CN205477664U - Twin side heading method undercut tunnel utility tunnel - Google Patents

Twin side heading method undercut tunnel utility tunnel Download PDF

Info

Publication number
CN205477664U
CN205477664U CN201620240611.8U CN201620240611U CN205477664U CN 205477664 U CN205477664 U CN 205477664U CN 201620240611 U CN201620240611 U CN 201620240611U CN 205477664 U CN205477664 U CN 205477664U
Authority
CN
China
Prior art keywords
lining
tunnel
sides
linings
contrast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620240611.8U
Other languages
Chinese (zh)
Inventor
孟学文
乔国刚
韩化龙
蔡锐
郭玉海
杨冬梅
李志强
李国帅
马继周
何川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Municipal Construction Co Ltd
Original Assignee
Beijing Municipal Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Municipal Construction Co Ltd filed Critical Beijing Municipal Construction Co Ltd
Priority to CN201620240611.8U priority Critical patent/CN205477664U/en
Application granted granted Critical
Publication of CN205477664U publication Critical patent/CN205477664U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a twin side heading method undercut tunnel utility tunnel, it includes, and the tunnel just serves as a contrast, two linings of bottom plate, two linings of both sides, two linings of roof arch, vertical wallboard, horizontal wallboard and pipeline support, wherein, the tunnel is the interior accommodating space that forms of lining just, two linings of bottom plate are pour in the bottom of the first lining in tunnel, two linings of both sides are pour in the both sides of the first lining in tunnel to with two lining butt joints of bottom plate, two linings of roof arch are pour in the top of two linings of both sides to connect two linings of both sides, vertical wallboard is vertical pours between two linings of bottom plate and roof arch two linings, horizontal wallboard is pour respectively on two linings of bottom plate to and between two linings of both sides and the vertical wallboard, pipeline support sets up respectively on vertical wallboard and horizontal wallboard. The utility model has the advantages of simple structure can arrange different pipelines, can to the pipeline protect and line arrangment with safeguard convenient etc. A great deal of.

Description

A kind of twin side heading method bored tunnel pipe gallery
[technical field]
This utility model relates to a kind of piping lane, is specifically related to a kind of twin side heading method bored tunnel pipe gallery, belongs to Technical field of tunnel construction.
[background technology]
In the underground tunnel project of prior art, the pipeline such as various heating power, communication, electric power, combustion gas, water supply, rain dirt pipe is past Toward being all integrated distribution, pipeline is not protected, have a strong impact on the service life of pipeline, and safe thing easily occurs Therefore, and the problems such as follow-up repairing is difficult, difficult in maintenance occur.
Therefore, for solving above-mentioned technical problem, the twin side heading method bored tunnel of a kind of innovation of necessary offer is combined Close piping lane, to overcome described defect of the prior art.
[utility model content]
For solving the problems referred to above, the purpose of this utility model is to provide a kind of simple in construction, can arrange different pipeline, energy Pipeline is protected and pipeline is arranged and twin side heading method bored tunnel pipe gallery easy to maintenance.
For achieving the above object, the technical scheme that this utility model is taked is: a kind of twin side heading method bored tunnel is combined Closing piping lane, it includes serving as a contrast at the beginning of tunnel, base plate two serves as a contrast, both sides two serve as a contrast, crown two serves as a contrast, vertical wallboard, transverse wall panel and pipeline prop up Frame;Wherein, a receiving space is formed in lining at the beginning of described tunnel;Described base plate two lining pours in the bottom of lining at the beginning of tunnel;Described two Side two lining pours in the both sides of lining at the beginning of tunnel, and and base plate two lining docking;Described crown two lining pours in the top of both sides two lining, And connect both sides two lining;Described vertical wallboard vertically pours and serves as a contrast between crown two lining in base plate two;Described transverse wall panel is respectively Pour in base plate two lining, and both sides two serve as a contrast and between vertical wallboard;Described line holder be respectively arranged at vertical wallboard and In transverse wall panel.
Twin side heading method bored tunnel pipe gallery of the present utility model is further arranged to: described vertical wallboard, horizontal stroke Split described receiving space to wallboard, and formed sewage storehouse, reserved prevention waterlogging storehouse, light current storehouse, to sump, forceful electric power storehouse, heating power storehouse with And combustion gas storehouse.
Twin side heading method bored tunnel pipe gallery of the present utility model is also configured to: described tunnel just lining is provided with super Front ductule.
Compared with prior art, this utility model has the advantages that twin side heading method of the present utility model is dark Comprehensive pipe gallery structure of holing is simple, can independently arrange different pipeline, and protect pipeline, it is simple to follow-up dimension in its tunnel Repair;Meanwhile, its easy construction is not affected by conditions such as traffic above-ground, river course, season, weathers, takes up an area few, to traffic impact Little, can the reduction of erection time.
[accompanying drawing explanation]
Fig. 1 is twin side heading method bored tunnel pipe gallery construction procedure 1 of the present utility model) schematic diagram.
Fig. 2 is twin side heading method bored tunnel pipe gallery construction procedure 2 of the present utility model) schematic diagram.
Fig. 3 is twin side heading method bored tunnel pipe gallery construction procedure 3 of the present utility model) schematic diagram.
Fig. 4 is twin side heading method bored tunnel pipe gallery construction procedure 4 of the present utility model) schematic diagram.
Fig. 5 is twin side heading method bored tunnel pipe gallery construction procedure 5 of the present utility model) schematic diagram.
Fig. 6 is the structural representation of twin side heading method bored tunnel pipe gallery (after completion) of the present utility model.
[detailed description of the invention]
Referring to shown in Figure of description 6, this utility model is a kind of twin side heading method bored tunnel pipe gallery, its By serving as a contrast 1 at the beginning of tunnel, base plate two serves as a contrast 2, both sides two serve as a contrast 3, crown two serves as a contrast 4, vertical wallboard 5, transverse wall panel 6 and line holder 7 etc. Several parts form.
Wherein, serve as a contrast 1 at the beginning of described tunnel and be provided with advanced tubule 8, by advanced tubule 9 pre-pouring grout strengthening stratum.In A receiving space 9 is formed in serving as a contrast 1 at the beginning of described tunnel.Described vertical wallboard 5, transverse wall panel 6 split described receiving space 9, and shape Become sewage storehouse 10, reserved prevention waterlogging storehouse 11, light current storehouse 12, to sump 13, forceful electric power storehouse 14, heating power storehouse 15 and combustion gas storehouse 16.Described Soil pipe can be arranged in sewage storehouse 10;Weak electric wire can be arranged in described light current storehouse 12;Described can assign water pipe in sump 13; Forceful electric power line can be arranged in described forceful electric power storehouse 14;Thermal pipe can be arranged in described heating power storehouse 15;Combustion can be arranged in described combustion gas storehouse 16 Trachea
Described base plate two serves as a contrast 2 and pours in the bottom serving as a contrast 1 at the beginning of tunnel;Described both sides two serve as a contrast 3 and pour at the beginning of tunnel the two of lining 1 Side, and serve as a contrast 2 docking with base plate two;Described crown two serves as a contrast 4 and pours the top serving as a contrast 3 in both sides two, and connects both sides two and serve as a contrast 3.
Described vertical wallboard 5 vertically pour in base plate two serve as a contrast 2 and crown two serve as a contrast between 4;Described transverse wall panel 6 pours respectively Serve as a contrast on 2 in base plate two, and both sides two serve as a contrast between 3 and vertical wallboard 5.
Described line holder 7 is arranged in vertical wallboard 5 and transverse wall panel 6, and it can install or shelve various pipeline.
Refer to shown in Figure of description 1 to accompanying drawing 6, twin side heading method bored tunnel pipe gallery of the present utility model Construction method include following construction procedure:
1), use twin side heading method to carry out bored tunnel construction, complete at the beginning of tunnel, to serve as a contrast 1 structure;
2), the bottom in lining 1 at the beginning of tunnel pours base plate two and serves as a contrast 2;
3), pour both sides two serve as a contrast 3 serving as a contrast the both sides in 1 at the beginning of tunnel, make both sides two serve as a contrast 3 and base plate two serve as a contrast 2 connections;
4), the top in lining 1 at the beginning of tunnel pours vault two and serves as a contrast 4, makes vault two serve as a contrast 4 connection both sides two and serves as a contrast 3;
5), base plate two serve as a contrast 2 and crown two serve as a contrast and between 4, pour vertical wallboard 5;Serve as a contrast on 2 at base plate two, and both sides two serve as a contrast Transverse wall panel 6 is poured between 3 and vertical wallboard 5;
6), various line holder 7 is installed, in order to the erection of follow-up various pipelines.
Above detailed description of the invention is only the preferred embodiment of this creation, not in order to limit this creation, all in this wound Any modification, equivalent substitution and improvement etc. done within the spirit made and principle, should be included in this creation protection domain it In.

Claims (3)

