CN204419256U - A kind of merging groove containing tunnel cable groove and roadside drainage ditch - Google Patents

A kind of merging groove containing tunnel cable groove and roadside drainage ditch Download PDF

Info

Publication number
CN204419256U
CN204419256U CN201520039532.6U CN201520039532U CN204419256U CN 204419256 U CN204419256 U CN 204419256U CN 201520039532 U CN201520039532 U CN 201520039532U CN 204419256 U CN204419256 U CN 204419256U
Authority
CN
China
Prior art keywords
groove
cable
district
merging
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520039532.6U
Other languages
Chinese (zh)
Inventor
刘志
甄俊杰
孟志豪
韩大千
侯豪斌
李永永
薛晓辉
郑齐银
程飞
郑亚强
张敏敏
路平
卫高红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201520039532.6U priority Critical patent/CN204419256U/en
Application granted granted Critical
Publication of CN204419256U publication Critical patent/CN204419256U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

The utility model discloses a kind of merging groove containing tunnel cable groove and roadside drainage ditch.Described merging groove digs in the concrete wall of road both sides, and it is divided into cable at vertical direction and lays district, central strip district and three sections, catchment; Described cable is laid district and be provided with cable bearer on its cell wall, is provided with lamina tecti above it, thereunder connects central strip district; The splash guard that described central strip district comprises the cover plate on upper strata, the corner of the geotextiles of lower floor and centre is turned up; Described catchment is positioned at below central strip district, the horizontal aqueduct after its cell wall is provided with and stretches to tunnel lining.Compared with prior art, the utility model shortens the drainage path of lining cutting behind ponding, and centre drain is arranged on the maintenance difficult problem that in the middle part of pavement of road, below causes under can solving traditional design form, meanwhile, cable channel and gutter are conducive to the ponding emission problem solving cable channel inner tunnel infiltration generation after building jointly.

