CN205554527U - Semi -submerged formula construction platform - Google Patents

Semi -submerged formula construction platform Download PDF

Info

Publication number
CN205554527U
CN205554527U CN201620148890.5U CN201620148890U CN205554527U CN 205554527 U CN205554527 U CN 205554527U CN 201620148890 U CN201620148890 U CN 201620148890U CN 205554527 U CN205554527 U CN 205554527U
Authority
CN
China
Prior art keywords
operation platform
water tank
lower floor
water
submerged body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620148890.5U
Other languages
Chinese (zh)
Inventor
翟世鸿
何超然
杨秀礼
汪存书
许磊磊
冯先导
周舒
黄睿奕
王聪
林红星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Original Assignee
Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd, CCCC Second Harbor Engineering Co filed Critical Zhongjiao Wuhan Zhixing International Engineering Consulting Co Ltd
Priority to CN201620148890.5U priority Critical patent/CN205554527U/en
Application granted granted Critical
Publication of CN205554527U publication Critical patent/CN205554527U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a semi -submerged formula construction platform, include: upper strata construction platform is equipped with the work plane that supplies the operation of construction equipment equipment, and inside is equipped with the working space who holds equipment and supply staff's operation, lower floor's submerged body, inside are equipped with the working space who holds equipment and supply staff's operation, at least one support column, interface channel makes upper construction platform and lower floor's submerged body intercommunication, the inside cat ladder that is equipped with of interface channel, and at least two water tanks adjustment subassembly, water tank adjustment subassembly includes water tank, built -in water pump and external water pump, through the pipeline intercommunication, is equipped with the solenoid valve on the pipeline between per two water tanks, wherein, the reservoir capacity setting of water tank is: make upper construction platform be located more than the surface of water, lower floor's submerged body is located below the surface of water. Can be under well long period wave condition all -weather operation, and not influenced by the depth of water, geological conditions, improved the work efficiency of operation on water greatly.

Description

Semi-submersible type operation platform
Technical field
This utility model relates to water project construction equipment field.More specifically, this utility model relates to a kind of reduction wave The semi-submersible type operation platform of impact.
Background technology
The construction of middle long period wave zone needs to use substantial amounts of equipment auxiliary construction waterborne, commonly uses when engineering construction at present Equipment waterborne is divided into two classes, a class to be engineering ships, and another kind of is jack up operation platform.Engineering ship is highly prone to middle length Cycle wave effect, owing to by wave effect, producing pitching, rolling and heave movement, and then having influence on engineering construction; The depth of water that conventional jack up operation platform adapts to is shallower, it is impossible to meet Deepwater Open Sea construction, and if using and lengthen spud leg Mode meets deep water construction, then construction safety and economy can be brought impact;And jack up operation platform spud leg inserts base Plinth is high to ground fundamental importance.Due to above-mentioned limitation, often take the selection time in the construction of middle long period wave zone The mode of window reduces the wave impact on construction equipment, causes extreme influence to construction efficiency, technique.Therefore, the most urgently Need a kind of operation platform can applied in the deepwater regions of middle long period wave is constructed.
Utility model content
A purpose of the present utility model is to solve at least the above, and provides the advantage that at least will be described later.
This utility model is it is also an object that provide a kind of semi-submersible type operation platform, and it can be under the conditions of middle long period wave All weather operations, and do not affected by the depth of water, geological conditions, substantially increase the work efficiency of operation at sea.
In order to realize according to these purposes of the present utility model and further advantage, it is provided that a kind of semi-submersible type operation platform, including:
Upper strata operation platform, described upper strata operation platform is provided with the working face for construction machinery equipment operation, described upper strata The inside of operation platform is provided with receiving equipment and the work space for staff's operation;
Lower floor's submerged body, is provided with receiving equipment and the work space for staff's operation inside described lower floor submerged body;
At least one support column, it is vertically arranged, and it is flat that the top and bottom of described support column are respectively connecting to the construction of described upper strata The lower surface of platform and the upper surface of described lower floor submerged body;
Interface channel, it is the hollow structure being vertically arranged, and the top and bottom of described interface channel are respectively connecting on described The layer lower surface of operation platform and the upper surface of described lower floor submerged body, make described upper strata operation platform work space and described under The work space connection of layer submerged body, is provided with cat ladder inside described interface channel;And
At least two water tank adjust assembly, it is arranged on inside described lower floor submerged body, described water tank adjust assembly include water tank, It is arranged on the built-in water pump within described water tank and is arranged on the outer water pump outside described water tank, water tank described in each two Between by pipeline communication, described pipeline is provided with electromagnetic valve;
Wherein, the moisture storage capacity of described water tank is arranged so that described upper strata operation platform is positioned at more than the water surface, and described lower floor dives Body is positioned at below the water surface.
Preferably, described semi-submersible type operation platform, also include: control system, described control system includes being arranged on institute State at least two pressure transducer of the lower surface of lower floor's submerged body and be connected with described pressure transducer and described electromagnetic valve Controller;One described water tank adjusts the lower section that the pressure transducer in assembly is positioned at a described water tank of correspondence.
Preferably, described semi-submersible type operation platform, described upper strata operation platform and described lower floor submerged body are cuboid box Type structure.
Preferably, described semi-submersible type operation platform, described interface channel is hollow columnar structures, is arranged on described Layer operation platform and the central authorities of described lower floor submerged body.
Preferably, described semi-submersible type operation platform, it is four water tanks adjustment assemblies that at least two water tank adjusts assembly, four Individual described water tank lays respectively at four drift angles of described lower floor submerged body.
Preferably, described semi-submersible type operation platform, at least one support column is six support columns, with multiple row and columns Formal distribution.
This utility model at least includes following beneficial effect:
The first, adaptability is good: be suitable for all weather operations platform under the conditions of middle long period wave, and not by the depth of water, geology bar Part affects, and substantially increases the work efficiency of operation at sea;
The second, good economy performance: platform architecture is simple, stress is clear and definite, and individual molecular engineering is ripe, can be substantially reduced cost;
3rd, use prospect good: along with engineering construction develops to off-lying sea, increasing middle long period wave zone can be run into Construction, this equipment reduces the impact of wave to greatest extent, decreases construction cost from technique, improves work efficiency.
Part is embodied by further advantage of the present utility model, target and feature by description below, and part also will be by this Research and the practice of utility model and be understood by the person skilled in the art.
Accompanying drawing explanation
Fig. 1 is the front view of semi-submersible type operation platform described in the utility model;
Fig. 2 is the vertical view cutaway drawing of lower floor described in the utility model submerged body.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in further detail, to make those skilled in the art with reference to description literary composition Word can be implemented according to this.
Should be appreciated that used herein such as " have ", " comprising " and " including " term do not allot one or many Other element individual or the existence of a combination thereof or interpolation.
It should be noted that experimental technique described in following embodiment, if no special instructions, it is conventional method, described Reagent and material, if no special instructions, the most commercially obtain;In description of the present utility model, term " laterally ", " longitudinally ", " on ", D score, "front", "rear", "left", "right", " vertically ", " level ", " top ", " end ", " interior ", Orientation or the position relationship of the instruction such as " outward " are based on orientation shown in the drawings or position relationship, are for only for ease of description originally Utility model and simplification describe, and are not to indicate or imply that the device of indication or element must have specific orientation, with specific Azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.
As shown in Figure 1, 2, this utility model provides a kind of semi-submersible type operation platform, including:
Upper strata operation platform 1, described upper strata operation platform 1 is provided with the working face for construction machinery equipment operation, described The inside of upper strata operation platform 1 is provided with receiving equipment and the work space for staff's operation;
Lower floor's submerged body 2, described lower floor submerged body 2 is internal is provided with receiving equipment and the work space for staff's operation;
At least one support column 4, it is vertically arranged, and the top and bottom of described support column 4 are respectively connecting to described upper strata and execute The lower surface of work platform 1 and the upper surface of described lower floor submerged body 2;
