CN204491663U - Prestressed structure function formula underground pipe gallery combined system - Google Patents
Prestressed structure function formula underground pipe gallery combined system Download PDFInfo
- Publication number
- CN204491663U CN204491663U CN201520075007.XU CN201520075007U CN204491663U CN 204491663 U CN204491663 U CN 204491663U CN 201520075007 U CN201520075007 U CN 201520075007U CN 204491663 U CN204491663 U CN 204491663U
- Authority
- CN
- China
- Prior art keywords
- pipe
- main body
- piping lane
- lane main
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model relates to a kind of prestressed structure function formula underground pipe gallery combined system, it comprises concrete pipe gallery main body, row's rainwater system, blowdown system, water supplying system, combustion gas system, ventilation system and ergasia, " Mechanical Builds is unique for the utility model, function combination is complete, interconnect rationally, system support is excellent " prestressed structure function formula underground pipe gallery combined system, adopt corresponding prestressed structure new paragon, quality specifications can be improved and reduce construction costs, adopt water suction, retaining, supply water, by the new model of water, draining can be set up, with the new system of water, adopt the new layout of " interconnection and interflow ", underground pipe gallery can be built up real " a underground system engineering ".
Description
Technical field
The utility model relates to a kind of prestressed structure function formula underground pipe gallery combined system.
Background technology
Along with China's sustain economic, stable development, as the underground pipeline construction of city Foundation Design important component part, the importance on maintenance urban sustainable development highlights day by day." supporting the notice of underground pipe gallery pilot work about carrying out state revenue " that the Ministry of Finance issues explicitly points out: will give special fund subsidy to underground pipe gallery experimental city, underground pipe gallery should be built in key area, city in experimental city, promotes that the underground space is to intensive, intelligent, systematization aspect development.Show thus: Urban Underground pipe gallery, become 21 century urban infrastructure Renovation and reconstruction and urban modernization build inexorable trend.
External big and medium-sized cities, in Foundation Design is built, generally adopt underground pipe gallery, and have also carried out corresponding construction to Wastewater Treatment Plant, regeneration water factory and some other urban disasters prevention facilities.Abroad, the key project that underground pipe gallery is the comprehensive utilization underground space is laid.Some developed country has established sustainable water supply, drainage system, also establish rainwater regeneration system simultaneously, and sewerage treatment system, the conventional process techniques that great majority adopt in engineering structures, functionally also do not form real system engineering, also underground pipe gallery is not formed an industry.
Along with the development of urban construction, its construction level of China's Foundation Design is also in continuous improve.The Foundation Design standard of construction of a country wants catch up with its construction level of new urbanization and improve the paces of workmanship, just must proceed from reality, according to the relevant principle and policy of country to Foundation Design Facilities Construction aspect, carry out " system research ", adhere to " structure innovation " and " function innovation ", just can be conducive to the perfect of the various system in underground, just can create " the underground system engineering " that be really suitable for novel Urbanization Construction.
Utility model content
The technical problems to be solved in the utility model is to provide the prestressed structure function formula underground pipe gallery combined system of one " Mechanical Builds is unique, function combination is complete, it is reasonable to interconnect, system support is excellent ", adopt corresponding prestressed structure new paragon, quality specifications can be improved and reduce construction costs, adopt the new model of water suction, retaining, water supply, use water, draining can be set up, use the new system of water, adopt the new layout of " interconnection and interflow ", underground pipe gallery can be built up real " a underground system engineering ".
The utility model adopts following technical scheme:
A kind of prestressed structure function formula underground pipe gallery combined system, it comprises concrete pipe gallery main body, row's rainwater system, blowdown system, water supplying system, combustion gas system, ventilation system and ergasia;
Corresponding shape bobbin has been arranged circumferentially along piping lane main body in the cage of reinforcement of described piping lane main body, longitudinal bobbin is vertically arranged with along piping lane main body, be provided with in corresponding shape bobbin and longitudinal bobbin and produce the fixing steel strand of prestressing force ground tackle through stretch-draw, piping lane main body is provided with as required several function connecting boxs, be connected by docking port between its with piping lane main body, piping lane main body is outside equipped with external suction water pipe, is provided with regeneration water pipe and feed pipe in piping lane main body;
Described row's rainwater system comprise rainwater import, with row's rain pipe of described rainwater inlet communication, row's rainwater pipe trench of being communicated with described row's rain pipe;
Described blowdown system comprises sewage pipe and device dredged in the tune be arranged on sewage pipe, and described tune is dredged device and is connected with row's rainwater pipe trench, or is connected with row's rain pipe by rainwater part flow arrangement;
Described water supplying system comprises water storing bin and supplies boiled water room, water-purifying apparatus and water supply installation, water storing bin is communicated with the regeneration water pipe in piping lane main body or feed pipe with water supply installation by water-purifying apparatus, and water storing bin bottom is dredged device by row's rainwater pipe trench with the tune on sewage pipe and is connected;
Described ventilation system comprises the ventilation ground mouth and by the connected ventilation installation of air chimney rest on the ground, and described ventilation ground mouth is communicated with the function connecting box in described piping lane main body;
Described combustion gas system comprises the combustion gas pipe trench be connected with function connecting box and the Gas Pipe be communicated with described combustion gas pipe trench;
Described ergasia comprises and being connected and the function room be communicated with described air chimney with function connecting box.
