CN204532379U - The pre-buried gutter structure of subway sectional tunnel waste water pump house - Google Patents
The pre-buried gutter structure of subway sectional tunnel waste water pump house Download PDFInfo
- Publication number
- CN204532379U CN204532379U CN201520065841.0U CN201520065841U CN204532379U CN 204532379 U CN204532379 U CN 204532379U CN 201520065841 U CN201520065841 U CN 201520065841U CN 204532379 U CN204532379 U CN 204532379U
- Authority
- CN
- China
- Prior art keywords
- preliminary bracing
- section
- water pump
- waste water
- inverted arch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
The pre-buried gutter structure of subway sectional tunnel waste water pump house, this structure not only can improve the corrosion resistance of drainage system, be conducive to the Maintenance and Repair of operating period simultaneously, can also reduce to greatest extent to close owing to just propping up structure the potential safety hazard brought not in time in passage construction process.Comprise the preliminary bracing structure covering tunnel surrounding, and be arranged on the secondary liner structure within preliminary bracing structure, preliminary bracing structure is made up of arch wall section, inverted arch section and crown section.Described inverted arch section is arcuate structure, applies the waterproofing course that loopful is closed in preliminary bracing structure Internal periphery surface.More than described inverted arch section, between waterproofing course and secondary liner structure bottom surface, arrange backfill layer, pre-buried gutter is embedded in this backfill layer.
Description
Technical field
The utility model relates to construction of tunnel, particularly relates to the pre-buried gutter structure of a kind of subway sectional tunnel waste water pump house.
Background technology
For meeting power conservation requirement, subway sectional tunnel longitudinal section is designed to " V " font longitudinal gradient all as far as possible, therefore need arrange waste water pump house near running tunnel minimum point, to meet tunnel minimum point drainage requirement.Current domestic subway sectional tunnel engineering arranges waste water pump house usually after main track is drawn by a bit of passage, and the current in main track tunnel enter in pump house via the gutter being embedded in below passage, two ends connect with main track tunnel drainage ditch and waste water pump house.
Current common way is when ground settlement and tunnel, in channel bottom slotting, and enters in stratum by drainpipe pre-buried, then carries out top tunnel structure construction.The shortcoming of this way is comparatively obvious, one, because subway engineering is century-old engineering, high to the life requirement of gutter, and the gutter buried underground directly contacts with stratum, be difficult to the application life ensureing drainage system, they are two years old, because gutter buries in the earth formation, later stage maintenance difficulty, to remedy cost higher; Further, need slotting to bury gutter underground due to channel bottom, in the area that formation condition is slightly poor, be unfavorable for that the quick closure of structure is just propped up in passage inverted arch position, in construction, there is certain potential safety hazard.
Based on above reason, be necessary further study the pre-buried gutter structure of traditional subway sectional tunnel waste water pump house and improve.
Utility model content
Technical problem to be solved in the utility model is to provide the pre-buried gutter structure of a kind of subway sectional tunnel waste water pump house, this structure not only can improve the corrosion resistance of drainage system, be conducive to the Maintenance and Repair of operating period simultaneously, can also reduce to greatest extent to close owing to just propping up structure the potential safety hazard brought not in time in passage construction process.
It is as follows that the utility model solves the problems of the technologies described above taked technical scheme:
The pre-buried gutter structure of subway sectional tunnel waste water pump house of the present utility model, comprise the preliminary bracing structure covering tunnel surrounding, and the secondary liner structure be arranged within preliminary bracing structure, preliminary bracing structure is made up of arch wall section, inverted arch section and crown section, it is characterized in that: described inverted arch section is arcuate structure, apply the waterproofing course that loopful is closed in preliminary bracing structure Internal periphery surface; More than described inverted arch section, between waterproofing course and secondary liner structure bottom surface, arrange backfill layer, pre-buried gutter is embedded in this backfill layer.
The beneficial effects of the utility model are, in work progress, passage preliminary bracing structure can be closed in time, substantially increases working security; Drainpipe pre-buried, in backfill layer, not only increases the corrosion resistance of drainage system, also the Maintenance and Repair of phase easy to use.
Accompanying drawing explanation
This manual comprises as next width accompanying drawing:
Fig. 1 is the profile of the pre-buried gutter structure of the utility model subway sectional tunnel waste water pump house.
Component name shown in figure and corresponding mark: arch wall section 11, inverted arch section 12, crown section 13, secondary liner structure 21, pre-buried gutter 31, backfill layer 41, waterproofing course 51.
Detailed description of the invention
Below in conjunction with accompanying drawing and concrete embodiment, the utility model is described in further detail.
As shown in Figure 1, the pre-buried gutter structure of subway sectional tunnel waste water pump house of the present utility model, comprise the preliminary bracing structure covering tunnel surrounding, and be arranged on the secondary liner structure 21 within preliminary bracing structure, preliminary bracing structure is made up of arch wall section 11, inverted arch section 12 and crown section 13.Described inverted arch section 12 is arcuate structure, applies the waterproofing course 51 that loopful is closed in preliminary bracing structure Internal periphery surface.Described inverted arch section more than 12, arranges backfill layer 41 between waterproofing course 51 and secondary liner structure 21 bottom surface, and pre-buried gutter 31 is embedded in this backfill layer 41.Passage preliminary bracing structure can be closed in time by waterproofing course 51, thus improves the safety of construction.Pre-buried gutter 31 reliably location and be not subject to formation influence and produce distortion, and under the protection being in backfill layer 41 water-proof and anti-corrosive material, therefore not only increase the application life of gutter 31, also the Maintenance and Repair of phase easy to use.
