CN205475148U - River course truss -like draws anchor to prevent floating device - Google Patents

River course truss -like draws anchor to prevent floating device Download PDF

Info

Publication number
CN205475148U
CN205475148U CN201521129153.2U CN201521129153U CN205475148U CN 205475148 U CN205475148 U CN 205475148U CN 201521129153 U CN201521129153 U CN 201521129153U CN 205475148 U CN205475148 U CN 205475148U
Authority
CN
China
Prior art keywords
steel pipe
truss
river course
flow direction
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521129153.2U
Other languages
Chinese (zh)
Inventor
董启朋
吴军民
吴文峰
黄荣卫
季强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Original Assignee
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Design Institute of Water Conservancy and Hydroelectric Power filed Critical Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority to CN201521129153.2U priority Critical patent/CN205475148U/en
Application granted granted Critical
Publication of CN205475148U publication Critical patent/CN205475148U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

River course truss -like draws anchor to prevent floating device, it says along the river that perpendicular water flow direction has arranged a pin or many pin, the steel pipe truss that every pin constitutes including the steel pipe that concrete pier, concrete foundation piece, dowel, the different direction in spaces of wire rope and edge were arranged, concrete pier is equipped with two in every pin river course truss -like draws anchor to prevent floating device, concrete pier separates the certain distance along perpendicular water flow direction and arranges the upstream side in the river course, the dowel is buried underground in concrete pier, the concrete foundation piece is the rectangular downstream side of arranging at concrete pier, it buries underground in the concrete foundation piece to constitute the bottom of steel pipe truss 's partial steel pipe, the dowel is connected to wire rope one end, and the steel pipe is connected to the other end. The utility model discloses can have construction convenience, environmental protection, be suitable for extensively, block the characteristics effectual, safe economy of floating in the construction of complicated topography.

Description

River course truss-like draws anchor means for preventing driftage
Technical field
This utility model relates to the river course means for preventing driftage of a kind of hydraulic engineering, especially relates to the purlin, river course that a kind of hydraulic engineering is passed the flood period Posture draws anchor means for preventing driftage.
Background technology
In water conservancy flood retarding project process of construction, owing to river course is dammed, diversion tunnel started water, when only diversion tunnel crosses water, Owing to the cross-section of river is less, it is difficult to by upstream floating thing, shrub and haystack and building waste in groups, thereby result in diversion tunnel Blocking, lifting river water level, have a strong impact on barrage building and pass the flood period safety.Therefore, the mode that drift-net pocket is blocked in general employing intercepts Floating thing.Flood retarding project construction period river course needs to meet the basic functions such as draining dado unobstructed, anti-flood requirement, and means for preventing driftage is usual Fairly simple, following several structural shapes: (1) blocks drift-net;(2) anti-floating cylinder;(3) drift row is blocked.
When water conservancy flood retarding project is built, general drift measure of blocking is that drift-net is blocked in erection, traditional block drift-net and to select in two sides, river course The anchor point taken, blocks drift-net mesh diameter less and obvious by windage, blocks drift-net main rope easy to wear, the floating thing of interception The most disposable, block drift-net and be not suitable with the factors such as river course that riverbed changes greatly.Therefore, comprehensive shadow need to be considered when drift-net is blocked in selection The factor of sound.
In water conservancy flood retarding project, being arranged on of anti-floating cylinder external is used more, mainly relies on the floating drum of different-diameter to float on not With on the water surface of the degree of depth, make full use of the angle of flow direction and floating drum and meet and lead drift effect, owing to floating drum floats on water surface difficulty With fixing, joint easy jam floating thing between floating drum, model need to be set up and calculate and can implement, when selecting anti-floating cylinder difficulty big, Cost is high, is not suitable for extensively applying.
When water conservancy flood retarding project is built, drift row is also blocked in the general drift measure of blocking used, and traditional blocks drift row mainly in river course Built-in concrete foundation, supporting structure, transition buoyancy tank etc. form, need to consider engineering site orographic condition, geological condition, The hydrologic regime in river, engineering place, floating thing number, maximum floating thing etc., determined the supporting blocking drift row by force analysis Version.Therefore, blocking drift row's complex structural designs, construction cost is higher, needs to the greatest extent may be used on the premise of meeting engineering function Simple supporting structure form can be used to reduce construction costs.
Utility model content
The purpose of this utility model is to overcome the defect of prior art, it is provided that a kind of river course truss-like draws anchor means for preventing driftage, full Foot is passed the flood period and is blocked the function of drift (floating log, shrub, in groups haystack, building waste etc.) simultaneously, and river training water quality improves water conservancy diversion Hole conveyance capacity, prevents diversion tunnel from blocking, and effectively reduces flood control water level, have easy construction, environmental protection, widely applicable, block drift Effective, the feature of safety economy.
The technical scheme of this utility model device is: river course truss-like draws anchor means for preventing driftage, is disposed with along river course Transverse to the flow direction One Pin or many Pin;Every Pin river course truss-like draws anchor means for preventing driftage to include concrete pier, concrete foundation block, dowel, steel wire rope And the steel pipe truss of the steel tube place's composition along different spaces direction layout;The every Pin of described concrete pier is provided with two, along vertical water The flow path direction upstream side being arranged in river course spaced apart, described dowel is embedded in concrete pier, described concrete foundation Block is the rectangular downstream being arranged in concrete pier, and described steel pipe connects composition steel pipe truss along different directions, forms steel pipe purlin The bottom of the part steel pipe of frame is embedded in concrete foundation block, and described steel wire rope one end connects dowel, other end joint steel pipe.
