CN107130635A - Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station - Google Patents

Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station Download PDF

Info

Publication number
CN107130635A
CN107130635A CN201710556399.5A CN201710556399A CN107130635A CN 107130635 A CN107130635 A CN 107130635A CN 201710556399 A CN201710556399 A CN 201710556399A CN 107130635 A CN107130635 A CN 107130635A
Authority
CN
China
Prior art keywords
cable
electric compartment
cable tunnel
tunnel
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710556399.5A
Other languages
Chinese (zh)
Inventor
张赟
毛峰
王家华
胡清源
庞传民
徐飞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Group Co Ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Group Co Ltd filed Critical Shanghai Urban Construction Design Research Institute Group Co Ltd
Priority to CN201710556399.5A priority Critical patent/CN107130635A/en
Publication of CN107130635A publication Critical patent/CN107130635A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/30Installations of cables or lines on walls, floors or ceilings
    • H02G3/32Installations of cables or lines on walls, floors or ceilings using mounting clamps

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical & Material Sciences (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The invention discloses entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station, including piping lane main body, piping lane main body includes electric compartment, wall in electric compartment close to both sides is provided with power cable, electric compartment side is provided with cable tunnel, the other end of cable tunnel is connected with transformer station, and by cable tunnel, laying enters transformer station to power cable nationality;Isolated between cable tunnel and electric compartment provided with fire wall;Fire wall is provided with fire resistant doorsets;Cable hanger is equipped with the top of electric compartment, cable tunnel, cable hanger is a cuboid framework structure, and the upper end of cable hanger is connected with the top of electric compartment and cable tunnel.Nationality of the present invention can effectively prevent from producing between cable the situation of intersection by setting a special cable tunnel between underground pipe gallery and transformer station, and cable tunnel is that follow-up regular maintenance and maintenance are provided and facilitated.

