CN205475360U - Basement secretly buries rubble drainage structures - Google Patents

Basement secretly buries rubble drainage structures Download PDF

Info

Publication number
CN205475360U
CN205475360U CN201620139987.XU CN201620139987U CN205475360U CN 205475360 U CN205475360 U CN 205475360U CN 201620139987 U CN201620139987 U CN 201620139987U CN 205475360 U CN205475360 U CN 205475360U
Authority
CN
China
Prior art keywords
rubble
basement
secretly
net
buries
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620139987.XU
Other languages
Chinese (zh)
Inventor
焦德贵
朱健
张正洪
李兴国
艾迪飞
温卫军
陈仲明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201620139987.XU priority Critical patent/CN205475360U/en
Application granted granted Critical
Publication of CN205475360U publication Critical patent/CN205475360U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model provides a basement secretly buries rubble drainage structures, the rubble that secretly buries including laying in the basement is netted and the sump pit, secretly bury rubble net communicate in sump pit and basement leakage point, secretly bury the drainage of rubble net aspect extremely the sump pit. The utility model discloses a basement sets up the sump pit and secretly buries the rubble net with laying, secretly buries the rubble net and communicates in sump pit and basement leakage point, and the water of basement leakage point seepage is secretly buried the drainage of rubble net aspect extremely the sump pit to can keep indoor seasoning, reduce and to safeguard the maintenance cost, both applicable temporary works, also can set up in formal engineering include that the room is built, road, underground pipe gallery, underground structure etc. Solved basement seepage, moist scheduling problem.

