CN106368732A - Pressure releasing and drainage system for double-track tunnel base of high speed railway - Google Patents

Pressure releasing and drainage system for double-track tunnel base of high speed railway Download PDF

Info

Publication number
CN106368732A
CN106368732A CN201611090371.9A CN201611090371A CN106368732A CN 106368732 A CN106368732 A CN 106368732A CN 201611090371 A CN201611090371 A CN 201611090371A CN 106368732 A CN106368732 A CN 106368732A
Authority
CN
China
Prior art keywords
tunnel
drainage system
speed railway
water
draining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611090371.9A
Other languages
Chinese (zh)
Inventor
张金柱
张俊儒
崔耀
李建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
China Railway 12th Bureau Group Co Ltd
Original Assignee
Southwest Jiaotong University
China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University, China Railway 12th Bureau Group Co Ltd filed Critical Southwest Jiaotong University
Priority to CN201611090371.9A priority Critical patent/CN106368732A/en
Publication of CN106368732A publication Critical patent/CN106368732A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a pressure releasing and drainage system for a double-track tunnel base of a high speed railway. A soakage pit is formed in a tunnel inverted arch base in advance; a central drainage ditch is arranged below the road surface of a tunnel central line; a draining guide pipe downwards extending into the soakage pit is arranged on the side wall of the central drainage ditch; a plurality of infiltrating holes are formed in the pipe wall of the lower end of the draining guide pipe; permeable geotextile wraps the lower end of the draining guide pipe; the infiltration well is filled with gravels. According to the pressure releasing and drainage system disclosed by the invention, water can be collected into the soakage pit, and further the draining of underground water is facilitated; the geotextile wraps the end, extending into the soakage pit, of the draining pipe, thereby preventing the blockage of an infiltration pipe, guaranteeing smooth draining of base water, reducing the pressure of the base water, and eventually reducing potential hidden danger of a project.