The cage of reinforcement be made up of supporting arch muscle and vertical muscle and dowel is provided with in described piping lane main body, corresponding shape bobbin and longitudinal bobbin is provided with in cage of reinforcement, be provided with in corresponding shape bobbin and produce the prestressing force ground tackle steel strand fixing in the bottom of piping lane main body through stretch-draw, steel strand in corresponding shape bobbin and longitudinal bobbin arrange more than one, longitudinal bobbin is arranged on four bights of piping lane main body or top and bottom, the interface of piping lane main body and longitudinal bobbin corresponding position are provided with interface shrinkage pool, the endoporus periphery of interface is provided with interface groove, water-swellable cushion rubber is provided with in interface groove, cement filler is provided with in interface shrinkage pool, the bottom of piping lane main body is provided with backing positioning beam, the sidepiece of backing positioning beam is provided with location backing plate, the profile of described piping lane main body is set to arch in foreign side, the upper and lower convex of foreign side, the lower convex of foreign side's arch, flat shape under upper circular arch, the lower flat shape of upside arch, the upper flat shape of side arch, and it is circular, oval or semicircle.
Described function connecting box is set to triangular in shape, tetragonal, pentagon or hexagon according to the plane distribution situation at crossing, longitudinal both ends of function connecting box are provided with docking port, docking port is connected with piping lane main body, between piping lane main body and docking port, be provided with dilatation seam, in dilatation seam, be provided with the rubber fastening band be connected with piping lane main body, docking port.
Described combustion gas pipe trench is set to prestressed structure, connected by function connecting box, the specification of standard determination combustion gas pipe trench is taken according to position population, be communicated with combustion gas pipe trench and be provided with upper and lower metal composite Gas Pipe that be connected, that be with self-con-tained unit, Gas Pipe is set to H-shaped or T-shaped burning line by piping lane main body, the ground mouth that ventilates is provided with on the top of combustion gas pipe trench, the ground mouth that ventilates is connected with piping lane main body, ventilating house by interface channel, and Gas Pipe ditch is connected with piping lane main body, air chimney by interface channel.
The left side of piping lane main body or right side are provided with together or row's rainwater pipe trench above together, row's rainwater pipe trench is set to prestressed structure, connected by function connecting box, the sidepiece of row's rainwater pipe trench is provided with row's rain pipe, the top of row's rain pipe is provided with rainwater import, row rain pipe top be that impartial mode distributes, row's rain pipe is connected with row's rainwater pipe trench by function connecting box, row's rain pipe ditch is connected with water storing bin by function connecting box, described water storing bin is connected with air chimney, and the main pipeline of air chimney is arranged in piping lane main body.
Be arranged on being communicated with water storing bin with leading the described external suction water pipe oozing function of piping lane main body two sides, interface channel is connected with water storing bin.
Described function system also comprise be connected with function room supervision center, repair and maintenance center, the Room, people's air defense underground, underground garage and rescue centre.
The side of piping lane main body inner wall and bottom surface are provided with the embedded iron in subsection setup, embedded iron is connected with bracing frame, bracing frame is respectively arranged with regeneration water pipe, feed pipe, power pipe, thermal pipe, cable tube, communication pipe, light controlling device, and described regeneration water pipe, feed pipe, power pipe, thermal pipe, cable tube, communication pipe interface channel are communicated with branch line piping lane body and the outer dedicated pipeline of system.
Good effect of the present utility model is as follows:
The utility model is adopted new technology, new technology and new material, corresponding shape bobbin is set in square structure body, belong to " structure innovation " and " function innovation ", in corresponding shape bobbin, steel strand are set, in the upper convex portion or lower protuberance of piping lane main body, confront crosswise and opposing stretch-draw is carried out with ground tackle, belong to special warfare technology, fundamentally can solve square structure and can not add periphery prestressed " especially big technical barrier ", the compressive resistance of square structure body can be improved several times or tens times, the build guality of square concrete structure can be brought up to a new height, the engineering cost of 20%-30% can also be reduced simultaneously, can be that country saves number construction fund huge especially, immeasurable constructional materials can also be saved.
The new model that the utility model adopts longitudinal prestressing to connect, the tube coupling of interior high 1.5-10 rice, wide 1.6-11 rice, long 1.5-10 rice can be connected the piping lane section of growth 30-300 rice, according to the plane figure of community, according to orientation and the branch line connector occupy-place angle in street, function connecting box is set, extend continuously with function connecting box, the piping lane road of grow up several kilometers or tens kilometers can be connected, as docked respectively with branch line piping lane, can be connected to become that stability is strong, the underground pipe gallery net of large area that the life-span is long, large regions.
