gallery
CN109356224A (en) A kind of skyscraper rainwater-collecting self-loopa utilizes system
CN206418520U (en) A kind of comprehensive pipe gallery structure for accessing storm sewer
CN202252422U (en) Multifunctional pre-stress underground draining integrated pipeline of city
CN205557570U (en) Prestressing force divides and adds series pipe storehouse formula underground pipe gallery side by side
CN206396789U (en) A kind of comprehensive pipe gallery structure for being easy to sewage collecting to discharge
CN205557571U (en) Prestressing force divides and adds series side storehouse drainage type underground pipe gallery
CN204080859U (en) High-strength resistance to compression centripetal-stress Urban Underground pipe gallery
CN204491663U (en) Prestressed structure function formula underground pipe gallery combined system
CN210288915U (en) Drainage riser structure suitable for upper cover development
CN203795512U (en) Rainwater recycling device
CN205557580U (en) Well storehouse cellular -type underground pipe gallery is assembled to adding to prestressing force
CN102979136B (en) Non-energy consumption centralized utilization system of high-rise building waste water
CN204401651U (en) Abnormity resistance to compression longitudinal prestressing pin-connected panel underground pipe gallery
CN205557569U (en) Prestressing force divides and adds special formula underground pipe gallery in serial limit storehouse

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20200129