Interface channel 3, it is the hollow structure being vertically arranged, and the top and bottom of described interface channel 3 are respectively connecting to institute Stating lower surface and the upper surface of described lower floor submerged body 2 of upper strata operation platform 1, the work making described upper strata operation platform 1 is empty Between connect with the work space of described lower floor submerged body 2, described interface channel 3 is internal is provided with cat ladder;And
At least two water tank adjusts assembly, and it is internal that it is arranged on described lower floor submerged body 2, and described water tank adjusts assembly and includes lower floor Submerged body 2 water tank 5, lower floor's submerged body 2 are arranged on the built-in water pump 7 within described water tank 5 and are arranged on described water tank 5 Outside outer water pump 6, is connected by pipeline 8 between water tank 5 described in each two, and described pipeline 8 is provided with electromagnetic valve 9;
Wherein, the moisture storage capacity of described water tank 5 is arranged so that described upper strata operation platform 1 is positioned at more than the water surface, described under Layer submerged body 2 is positioned at below the water surface.
In technique scheme, utilizing wave effect scope theoretical, the moisture storage capacity of water tank 5 makes upper strata operation platform 1 More than wave effect scope, providing operation plane for construction equipment, the most directly by wave action under duty, lower floor dives It is in suspended state under body 2 duty, slips into below wave effect line, be substantially reduced wave effect, thus realize construction Operation.Upper strata operation platform 1 may be configured as box-structure, for object storing, and can carry out counterweight, and lower floor's submerged body 2 can profit With remaining space as living area.Interface channel 3 connects upper strata operation platform 1 and lower floor's submerged body 2, and cross section is rounded, can Change for infrastructure devices, maintenance provides passage and the lower channel of staff, facilitates the installation of platform, operation and maintenance, Its concrete size is according to depending on instrument size.Support column 4 makes upper strata operation platform 1 be supported on lower floor's submerged body 2, constitutes whole Body, and it is transmitted load.Lower floor's submerged body 2 is internal arranges at least two water tank 5, by pipeline 8 between each water tank 5 Connect, water tank 5 is equipped with built-in water pump 7, each relative moisture storage capacity of water tank 5 can be regulated, mainly in order to regulate on whole The attitude of layer operation platform 1, provides a stable work surface for construction equipment on upper strata operation platform 1;The most each water The outer water pump 6 of case 5 additional configuration one, in order to regulate the overall moisture storage capacity of all water tanks 5, the main upper strata that adjusts is constructed flat The overall buoyancy that platform 1 provides, is widely varied adapting to load on upper strata operation platform 1.
In another kind of technical scheme, described semi-submersible type operation platform, also include: control system, described control system bag Include the lower surface being arranged on described lower floor submerged body 2 at least two pressure transducer and with described pressure transducer and described The controller that electromagnetic valve 9 connects;One described water tank adjusts the pressure transducer in assembly and is positioned at a described water tank of correspondence The lower section of 5.
In technique scheme, described controller is set to: the pressure of all described pressure transducers is equal and be one initial Being worth, and described initial value makes described upper strata operation platform 1 be positioned at more than the water surface, described lower floor submerged body 2 is positioned at below the water surface;
When the pressure of arbitrary described pressure transducer changes, described controller controls one below this pressure transducer Built-in water pump 7 within water tank 5 starts the electromagnetic valve 9 of the pipeline 8 being connected with this water tank 5 and starts, regulate this water tank 5, And the relative moisture storage capacity of other water tanks 5 with the connection of this water tank 5, extremely the pressure recovery of described pressure transducer is to initial value, Making described upper strata operation platform 1 be positioned at more than the water surface, described lower floor submerged body 2 is positioned at below the water surface;
When the pressure of all described pressure transducers changes, described controller controls all outer water pumps 6 and starts, and adjusts The overall moisture storage capacity of water-saving box 5, extremely the pressure recovery of all described pressure transducers is to initial value so that construct in described upper strata Platform 1 is positioned at more than the water surface, and described lower floor submerged body 2 is positioned at below the water surface.
The cooperation of multiple pressure transducers and controller by being arranged on diving body lower surface coordinates, under pressure transducer detection The pressure of the lower surface of layer submerged body 2, as the foundation of adjustment water tank 5 moisture storage capacity, when pressure transducer detects that semi-submersible type is executed The attitudes vibration that work platform loads change causes, can automatically control each water of lower floor's submerged body 2 platform lower surface by controller In case 5, water level is balanced, it is ensured that platform stable.When each pressure transducer of lower floor's submerged body 2 all changes, from The outer water pump 6 (taking out) of dynamic unlatching discharges water so that it is pressure recovery initial value;When lower floor's submerged body 2 wherein one jiao of pressure becomes During change, automatically turn on the built-in water pump 7 in water tank 5, regulate the relative moisture storage capacity in each water tank 5 so that it is each angle point pressure Power replys initial value.
In another kind of technical scheme, described semi-submersible type operation platform, described upper strata operation platform 1 and described lower floor submerged body 2 are cuboid box-structure.Upper strata operation platform 1 and lower floor's submerged body 2 are cuboid box-structure, it is simple to whole execute The layout of the construction equipment of work platform.
In another kind of technical scheme, described semi-submersible type operation platform, described interface channel 3 is hollow columnar structures, It is arranged on described upper strata operation platform 1 and the central authorities of described lower floor submerged body 2.Interface channel 3 is hollow columnar structures, if Put in upper strata operation platform 1 and the central authorities of lower floor's submerged body 2, when upper strata operation platform 1 loads change causes interface channel 3 to eat During water change, it is possible to increase or reduce overall buoyancy, auxiliary keeps platform stable.
In another technical scheme, described semi-submersible type operation platform, it is that four water tanks are adjusted that at least two water tank adjusts assembly Whole assembly, four described water tanks 5 lay respectively at four drift angles of described lower floor submerged body 2.At least two water tank adjusts assembly Being that four water tanks adjust assembly, four described water tanks 5 lay respectively at four drift angles of described lower floor submerged body 2.Lower floor's submerged body 2 four jiaos respectively arrange a water tank 5, connected by pipeline 8, can regulate four water tanks 5 and relatively store up between each water tank 5 The water yield and overall moisture storage capacity.
In another technical scheme, described semi-submersible type operation platform, at least one support column 4 is six support columns 4, Formal distribution with multiple row and columns.Increase upper strata operation platform 1 and the connection area of lower floor's submerged body 2, with multiple row and columns Formal distribution, make to be more uniformly stressed, increase intensity.
Number of devices described herein and treatment scale are used to simplify explanation of the present utility model.Answer of the present utility model Will be readily apparent to persons skilled in the art by, modifications and variations.
Although embodiment of the present utility model is disclosed as above, but it is not restricted in description and embodiment listed Using, it can be applied to various applicable field of the present utility model completely, for those skilled in the art, and can It is easily achieved other amendment, therefore under the general concept limited without departing substantially from claim and equivalency range, this practicality Novel be not limited to specific details and shown here as with describe legend.

Claims (6)

1. a semi-submersible type operation platform, it is characterised in that including:
Upper strata operation platform, described upper strata operation platform is provided with the working face for construction machinery equipment operation, described upper strata The inside of operation platform is provided with receiving equipment and the work space for staff's operation;
Lower floor's submerged body, is provided with receiving equipment and the work space for staff's operation inside described lower floor submerged body;
At least one support column, it is vertically arranged, and it is flat that the top and bottom of described support column are respectively connecting to the construction of described upper strata The lower surface of platform and the upper surface of described lower floor submerged body;
Interface channel, it is the hollow structure being vertically arranged, and the top and bottom of described interface channel are respectively connecting on described The layer lower surface of operation platform and the upper surface of described lower floor submerged body, make described upper strata operation platform work space and described under The work space connection of layer submerged body, is provided with cat ladder inside described interface channel;And
At least two water tank adjust assembly, it is arranged on inside described lower floor submerged body, described water tank adjust assembly include water tank, It is arranged on the built-in water pump within described water tank and is arranged on the outer water pump outside described water tank, water tank described in each two Between by pipeline communication, described pipeline is provided with electromagnetic valve;
Wherein, the moisture storage capacity of described water tank is arranged so that described upper strata operation platform is positioned at more than the water surface, and described lower floor dives Body is positioned at below the water surface.
2. semi-submersible type operation platform as claimed in claim 1, it is characterised in that also include: control system, described control At least two pressure transducer that system processed includes being arranged on the lower surface of described lower floor submerged body and with described pressure transducer The controller connected with described electromagnetic valve;One described water tank adjusts the pressure transducer in assembly and is positioned at described in corresponding one The lower section of water tank.
3. semi-submersible type operation platform as claimed in claim 1, it is characterised in that described upper strata operation platform and described under Layer submerged body is cuboid box-structure.
4. semi-submersible type operation platform as claimed in claim 1, it is characterised in that described interface channel is hollow cylindrical Structure, is arranged on described upper strata operation platform and the central authorities of described lower floor submerged body.
5. semi-submersible type operation platform as claimed in claim 3, it is characterised in that it is four that at least two water tank adjusts assembly Individual water tank adjusts assembly, and four described water tanks lay respectively at four drift angles of described lower floor submerged body.
6. semi-submersible type operation platform as claimed in claim 1, it is characterised in that at least one support column is six supports Post, with the formal distribution of multiple row and columns.
CN201620148890.5U 2016-02-26 2016-02-26 Semi -submerged formula construction platform Expired - Fee Related CN205554527U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620148890.5U CN205554527U (en) 2016-02-26 2016-02-26 Semi -submerged formula construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620148890.5U CN205554527U (en) 2016-02-26 2016-02-26 Semi -submerged formula construction platform

Publications (1)

Publication Number Publication Date
CN205554527U true CN205554527U (en) 2016-09-07

Family

ID=56819691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620148890.5U Expired - Fee Related CN205554527U (en) 2016-02-26 2016-02-26 Semi -submerged formula construction platform

Country Status (1)

Country Link
CN (1) CN205554527U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105667725A (en) * 2016-02-26 2016-06-15 中交第二航务工程局有限公司 Semi-submersible type construction platform
CN106697212A (en) * 2017-03-09 2017-05-24 卢如年 Safety shelter cabin capable of floating on sea
CN109533215A (en) * 2018-11-06 2019-03-29 杭州华艺喷泉设备有限公司 A kind of floating platform equipped with underwater control room

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105667725A (en) * 2016-02-26 2016-06-15 中交第二航务工程局有限公司 Semi-submersible type construction platform
CN105667725B (en) * 2016-02-26 2018-03-16 中交第二航务工程局有限公司 Semi-submersible type construction platform
CN106697212A (en) * 2017-03-09 2017-05-24 卢如年 Safety shelter cabin capable of floating on sea
CN106697212B (en) * 2017-03-09 2018-11-20 卢如年 Floating marine formula keeps away safely Hu Cang
CN109533215A (en) * 2018-11-06 2019-03-29 杭州华艺喷泉设备有限公司 A kind of floating platform equipped with underwater control room
CN109533215B (en) * 2018-11-06 2020-10-02 杭州华艺喷泉设备有限公司 Floating platform with underwater control room

Similar Documents

Publication Publication Date Title
CN205554527U (en) Semi -submerged formula construction platform
US4938630A (en) Method and apparatus to stabilize an offshore platform
CN102322069B (en) Underwater combination base of open caisson and steel pipe piles and construction method
CN108842807A (en) A kind of construction technology of the embedding rock single pile of offshore wind power foundation embedded type
CN107653895A (en) Six floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN107806108A (en) Three floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN103738481B (en) Removable self-mounting type drilling processes oil storage platform
CN106143818A (en) Middle deep water semi-submersible drilling platform
CN102140801A (en) Cofferdam construction method in construction of deepwater pier bearing platform
CN107630461A (en) Four floating drum buoyancy tank foundation structures and its construction method on a kind of combined type sea
CN101962954A (en) Cylindrical steel boxed cofferdam and construction method thereof
CN109183838B (en) A kind of high anti-floating cracking resistance basement floor constructions and its design method
CN107630462A (en) A kind of six floating drum buoyancy tank combined type foundation structures of sea and its construction method
GB1580667A (en) Underwater structures
CN105667725B (en) Semi-submersible type construction platform
CN110387898A (en) Water level management open caisson posture method in low-permeability soil layer cabin
CN207987950U (en) Four floating drum buoyancy tank foundation structures on a kind of combined type sea
CN103466052A (en) Integral-floating-box-type semi-submersible platform
CN103419906A (en) A-shaped deep sea floating island
CN103466050A (en) Three-floating-body type semi-submersible platform
CN105216971B (en) Floating body guide pile
NO337402B1 (en) A floating hull with stabilizer section
CN208136938U (en) A kind of marine four floating drums-buoyancy tank combined type foundation structure
CN203684192U (en) Offshore jacket production platform
CN109552572A (en) Small-sized semi-submersible type produces oil storage platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

CF01 Termination of patent right due to non-payment of annual fee