Description

Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station
Technical field
The present invention relates to underground pipe gallery building technology field, more particularly to enter for connecting underground pipe gallery with transformer station Stand the node structure of cable tunnel.
Background technology
In existing underground pipe gallery, transformer station's power cable out of the station needs to lay by underground pipe gallery, Existing piping lane electric compartment walkway both sides be required for lay cable, but cable need again from the side of electric compartment pass into Enter transformer station, now cable will be travelling through walkway, this just considerably increases the difficulty of cable laying and later maintenance;And manage When power cable is drawn from side in the electric compartment of corridor, intersections can be produced between cable, increases the laying and subsequently of power cable The difficulty of maintenance.
Therefore, the connection for being badly in need of entering the station to existing underground pipe gallery and transformer station between cable tunnel is improved, Overcome the defect of prior art, ensureing that power cable can be that follow-up maintaining is carried on the premise of safe and efficient transmission of electricity Supplier is just.
The content of the invention
In view of the drawbacks described above of prior art, the present invention is provided to connect underground pipe gallery and transformer station to enter the station electricity The node structure in cable tunnel, the first purpose of realization is that power cable is led to cable tunnel by nationality by the top from existing electric compartment The mode in road, overcomes the defect of prior art, is ensureing that power cable can be follow-up dimension on the premise of safe and efficient transmission of electricity Shield maintenance provides convenient.
To achieve the above object, the invention discloses entered the station cable tunnel for connecting underground pipe gallery and transformer station Node structure, including piping lane main body, the wall that the piping lane main body includes in electric compartment, the electric compartment close to both sides are provided with Power cable.
Wherein, the electric compartment side is provided with cable tunnel, and the other end of the cable tunnel is connected with transformer station, described By the cable tunnel, laying enters the transformer station to power cable nationality;
Isolated between the cable tunnel and the electric compartment provided with fire wall;The fire wall is provided with fire prevention Door;
Cable hanger is equipped with the top of the electric compartment, the cable tunnel, the cable hanger is a cuboid frame Frame structure, the upper end of the cable hanger is connected with the top of the electric compartment and the cable tunnel.
It is preferred that, the center section of the electric compartment bottom is higher, relatively low at the corner of both sides, and the electric compartment bottom is close Rhone is provided with the corner of both sides.
It is preferred that, absolute altitude of the absolute altitude higher than the bottom of the electric compartment of the bottom of the cable tunnel, the cable tunnel Linked up between road and the electric compartment provided with stair.
It is preferred that, the cable hanger is divided into upper and lower two layers, and upper and lower two layers of the cable hanger is respectively used to set Not homonymy and/or the power cable do not gone the same way.
Beneficial effects of the present invention:
Nationality of the present invention is consolidated by drawing power cable from the top of existing electric compartment, then using cable hanger to cable Fixed and share split, collects in cable tunnel, transformer station is re-fed into afterwards;It can effectively prevent from producing between cable the feelings of intersection Condition, and cable tunnel is that follow-up regular maintenance and maintenance are provided conveniently.
The technique effect of the design of the present invention, concrete structure and generation is described further below with reference to accompanying drawing, with It is fully understood from the purpose of the present invention, feature and effect.
Brief description of the drawings
Fig. 1 shows the structural representation of power cable laying state in one embodiment of the invention.
Fig. 2 shows the structural representation of one embodiment of the invention.
Fig. 3 shows the structural representation of cable hanger in one embodiment of the invention.
Embodiment
Embodiment
As shown in Figure 1 to Figure 3, entered the station the node structure of cable tunnel, bag for connecting underground pipe gallery and transformer station Piping lane main body 1 is included, the wall that piping lane main body 1 includes in electric compartment 2, electric compartment 2 close to both sides is provided with power cable 5.
Wherein, the side of electric compartment 2 is provided with cable tunnel 3, and the other end of cable tunnel 3 is connected with transformer station, power cable 5 Nationality is laid by cable tunnel 3 enters transformer station;
Isolated between cable tunnel 3 and electric compartment 2 provided with fire wall 7;Fire wall 7 is provided with fire resistant doorsets 8;
Electric compartment 2, the top of cable tunnel 3 are equipped with cable hanger 4, and cable hanger 4 is a cuboid framework structure, electricity The upper end of cable suspension bracket 4 is connected with the top of electric compartment 2 and cable tunnel 3.
The principle of the present invention is that nationality is hung by drawing power cable 5 from the top of existing electric compartment 2, then using cable Frame 4 cable is fixed and share split, collects in cable tunnel 3, and last power cable 5 enters power transformation by cable tunnel 3 Stand.
Because power cable 5 is the top extraction from electric compartment 2, electric compartment 2 will not be crossed because of power cable and caused Staff is difficult to take action, and power cable is fixed using cable hanger 4 and share split can be prevented effectively between cable Situation about intersecting is produced, and is that follow-up regular maintenance and maintenance are provided conveniently.
In certain embodiments, the center section of the bottom of electric compartment 2 is higher, relatively low at the corner of both sides, and the bottom of electric compartment 2 is leaned on Rhone is provided with nearly both sides corner.
In certain embodiments, the absolute altitude of the bottom of cable tunnel 3 is higher than the absolute altitude of the bottom of electric compartment 2, cable tunnel 3 Linked up between electric compartment 2 provided with stair 6.
In certain embodiments, 4 points of cable hanger is upper and lower two layers, and upper and lower two layers of cable hanger 4 is respectively used to set The power cable 5 put not homonymy and/or do not gone the same way.
Preferred embodiment of the invention described in detail above.It should be appreciated that one of ordinary skill in the art without Need creative work just can make many modifications and variations according to the design of the present invention.Therefore, all technologies in the art Personnel are available by logical analysis, reasoning, or a limited experiment on the basis of existing technology under this invention's idea Technical scheme, all should be in the protection domain being defined in the patent claims.

Claims (4)

1. entered the station the node structure of cable tunnel, including piping lane main body (1) for connecting underground pipe gallery and transformer station, it is described The wall that piping lane main body (1) includes in electric compartment (2), the electric compartment (2) close to both sides is provided with power cable (5);It is special Levy and be, electric compartment (2) side is provided with cable tunnel (3), the other end of the cable tunnel (3) is connected with transformer station, Power cable (5) nationality enters the transformer station by the cable tunnel (3) laying;
Isolated between the cable tunnel (3) and the electric compartment (2) provided with fire wall (7);Set on the fire wall (7) There are fire resistant doorsets (8);
Cable hanger (4) is equipped with the top of the electric compartment (2), the cable tunnel (3), the cable hanger (4) is one Cuboid framework structure, the upper end of the cable hanger (4) at the top of the electric compartment (2) and the cable tunnel (3) with connecting Connect.
It is used to connecting underground pipe gallery and transformer station 2. according to claim 1 and enters the station the node structure of cable tunnel, Characterized in that, the center section of electric compartment (2) bottom is higher, relatively low at the corner of both sides, electric compartment (2) bottom is leaned on Rhone is provided with nearly both sides corner.
It is used to connecting underground pipe gallery and transformer station 3. according to claim 1 and enters the station the node structure of cable tunnel, Characterized in that, absolute altitude of the absolute altitude of the bottom of the cable tunnel (3) higher than the bottom of the electric compartment (2), the cable Linked up between tunnel (3) and the electric compartment (2) provided with stair (6).
It is used to connecting underground pipe gallery and transformer station 4. according to claim 1 and enters the station the node structure of cable tunnel, Characterized in that, the cable hanger (4) is divided into upper and lower two layers, upper and lower two layers of the cable hanger (4) is respectively used to set The power cable (5) put not homonymy and/or do not gone the same way.
CN201710556399.5A 2017-07-10 2017-07-10 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station Pending CN107130635A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710556399.5A CN107130635A (en) 2017-07-10 2017-07-10 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710556399.5A CN107130635A (en) 2017-07-10 2017-07-10 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station

Publications (1)

Publication Number Publication Date
CN107130635A true CN107130635A (en) 2017-09-05

Family

ID=59737415

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710556399.5A Pending CN107130635A (en) 2017-07-10 2017-07-10 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station

Country Status (1)