Description

A kind of high-speed railway double track tunnel substrate decompression drainage system
Technical field
The present invention relates to tunnels and underground engineering technical field, specially a kind of high-speed railway double track tunnel substrate decompression row Water system.
Background technology
The guarded drainage technology in tunnel, is exactly the important step during Tunnel Design, Tunnel Design is to subsoil water always Process and will have influence on the stress of structure, influence degree of ecological environment etc..For the Railway Tunnel built in region of FuShui, Because substrate is acted on by groundwater pressure, lead to inverted arch under effect of water pressure, produce inverted arch lifting, the disease of craze and transfiguration Evil, so that high speed railway track deforms, causes guideway irregularity, leaves serious potential safety hazard to later stage operation, makes Become life and property loss.
For prevent due to groundwater pressure excessive, and lead to tunnel inverted arch to bear excessive active force, cause inverted arch to swell Deformation, destroys the ride comfort of high-speed railway circuit, has some scholars that it is studied it is proposed that some working measures, but just For the drainage system of high-speed railway substrate decompression at present, there is not the reliable method of system.If Wang Yuan is clearly in " rich water tunnel subregion Decompression guarded drainage technical research " propose in a literary composition, in centre drain bottom, pvc pipe and substrate UNICOM are installed in advance, to When water pressure increases, subsoil water can be discharged into centre drain along conduit, and this theoretical method is feasible, but answers actual With during, pvc pipe is susceptible to plugging phenomenon, leads to subsoil water cannot normally circulate it is impossible to produce a desired effect;Due in The water in centre gutter, easily along pvc pipe flow to ground, makes substrate be chronically at rich water state, easily makes foundation softening, cause country rock strong Degree reduces, and induces disease;And, due to being not provided with charge for remittance area, subsoil water is difficult to self-conductance bank of tubes to centre drain.Germany Some mountain tunnels due to buried depth less, using full plugging structure, but adopt in inverted arch gutter arranged below when head is higher Method reducing waterpower, outside substrate subsoil water effectively can be discharged tunnel by the method, reduce water pressure at the bottom of the foundation, but should Method needs to apply gutter inside and outside tunnel-liner, and quantities is larger.
Content of the invention
For the problems referred to above it is an object of the invention to proposing a kind of high-speed railway double track tunnel substrate decompression drainage system, This system can successfully collect subsoil water, also smoothly can arrange substrate subsoil water to centre drain simultaneously, and then Reduce water pressure at the bottom of the foundation, prevent inverted arch protuberance deformation, reduce the hidden dangers in project during the operation of high-speed railway later stage.Technical scheme As follows:
A kind of high-speed railway double track tunnel substrate decompression drainage system, tunnel inverted arch substrate is preset with filter well, tunnel center line It is provided with centre drain, centre drain side wall is provided with the drainage duct extending down into filter well below road surface.
Further, described drainage duct lower end tube wall is provided with multiple water seepage holes.
Further, described drainage duct lower end is enclosed with permeable geotextiles.
Further, it is filled with rubble in described filter well.
The invention has the beneficial effects as follows: the present invention relatively has substrate decompression drainage system innovation and is to be provided with substrate Filter well, water is come together among filter well, and then is conducive to the discharge of subsoil water;And the rich water situation according to stratum, can With the rational quantity arranging filter well, make design more reasonable, effective, and then reduce quantities, reduction of erection time;Simultaneously in row Water conduit stretches into filter well end permeable geotextiles parcel termination, thus the blockage that avoids seeping water is it is ensured that the smooth row of sole Remove, reduce water pressure at the bottom of the foundation, and then reduce hidden dangers in project.
Brief description
Fig. 1 is the structural representation of high-speed railway double track tunnel substrate decompression drainage system of the present invention.
Fig. 2 is high-speed railway double track tunnel substrate decompression drainage system vertical view cutaway drawing of the present invention.
Fig. 3 is high-speed railway double track tunnel substrate decompression drainage system side sectional view of the present invention.
Fig. 4 is drainage duct structural representation of the present invention.
In figure: 1- centre drain;2- filter well;3- drainage duct;31- water seepage hole;4- rubble;The permeable geotextiles of 5-; 7- preliminary bracing;8- secondary lining.
Specific embodiment
With specific embodiment, the present invention is described in further details below in conjunction with the accompanying drawings.As shown in figure 1, a kind of high-speed iron Road double track tunnel substrate decompression drainage system, tunnel inverted arch substrate is preset with filter well 2, in being provided with below the road surface of tunnel center line Centre gutter 1, centre drain 1 side wall is provided with the drainage duct 3 extending down into filter well 2.
After inverted arch excavation completes, left and right sides suitable distance below centre drain, excavate rectangular cross section infiltration Well, cross dimensions is length × wide=(60cm ~ 80cm) × (60cm ~ 80cm), and infiltration well depth is with deep near the tunnel central side borehole wall Degree is reference, is advisable with 80cm, depending on other borehole wall depth are with tunnel inverted arch profile.
The drainage duct 3 lower end tube wall of the present embodiment is provided with multiple water seepage holes 31.Drainage duct adopts φ 100pvc to manage, Its embedment infiltration well section arranges water seepage hole 31 according to blossom type, and pitch of holes is advisable with 5 ~ 10cm, as shown in Figure 4.
Drainage duct 3 lower end of the present embodiment is enclosed with permeable geotextiles 5.Drainage duct 3 stretches into infiltration well section using thoroughly Water geotextiles colligation, can avoid seeping water hole plug it is ensured that the smooth exclusion of sole;The drainage duct other end is below cover plate Centre drain is introduced the water at 5cm.
As shown in Fig. 2 drainage duct is longitudinally arranged along tunnel, spacing is advisable with 25 ~ 30cm;Filter well spacing is according to tunnel Country rock rich water situation is advisable with 15m ~ 20m.
It is filled with rubble 4 in the filter well 2 of the present embodiment.As shown in figure 3, fixing drainage duct, will adopt in filter well Block stone is filled the water penetration it is ensured that in filter well.

Claims (4)

1. a kind of high-speed railway double track tunnel substrate decompression drainage system is it is characterised in that tunnel inverted arch substrate is preset with infiltration Well (2), is provided with centre drain (1) below the road surface of tunnel center line, centre drain (1) side wall is provided with to extend down into and oozes The drainage duct (3) of well (2).
2. high-speed railway double track tunnel substrate according to claim 1 decompression drainage system is it is characterised in that described draining Conduit (3) lower end tube wall is provided with multiple water seepage holes (31).
3. high-speed railway double track tunnel substrate according to claim 1 decompression drainage system is it is characterised in that described draining Conduit (3) lower end is enclosed with permeable geotextiles (5).
4. high-speed railway double track tunnel substrate according to claim 1 decompression drainage system is it is characterised in that described infiltration It is filled with rubble (4) in well (2).
CN201611090371.9A 2016-12-01 2016-12-01 Pressure releasing and drainage system for double-track tunnel base of high speed railway Pending CN106368732A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611090371.9A CN106368732A (en) 2016-12-01 2016-12-01 Pressure releasing and drainage system for double-track tunnel base of high speed railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611090371.9A CN106368732A (en) 2016-12-01 2016-12-01 Pressure releasing and drainage system for double-track tunnel base of high speed railway

Publications (1)

