CN206389008U - Tank unifies power station cabin - Google Patents
Tank unifies power station cabin Download PDFInfo
- Publication number
- CN206389008U CN206389008U CN201621381374.3U CN201621381374U CN206389008U CN 206389008 U CN206389008 U CN 206389008U CN 201621381374 U CN201621381374 U CN 201621381374U CN 206389008 U CN206389008 U CN 206389008U
- Authority
- CN
- China
- Prior art keywords
- cabin
- built
- row
- power station
- wardrobe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bay Windows, Entrances, And Structural Adjustments Related Thereto (AREA)
Abstract
Tank unification power station cabin belongs to power transmission and distribution project technical field.Nacelle is long hexahedron:Front-back is bulkhead 4.Left and right face is side wall 3.The above is cabin top 1.Here is the bilge 10.It is close to front and rear bulkhead 4 along length in cabin, respectively fills and cabin top 1, the built-in wardrobe of the lower vertical bilge 10 are supported on a row.Often row's built-in wardrobe has several frameworks, and each framework constitutes rectangle ladder by two columns 5 and a few walings 6.It is elongated on crosspiece 6 to be covered with frame plate 7, lay electrical device.By having unscrewing type screen door 9, upper dress instrument, window on the column 5 in cabin.It is operation road 11 between two row's built-in wardrobes.There is hatch door 8 on side wall 3.Structural reduction low cost;Space availability ratio is high;It is easily installed maintenance.For buried cable transmission of electricity.
Description
Technical field
Power transmission and distribution project.
Background technology
The popularization of urban skyscraper, has expedited the emergence of underground transmission.Underground transmission has expedited the emergence of dispatching formula intelligent substation.Dispatching
Formula intelligent substation is that scene is dispensed after the power station cabin of installation electric power equipment cabinet is made into dress, is then placed one by one in it
Rack, lays secondary device.Existing power station cabin, in order to adapt to narrow space in cabin, although rack employs biserial according to bulkhead
It is vertical;But still transformer station's computer room single cabinet rows of conventional arrangement side by side is continued to use, it is not special using the structure at power station cabin " steel wall top bottom "
Point.
The content of the invention
Tank unifies the power station cabin technical problem to be solved:Power station cabin structure is intensive.
The technical scheme of use is:Tank is unified, and bulkhead sets cabinet.
The nacelle of tank unification power station cabin (Fig. 1) is long hexahedron:Front-back is bulkhead 4.Left and right face is side wall 3.Above
It is cabin top 1.Here is the bilge 10.
It is close to front and rear bulkhead 4 along length in cabin, respectively fills and cabin top 1, the built-in wardrobe of the lower vertical bilge 10 are supported on a row.Often row's built-in wardrobe has several
Individual framework, each framework constitutes ladder shape by two columns 5 and a few walings 6.It is elongated on crosspiece 6 to be covered with frame plate 7, lay electric power
Device.By having unscrewing type screen door 9, upper dress instrument, window on the column 5 in cabin.It is operation road 11 between two row's built-in wardrobes.Side wall 3
On have hatch door 8.
Tank unification power station cabin beneficial effect be:Structural reduction low cost;Space availability ratio is high;It is easy to lay device cloth
If cable;It is easy to safeguard.
Brief description of the drawings
Fig. 1 shows that tank unifies power station cabin cross-sectional structure schematic diagram.
In figure:1 --- push up in cabin;2 --- embedded lamp;3 --- side wall;4 --- bulkhead;5 --- column;6 --- crosspiece;
7 --- frame plate;8 --- hatch door;9 --- screen door;10 --- the bilge;11 --- operation road.
Embodiment
There is mineral wool thermal insulation layer on the cabin top 1 of nacelle.Operate the paving insulation board of road 11.There is maintenance area close to hatch door 8.Cabin top 1 has logical
Wind devices, embedded lamp 2.
The framework of built-in wardrobe is constituted, column 5, crosspiece 6 are made of thin-wall galvanized steel pipe and is welded into rectangle ladder.To realize different factories in cabinet
Family's equipment can be installed, and " being shown before preceding wiring " secondary device installs fixing point and device front panel position using unified device
Put.It is 130mm that device, which installs fixing point with device front panel spacing,;350mm should be not more than by installing fixing point to device rear portion;Dress
Put front panel and be necessary for a plane;Unified device front panel width is 447mm;Device front panel is 85mm with the spacing of screen door 9;
Nacelle framework depth 550mm.