1. a twin side heading method bored tunnel pipe gallery, it is characterised in that: include at the beginning of tunnel serve as a contrast, base plate two serve as a contrast, both sides Two linings, crown two serve as a contrast, vertical wallboard, transverse wall panel and line holder;Wherein, a collecting sky is formed in lining at the beginning of described tunnel Between;Described base plate two lining pours in the bottom of lining at the beginning of tunnel;Described both sides two lining pours in the both sides of lining at the beginning of tunnel, and and base plate Two lining docking;Described crown two lining pours in the top of both sides two lining, and connects both sides two lining;Described vertical wallboard vertically pours Serve as a contrast between crown two lining in base plate two;Described transverse wall panel pours respectively in base plate two lining, and both sides two lining is with vertical Between wallboard;Described line holder is respectively arranged in vertical wallboard and transverse wall panel.
2. twin side heading method bored tunnel pipe gallery as claimed in claim 1, it is characterised in that: described vertical wallboard, Transverse wall panel splits described receiving space, and formed sewage storehouse, reserved prevention waterlogging storehouse, light current storehouse, to sump, forceful electric power storehouse, heating power storehouse And combustion gas storehouse.
3. twin side heading method bored tunnel pipe gallery as claimed in claim 2, it is characterised in that: described tunnel just lining It is provided with advanced tubule.
CN201620240611.8U 2016-03-28 2016-03-28 Twin side heading method undercut tunnel utility tunnel Expired - Fee Related CN205477664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620240611.8U CN205477664U (en) 2016-03-28 2016-03-28 Twin side heading method undercut tunnel utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620240611.8U CN205477664U (en) 2016-03-28 2016-03-28 Twin side heading method undercut tunnel utility tunnel

Publications (1)

Publication Number Publication Date
CN205477664U true CN205477664U (en) 2016-08-17

Family

ID=56653007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620240611.8U Expired - Fee Related CN205477664U (en) 2016-03-28 2016-03-28 Twin side heading method undercut tunnel utility tunnel

Country Status (1)

Country Link
CN (1) CN205477664U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781581A (en) * 2016-03-29 2016-07-20 北京市政建设集团有限责任公司 Comprehensive pipe rack of subsurface tunnel adopting twin-side heading method and construction method of comprehensive pipe rack
CN106848982A (en) * 2017-03-31 2017-06-13 中冶南方城市建设工程技术有限公司 Rack arrangement method when pipe gallery electric power cabin line linear lays straight line arranged in parallel
CN107130635A (en) * 2017-07-10 2017-09-05 上海市城市建设设计研究总院(集团)有限公司 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station
CN107965328A (en) * 2017-12-29 2018-04-27 中车建设工程有限公司 Underground station whole dark digging construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105781581A (en) * 2016-03-29 2016-07-20 北京市政建设集团有限责任公司 Comprehensive pipe rack of subsurface tunnel adopting twin-side heading method and construction method of comprehensive pipe rack
CN106848982A (en) * 2017-03-31 2017-06-13 中冶南方城市建设工程技术有限公司 Rack arrangement method when pipe gallery electric power cabin line linear lays straight line arranged in parallel
CN107130635A (en) * 2017-07-10 2017-09-05 上海市城市建设设计研究总院(集团)有限公司 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station
CN107965328A (en) * 2017-12-29 2018-04-27 中车建设工程有限公司 Underground station whole dark digging construction method
CN107965328B (en) * 2017-12-29 2019-09-06 中车建设工程有限公司 Underground station whole dark digging construction method

Similar Documents

Publication Publication Date Title
CN202969415U (en) Multifunctional assembled comprehensive pipe gallery
CN205477664U (en) Twin side heading method undercut tunnel utility tunnel
CN204898721U (en) Steel construction city utility tunnel
CN106381885B (en) A kind of Underground Steel pipe gallery with skeleton
CN105064400A (en) Urban comprehensive pipe rack of steel corrugated plate structure
CN105673021A (en) Comprehensive pipe rack of shield tunnel and construction method of comprehensive pipe rack
CN105626094A (en) Large-diameter shield tunnel comprehensive pipe rack combined with highway tunnel and construction method thereof
CN105240024A (en) Parallel shield tunneling method for extended construction of subway station
CN205400736U (en) CRD undercut tunnel utility tunnel
CN204023628U (en) A kind of water-stopping structure
CN205617426U (en) Cast -in -place bottom plate of utility tunnel and prefabricated outer panel connection structure
CN205400742U (en) Major diameter shield tunnel utility tunnel with highway tunnel combination
CN205400743U (en) Major diameter shield tunnel utility tunnel
CN208685678U (en) A kind of float Structure of subway station
CN205400735U (en) Shield tunnel utility tunnel
CN105781569A (en) Large-diameter shield tunnel comprehensive pipe gallery and construction method thereof
CN205894103U (en) Prefabricated parabola type utility tunnel
CN204419256U (en) A kind of merging groove containing tunnel cable groove and roadside drainage ditch
CN208136954U (en) Precast splice type Pipe rack
CN205153244U (en) Metal roof waterproof people pore structure
CN105240023A (en) Method of adopting curved pipe-jacking supporting structure for extension of shield-driven subway station
CN206204998U (en) A kind of communication check well with water-tight device
CN205894519U (en) Structure of waterproof parapet of roofing stainless steel and open drain combination
CN105781581A (en) Comprehensive pipe rack of subsurface tunnel adopting twin-side heading method and construction method of comprehensive pipe rack
CN204532379U (en) The pre-buried gutter structure of subway sectional tunnel waste water pump house

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20200328

CF01 Termination of patent right due to non-payment of annual fee