Description

Basement secretly buries rubble discharge structure
Technical field
The basement bottom board antiseepage that this utility model relates to the realm of building construction is moistureproof, is specifically related to one Basement secretly buries rubble discharge structure.
Background technology
Now with the exploitation of the underground space, stepping up of people's living standard, the ring to the underground space Border proposes high requirement, and basement bottom board is due to by the factor shadow such as foundation uneven settlement, groundwater pressure Ring, it may appear that Seepage, bring worry to the work of people, life.Basement indoor and outdoor wall, the end Plate structure construction seepage, for breakthrough leak stopping, repair more convenient effectively, but be to look for seepage place Relatively difficult, because part backplane and body of wall are composite constructions, external structure leaks through composite construction layer Gap manifests at other positions of surface texture, and part substantially repairing point is not actual breakthrough, then There are other breakthroughs in surface texture, increases and searches breakthrough difficulty, strengthens actual maintenance maintenance expense.
Utility model content
For overcoming the defect existing for prior art, a kind of basement of existing offer secretly buries rubble discharge structure, To solve the problem such as basement leakage, humidity.
For achieving the above object, a kind of basement secretly buries rubble discharge structure, including being layed in basement Secretly bury rubble net and sump, the described rubble net that secretly buries is communicated in described sump and basement leakage Point, the described rubble net slope aspect that secretly buries is drained to described sump.
This utility model basement secretly buries further improvement is that of rubble discharge structure, described secretly bury broken Stone net includes the crisscross rubble passage communicated, and described rubble passage is enclosed with molding soft cloth layer.
This utility model basement secretly buries further improvement is that of rubble discharge structure, and described molding is soft Layer of cloth is plastic sheeting or needle-punched geotextiles.
This utility model basement secretly buries further improvement is that of rubble discharge structure, and described rubble leads to Road width is 150mm to 600mm, and thickness is 50mm to 300mm.
This utility model basement secretly buries further improvement is that of rubble discharge structure, described secretly bury broken The backfill on ground floor, basement bottom board basis underlayer or basement roof that stone net laying is located on base plate Soil layer.
This utility model basement secretly buries further improvement is that of rubble discharge structure, described secretly bury broken The rubble laid in stone net selects 30mm to 40mm rubble, 20mm to 30mm rubble, 10mm One or more to 20mm rubble.
The beneficial effects of the utility model are, arrange sump by basement and rubble is secretly buried in laying Net, secretly buries rubble net and is communicated in sump and basement leakage point, and the water of basement leakage point seepage is by secretly Bury rubble net slope aspect and be drained to described sump such that it is able to keep indoor seasoning, reduce maintenance and repair and take By, the most applicable temporary project, it is possible to be arranged at formal engineering include room build, road, underground pipe gallery, Underground structures etc., solve the problem such as basement leakage, humidity.
Accompanying drawing explanation
Fig. 1 is the partial top view that this utility model basement secretly buries rubble discharge structure.
Fig. 2 is the drain schematic diagram that this utility model basement secretly buries rubble discharge structure.
Fig. 3 is the sectional view that this utility model basement secretly buries rubble discharge structure medium stone passage.
Detailed description of the invention
Below by way of specific instantiation, embodiment of the present utility model, those skilled in the art are described Other advantages of the present utility model and effect can be understood easily by the content disclosed by this specification.This reality Can also be carried out by the most different detailed description of the invention with novel or apply, in this specification Every details can also be carried out under without departing from spirit of the present utility model based on different viewpoints and application Various modifications or change.
It should be noted that structure depicted in this specification institute accompanying drawings, ratio, size etc., the most only In order to coordinate the content disclosed in description, understand for those skilled in the art and read, not using To limit the enforceable qualifications of this utility model, therefore do not has technical essential meaning, any structure Modification, the change of proportionate relationship or the adjustment of size, do not affecting the merit that this utility model can be generated by Under the purpose imitated and can reach, all should still fall and obtain can contain at the technology contents disclosed in this utility model In the range of.Meanwhile, in this specification cited as " on ", D score, "left", "right", The term of " middle " and " one " etc., is merely convenient to understanding of narration, and is not used to limit this practicality Novel enforceable scope, being altered or modified of its relativeness, changing under technology contents without essence, When being also considered as the enforceable category of this utility model.
Refer to Fig. 1, Fig. 2 and Fig. 3, Fig. 1 is that this utility model basement secretly buries rubble discharge structure Partial top view, Fig. 2 is the drain schematic diagram that this utility model basement secretly buries rubble discharge structure, Fig. 3 is the sectional view that this utility model basement secretly buries rubble discharge structure medium stone passage.