Claims (3)
1. tank unifies power station cabin, bulkhead sets cabinet, it is characterized in that:Nacelle is long hexahedron, and front-back is bulkhead (4);Left and right face
It is side wall (3);The above is cabin top (1);Here is the bilge (10);
It is close to front and rear bulkhead (4) along length in cabin, respectively fills and cabin top (1), the built-in wardrobe of the lower vertical bilge (10) are supported on a row;Often row's built-in wardrobe has
Several frameworks, each framework constitutes ladder shape by two columns (5) and a few walings (6);It is elongated on crosspiece (6) to be covered with frame plate
(7);By having unscrewing type screen door (9) on the column (5) in cabin;It is operation road (11) between two row's built-in wardrobes;Side wall has hatch door on (3)
(8)。
2. tank according to claim 1 unifies power station cabin, it is characterized in that:There is mineral wool thermal insulation layer on the cabin top (1) of nacelle;Behaviour
Make (11) paving insulation board;There is maintenance area close to hatch door (8);There are ventilation equipment, embedded lamp (2) in cabin top (1).
3. tank according to claim 1 unifies power station cabin, it is characterized in that:The framework of built-in wardrobe is constituted, zinc-plated Steel Thin-Wall is used
Pipe does column (5), crosspiece (6) and is welded into rectangle ladder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621381374.3U CN206389008U (en) | 2016-12-16 | 2016-12-16 | Tank unifies power station cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621381374.3U CN206389008U (en) | 2016-12-16 | 2016-12-16 | Tank unifies power station cabin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206389008U true CN206389008U (en) | 2017-08-08 |
Family
ID=59488177
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621381374.3U Active CN206389008U (en) | 2016-12-16 | 2016-12-16 | Tank unifies power station cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206389008U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106451121A (en) * | 2016-12-16 | 2017-02-22 | 国网山西电力设计研究院 | Power station cabin combined with cabinets |
-
2016
- 2016-12-16 CN CN201621381374.3U patent/CN206389008U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106451121A (en) * | 2016-12-16 | 2017-02-22 | 国网山西电力设计研究院 | Power station cabin combined with cabinets |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202059135U (en) | Distributing structure of cable brackets in cable tunnel | |
CN206389008U (en) | Tank unifies power station cabin | |
CN203289039U (en) | Bus duct housing | |
CN206237000U (en) | A kind of site terminal box with lateral wall type support | |
CN203632157U (en) | A secondary cable shaft well of a cabinet-type structure | |
CN204243477U (en) | A cable laying structure of a secondary screen cabinet | |
CN107809066B (en) | Centralized cable routing module for prefabricated cabin and prefabricated cabin using this module | |
CN106451121A (en) | Power station cabin combined with cabinets | |
CN105137555A (en) | Concentrated optical fiber distribution cabinet based on pre-wiring prefabricated optical cable plug boxes and layout method | |
CN204391512U (en) | A kind of control cables arrangement of intelligent substation 10kV Machine Room | |
CN205724763U (en) | A kind of air insulation bus-slot | |
CN204203522U (en) | Fiber to the home distributor box | |
CN204464759U (en) | A cabin-mounted screen for displaying prefabricated cabins before wiring | |
CN204216523U (en) | A kind of vertical shaft of layering cabling | |
CN203618260U (en) | Automatic line single machine electrical cabinet | |
CN207875418U (en) | A kind of electric vehicle alternating-current charging pile | |
CN207151012U (en) | Vertical flat rack | |
CN205811492U (en) | Assembled overground cable ditch | |
CN205176349U (en) | Embedded OPGW optical cable termination case of indoor transformer substation | |
CN206364387U (en) | Insulated protection type switch cubicle | |
CN204333663U (en) | A kind of high-voltage metering cubicle | |
CN201838952U (en) | Branch groove connecting piece of cable groove | |
CN104362517A (en) | Prefabricated ceiling and secondary device prefabricating bin using same | |
CN205565307U (en) | 10kV high tension switchgear of reliable wall installation | |
CN205301640U (en) | Concentrate optic fibre distribution cabinet based on prefabricated optical cable jack box of preceding wiring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: Huang Yu No. 89 building, 030002 Shanxi city of Taiyuan Province East Room 907 Xinghualing District Patentee after: State Grid Shanxi Electric Power Survey Design & Research Institute Co., Ltd. Address before: Huang Yu No. 89 building, 030002 Shanxi city of Taiyuan Province East Room 907 Xinghualing District Patentee before: STATE GRID SHANDONG ELECTRICAL DESIGN INSTITUTE |