Described steel pipe be divided into stand vertically steel pipe, tilt erect steel pipe, level longitudinal direction steel pipe, horizontal cross steel pipe, short bearing diagonal Steel pipe, long bearing diagonal steel pipe, be provided with a row at Parallel to the flow direction and stand vertically steel pipe and two rows all to standing vertically what steel pipe tilted Tilting to erect steel pipe, two rows tilt to erect steel pipe and are respectively provided at the both sides, upstream and downstream standing vertically steel pipe;Described concrete foundation Block is provided with three rows;Often arrange the every bottom standing vertically steel pipe described with the most corresponding embedment in bottom often arranging every inclination setting steel pipe Often arrange in every block concrete basic blocks;The top that Parallel to the flow direction every stands vertically steel pipe and the both sides, upstream and downstream being adjacent Every inclination erect steel pipe top be all fixed together;The every bottom standing vertically steel pipe and the upstream and downstream being adjacent The bottom that steel pipe is erect in every inclination of both sides is respectively connected with level longitudinal direction steel pipe;The every top standing vertically steel pipe and with its phase Two adjacent bottoms standing vertically steel pipe are respectively connected with long bearing diagonal steel pipe, the Transducers Embedded in Concrete basis, bottom of long bearing diagonal steel pipe In block;The every top standing vertically steel pipe and be adjacent two tops standing vertically steel pipe and be respectively connected with horizontal cross steel pipe; Every bottom standing vertically steel pipe and the middle pipeline section tilting to erect steel pipe of both sides, upstream and downstream being adjacent are respectively connected with short Bearing diagonal steel pipe, the bottom of short bearing diagonal steel pipe is all embedded in concrete foundation block;Upstream side is along every phase of Transverse to the flow direction Being respectively connected with horizontal cross steel pipe between adjacent two bottoms tilting to erect steel pipe, upstream side is along the most adjacent the two of Transverse to the flow direction Root inclination is erect and is respectively connected with horizontal cross steel pipe between the middle pipeline section at the identical height of steel pipe;Downstream is along vertical current side To the most adjacent two tilt erect steel pipes bottoms between be respectively connected with horizontal cross steel pipe, downstream is along Transverse to the flow direction It is respectively connected with horizontal cross steel pipe between middle pipeline section at the most adjacent two identical height tilting setting steel pipe;All steel pipe Become steel pipe truss.
Described steel wire rope is provided with two, and one end of every steel wire rope connects dowel, and it is every that other end connection is located along Transverse to the flow direction Pin high order end and the top standing vertically steel pipe of low order end, steel wire rope connected mode can have multiple, such as uses steel cable clamp Connected mode, inserting mode etc..
Connection between described steel pipe is hinged by fastener.
Described river course truss-like draws and is reserved with gap according to water conservancy diversion span width between every two Pin of anchor means for preventing driftage.
The steel tube surface of described composition steel pipe truss is coated with anticorrosion enamelled coating.
The beneficial effects of the utility model are:
(1) this utility model not only have traditional water conservancy dam lead dam after block the function of drift, with existing block drift-net technology compared with, Better effects can be played to intercepting shrub, floating log and building waste, and river topography change can be met.Concrete pier and concrete Can use manually or mechanically during basic blocks construction, still can be according to concrete feelings when, flow rate of water flow big in bed configuration fluctuations is different Condition uses and manually or mechanically constructs.Owing to the truss structure of steel pipe composition has certain motility, can enter according to different landform Row regulation steel pipe length, and draw anchor length also dependent on topography variation.This utility model directly utilizes steel pipe truss formula anchor structure As anti-drift measure, easy construction, environmental protection.
(2) widely applicable.Due to river course truss-like draw anchor means for preventing driftage composition material easily to purchase, easy construction, adapt to various Landform, therefore all can use in various barrage construction projects.
(3) drift is blocked effective.River course truss-like draws the spacing between the steel pipe of anchor means for preventing driftage and the spacing between every Pin to be bases Water conservancy diversion span width determines, while not affecting river course conveyance capacity, both can effectively intercept floating log, shrub, and can carry again Crossing of high diversion tunnel etc. is flowed and flood carrying capacity, protection dam body and diversion canal, and can reach the effect of river training water quality, meets The requirement of passing the flood period after damming is led in hydraulic engineering.