As shown in Figure 1, Figure 2 and Figure 3, this utility model provides a kind of basement and secretly buries rubble draining Structure, secretly buries rubble net 1 and sump 2 including be layed in basement, described secretly buries rubble net 1 even Lead in described sump 2 and basement leakage point, described secretly bury rubble net 1 slope aspect be drained to described in catchment Well 2.Can be drained to described sump 2 for the ease of secretly burying rubble net 1, sump 2 is located at underground Room physical features lowest part, so that secretly bury rubble net 1 have a drainage grade, it is possible to automatically will enter Secretly bury the water in rubble net 1 to be drained in sump 2.Described basement leakage point at least includes basement Exterior wall, base plate, structural column 3 and wall pipe hole.This utility model basement secretly buries rubble discharge structure and exists During construction, illustrate with structural column 3 for breakthrough, as depicted in figs. 1 and 2, first, in underground Room arranges sump 2;Then, lay rubble at basement and secretly bury rubble net 1, wherein, secretly to be formed Bury rubble net 1 and be communicated in sump 2 and basement leakage point, such as, secretly bury rubble net 1 and be communicated in knot Structure post 3, when the junction of structural column 3 with basement bottom board occurs seepage, the aquiform stool of seepage flows into dark Bury in rubble net 1;Then as it is shown on figure 3, casting concrete ground floor 51, the concrete ground poured Surface layer 51 is covered in and secretly buries rubble net 1;When there is seepage, structural column 3 and basement floor constructions 50 The water that leaks out of junction and the water that leaks out of other breakthrough flow into and secretly bury rubble net 1, and by secretly Bury rubble net 1 to be drained in sump 2 such that it is able to keep indoor seasoning, reduce maintenance and repair expense, The most applicable temporary project, it is possible to be arranged at formal engineering include room build, road, underground pipe gallery, underground Structures etc., solve the problem such as basement leakage, humidity.
Hereinafter said modules is described in detail.
Refer to Fig. 1, Fig. 2 and Fig. 3, Fig. 3 is that this utility model basement secretly buries rubble discharge structure The sectional view of medium stone passage 10, secretly bury rubble net 1 can with the ground floor on base plate, can also lay In basement bottom board basis underlayer, or the back fill course being layed on basement roof.Secretly bury rubble Net 1 is constructed for basement bottom board, when being layed in the blinding layer under basement bottom board, and basement structure Row underground hydrops can be dropped during construction swim with underground;Secretly bury rubble net 1 to can also be used on basement roof Back fill course is constructed, when being layed in basement roof back fill course, it is possible to reduces basement roof hydrops and prevents Only seepage, improves backfill soil drainage effect.
Refer to Fig. 1 and Fig. 3, closer, secretly bury rubble net 1 include crisscross communicate broken Stone passage 10, described rubble passage 10 is enclosed with molding soft cloth layer 11.Molding soft cloth layer 11 is permissible For plastic sheeting or needle-punched geotextiles.As it is shown on figure 3, rubble passage 10 can be layed at the bottom of basement On concrete ground surface layer 51 on plate, rubble passage 10 width is 150mm to 600mm, and thickness is 50mm to 300mm.Secretly bury rubble net 1 in basement, arrange distance exterior wall 0mm to 600mm, Distance interior wall, intercolumniation axis 0mm to 600mm.The rubble of composition rubble passage 10 selects coarse aggregate One in 30mm to 40mm rubble, 20mm to 30mm rubble, 10mm to 20mm rubble Or it is multiple.Rubble uses the parcel molding of the soft cloth such as plastic sheeting or needle-punched geotextiles after laying, or formwork becomes Type.
After having said structure feature, in conjunction with Fig. 1 to Fig. 3, this utility model can be real by procedure below Execute:
First, sump 2 is set at basement physical features lowest part;
Then, rubble is laid to form rubble passage 10, the crisscross phase of rubble passage 10 at basement What logical formation was communicated in sump 2 secretly buries rubble net 1, and wherein, some rubble passage 10 is communicated in ground Lower room breakthrough, such as outer wall of basement, base plate, structural column 3 etc., rubble passage 10 is communicated in knot Structure post 3, when the junction of structural column 3 with basement bottom board occurs seepage, the aquiform stool of seepage flows into broken In stone passage 10;
Then, rubble passage 10 uses the parcel molding of the soft cloth such as plastic sheeting or needle-punched geotextiles; It is preferred that arrange bright gutter 4 at basement bottom board formwork, for bright gutter 4, rubble passage 10 Be equivalent to covered drainage ditch;
Then, casting concrete ground floor 51, the concrete ground surface layer 51 poured is covered in and secretly buries rubble Net 1;When there is seepage, the water that the junction of structural column 3 and basement floor constructions 50 leaks out with And the water that other breakthrough leaks out flows in rubble passage 10, and it is drained to by secretly burying rubble net 1 In sump 2 such that it is able to keep indoor seasoning, reduce maintenance and repair expense, the most applicable casual labour Journey, it is possible to be arranged at formal engineering include room build, road, underground pipe gallery, underground structure etc., solve The problems such as basement leakage.
The beneficial effects of the utility model are:
By basement arrange sump and lay secretly bury rubble net, secretly bury rubble net be communicated in sump and Basement leakage point, the water of basement leakage point seepage secretly buried rubble net slope aspect be drained to described in catchment Well such that it is able to keep indoor seasoning, reduces maintenance and repair expense, the most applicable temporary project, it is possible to Be arranged at formal engineering include room build, road, underground pipe gallery, underground structure etc., solve basement The problem such as seepage, humidity.
Above in association with accompanying drawing embodiment, this utility model is described in detail, ordinary skill in this area This utility model can be made many variations example by personnel according to the above description.Thus, some in embodiment Details should not constitute restriction of the present utility model, and this utility model will define with appended claims Scope is as protection domain.