The utility model is on a left side for piping lane main body, the right side row of setting rainwater pipe trench, the specification of rainwater pipe trench is arranged according to community's catchment area and the optimization of rainwater maximum inventory, size, and press the drop of 3/1000ths, segment design enters the gradient of water storing bin, reach " gravity flow, self-cleaning, from clear " target, at the sidepiece of water storing bin, water-purifying apparatus is set, water storing bin through precipitation upper water through purification after, feed pipe and the regeneration water pipe of piping lane main body is delivered to water supply installation, the lower layer of water water supply installation of the band silt after water storing bin precipitation by delivering to sewage pipe for boiled water room, arrange to adjust at the middle section of sewage pipe and dredge device, what control the water timing of water storing bin band silt or not timing washes away sewage pipe, reach that " self-insurance is unimpeded, never plugging " target, the relevant water suction of building sponge city can be reached, retaining, water purification, release the requirement of water, the high-grade level of the regeneration of rainwater resource can also be reached.
The utility model is provided with combustion gas pipe trench at the sidepiece of piping lane main body, meet relevant technical specification, the ground mouth that ventilates is set on the top of combustion gas pipe trench, belong to " structure innovation ", adopt the mode of " interconnection and interflow ", supporting underground pipe gallery and pipe trench are coupled together, in substance form a huge especially underground space, sufficient gas can be had to circulate, the using underground space winter warms up, the advantage of Xia Liang, underground gas resource ventilation installation can be converted to warm braw and cold air, deliver to underground or the Room, people's air defense underground on the ground, rescue centre, Trade City, the places such as food and beverage department, so not only electricity consumption can be saved, all right pollution abatement, can reach and " exploit natural resources, energy-saving and emission-reduction " target.
At the middle part of piping lane main body side and bottom, external suction water pipe is set, meet " General Office of the State Council is about the notice carrying out urban sewerage and drainage prevention waterlogging Facilities Construction work " (Office of the State Council is sent out [2013] No. 23) requirement, be arranged on layer of sand below sidewalk and recessed greenery patches and cobble bed course when raining continuously, will inevitably down permeate to mix with surface water for together with form mixing ponding, the natural ponding that a large amount of mixing is accumulated formed saturated after, the road bed of tactile piping lane main body and trunk line will inevitably be invaded, also has other supporting pipe trench, in the course of time also the engineering life-span can be affected, under the effect of suction water pipe in vitro, not only mixing ponding is become reproducible water resource, and piping lane main body and main line road surface and other conveyance system can also be protected.
In sum: important invention is that piping lane main body and ancillary facility have been carried out " structure innovation " and " function innovation ", and based on piping lane main body and core, adopt the new model of " interconnection and interflow ", be communicated with other ancillary facility, formed one " reliable in quality, multiple functional, stable, inexpensive ", can " combined system " of " symbiotic fungi, send out advantage altogether, subtract cost altogether, increase benefit altogether ".
Accompanying drawing explanation
Accompanying drawing 1 is the utility model underground pipe gallery combined system structural representation;
Accompanying drawing 2 is the utility model underground pipe gallery combined system section structure schematic diagram;
Accompanying drawing 3 is the utility model piping lane main body section corresponding shape bobbin structure schematic diagram;
Accompanying drawing 4 is the utility model piping lane main body connection diagram;
Accompanying drawing 5 is the utility model piping lane main body and function connecting box connection side facade structures schematic diagram;
Accompanying drawing 6 is the utility model utility function connecting box, function room combination schematic diagram;
Accompanying drawing 7 is the utility model water storing bin connection plane structure schematic diagram;
Accompanying drawing 8 is the utility model utility function connecting box, combines schematic diagram for boiled water room;
Accompanying drawing 9 is the utility model utility function connecting box, ventilating house combination schematic diagram;
Accompanying drawing 10 is the utility model piping lane main body arrangement of bores schematic diagram.
In the accompanying drawings: 1, piping lane main body 2, function connecting box 3, docking port 4, dilatation seam 5, cage of reinforcement 6, corresponding shape bobbin 7, longitudinal bobbin 8, steel strand 9, ground tackle 10, rainwater import 11, row's rain pipe 12, row's rainwater pipe trench 13, combustion gas pipe trench 14, Gas Pipe 15, interface channel 16, function room 17, repair and maintenance center 18, supervision center 19, water storing bin 20, water-purifying apparatus 21, for boiled water room 22, water supply installation 23, sewage pipe 24, adjust and dredge device 25, ventilating house 26, ventilate ground mouth 27, air chimney 28, ventilation installation 29, driving passage 30, the Room, people's air defense underground 31, rescue centre 32, underground garage 33, rubber fastening band 34, sidewalk ground 35, trunk line road surface 36, drain hole 37, external suction water pipe 38, interface groove 39, interface shrinkage pool 40, water-swellable cushion rubber 41, cement filler 42, location backing plate 43, backing positioning beam 44, embedded iron 45, bracing frame 46, regeneration water pipe 47, feed pipe 48, power pipe 49, thermal pipe 50, cable tube 51, communication pipe 52, light controlling device.