Description

A kind of merging groove containing tunnel cable groove and roadside drainage ditch
Technical field
The utility model belongs to tunnel groove technical field, specifically, relates to a kind of merging groove containing tunnel cable groove and roadside drainage ditch.
Background technology
China's rapid development of economy brings the traffic volume to be increased significantly, the leakage problem of highway tunnel more and more highlights, in operation tunnel, the situation that cable trench ponding or centre drain impeded drainage are difficult to again keep in repair often has generation, is necessary to be optimized design and necessary improvement to this situation.
The drainage system of tunnel internal is a complicated system engineering, and traditional tunnel drainage system roughly can be divided into two parts, and a part is that tunnel road surface and lining cutting seepage form " open fire ", is generally discharged by the gutter be arranged on both sides of the road; Another part is tunnel lining behind " dark water ", and the centre drain generally by being arranged on below in road is discharged.Tunnel lining Drainage Design behind adopts the form of centre drain usually, there is certain defect in this design, in the liner structure establishing inverted arch, the existence of centre drain can make the cast of inverted arch not carry out simultaneously, downward excavation is needed again when not establishing inverted arch, the globality of inverted arch or foundation structure will be destroyed like this, be unfavorable for the stable of tunnel support structure.Meanwhile, centre drain position is in below in the middle part of road surface, occurs that the maintenance after the problems such as blocking can be more difficult.
Tunnel internal cable trench is generally arranged on the both sides of tunnel carriage way, and wherein, the inner side of direction of traffic arranges strong cable channel, arranged outside weak cable groove.Cable run is arranged on the support of cable channel cell wall, be welded into a whole with galvanized flat steel between cable bearer, and be welded into a whole with power pipe outside pre-buried copper pipe, tunnel in tunnel, ensure electrical grounding path, in, in long tunnel, weak cable groove inside also can arrange fire protection pipeline, and pipeline is fixed on cell wall by support equally.Because the defects such as tunnel drainage system impeded drainage or tunnel structure crack cause the situation of tunnel internal percolating water to happen occasionally, it is smaller that cable channel inner drainage channel is often arranged, self dewatering needs can not be met, in factual survey process, just there is the situation that cable channel internal water accumulation too much jeopardizes groove inner cable facility.
Summary of the invention
For solving the problems of the technologies described above, the utility model provides a kind of simple, unobstructed merging groove containing tunnel cable groove and roadside drainage ditch.
A kind of merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model, described merging groove digs in the concrete wall 1 of road both sides, and it is divided into cable at vertical direction and lays district 2, central strip district and 3 three sections, catchment; Described cable is laid district 2 and be provided with cable bearer 5 on its cell wall, is provided with lamina tecti 4 above it, thereunder connects central strip district; The splash guard 7 that described central strip district comprises the cover plate 6 on upper strata, the corner of the geotextiles 8 of lower floor and centre is turned up; Described catchment 3 is positioned at below central strip district, the horizontal aqueduct 9 after its cell wall is provided with and stretches to tunnel lining.
A kind of merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model, the seam crossing of described cover plate 6 is provided with the cover plate puncture 10 running through splash guard and geotextiles.Cover plate puncture is utilized to make catchment, bottom realize discharging the function of cable channel ponding.
A kind of merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model, described cover plate puncture 10 establishes one every 25m.
A kind of merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model, described lamina tecti 4 and cover plate 6 adopt lightweight hard plastic or plank.
A kind of merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model, described lamina tecti 4 and cover plate 6 all just disconnect once every 0.75m.Cover plate monolithic length is slightly less than cable district support minimum spacing, is taken as 75cm, and when catchment needs repairing because of blocking, cover plate can take out by block-by-block between cable district support, is convenient to raceway groove maintenance.
A kind of merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model, described merging groove is divided into forceful electric power side to merge groove and weak-feedback side of transmission line merges groove, and both are located at the inner side and outer side of tunnel direction of traffic respectively.
A kind of merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model, the length and width size that district 2 laid by the cable that described forceful electric power side merges groove is greater than 70 × 60cm; The length and width size that district 2 laid by the cable that described forceful electric power side merges groove is greater than 50 × 50cm; The length and width size of described catchment 3 is greater than 35 × 30cm.
A kind of merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model, the cable of described weak-feedback side of transmission line merging groove is laid district 2 and be also provided with support of pipelines 12 on its cell wall, and this support of pipelines 12 is provided with fire protection pipeline 11.
Compared with prior art, the merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model eliminates the centre drain form of medium tunnel traditional design, is divided into two grooves and designs respectively below the cable trench of road both sides.This design form shortens the drainage path of lining cutting behind ponding, and two gutters of design can meet the drainage requirement in tunnel.Building jointly under form, gutter is arranged on the below of cable trench, and top adopts geotextiles, splash guard and light cover plate to close, and can both accomplish more convenient to make groove construction and maintenance.Under this new design can solve traditional design form, centre drain is arranged on the maintenance difficult problem that in the middle part of pavement of road, below causes, and meanwhile, cable channel and gutter are conducive to the ponding emission problem solving cable channel inner tunnel infiltration generation after building jointly.
Accompanying drawing explanation
Fig. 1: forceful electric power side merges groove structure figure; Fig. 2: weak-feedback side of transmission line merges groove structure figure; Fig. 3: middle part deck portion floor map; Concrete wall-1, cable lay district-2, catchment-3, lamina tecti-4, cable bearer 5, cover plate-6, splash guard-7, geotextiles-8, horizontal aqueduct-9, cover plate puncture-10, fire protection pipeline-11, support of pipelines-12.
Detailed description of the invention
Be described further containing tunnel cable groove and roadside drainage ditch described in the utility model below in conjunction with specific embodiment, but protection domain of the present utility model is not limited to this.
Embodiment 1
Contain a merging groove for tunnel cable groove and roadside drainage ditch, described merging groove digs in the concrete wall 1 of road both sides, and it is divided into cable at vertical direction and lays district 2, central strip district and 3 three sections, catchment; Described cable is laid district 2 and be provided with cable bearer 5 on its cell wall, is provided with lamina tecti 4 above it, thereunder connects central strip district; The splash guard 7 that described central strip district comprises the cover plate 6 on upper strata, the corner of the geotextiles 8 of lower floor and centre is turned up; Described catchment 3 is positioned at below central strip district, the horizontal aqueduct 9 after its cell wall is provided with and stretches to tunnel lining.Described cable is laid district 2 and be also provided with support of pipelines 12 on its cell wall, and this support of pipelines 12 is provided with fire protection pipeline 11; The length and width that district 2 laid by described cable are of a size of 75 × 65cm; The length and width of described catchment 3 are of a size of 40 × 35cm.
Embodiment 2
Contain a merging groove for tunnel cable groove and roadside drainage ditch, described merging groove digs in the concrete wall 1 of road both sides, and it is divided into cable at vertical direction and lays district 2, central strip district and 3 three sections, catchment; Described cable is laid district 2 and be provided with cable bearer 5 on its cell wall, is provided with lamina tecti 4 above it, thereunder connects central strip district; The splash guard 7 that described central strip district comprises the cover plate 6 on upper strata, the corner of the geotextiles 8 of lower floor and centre is turned up; Described catchment 3 is positioned at below central strip district, the horizontal aqueduct 9 after its cell wall is provided with and stretches to tunnel lining; The seam crossing of described cover plate 6 is provided with the cover plate puncture 10 running through splash guard and geotextiles; Described cover plate puncture 10 establishes one every 25m; Described lamina tecti 4 and cover plate 6 adopt lightweight plank; Described lamina tecti 4 and cover plate 6 all just disconnect once every 0.75m; Described merging groove is divided into forceful electric power side to merge groove and weak-feedback side of transmission line merges groove, and both are located at the inner side and outer side of tunnel direction of traffic respectively; The length and width that district 2 laid by the cable that described forceful electric power side merges groove are of a size of 75 × 65cm; The length and width that district 2 laid by the cable that described forceful electric power side merges groove are of a size of 55 × 55cm; The length and width of described catchment 3 are of a size of 40 × 35cm; The cable of described weak-feedback side of transmission line merging groove is laid district 2 and be also provided with support of pipelines 12 on its cell wall, and this support of pipelines 12 is provided with fire protection pipeline 11.
Compared with prior art, the merging groove containing tunnel cable groove and roadside drainage ditch described in the utility model eliminates the centre drain form of medium tunnel traditional design, is divided into two grooves and designs respectively below the cable trench of road both sides.This design form shortens the drainage path of lining cutting behind ponding, and two gutters of design can meet the drainage requirement in tunnel.Building jointly under form, gutter is arranged on the below of cable trench, and top adopts geotextiles, splash guard and light cover plate to close, and can both accomplish more convenient to make groove construction and maintenance.Under this new design can solve traditional design form, centre drain is arranged on the maintenance difficult problem that in the middle part of pavement of road, below causes, and meanwhile, cable channel and gutter are conducive to the ponding emission problem solving cable channel inner tunnel infiltration generation after building jointly.