Usually, described backfill layer 41 can adopt the materials such as cement mortar, concrete or epoxy resin to fill, and described pre-buried gutter 31 can adopt ductile iron pipe, steel pipe or polyvinyl chloride (PVC) tubing.
The general principle of the pre-buried gutter structure of the above the utility model subway sectional tunnel waste water pump house that just explains through diagrams and structure, be not the utility model to be confined to shown in and in described concrete structure and parameter area, therefore every corresponding modify of being likely utilized and equivalent, all belong to the scope of the claims that the utility model is applied for.
Claims (2)
1. the pre-buried gutter structure of subway sectional tunnel waste water pump house, comprise the preliminary bracing structure covering tunnel surrounding, and the secondary liner structure (21) be arranged within preliminary bracing structure, preliminary bracing structure is made up of arch wall section (11), inverted arch section (12) and crown section (13), it is characterized in that: described inverted arch section (12) is arcuate structure, apply the waterproofing course (51) that loopful is closed in preliminary bracing structure Internal periphery surface; More than described inverted arch section (12), between waterproofing course (51) and secondary liner structure (21) bottom surface, arrange backfill layer (41), pre-buried gutter (31) is embedded in this backfill layer (41).
2. the pre-buried gutter structure of subway sectional tunnel waste water pump house as claimed in claim 1, it is characterized in that: described backfill layer (41) adopts cement mortar, concrete or epoxide resin material to fill, and described pre-buried gutter (31) adopts ductile iron pipe, steel pipe or polychloroethylene pipes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520065841.0U CN204532379U (en) | 2015-01-30 | 2015-01-30 | The pre-buried gutter structure of subway sectional tunnel waste water pump house |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520065841.0U CN204532379U (en) | 2015-01-30 | 2015-01-30 | The pre-buried gutter structure of subway sectional tunnel waste water pump house |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204532379U true CN204532379U (en) | 2015-08-05 |
Family
ID=53746401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520065841.0U Active CN204532379U (en) | 2015-01-30 | 2015-01-30 | The pre-buried gutter structure of subway sectional tunnel waste water pump house |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204532379U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105545356A (en) * | 2016-03-04 | 2016-05-04 | 中国五冶集团有限公司 | Drainage treatment structure of concealed excavated tunnel base plate |
CN109681271A (en) * | 2019-01-04 | 2019-04-26 | 交通运输部公路科学研究所 | A kind of built-in type tunnel ring direction drainpipe method for arranging |
-
2015
- 2015-01-30 CN CN201520065841.0U patent/CN204532379U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105545356A (en) * | 2016-03-04 | 2016-05-04 | 中国五冶集团有限公司 | Drainage treatment structure of concealed excavated tunnel base plate |
CN105545356B (en) * | 2016-03-04 | 2018-02-13 | 中国五冶集团有限公司 | Bored tunnel bottom plate drainage sunk well |
CN109681271A (en) * | 2019-01-04 | 2019-04-26 | 交通运输部公路科学研究所 | A kind of built-in type tunnel ring direction drainpipe method for arranging |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103306683B (en) | A kind of construction method of comprehensive precipitation in hole when excavating deep tunnel | |
CN204357484U (en) | The drainage system of anti-tunnel invert constuction joint infiltration | |
CN204266220U (en) | A kind of plugging device of precipitation well in foundation pit | |
CN102797266B (en) | Well sealing waterproof construction method for dewatering well | |
CN206386134U (en) | A kind of Underground Subway Station guarded drainage construction | |
CN204552818U (en) | The drainage system of ditch, side, anti-tunnel bottom leaky | |
CN102535441A (en) | Construction method of underground diaphragm wall | |
CN103291326A (en) | Reconstructed bearing layer control technology of large-deformation roadway surrounding rock | |
CN107152035A (en) | The construction method of underground pipe gallery river crossing | |
CN105696550A (en) | Three axes agitating pile construction method capable of assisting in grooving of reinforced underground diaphragm wall | |
CN103883328A (en) | Semi-covering semi-darkened construction method for separated tunnels downwards penetrating through high and steep V-shaped gully eccentric compression section | |
CN102162253A (en) | Precipitation construction method employing pipe embedding in deep foundation pits | |
CN104612696A (en) | Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method | |
CN103993885A (en) | Construction method for underground excavation tunnel side-direction hole opening supporting system | |
CN204532364U (en) | Tunneling boring rock tunnel development machine engineering method subway tunnel pressure release type liner structure | |
CN102758639B (en) | Anti-blowout long tube grouting method for limited-space tunnels | |
CN204715426U (en) | A kind of water burst drainage system for closed deep foundation ditch exploratory hole | |
CN204532379U (en) | The pre-buried gutter structure of subway sectional tunnel waste water pump house | |
CN103437779B (en) | The construction method of regulation tunnel lining pore gas flow | |
CN102619521B (en) | Construction method for vertical shaft bedrock section wall structure | |
CN204551510U (en) | A kind of filled-up ground catchments pressure reduction well drop and drainage structure | |
CN203768925U (en) | Seal device for dewatering well in foundation pit | |
CN203412598U (en) | Cable-tunnel composite lining waterproof structure | |
CN204941551U (en) | A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction | |
CN105040705A (en) | Ground foundation treatment construction technology under multi-karst-cave geological conditions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |