CN205531267U - Combined structure support body convenient to construction is decorated to building eaves - Google Patents

Combined structure support body convenient to construction is decorated to building eaves Download PDF

Info

Publication number
CN205531267U
CN205531267U CN201620282841.0U CN201620282841U CN205531267U CN 205531267 U CN205531267 U CN 205531267U CN 201620282841 U CN201620282841 U CN 201620282841U CN 205531267 U CN205531267 U CN 205531267U
Authority
CN
China
Prior art keywords
platform
scaffold
support body
eaves
guard rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620282841.0U
Other languages
Chinese (zh)
Inventor
杨洁
王海兵
于晓松
卢月明
韩凤艳
孙浩杰
康含
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, First Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201620282841.0U priority Critical patent/CN205531267U/en
Application granted granted Critical
Publication of CN205531267U publication Critical patent/CN205531267U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a construction field specifically is a integrated configuration support body convenient to construction eaves decorates construction. The platform scaffold comprises an electric lifting platform consisting of a platform base, stand columns, a driving unit and a platform beam, wherein a steel cantilever frame is arranged on the platform beam, the platform scaffold further comprises a platform scaffold fixed on the steel cantilever frame, the platform scaffold consists of an outer protective guard, a side protective guard and a scaffold board, the outer protective guard and the side protective guard form three-side protection, the outer protective guard and the side protective guard are fixedly provided with inclined struts, one side of the platform scaffold without the protective guard is coated with eave for buildings and is provided with a scaffold ladder stand, and the scaffold board is laid on the steel cantilever frame. Utilize the simple support component atress to be less than with span cantilever component, lift platform both as the support, as operation platform again, the load is vertical to be passed to the base along the stand, and the atress is reasonable, can provide operating space for the outer facade construction of large tracts of land, also can set up the support body on it and provide operating space for the part is encorbelmented and the adduction is regional.

Description

A kind of being easy to builds the combinative structure support body draping over one's shoulders eaves decoration construction
Technical field
This utility model relates to the realm of building construction, and a kind of being easy to builds the combinative structure support body draping over one's shoulders eaves decoration construction.
Background technology
MC3516 electric lifting platform is applicable to the construction of smooth facade, for alien invasion with the presence of outside choose or the building element of interior receipts can be because Steric clashes bottleneck, and the curtain wall of building roof drapes over one's shoulders eaves and just creating this kind of problem that encounter on construction operation platform, the employing of conventional construction technical schemes is set up the ways such as the shaped steel suspension scaffolding and is carried out overhanging component construction.
But, set up the shaped steel suspension scaffolding and can use shaped steel and steel pipe in a large number, and only for drape over one's shoulders eaves construction set up, steel using amount is very big, and projects turnover use has some setbacks, and causes waste of material, and it is bigger to drape over one's shoulders eaves width, shaped steel cantilever span is long, it is desirable to set up both also can to construct in the construction of roofing layer following alien invasion and drapes over one's shoulders the operating platform of eaves, it is to avoid secondary is set up.
Utility model content
In order to solve above-mentioned technical problem, the utility model discloses a kind of being easy to and build the combinative structure support body draping over one's shoulders eaves decoration construction, take full advantage of electric lifting platform and the advantage of common steel tube scaffold, the two is combined, carry out the decoration construction of prominent facade efficiently.
Concrete solution is: a kind of being easy to builds the combinative structure support body draping over one's shoulders eaves decoration construction, including by platform base, column, the electric lifting platform that driver element and landing beam are constituted, steel suspension scaffold it is provided with on landing beam, also include the platform scaffold being fixed on steel suspension scaffold, platform legs hand cradle is by outer guard rail, side guard rail and scaffold board are constituted, outer guard rail, side guard rail forms three frontier defenses to be protected, outer guard rail, side guard rail is fixedly installed diagonal brace, platform legs hand cradle does not has the side of guard rail drape over one's shoulders eaves towards building and be provided with foot hands cat ladder, scaffold board is laid on steel suspension scaffold.
Further, the length of described steel suspension scaffold end face of encorbelmenting drapes over one's shoulders eaves to building, short outwards encorbelments end.
Further, being respectively arranged with drag-line inside and outside the landing beam of described electric lifting platform, the lower end of drag-line is fixed on landing beam, and upper end is fixed in the agent structure of building.
Further, described foot hands cat ladder is made up of cross bar, vertical rod and brace, and the cross bar being available for trampling is fixed on the brace of lower floor, and brace bottom fixed placement is draped over one's shoulders on the flooring under eaves in building.
Further, described steel suspension scaffold drapes over one's shoulders the length of eaves towards building and encorbelments and be provided with bracing frame below end, and bracing frame is arranged on flooring, is consisted of interconnective section of cross bar biserial vertical rod and biserial long transverse lever.
Further, it is fixed with connecting rod between the column of described electric lifting platform and floor breast board;Being fixedly connected with upper and lower twice between foot hands cat ladder and bracing frame and be connected cross bar, the outer end of upper track connection cross bar is fixed on the top of floor breast board.
Further, described platform legs hand cradle, foot hands cat ladder, connecting rod and connection cross bar are common scaffolding steel pipe, and connect by fastener is fixing.
Beneficial effect: utilize simple-supported beams stress less than with span cantilever member, hoistable platform is both as bearing, again as operating platform, load vertically reaches base along column, reasonable stress, can be that the construction of large area alien invasion provides working place, it is possible to set up support body thereon and encorbelment and offer working place, interior receipts region for part.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure, 1-platform base;2-column;3-driver element;4-landing beam;5-steel suspension scaffold;The outer guard rail of 6-;7-side guard rail;8-scaffold board;9-building drapes over one's shoulders eaves;10-foot hands cat ladder;11-flooring;12-drag-line;13-agent structure;14-bracing frame;15-floor breast board;16-connecting rod;17-connects cross bar, 18-diagonal brace.
Detailed description of the invention
Below in conjunction with the accompanying drawings 1, detailed description of the invention of the present utility model is illustrated.Drape over one's shoulders as a example by eaves decoration construction by facade glass curtain wall, using MC3516 type electric lifting platform is main construction machinery, including the electric lifting platform being made up of platform base 1, column 2, driver element 3 and landing beam 4, platform column standard knot 1.5 meter one joint, connect with M20*80 bolt between column, the load on operation platform is vertically reached base.Steel suspension scaffold 5 it is provided with on landing beam, long end face of encorbelmenting drapes over one's shoulders eaves 9 to building, short encorbelment end outwards, steel suspension scaffold 5 drapes over one's shoulders the length of eaves 9 towards building and encorbelments and be provided with bracing frame 14 below end, bracing frame 14 is arranged on flooring 11, is consisted of interconnective section of cross bar biserial vertical rod and biserial long transverse lever.
The fixing platform legs hand cradle being made up of outer guard rail 6, side guard rail 7 and scaffold board 8 on steel suspension scaffold, outer guard rail, side guard rail form three frontier defenses to be protected, outer guard rail 6, side guard rail 7 are fixedly installed diagonal brace 18, platform legs hand cradle does not has the side of guard rail drape over one's shoulders eaves 9 towards building and be provided with foot hands cat ladder 10, and scaffold board 8 is laid on steel suspension scaffold 5.
Being respectively arranged with drag-line 12 inside and outside the landing beam 4 of electric lifting platform, the lower end of drag-line 12 is fixed on landing beam 4, and upper end is fixed in the agent structure 13 of building.
Foot hands cat ladder 10 supports for double-pole scaffold, is made up of cross bar, vertical rod and brace, and the cross bar being available for trampling is fixed on the brace of lower floor, and brace bottom fixed placement is draped over one's shoulders on the flooring 11 under eaves 9 in building.Foot hands cat ladder height is 3 meters, is connected with platform above cat ladder, and outside arranges 5 road protective upright rods, and spacing is 400mm, and support body connects with bowl buckle frame and structure.
Between the column 2 of electric lifting platform and floor breast board 15, anchor connection has connecting rod 16, plays electric lifting platform antidumping;
Being fixedly connected with upper and lower twice between foot hands cat ladder 10 and bracing frame 14 and be connected cross bar 17, the outer end of upper track connection cross bar 17 is fixed on the top of floor breast board 15.
Platform legs hand cradle, foot hands cat ladder 10, connecting rod 16 and connection cross bar 17 are common scaffolding steel pipe, and connect by fastener is fixing.
Before setting up support body, according to facade feature, the position of reasonable Arrangement hoistable platform, can be that the construction of large area alien invasion provides working place, it is possible to set up support body thereon and encorbelment and offer working place, interior receipts region for part.
When support body is set up, utilizing simple-supported beams stress less than with span cantilever member, reasonable Arrangement support position hoistable platform is both as bearing, again as operating platform.Idiographic flow is: hoistable platform horizontal layout → vertical design → support body of encorbelmenting designs → set up MC3615 hoistable platform → set up suspension scaffold to draping over one's shoulders eaves Position Design distance.The MC3615 electric lifting platform province efficient feature of material is combined with the motility of steel tube fastener scaffold building, drapes over one's shoulders eaves construction for curtain wall and create operation platform.