Country Link
CN (1) CN107130635A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953068A (en) * 2014-05-19 2014-07-30 上海市城市建设设计研究总院 Underground integrated pipe gallery structure
CN205296223U (en) * 2016-01-12 2016-06-08 上海市城市建设设计研究总院 Combine utility tunnel cross well and end well node structure arranged
CN205296224U (en) * 2016-01-12 2016-06-08 上海市城市建设设计研究总院 Air intake, hoist and mount mouthful and mouthful combined layout's utility tunnel node structure of fleing
CN205296220U (en) * 2016-01-12 2016-06-08 上海市城市建设设计研究总院 Utility tunnel node structure that unilateral enlarges
CN205329721U (en) * 2016-01-12 2016-06-22 上海市城市建设设计研究总院 Air exit and mouthful combined layout's that flees utility tunnel node structure
CN205477664U (en) * 2016-03-28 2016-08-17 北京市政建设集团有限责任公司 Twin side heading method undercut tunnel utility tunnel
CN205617424U (en) * 2016-04-13 2016-10-05 深圳前海冠华城市管廊智慧技术有限公司 Build in advance and alternately pass through city utility tunnel of function
CN206143899U (en) * 2016-09-26 2017-05-03 上海市城市建设设计研究总院(集团)有限公司 Crossover node structure suitable for sewer line incorporates utility tunnel in
CN206189462U (en) * 2016-11-16 2017-05-24 江苏中设集团股份有限公司 Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line
CN106759481A (en) * 2017-01-05 2017-05-31 周彩华 Guan Suicanggou formulas communication station
CN206888011U (en) * 2017-07-10 2018-01-16 上海市城市建设设计研究总院(集团)有限公司 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953068A (en) * 2014-05-19 2014-07-30 上海市城市建设设计研究总院 Underground integrated pipe gallery structure
CN205296223U (en) * 2016-01-12 2016-06-08 上海市城市建设设计研究总院 Combine utility tunnel cross well and end well node structure arranged
CN205296224U (en) * 2016-01-12 2016-06-08 上海市城市建设设计研究总院 Air intake, hoist and mount mouthful and mouthful combined layout's utility tunnel node structure of fleing
CN205296220U (en) * 2016-01-12 2016-06-08 上海市城市建设设计研究总院 Utility tunnel node structure that unilateral enlarges
CN205329721U (en) * 2016-01-12 2016-06-22 上海市城市建设设计研究总院 Air exit and mouthful combined layout's that flees utility tunnel node structure
CN205477664U (en) * 2016-03-28 2016-08-17 北京市政建设集团有限责任公司 Twin side heading method undercut tunnel utility tunnel
CN205617424U (en) * 2016-04-13 2016-10-05 深圳前海冠华城市管廊智慧技术有限公司 Build in advance and alternately pass through city utility tunnel of function
CN206143899U (en) * 2016-09-26 2017-05-03 上海市城市建设设计研究总院(集团)有限公司 Crossover node structure suitable for sewer line incorporates utility tunnel in
CN206189462U (en) * 2016-11-16 2017-05-24 江苏中设集团股份有限公司 Double -cabin utility tunnel structure of corridor is gone into to gas and run by gravity sewer line
CN106759481A (en) * 2017-01-05 2017-05-31 周彩华 Guan Suicanggou formulas communication station
CN206888011U (en) * 2017-07-10 2018-01-16 上海市城市建设设计研究总院(集团)有限公司 Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station

Similar Documents

Publication Publication Date Title
CN107747320B (en) Double-layer comprehensive pipe gallery
CN206143899U (en) Crossover node structure suitable for sewer line incorporates utility tunnel in
WO2017133245A1 (en) Support for rail
CN206888011U (en) Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station
CN110258632B (en) Comprehensive pipe rack pipeline branch port of direct buried outgoing line
CN107130635A (en) Entered the station the node structure of cable tunnel for connecting underground pipe gallery and transformer station
CN206888007U (en) For connecting the special type contact node structure of underground pipe gallery and control centre
CN205348223U (en) Node structure of being connected control center and two cabin utility tunnel
CN208272403U (en) A kind of spliced ring network cabinet precast construction
CN208072456U (en) A kind of underground pipe gallery and underground garage connecting taxiway structure based on road
CN214574119U (en) Comprehensive pipe rack branch mouth structure of dodging barrier
CN209703936U (en) A kind of floor ground structure suitable for information system computer floor in building
CN210507520U (en) City utility tunnel structure
CN218771016U (en) Two cabin piping lane crossing node in cabin is switched in a flexible way to power cable
CN204082217U (en) A kind of linkage for being communicated with the groundwater reservoir in upper and lower coal seam
CN202300418U (en) Longitudinal evacuating structure of underground tunnel and underground tunnel
CN206617174U (en) A kind of tunnel structure
CN206820255U (en) A kind of power transformer distribution system
CN105909006A (en) Prefabricated splicing-combined transformer substation
CN102383807B (en) Longitudinal evacuation structure of underground tunnel and underground tunnel
CN206418519U (en) A kind of Urban Underground intelligent comprehensive piping lane
CN208685667U (en) Pipe gallery T-junction joint structure
CN206389008U (en) Tank unifies power station cabin
CN209025110U (en) Pipe gallery grade separation type " T " -intersection structure with rainwater cabin and bilge tank
CN205646701U (en) Outlet structure of transformer substation's cable intermediate layer

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170905