Publication Number Publication Date
CN106368732A true CN106368732A (en) 2017-02-01

Family

ID=57892236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611090371.9A Pending CN106368732A (en) 2016-12-01 2016-12-01 Pressure releasing and drainage system for double-track tunnel base of high speed railway

Country Status (1)

Country Link
CN (1) CN106368732A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109236321A (en) * 2018-11-28 2019-01-18 西南交通大学 A kind of band can maintenance type drainage gallery composite lining of tunnel structure
CN116664582A (en) * 2023-08-02 2023-08-29 四川公路桥梁建设集团有限公司 Road surface detection method and device based on neural vision network

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201943177U (en) * 2011-02-23 2011-08-24 四川省交通运输厅公路规划勘察设计研究院 Highway tunnel central drainage inspection well
CN204419256U (en) * 2015-01-20 2015-06-24 山西省交通科学研究院 A kind of merging groove containing tunnel cable groove and roadside drainage ditch
CN104806270A (en) * 2015-05-09 2015-07-29 西安科技大学 Double-arch tunnel modularized middle wall with waterproofing and draining functions and construction method thereof
CN104818991A (en) * 2015-03-30 2015-08-05 中铁二十四局集团福建铁路建设有限公司 Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN206233951U (en) * 2016-11-11 2017-06-09 中铁十二局集团第三工程有限公司 Depressurize drainage system in a kind of high-speed railway double track tunnel base

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201943177U (en) * 2011-02-23 2011-08-24 四川省交通运输厅公路规划勘察设计研究院 Highway tunnel central drainage inspection well
CN204419256U (en) * 2015-01-20 2015-06-24 山西省交通科学研究院 A kind of merging groove containing tunnel cable groove and roadside drainage ditch
CN104818991A (en) * 2015-03-30 2015-08-05 中铁二十四局集团福建铁路建设有限公司 Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN104806270A (en) * 2015-05-09 2015-07-29 西安科技大学 Double-arch tunnel modularized middle wall with waterproofing and draining functions and construction method thereof
CN206233951U (en) * 2016-11-11 2017-06-09 中铁十二局集团第三工程有限公司 Depressurize drainage system in a kind of high-speed railway double track tunnel base

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109236321A (en) * 2018-11-28 2019-01-18 西南交通大学 A kind of band can maintenance type drainage gallery composite lining of tunnel structure
CN116664582A (en) * 2023-08-02 2023-08-29 四川公路桥梁建设集团有限公司 Road surface detection method and device based on neural vision network
CN116664582B (en) * 2023-08-02 2023-10-27 四川公路桥梁建设集团有限公司 Road surface detection method and device based on neural vision network

Similar Documents

Publication Publication Date Title
CN206233951U (en) Depressurize drainage system in a kind of high-speed railway double track tunnel base
US20220267974A1 (en) Method for constructing inner dump type strip mine pit bottom reservoirs section by section
CN104878760B (en) A kind of side slope is from draining electric osmose anchor pole and construction method
CN104480974B (en) Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond
CN103032097B (en) Be applicable to tunnel drainage structure and the construction method thereof of bias voltage water rich strata
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN201485847U (en) Novel synchronous draining leakage and reinforcing device for tailing dams
CN105926576A (en) Method for accelerating tailing pulp dewatering and consolidating in upstream method milltailing alluviation dam building
CN208533546U (en) A kind of series-parallel underground stereo drainage system suitable for side landslide engineering
CN201933510U (en) Outlet shaft structure of underground factories in hydroelectric engineering
CN206448286U (en) It is a kind of to be used to reduce the radial system of grey field dam seepage line
CN106368732A (en) Pressure releasing and drainage system for double-track tunnel base of high speed railway
CN203320494U (en) High dam spillway foundation drainage system
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN205024710U (en) Adopt raft foundation structure of anti prestressed anchorage of floating cable
CN102383408A (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN205035768U (en) Enrockment concrete permeable dike
CN206233950U (en) Depressurize drainage system in a kind of high-speed railway single-track tunnel base
CN203050779U (en) Tunnel drainage structure suitable for bias pressure rich water strata
CN111271118A (en) Drainage structure suitable for reconstruction of tunnel bottom structure of karst tunnel and construction method thereof
CN208168937U (en) A kind of tunnel bottom discharge structure
CN106703881A (en) Pressure-reduction water-draining system for high-speed-railway-single-track-tunnel substrate
CN113279729B (en) Gas extraction method for leaking stoppage and concentration
CN215804714U (en) Drainage depressurization system at bottom of rich water section tunnel
CN212003256U (en) Drainage system of seepage water is filled to tunnel invert

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170201