(4) safety economy.Form bearing diagonal by fastener between the rod members such as horizontal, longitudinal steel pipe, connect composition the most each other Stable plane and space truss structure;Truss structure is connected formation anchor structure by steel wire rope with concrete pier and resists current Impulse force and impact force;Repeatable utilization and the low costs such as steel pipe, fastener, steel wire rope, therefore river course truss-like draws anchor device both to pacify Complete economical again.
Accompanying drawing explanation
Fig. 1 is the site plan that this utility model river course truss-like draws anchor means for preventing driftage.
Fig. 2 is the cross-sectional view of Fig. 1.
Fig. 3 is the profilograph of Fig. 1.
Fig. 4 is many Pin unit layout schematic diagram of the present utility model.
Fig. 5 is schematic perspective view of the present utility model.
In figure: 1-concrete pier;2-concrete foundation block;3-dowel;4-steel pipe truss;41-stands vertically steel pipe;42-tilts Erect steel pipe;43-level longitudinal direction steel pipe;44-horizontal cross steel pipe;45-long bearing diagonal steel pipe;46-short bearing diagonal steel pipe;5-detains Part;6-steel wire rope.
Detailed description of the invention
Below in conjunction with the accompanying drawings and embodiment, this utility model is described in further detail.
As shown in Figures 1 to 5, this utility model river course truss-like draws anchor means for preventing driftage, is disposed with along river course Transverse to the flow direction 5 Pin;Every Pin include concrete pier 1, concrete foundation block 2, dowel 3, by standing vertically steel pipe 41, tilting to erect steel pipe 42, level longitudinal direction steel pipe 43, horizontal cross steel pipe 44, long bearing diagonal steel pipe 45, short bearing diagonal steel pipe 46 are by fastener 5 even Connect the steel pipe truss 4 of composition, and steel wire rope 6.Every Pin is provided with two concrete piers, spaced apart along Transverse to the flow direction The upstream side being arranged in river course, embedment dowel 3 in concrete pier 1, concrete foundation block 2 is arranged on river in three rows are rectangular The downstream of concrete pier 1 in road, stands vertically steel pipe, tilts to erect steel pipe, long bearing diagonal steel pipe, the bottom of short bearing diagonal Being cast in concrete foundation block 2, steel wire rope 6 is provided with two, and one end connection of every steel wire rope 6 is embedded in concrete pier 1 in advance Interior dowel 3, the other end connects the top standing vertically steel pipe 41 being located along Transverse to the flow direction every Pin high order end with low order end.
Every Pin river course truss-like draws anchor means for preventing driftage to be equipped with a row at Parallel to the flow direction and stands vertically steel pipe 41 and two rows all to hanging down Straight erectting the inclination that steel pipe 41 tilts and erect steel pipe 42, two rows tilt to erect steel pipe 42 and are respectively provided at and stand vertically steel pipe 41 Both sides, upstream and downstream;Described concrete foundation block 2 is provided with three rows;Often arrange the every bottom standing vertically steel pipe 41 and often arrange every The bottom all correspondences tilting to erect steel pipe 42 imbed described often row in every block concrete basic blocks 2;Parallel to the flow direction every is the most perpendicular The top of vertical steel pipe 41 is all connected by fastener 5 with the top of every inclination setting steel pipe 42 of the both sides, upstream and downstream being adjacent It is connected together;Steel pipe 42 is erect in every bottom standing vertically steel pipe 41 and the every inclination of both sides, upstream and downstream being adjacent Bottom be respectively connected with level longitudinal direction steel pipe 43;The every top standing vertically steel pipe 41 and be adjacent two and stand vertically steel The bottom of pipe 41 is respectively connected with long bearing diagonal steel pipe 45, and the bottom of long bearing diagonal steel pipe 45 is embedded in basic blocks 2;Every hangs down The straight top erectting steel pipe 41 and two tops standing vertically steel pipe 41 being adjacent are respectively connected with horizontal cross steel pipe 44; Every bottom standing vertically steel pipe 41 and the middle pipeline section tilting to erect steel pipe 42 of both sides, upstream and downstream being adjacent all connect Being connected to short bearing diagonal steel pipe 46, the bottom of short bearing diagonal steel pipe 46 is embedded in concrete foundation block 2;Upstream side is along vertical water Being respectively connected with horizontal cross steel pipe 44 between the most adjacent two bottoms tilting to erect steel pipe 42 of flow path direction, upstream side is along vertical It is respectively connected with horizontal cross steel between middle pipeline section at the most adjacent two identical height tilting setting steel pipe 42 of water (flow) direction Pipe 44;Downstream is respectively connected with horizontal cross between the most adjacent two bottoms tilting to erect steel pipe 42 of Transverse to the flow direction Steel pipe 44, downstream along Transverse to the flow direction the most adjacent two tilt erect the steel pipe 42 middle pipeline sections at identical height it Between be respectively connected with horizontal cross steel pipe 44;All steel pipes composition steel pipe truss 4.