Detailed description of the invention
As Figure 1-10 shows, the utility model comprises concrete pipe gallery main body 1, row's rainwater system, blowdown system, water supplying system, combustion gas system, ventilation system and ergasia;
Corresponding shape bobbin 6 has been arranged circumferentially along piping lane main body 1 in the cage of reinforcement 5 of described piping lane main body 1, longitudinal bobbin 7 is vertically arranged with along piping lane main body 1, be provided with in corresponding shape bobbin 6 and longitudinal bobbin 7 and produce the fixing steel strand 8 of prestressing force ground tackle 9 through stretch-draw, piping lane main body 1 is provided with as required several function connecting boxs 2, be connected by docking port 3 between its with piping lane main body 1, piping lane main body 1 is outside equipped with external suction water pipe 37, is provided with regeneration water pipe 46 and feed pipe 47 in piping lane main body 1;
Described row's rainwater system comprises rainwater import 10, the row's rain pipe 11 be communicated with described rainwater import 10, row's rainwater pipe trench 12 of being communicated with described row's rain pipe 11;
Described blowdown system comprises sewage pipe 23 and device 24 dredged in the tune be arranged on sewage pipe 23, and described tune is dredged device 24 and is connected with row's rainwater pipe trench 12, or is connected with row's rain pipe 11 by rainwater part flow arrangement;
Described water supplying system comprises water storing bin 19 and supplies boiled water room 21, water-purifying apparatus 20 and water supply installation 22, water storing bin 19 is communicated with the regeneration water pipe 46 in piping lane main body 1 or feed pipe 47 with water supply installation 22 by water-purifying apparatus 20, and water storing bin 19 bottom is dredged device 24 by row's rainwater pipe trench 12 with the tune on sewage pipe 23 and is connected;
Described ventilation system comprises the ventilation ground mouth 26 and by the connected ventilation installation 28 of air chimney 27 rest on the ground, described ventilations mouth 26 be communicated with the function connecting box 2 in described piping lane main body 1;
Described combustion gas system comprises the combustion gas pipe trench 13 be connected with function connecting box 2 and the Gas Pipe 14 be communicated with described combustion gas pipe trench 13;
Described ergasia comprises and being connected and the function room 16 be communicated with described air chimney 27 with function connecting box 2.
The cage of reinforcement 5 be made up of supporting arch muscle and vertical muscle and dowel is provided with in described piping lane main body 1, corresponding shape bobbin 6 and longitudinal bobbin 7 is provided with in cage of reinforcement 5, be provided with in corresponding shape bobbin 6 and produce prestressing force ground tackle 9 steel strand 8 fixing in the bottom of piping lane main body 1 through stretch-draw, steel strand 8 in corresponding shape bobbin 6 and longitudinal bobbin 7 arrange more than one, longitudinal bobbin 7 is arranged on four bights of piping lane main body 1 or top and bottom, the interface of piping lane main body 1 and longitudinal bobbin 7 corresponding position are provided with interface shrinkage pool 39, the endoporus periphery of interface is provided with interface groove 38, water-swellable cushion rubber 40 is provided with in interface groove 38, cement filler 41 is provided with in interface shrinkage pool 39, the bottom of piping lane main body 1 is provided with backing positioning beam 43, the sidepiece of backing positioning beam 43 is provided with location backing plate 42, the profile of described piping lane main body 1 is set to arch in foreign side, the upper and lower convex of foreign side, the lower convex of foreign side's arch, flat shape under upper circular arch, the lower flat shape of upside arch, the upper flat shape of side arch, and it is circular, oval or semicircle.
Described function connecting box 2 is set to triangular in shape, tetragonal, pentagon or hexagon according to the plane distribution situation at crossing, longitudinal both ends of function connecting box 2 are provided with docking port 3, docking port 3 is connected with piping lane main body 1, between piping lane main body 1 and docking port 3, be provided with dilatation seam 4, in dilatation seam 4, be provided with the rubber fastening band 33 be connected with piping lane main body 1, docking port 3.
Described combustion gas pipe trench 13 is set to prestressed structure, connected by function connecting box 2, the specification of standard determination combustion gas pipe trench 13 is taken according to position population, be communicated with combustion gas pipe trench 13 and be provided with, under to be connected, with the metal composite Gas Pipe 14 of self-con-tained unit, Gas Pipe 14 is set to H-shaped or T-shaped burning line by piping lane main body 1, the ground mouth 26 that ventilates is provided with on the top of combustion gas pipe trench 13, ventilate ground mouth 26 by interface channel 15 and piping lane main body 1, ventilating house 25 is connected, combustion gas pipe trench 13 is by interface channel 15 and piping lane main body 1, air chimney 27 is connected.
The left side of piping lane main body 1 or right side are provided with together or row's rainwater pipe trench 12 above together, row's rainwater pipe trench 12 is set to prestressed structure, connected by function connecting box 2, the sidepiece of row's rainwater pipe trench 12 is provided with row's rain pipe 11, the top of row's rain pipe 11 is provided with rainwater import 10, row rain pipe 11 top be that impartial mode distributes, row's rain pipe 11 is connected with row's rainwater pipe trench 12 by function connecting box 2, row's rainwater pipe trench 12 is connected with water storing bin 19 by function connecting box 2, described water storing bin 19 is connected with air chimney 27, the main pipeline of air chimney 27 is arranged in piping lane main body 1.
Be arranged on being communicated with water storing bin 19 with leading the described external suction water pipe 37 oozing function of piping lane main body 1 two sides, interface channel 15 is connected with water storing bin 19.
Described function system also comprise be connected with function room 18 supervision center 20, repair and maintenance center 19, the Room, people's air defense underground 29, underground garage 31 and rescue centre 30.