Claims (8)

1. one kind contains the merging groove of tunnel cable groove and roadside drainage ditch, it is characterized in that, described merging groove digs in the concrete wall (1) of road both sides, and it is divided into cable at vertical direction and lays district (2), central strip district and (3) three sections, catchment; Described cable is laid district (2) on its cell wall, is provided with cable bearer (5), is provided with lamina tecti (4) above it, thereunder connects central strip district; Described central strip district comprises the splash guard (7) that the cover plate (6) on upper strata, the geotextiles (8) of lower floor and middle corner are turned up; Described catchment (3) is positioned at below central strip district, the horizontal aqueduct (9) after its cell wall is provided with and stretches to tunnel lining.
2. a kind of merging groove containing tunnel cable groove and roadside drainage ditch according to claim 1, it is characterized in that, the seam crossing of described cover plate (6) is provided with the cover plate puncture (10) running through splash guard and geotextiles.
3. a kind of merging groove containing tunnel cable groove and roadside drainage ditch according to claim 2, it is characterized in that, described cover plate puncture (10) establishes one every 25m.
4. a kind of merging groove containing tunnel cable groove and roadside drainage ditch according to claim 1, is characterized in that, described lamina tecti (4) and cover plate (6) adopt lightweight hard plastic or plank.
5. a kind of merging groove containing tunnel cable groove and roadside drainage ditch according to claim 1, it is characterized in that, described lamina tecti (4) and cover plate (6) all just disconnect once every 0.75m.
6. a kind of merging groove containing tunnel cable groove and roadside drainage ditch according to claim 1, is characterized in that, described merging groove is divided into forceful electric power side to merge groove and weak-feedback side of transmission line merges groove, and both are located at the inner side and outer side of tunnel direction of traffic respectively.
7. a kind of merging groove containing tunnel cable groove and roadside drainage ditch according to claim 6, is characterized in that, the length and width size that district (2) laid by the cable that described forceful electric power side merges groove is greater than 70 × 60cm; The length and width size that district (2) laid by the cable that described forceful electric power side merges groove is greater than 50 × 50cm; The length and width size of described catchment (3) is greater than 35 × 30cm.
8. a kind of merging groove containing tunnel cable groove and roadside drainage ditch according to claim 6, it is characterized in that, the cable of described weak-feedback side of transmission line merging groove is laid district (2) on its cell wall, is also provided with support of pipelines (12), and this support of pipelines (12) is provided with fire protection pipeline (11).
CN201520039532.6U 2015-01-20 2015-01-20 A kind of merging groove containing tunnel cable groove and roadside drainage ditch Expired - Fee Related CN204419256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520039532.6U CN204419256U (en) 2015-01-20 2015-01-20 A kind of merging groove containing tunnel cable groove and roadside drainage ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520039532.6U CN204419256U (en) 2015-01-20 2015-01-20 A kind of merging groove containing tunnel cable groove and roadside drainage ditch