The river course truss-like that the present embodiment provides draws the construction method of anchor means for preventing driftage as follows:
A () is had ready conditions when using excavator in riverbed construction concrete pier 1, construction site, preferential employing excavator Dun Keng, Pier hole length and width is 3.0m, and spacing 20.0m is arranged, concrete pier 1 strength grade must not be less than C20, the pre-buried dowel in top 3, pier body 1 degree of depth, the pre-buried degree of depth of dowel 3 determine according to calculating, and pier body 1 top extends on ground, and dowel 3 exceeds ground, riverbed Face 0.1m;When construction site does not has condition to use excavation machinery, use hand excavation, the most successively excavate, be excavated to set Meter degree of depth after-pouring concrete pier 1 also buries screw-thread steel dowel 3 underground.
B () arranges three row's steel pipes in the downstream of riverbed concrete pier 1, a row stands vertically steel pipe 41 and two rows tilt to erect Steel pipe 42, the long 6.0m of steel pipe 4, spacing 3.0m, in Transducers Embedded in Concrete basic blocks 2, at least 0.5m is deep, has ready conditions in construction site When using excavator, preferential employing excavator foundation pit, concrete foundation block 2 length and width is 0.8m, concrete foundation block The buried depth of 2 is determined by calculating;When construction site does not has condition to use excavation machinery, use hand excavation, the most successively open Dig, be excavated to projected depth after-pouring concrete and bury steel pipe 4 underground.
C steel pipe 42 is erect in () every inclination in the every bottom standing vertically steel pipe 41 with the both sides, upstream and downstream being adjacent Bottom be respectively connected with level longitudinal direction steel pipe 43;The every top standing vertically steel pipe 41 and be adjacent two and stand vertically steel The bottom of pipe 41 is respectively connected with long bearing diagonal steel pipe 45, and the bottom of long bearing diagonal steel pipe 45 is embedded at least 0.5m in basic blocks 2 Deeply;The top standing vertically steel pipe 41 and two tops standing vertically steel pipe 41 being adjacent are respectively connected with horizontal cross steel Pipe 44;Every bottom standing vertically steel pipe 41 and the both sides, upstream and downstream that are adjacent tilt to erect the intervalve of steel pipe 42 Section is respectively connected with short bearing diagonal steel pipe 46, and in the bottom of short bearing diagonal steel pipe 46 is embedded in concrete foundation block 2, at least 0.5m is deep; Upstream side is respectively connected with horizontal cross steel pipe 44 between the most adjacent two bottoms tilting to erect steel pipe 42 of Transverse to the flow direction, Upstream side is all connected with between the middle pipeline section at the most adjacent two identical height tilting setting steel pipe 42 of Transverse to the flow direction There is horizontal cross steel pipe 44;Downstream all connects between the most adjacent two bottoms tilting to erect steel pipe 42 of Transverse to the flow direction Being connected to horizontal cross steel pipe 44, steel pipe 42 is erect at identical height along the most adjacent two inclinations of Transverse to the flow direction in downstream Middle pipeline section between be respectively connected with horizontal cross steel pipe 44;All steel pipes composition steel pipe truss 4.Steel pipe is erect at neighboring vertical Between 41, spacing is defined as 2.5m by water conservancy diversion span width, and described fastener 5 uses the rotary buckle of Yongcheng hot investment casting company limited.
D () steel wire rope 6 one end is connected with the top standing vertically steel pipe of low order end with being located along Transverse to the flow direction high order end, The other end is connected with the dowel 3 in upstream side concrete pier 1, and steel wire rope connected mode is more, such as uses steel cable clamp even Connect mode, inserting mode etc., refer to steel wire rope and connect specification, draw anchor to tie so that steel pipe 4, concrete pier 1, dowel 3 are formed Structure.
E () is formed truss-like drawn by concrete pier 1, concrete foundation block 2, dowel 3, steel pipe 4, fastener 5, steel wire rope 6 Anchor means for preventing driftage, is a Pin according to 20.0m after completion, and between two Pin, spacing is 2.5m.
F () considers attractive in appearance and corrosion resistance, at steel pipe 4 surface smear anticorrosion enamelled coating.