The side of piping lane main body 1 inwall and bottom surface are provided with the embedded iron 44 in subsection setup, embedded iron 44 is connected with bracing frame 45, bracing frame 45 is respectively arranged with regeneration water pipe 46, feed pipe 47, power pipe 48, thermal pipe 49, cable tube 50, communication pipe 51, light controlling device 52, and described regeneration water pipe 46, feed pipe 47, power pipe 48, thermal pipe 49, cable tube 50, communication pipe 51 interface channel 15 is communicated with branch line piping lane body and the outer dedicated pipeline of system.
Below in conjunction with accompanying drawing, the utility model is done to discuss in detail:
As shown in Figure 1, the utility model comprises concrete pipe gallery main body 1 and is arranged on function connecting box 2 and the docking port 3 of piping lane main body 1 end various shape, dilatation seam 4 is provided with between docking port 3 and piping lane main body 1, cage of reinforcement 5 is provided with in described piping lane main body 1, corresponding shape bobbin 6 and longitudinal bobbin 7 is provided with in cage of reinforcement 5, the steel strand 8 fixed at interface or the end face of piping lane main body 1 through stretch-draw generation prestressing force ground tackle 9 are provided with in corresponding shape bobbin 6 and longitudinal bobbin 7, the left side of piping lane main body 1 or right side are provided with together or row's rainwater pipe trench 12 above together, row's rainwater pipe trench 12 is set to prestressed structure, the sidepiece of row's rainwater pipe trench 12 is provided with row's rain pipe 11, the top of row's rain pipe 11 is provided with rainwater import 10, row rain pipe 11 top be that impartial mode distributes, row's rain pipe 11 is connected with row's rainwater pipe trench 12 by function connecting box 2, row's rain pipe 11 also can be connected with the rainwater import 10 of avris greenery patches and community, the right side of piping lane main body 1 or left side are provided with combustion gas pipe trench 13, be provided with in combustion gas pipe trench 13, under to be connected, with the metal composite Gas Pipe 14 of self-con-tained unit, the sidepiece of described function connecting box 2 is provided with interface channel 15, combustion gas pipe trench 13 is connected with piping lane main body 1 by interface channel 15, the left side of described function connecting box 2 or right side are provided with function room 16, the both ends in function room 16 are provided with repair and maintenance center 17, supervision center 18, the end of piping lane main body 1 or sidepiece are provided with water storing bin 19, the side end of water storing bin 19 is provided with water-purifying apparatus 20, be provided with for boiled water room 21 in the end of piping lane main body 1 or sidepiece, be connected with water supply installation 22 by water storing bin 19 for boiled water room 21, the side of described piping lane main body 1 is provided with sewage pipe 23, the middle part of sewage pipe 23 is provided with one or more tune and dredges device 24, the side of piping lane main body 1 and function connecting box 2 is provided with ventilating house 25, the ground mouth 26 that ventilates is provided with on the top of combustion gas pipe trench 13, the ground mouth 26 that ventilates is connected with piping lane main body 1 by interface channel 15, described ventilation ground mouth 26 arranges one or more, the ground mouth 26 that ventilates is connected with ventilation installation 28 by air chimney 27, described driving passage 29, the Room, people's air defense underground 30, rescue centre 31, underground garage 32 is connected with ventilation ground mouth 26, driving passage 29 arranges one or more.
As shown in Figure 2, dilatation seam 4 is provided with between piping lane main body 1 and docking port 3, be provided with and piping lane main body 1 in dilatation seam 4, the rubber fastening band 33 that docking port 3 is connected, the bottom of described function connecting box 2 is provided with drain hole 36, piping lane main body 1 side surface upper part or bottom are provided with external suction water pipe 37, be arranged on bottom, sidewalk ground 34 with leading rain infiltration that the external suction water pipe 37 that oozes function can be formed continuous rainfall or backwater is drawn onto special water storing bin 19, what be arranged on piping lane main body 1 two sides can the special water storing bin 19 of earth's surface mixing water inspiration of deposition with leading the external suction water pipe 37 oozing function, the top of described piping lane main body 1 and function connecting box 2 is provided with trunk line road surface 35, sidewalk ground 34.
As shown in Figure 3, corresponding shape bobbin 6, longitudinal bobbin 7 is provided with in piping lane main body 1, be provided with in corresponding shape bobbin 6 and longitudinal bobbin 7 and produce the steel strand 8 of prestressing force ground tackle 9 at piping lane main body 1 end winding support through stretch-draw, the bottom of piping lane main body 1 is provided with backing positioning beam 43, be provided with location backing plate 42 in the both sides of backing positioning beam 43, on the left of the inwall of described piping lane main body 1 or right side and bottom be provided with embedded iron 44.
As shown in Figure 4, the joint face of described piping lane main body 1 is provided with interface groove 38 and interface shrinkage pool 39, in interface groove 38, be provided with water-swellable cushion rubber 40, in interface shrinkage pool 39, be provided with cement filler 41, the piping lane main body 1 of more than can be docking together.