Publications (1)

Publication Number Publication Date
CN204419256U true CN204419256U (en) 2015-06-24

Family

ID=53469638

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520039532.6U Expired - Fee Related CN204419256U (en) 2015-01-20 2015-01-20 A kind of merging groove containing tunnel cable groove and roadside drainage ditch

Country Status (1)

Country Link
CN (1) CN204419256U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368732A (en) * 2016-12-01 2017-02-01 中铁十二局集团有限公司 Pressure releasing and drainage system for double-track tunnel base of high speed railway
CN106703881A (en) * 2016-12-01 2017-05-24 中铁十二局集团有限公司 Pressure-reduction water-draining system for high-speed-railway-single-track-tunnel substrate
JP2018204249A (en) * 2017-06-01 2018-12-27 大成建設株式会社 Purity and impurity separation drainage structure in tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106368732A (en) * 2016-12-01 2017-02-01 中铁十二局集团有限公司 Pressure releasing and drainage system for double-track tunnel base of high speed railway
CN106703881A (en) * 2016-12-01 2017-05-24 中铁十二局集团有限公司 Pressure-reduction water-draining system for high-speed-railway-single-track-tunnel substrate
JP2018204249A (en) * 2017-06-01 2018-12-27 大成建設株式会社 Purity and impurity separation drainage structure in tunnel

Similar Documents

Publication Publication Date Title
CN102661171B (en) Frost damage prevention drainage system for tunnel
CN101768976B (en) Base pit dewatering and water saving device and construction method thereof
CN204266220U (en) A kind of plugging device of precipitation well in foundation pit
CN107131001A (en) A kind of and water delivery and the Railway Tunnel of communication function
CN103046579B (en) A kind of two-way eight track lakebed open cuts secretly bury tunnel structure
CN102839670A (en) Shallow foundation pit freezing enclosure and construction method thereof
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN110424988B (en) Tunnel waterproof structure and tunnel waterproof method
CN204419256U (en) A kind of merging groove containing tunnel cable groove and roadside drainage ditch
CN103526724A (en) Anchoring impervious structure in which reservoir bottom geomembrane is connected with reservoir periphery drainage gallery peripheral joints
CN108843386A (en) Tunnel roof waterproof drainage structure and water seepage treatment method thereof
CN104533469A (en) Method and device for solving water seepage and leakage of lining surface of underground cavern
CN106368239A (en) Water stop structure arranged at position of expansion joint of urban underground comprehensive pipe rack and construction method of water stop structure
CN204402513U (en) Device for solving water seepage and leakage of lining surface of underground cavern
CN208619166U (en) Waterproof drainage structure of tunnel roof
CN103225261A (en) Bridge drainage structure
CN113914361B (en) Subway station cover-excavation construction method without road surface breaking
CN105926665A (en) Prefabricated large-sized building block assembly type concrete drainage pipeline base and construction method thereof
CN106368211B (en) Rectangular concrete pile for building piping lane side wall
CN104047273B (en) Power station dissipation and scouring wall and construction method thereof
CN205206824U (en) Structure is segmented secretly to intercept water by square vertical
CN111365039B (en) Tunnel water leakage treatment method
CN103726514A (en) Anti-leakage structure and anti-leakage construction method for underground continuous wall
CN107221885A (en) Underground pipe gallery cable draws node and its construction method
CN202220345U (en) Drain pipe system below community driveway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150624

Termination date: 20190120

CF01 Termination of patent right due to non-payment of annual fee