Claims (6)

1. a basement secretly buries rubble discharge structure, it is characterised in that include being layed in basement Secretly burying rubble net and sump, the described rubble net that secretly buries is communicated in described sump and basement leakage point, The described rubble net slope aspect that secretly buries is drained to described sump.
Basement the most according to claim 1 secretly buries rubble discharge structure, it is characterised in that institute State and secretly bury rubble net and include the crisscross rubble passage communicated, described rubble passage is enclosed with molding soft Layer of cloth.
Basement the most according to claim 2 secretly buries rubble discharge structure, it is characterised in that institute Stating molding soft cloth layer is plastic sheeting or needle-punched geotextiles.
Basement the most according to claim 2 secretly buries rubble discharge structure, it is characterised in that institute Stating rubble channel width is 150mm to 600mm, and thickness is 50mm to 300mm.
Basement the most according to claim 1 secretly buries rubble discharge structure, it is characterised in that institute State ground floor, basement bottom board basis underlayer or the basement roof secretly burying rubble net laying and being located on base plate On back fill course.
Basement the most according to claim 1 secretly buries rubble discharge structure, it is characterised in that institute State and secretly bury the rubble laid in rubble net and select 30mm to 40mm rubble, 20mm to 30mm broken One or more in stone, 10mm to 20mm rubble.
CN201620139987.XU 2016-02-25 2016-02-25 Basement secretly buries rubble drainage structures Expired - Fee Related CN205475360U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620139987.XU CN205475360U (en) 2016-02-25 2016-02-25 Basement secretly buries rubble drainage structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620139987.XU CN205475360U (en) 2016-02-25 2016-02-25 Basement secretly buries rubble drainage structures

Publications (1)

Publication Number Publication Date
CN205475360U true CN205475360U (en) 2016-08-17

Family

ID=56678926

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620139987.XU Expired - Fee Related CN205475360U (en) 2016-02-25 2016-02-25 Basement secretly buries rubble drainage structures

Country Status (1)

Country Link
CN (1) CN205475360U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678029A (en) * 2018-06-29 2018-10-19 中国建筑第五工程局有限公司 A kind of hills rich water area basement guarded drainage construction method near a river

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678029A (en) * 2018-06-29 2018-10-19 中国建筑第五工程局有限公司 A kind of hills rich water area basement guarded drainage construction method near a river
CN108678029B (en) * 2018-06-29 2023-12-26 中国建筑第五工程局有限公司 Water-rich land area basement water-proof and drainage construction method for river-facing hills

Similar Documents

Publication Publication Date Title
CN103266724B (en) Drainage structure of planted roof
CN107100227B (en) A kind of pergola on the city road LID biology delay ditch construction method
CN103741715B (en) The hydrophobic construction method of a kind of basement waterproofing
CN106193263A (en) The biological stagnant pool system in sponge city
CN204982908U (en) Elevartor shaft deep basal pit seepage prevention structure
JP2003193543A (en) Construction method for draining ground and member used therefor
CN207268004U (en) Toilet leakage protective system
CN205444257U (en) Novel drainage system is prevented to bottom plate
CN107852880A (en) A kind of coastal saline-alkali area Yield rainfall relation is every drenching layer and hidden pipe salt discharge alkali system
CN205776257U (en) A kind of foundation pit supporting construction based on high-pressure rotary jet grouting pile
CN107152012A (en) Sluice construction technique
CN204826447U (en) Collapsible loess area underground garage planting roof seeps water to get rid of and uses drainage structures
CN106759472A (en) A kind of buttress type Ecological Retaining Wall structure
CN205475360U (en) Basement secretly buries rubble drainage structures
TWM621567U (en) High-intensity road for water resource adaptive system in response to climate change
CN110226379A (en) The saline and alkaline region water resource of the automatic dripping irrigation of the structure containing terraced fields, which is regulated and stored, utilizes system
CN206887669U (en) Water storage module, drainage structure and water-storing device
CN104196046B (en) Reduce the water proof drainage system of underground hydrostatic water table
CN212104515U (en) Be used for basement percolating water prevention and cure construction structures
CN205804423U (en) A kind of discharge structure of basement
CN112681624A (en) Construction method of roof planted in independent basement
CN105178134B (en) Green road reconstruction method
CN207988424U (en) A kind of moisture-proof ground of rubble drainage layer draining
CN203716273U (en) Multifunctional ecological draining gutter
CN203654332U (en) Novel water prevention and dredge construction structure of basement

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

CF01 Termination of patent right due to non-payment of annual fee