As shown in Figure 5, dilatation seam 4 is provided with between described piping lane main body 1 and function connecting box 2, the bottom of piping lane main body 1 is provided with backing positioning beam 43, be provided with location backing plate 42 in the two sides of backing positioning beam 43, be provided with drain hole 36, external suction water pipe 37 in the bottom of described function connecting box 2.
As shown in Figure 6, the sidepiece of described function connecting box 2 is provided with the function room 16 that be connected upper and lower with sidewalk ground 34, dilatation seam 4, interface channel 15, rubber fastening band 33 is provided with between described function connecting box 2 function room 16, the bottom in described function room 16 is provided with external suction water pipe 37, and function room 16 is arranged on the upper and lower on sidewalk ground 34.
As shown in Figure 7, described water storing bin 19 is connected with function connecting box 2 by interface channel 15, described row's rain pipe 11 is connected with water storing bin 19 by small-sized function connecting box 2, a large amount of rainwater is entered water storing bin 19 by interface channel 15 by row's rain pipe 11, air chimney 27 can the drying, clean of security function connecting box 2 inwall, the gas of underground abundance can also be developed to resource.
As accompanying drawing 8, shown in 9, be provided with on sidewalk ground 34 at the sidepiece of described function connecting box 2, under be connected for boiled water room 21, ventilating house 25, water supply installation 22 is provided with in confession boiled water room 21, air chimney 27 is provided with in ventilating house 25, ventilation installation 28, air chimney 27 and ventilation installation 28, function connecting box 2 is connected, at described function connecting box 2 with for boiled water room 21, dilatation seam 4 is provided with between ventilating house 25, interface channel 15, rubber fastening band 33, described ventilating house 25, the upper and lower on sidewalk ground 34 is arranged on for boiled water room 21, function connecting box 2, function room 16, for boiled water room 21, ventilating house 25 also can cast in situs, also can precast assembly.
As shown in Figure 10, on the left of the inwall of piping lane main body 1 or right side and bottom be provided with embedded iron 44, bracing frame 45 is provided with in piping lane main body 1, embedded iron 44 is connected with bracing frame 45, bracing frame 45 is provided with regeneration water pipe 46, feed pipe 47, power pipe 48, thermal pipe 49, cable tube 50, communication pipe 51, the top of piping lane main body 1 is provided with light controlling device 52, other municipal dedicated pipeline also can be set in piping lane main body, discharge by the drain hole 36 of function connecting box 2 at the ponding of piping lane main body 1 endoporus as produced because installing pipeline, be connected by supervision center 18 automatic device can also set up informationization with various pipeline, intelligentized management system.
Prestressed structure function formula underground pipe gallery combined system, adopt new technology, new technology, new material carries out " structure innovation, function innovation " and " system innovation ", meet " industrial policy " of country, meet the national conditions of our country, meet the rule of development in science and technology, with the new model of " structure innovation ", " standard can be compared with square pipe culvert, specific mass, compare cost, compare effect, than the life-span ", the final result of " survival of the fittest " must be had, " moulding can be compared with built square tunnel with " function innovation ", compare level, compare general character, be compared to use, than being worth ", must have one " worth, must use up its with " conclusion, described prestressed structure function formula underground pipe gallery combined system, effect that is leading and that promote must be played as underground pipe gallery demonstration project will be used for.
Prestressed structure function formula underground pipe gallery combined system, the row's of being provided with rainwater, supply water and external water suction, with pipe trench and the pipeline of water, meet nation-building naturally to accumulate, naturally osmotic, the relevant requirements (sponge urban construction guide) of self-purification, it is no matter city that southern rainfall is large or northern rainfall is little, the city of lack of water, rational exploitation earth's surface mixing water, recycle, create good execution conditions, it is all necessary for extending the engineering life-span, the more important thing is, drainage system and water supplying system can be just set up for building sponge city, underground water suction can also be set up by the recessed greenery patches on ground and other facility, fresh water supply system, when conditions permit, if merge design and construction with the relevant facility in sponge city, the advantage of " structure innovation " and " function innovation " can be played, operation can also be played more reliable, continue more durable effect.
Prestressed structure function formula underground pipe gallery combined system, be applicable to large, in, small city, can according to the Floorplanning in each city and urban construction plan, optimize " General layout Plan ", can built by separate periods, also can build continuously, the mode of " excavation and cast-in-place " can be adopted to construct, also the mode of " precast assembly " can be adopted to construct, the mode of " merge and share " also can be adopted to construct, select any one mode of production all can reach the level of factorial praluction, as the scope of national demonstration project will be entered, not only underground pipe gallery can be forged into the real underground system engineering having scientific and technological guide's meaning, underground pipe gallery can also be pushed to the ranks of industrialization, become leading engineering, can develop into " the new industry chain " that drive auxiliary products to be formed with industry characteristic, reach " functionalization, modularization, information-based, intelligent, industrialization " general objective.
Claims (8)
1. a prestressed structure function formula underground pipe gallery combined system, is characterized in that: comprise concrete pipe gallery main body (1), row's rainwater system, blowdown system, water supplying system, combustion gas system, ventilation system and ergasia;
Corresponding shape bobbin (6) has been arranged circumferentially along piping lane main body (1) in the cage of reinforcement (5) of described piping lane main body (1), longitudinal bobbin (7) is vertically arranged with along piping lane main body (1), be provided with in corresponding shape bobbin (6) and longitudinal bobbin (7) and produce the fixing steel strand (8) of prestressing force ground tackle (9) through stretch-draw, piping lane main body (1) is provided with as required several function connecting boxs (2), be connected by docking port (3) between its with piping lane main body (1), piping lane main body (1) is outside equipped with external suction water pipe (37), regeneration water pipe (46) and feed pipe (47) is provided with in piping lane main body (1),
Described row's rainwater system comprises rainwater import (10), the row's rain pipe (11) be communicated with described rainwater import (10), row's rainwater pipe trench (12) of being communicated with described row's rain pipe (11);
Described blowdown system comprises sewage pipe (23) and device (24) dredged in the tune be arranged on sewage pipe (23), described tune is dredged device (24) and is connected with row's rainwater pipe trench (12), or is connected with row's rain pipe (11) by rainwater part flow arrangement;
Described water supplying system comprises water storing bin (19) and supplies boiled water room (21), water-purifying apparatus (20) and water supply installation (22), water storing bin (19) is communicated with the regeneration water pipe (46) in piping lane main body (1) or feed pipe (47) with water supply installation (22) by water-purifying apparatus (20), and water storing bin (19) bottom is dredged device (24) by row's rainwater pipe trench (12) with the tune on sewage pipe (23) and is connected;
Described ventilation system comprises ventilation ground mouth (26) that rest on the ground and by air chimney (27) connected ventilation installation (28), described ventilations mouth (26) be communicated with the function connecting box (2) on described piping lane main body (1);
Described combustion gas system comprises the combustion gas pipe trench (13) be connected with function connecting box (2) and the Gas Pipe (14) be communicated with described combustion gas pipe trench (13);
Described ergasia comprises and being connected and the function room (16) be communicated with described air chimney (27) with function connecting box (2).
2. a kind of prestressed structure function formula underground pipe gallery combined system according to claim 1, it is characterized in that: in described piping lane main body (1), be provided with the cage of reinforcement (5) be made up of supporting arch muscle and vertical muscle and dowel, corresponding shape bobbin (6) and longitudinal bobbin (7) is provided with in cage of reinforcement (5), be provided with in corresponding shape bobbin (6) and produce prestressing force ground tackle (9) steel strand (8) fixing in the bottom of piping lane main body (1) through stretch-draw, steel strand (8) in corresponding shape bobbin (6) and longitudinal bobbin (7) arrange more than one, longitudinal bobbin (7) is arranged on four bights of piping lane main body (1) or top and bottom, the interface of piping lane main body (1) and longitudinal bobbin (7) corresponding position are provided with interface shrinkage pool (39), the endoporus periphery of interface is provided with interface groove (38), water-swellable cushion rubber (40) is provided with in interface groove (38), cement filler (41) is provided with in interface shrinkage pool (39), the bottom of piping lane main body (1) is provided with backing positioning beam (43), the sidepiece of backing positioning beam (43) is provided with location backing plate (42), the profile of described piping lane main body (1) is set to arch in foreign side, the upper and lower convex of foreign side, the lower convex of foreign side's arch, flat shape under upper circular arch, the lower flat shape of upside arch, the upper flat shape of side arch, and it is circular, oval or semicircle.
3. a kind of prestressed structure function formula underground pipe gallery combined system according to claim 1 and 2, it is characterized in that: described function connecting box (2) is set to triangular in shape according to the plane distribution situation at crossing, quadrangle, pentagon or hexagon, longitudinal both ends of function connecting box (2) are provided with docking port (3), docking port (3) is connected with piping lane main body (1), dilatation seam (4) is provided with between piping lane main body (1) and docking port (3), be provided with and piping lane main body (1) in dilatation seam (4), the rubber fastening band (33) that docking port (3) is connected.
4. a kind of prestressed structure function formula underground pipe gallery combined system according to claim 1 and 2, it is characterized in that: described combustion gas pipe trench (13) is set to prestressed structure, connected by function connecting box (2), the specification of standard determination combustion gas pipe trench (13) is taken according to position population, be communicated with combustion gas pipe trench (13) and be provided with, under to be connected, with the metal composite Gas Pipe (14) of self-con-tained unit, Gas Pipe (14) is set to H-shaped or T-shaped burning line by piping lane main body (1), ground mouth (26) that ventilates is provided with on the top of combustion gas pipe trench (13), ventilate ground mouth (26) by interface channel (15) and piping lane main body (1), ventilating house (25) is connected, combustion gas pipe trench (13) is by interface channel (15) and piping lane main body (1), air chimney (27) is connected.
5. a kind of prestressed structure function formula underground pipe gallery combined system according to claim 1 and 2, it is characterized in that: the left side of piping lane main body (1) or right side are provided with together or row's rainwater pipe trench (12) above together, row's rainwater pipe trench (12) is set to prestressed structure, connected by function connecting box (2), the sidepiece of row's rainwater pipe trench (12) is provided with row's rain pipe (11), the top of row's rain pipe (11) is provided with rainwater import (10), row rain pipe (11) top be that impartial mode distributes, row's rain pipe (11) is connected with row's rainwater pipe trench (12) by function connecting box (2), row's rainwater pipe trench (12) is connected with water storing bin (19) by function connecting box (2), described water storing bin (19) is connected with air chimney (27), the main pipeline of air chimney (27) is arranged in piping lane main body (1).
6. a kind of prestressed structure function formula underground pipe gallery combined system according to claim 1 and 2, it is characterized in that: be arranged on being communicated with water storing bin (19) with leading the described external suction water pipe (37) oozing function of piping lane main body (1) two sides, interface channel (15) is connected with water storing bin (19).
7. a kind of prestressed structure function formula underground pipe gallery combined system according to claim 1 and 2, is characterized in that: described function system also comprise be connected with function room (18) supervision center (20), repair and maintenance center (19), the Room, people's air defense underground (29), underground garage (31) and rescue centre (30).
8. a kind of prestressed structure function formula underground pipe gallery combined system according to claim 1 and 2, it is characterized in that: be provided with the embedded iron (44) in subsection setup in the side of piping lane main body (1) inwall and bottom surface, embedded iron (44) is connected with bracing frame (45), bracing frame (45) is respectively arranged with regeneration water pipe (46), feed pipe (47), power pipe (48), thermal pipe (49), cable tube (50), communication pipe (51), light controlling device (52), described regeneration water pipe (46), feed pipe (47), power pipe (48), thermal pipe (49), cable tube (50), communication pipe (51) interface channel (15) is communicated with branch line piping lane body and the outer dedicated pipeline of system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520075007.XU CN204491663U (en) | 2015-02-03 | 2015-02-03 | Prestressed structure function formula underground pipe gallery combined system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520075007.XU CN204491663U (en) | 2015-02-03 | 2015-02-03 | Prestressed structure function formula underground pipe gallery combined system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204491663U true CN204491663U (en) | 2015-07-22 |
Family
ID=53570965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520075007.XU Expired - Fee Related CN204491663U (en) | 2015-02-03 | 2015-02-03 | Prestressed structure function formula underground pipe gallery combined system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204491663U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013236A (en) * | 2016-07-19 | 2016-10-12 | 上海宝冶集团有限公司 | Underground comprehensive pipe gallery with water storage function |
CN106320370A (en) * | 2016-10-17 | 2017-01-11 | 天津滨港电镀企业管理有限公司 | Underground comprehensive pipe rack system |
-
2015
- 2015-02-03 CN CN201520075007.XU patent/CN204491663U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106013236A (en) * | 2016-07-19 | 2016-10-12 | 上海宝冶集团有限公司 | Underground comprehensive pipe gallery with water storage function |
CN106320370A (en) * | 2016-10-17 | 2017-01-11 | 天津滨港电镀企业管理有限公司 | Underground comprehensive pipe rack system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102995660B (en) | Multifunctional arched combined prestress underground pipe gallery for cisty and preparation process thereof | |
CN106381885B (en) | A kind of Underground Steel pipe gallery with skeleton | |
CN106351258B (en) | A kind of full precast assembly steel concrete combination underground pipe gallery | |
CN110924434B (en) | UHPC (ultra high performance polycarbonate) fabricated tunnel open cut tunnel lining structure and construction method | |
CN204401650U (en) | Square longitudinally connection prestressed assembly formula underground pipe gallery | |
CN204401649U (en) | Arch resistance to compression longitudinal prestressing pin-connected panel underground pipe gallery | |
CN204151825U (en) | Super-section prestressing force Urban Underground pipe gallery | |
CN204491663U (en) | Prestressed structure function formula underground pipe gallery combined system | |
CN204491659U (en) | Jack arch shape prestressed structure pin-connected panel underground pipe gallery | |
CN203256772U (en) | Multifunctional arched combination pre-stress urban underground pipe gallery | |
CN211115052U (en) | Shaft type underground stereo garage structure | |
CN202324155U (en) | Adjustable corrugated prestress anti-pollution drainage culvert | |
CN203007978U (en) | Multifunctional net-shaped combined prestressed underground pipe gallery | |
CN204491662U (en) | Abnormity resistance to compression prestressed structure function formula underground pipe gallery | |
CN204491665U (en) | Prestressed structure expanded type underground pipe gallery combined system | |
CN205557579U (en) | Well controllable formula underground pipe gallery in storehouse is assembled to adding to prestressing force | |
CN204491664U (en) | The adjustable underground pipe gallery combined system of prestressed structure | |
CN205617186U (en) | Finished product escape canal of holding concurrently flat stone function of side | |
CN209509022U (en) | A kind of pipe gallery space releasing system improving space utilization rate | |
CN204080859U (en) | High-strength resistance to compression centripetal-stress Urban Underground pipe gallery | |
CN204401651U (en) | Abnormity resistance to compression longitudinal prestressing pin-connected panel underground pipe gallery | |
CN205557580U (en) | Well storehouse cellular -type underground pipe gallery is assembled to adding to prestressing force | |
CN210288915U (en) | Drainage riser structure suitable for upper cover development | |
CN205557563U (en) | Prestressing force list adds series pipe storehouse and share formula underground pipe gallery | |
CN203429528U (en) | Bridge-type precast-reinforced-concrete-trough-plate wear-resistant pavement structure system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150722 Termination date: 20200203 |