Claims (7)

1. it is easy to build the combinative structure support body draping over one's shoulders eaves decoration construction for one kind, including by platform base (1), column (2), the electric lifting platform that driver element (3) and landing beam (4) are constituted, steel suspension scaffold (5) it is provided with on landing beam, it is characterized in that, also include the platform scaffold being fixed on steel suspension scaffold, platform legs hand cradle is by outer guard rail (6), side guard rail (7) and scaffold board (8) are constituted, outer guard rail, side guard rail forms three frontier defenses to be protected, outer guard rail, side guard rail is fixedly installed diagonal brace (18), platform legs hand cradle does not has the side of guard rail drape over one's shoulders eaves (9) towards building and be provided with foot hands cat ladder (10), scaffold board is laid on steel suspension scaffold (5).
Combinative structure support body the most according to claim 1, it is characterised in that the length of described steel suspension scaffold (5) end face of encorbelmenting drapes over one's shoulders eaves (9) to building, short outwards encorbelments end.
Combinative structure support body the most according to claim 1, it is characterized in that, it is respectively arranged with drag-line (12) inside and outside the landing beam (4) of described electric lifting platform, the lower end of drag-line (12) is fixed on landing beam (4), and upper end is fixed in the agent structure (13) of building.
Combinative structure support body the most according to claim 1, it is characterized in that, described foot hands cat ladder (10) is made up of cross bar, vertical rod and brace, the cross bar being available for trampling is fixed on the brace of lower floor, on brace bottom fixed placement flooring (11) under building drapes over one's shoulders eaves (9).
Combinative structure support body the most according to claim 1, it is characterized in that, described steel suspension scaffold (11) is draped over one's shoulders the length of eaves (9) towards building and is encorbelmented and be provided with bracing frame (14) below end, bracing frame (14) is arranged on flooring (11), is consisted of interconnective section of cross bar biserial vertical rod and biserial long transverse lever.
Combinative structure support body the most according to claim 5, it is characterised in that be fixed with connecting rod (16) between the column (2) of described electric lifting platform and floor breast board (15);Being fixedly connected with upper and lower twice between foot hands cat ladder (10) with bracing frame (14) and be connected cross bar (17), the outer end of upper track connection cross bar (17) is fixed on the top of floor breast board (15).
Combinative structure support body the most according to claim 6, it is characterized in that, described platform legs hand cradle, foot hands cat ladder (10), connecting rod (16) and connection cross bar (17) are common scaffolding steel pipe, and connect by fastener is fixing.
CN201620282841.0U 2016-04-07 2016-04-07 Combined structure support body convenient to construction is decorated to building eaves Expired - Fee Related CN205531267U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620282841.0U CN205531267U (en) 2016-04-07 2016-04-07 Combined structure support body convenient to construction is decorated to building eaves

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620282841.0U CN205531267U (en) 2016-04-07 2016-04-07 Combined structure support body convenient to construction is decorated to building eaves

Publications (1)

Publication Number Publication Date
CN205531267U true CN205531267U (en) 2016-08-31

Family

ID=57141747

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620282841.0U Expired - Fee Related CN205531267U (en) 2016-04-07 2016-04-07 Combined structure support body convenient to construction is decorated to building eaves

Country Status (1)

Country Link
CN (1) CN205531267U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359645A (en) * 2019-06-12 2019-10-22 中建二局第一建筑工程有限公司 Roofing cornices support system and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110359645A (en) * 2019-06-12 2019-10-22 中建二局第一建筑工程有限公司 Roofing cornices support system and its construction method

Similar Documents

Publication Publication Date Title
CN206053274U (en) The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose
CN103276886B (en) Overhanging frame at position of high-rise building sloping roof outer eave window and construction method thereof
CN201125524Y (en) Construction site climbing mobile platform
RU2011141929A (en) MOBILE MODULAR SCAFFOLDING SYSTEM FOR CONSTRUCTION WORKS AND METHOD OF ITS INSTALLATION
CN206128603U (en) Curtain mounting structure that leads a wandering life cornices
CN205713096U (en) A kind of roofing cantilevered structure form bracing system
CN205531267U (en) Combined structure support body convenient to construction is decorated to building eaves
CN201165752Y (en) Moveable building construction platform
CN207686260U (en) A construction system of encorbelmenting for building eaves mouth position construction
CN205529912U (en) Platform is decoratied in continuous beam construction
CN205475250U (en) Pin -connected panel steel stair in foundation ditch
CN111005547A (en) Construction method of external scaffold with two-way twist staggered floor vertical face
CN201649607U (en) Overhung-type outer wall scaffold
CN201762664U (en) Bracket for mounting guardrail templates in bridge building
CN204754150U (en) Dish -type node formula scaffold
CN210369838U (en) Novel hanging basket type construction operation platform
CN203924655U (en) Novel elevator shaft operating platform frame
CN206737397U (en) Type multi-layer scaffold can be climbed
CN205100242U (en) Three laminar cantilever operation platform systems
CN206769335U (en) A kind of high stability scaffold for building
CN205558305U (en) Steel gallery promotes reinforcing apparatus
CN211313312U (en) Bailey frame and steel pipe scaffold combined roof supporting structure
CN203878952U (en) Simple telescopic scaffold
CN204060041U (en) Kiosk type combination body-building device
CN202689492U (en) Construction platform of engineering people and goods elevator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20170407

CF01 Termination of patent right due to non-payment of annual fee