Claims (5)

1. river course truss-like draws anchor means for preventing driftage, it is characterised in that: it is disposed with a Pin or many Pin along river course Transverse to the flow direction;Every Pin includes concrete pier, concrete foundation block, dowel, steel wire rope and the steel pipe truss of the steel pipe composition along different spaces direction layout;Described concrete pier draws at every Pin river course truss-like and is provided with two in anchor means for preventing driftage, concrete pier is along the Transverse to the flow direction upstream side being arranged in river course spaced apart, described dowel is embedded in concrete pier, described concrete foundation block is the rectangular downstream being arranged in concrete pier, the bottom of the part steel pipe of described composition steel pipe truss is embedded in concrete foundation block, described steel wire rope one end connects dowel, other end joint steel pipe.
River course the most according to claim 1 truss-like draws anchor means for preventing driftage, it is characterized in that: described steel pipe be divided into stand vertically steel pipe, tilt erect steel pipe, level longitudinal direction steel pipe, horizontal cross steel pipe, short bearing diagonal steel pipe, long bearing diagonal steel pipe, being provided with a row at Parallel to the flow direction to stand vertically steel pipe and two rows and all erect steel pipe to standing vertically the inclination that steel pipe tilts, two rows tilt to erect steel pipe and are respectively provided at the both sides, upstream and downstream standing vertically steel pipe;Described concrete foundation block is provided with three rows;Often arrange the every bottom standing vertically steel pipe and often arrange that every bottom tilting to erect steel pipe is the most corresponding imbeds described often row in every block concrete basic blocks;The top that Parallel to the flow direction every stands vertically steel pipe is all fixed together with the top of every inclination setting steel pipe of the both sides, upstream and downstream being adjacent;The bottom that steel pipe is erect in every bottom standing vertically steel pipe and the every inclination of both sides, upstream and downstream being adjacent is respectively connected with level longitudinal direction steel pipe;The every top standing vertically steel pipe and two bottoms standing vertically steel pipe being adjacent are respectively connected with long bearing diagonal steel pipe, in the bottom Transducers Embedded in Concrete basic blocks of long bearing diagonal steel pipe;The every top standing vertically steel pipe and be adjacent two tops standing vertically steel pipe and be respectively connected with horizontal cross steel pipe;Every bottom standing vertically steel pipe and the middle pipeline section tilting to erect steel pipe of both sides, upstream and downstream being adjacent are respectively connected with short bearing diagonal steel pipe, and the bottom of short bearing diagonal steel pipe is embedded in concrete foundation block;Upstream side is respectively connected with horizontal cross steel pipe between the most adjacent two bottoms tilting to erect steel pipe of Transverse to the flow direction, and upstream side is respectively connected with horizontal cross steel pipe between the middle pipeline section at the most adjacent two identical height tilting setting steel pipe of Transverse to the flow direction;Downstream is respectively connected with horizontal cross steel pipe between the most adjacent two bottoms tilting to erect steel pipe of Transverse to the flow direction, and downstream is respectively connected with horizontal cross steel pipe between the middle pipeline section at the most adjacent two identical height tilting setting steel pipe of Transverse to the flow direction;All steel pipes composition steel pipe truss.
River course the most according to claim 2 truss-like draws anchor means for preventing driftage, it is characterized in that: described steel wire rope is provided with two, one end of every steel wire rope connects dowel, and the other end connects the top standing vertically steel pipe being located along Transverse to the flow direction every Pin high order end or low order end.
River course the most according to claim 1 and 2 truss-like draws anchor means for preventing driftage, it is characterised in that: hinged by fastener between described steel pipe.
River course the most according to claim 1 truss-like draws anchor means for preventing driftage, it is characterised in that: the steel tube surface of described composition steel pipe truss is coated with anticorrosion enamelled coating.
CN201521129153.2U 2015-12-30 2015-12-30 River course truss -like draws anchor to prevent floating device Withdrawn - After Issue CN205475148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521129153.2U CN205475148U (en) 2015-12-30 2015-12-30 River course truss -like draws anchor to prevent floating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521129153.2U CN205475148U (en) 2015-12-30 2015-12-30 River course truss -like draws anchor to prevent floating device

Publications (1)

Publication Number Publication Date
CN205475148U true CN205475148U (en) 2016-08-17

Family

ID=56662956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521129153.2U Withdrawn - After Issue CN205475148U (en) 2015-12-30 2015-12-30 River course truss -like draws anchor to prevent floating device

Country Status (1)

Country Link
CN (1) CN205475148U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568943A (en) * 2015-12-30 2016-05-11 浙江省水利水电勘测设计院 Riverway truss type anchor pulling anti-floating device and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568943A (en) * 2015-12-30 2016-05-11 浙江省水利水电勘测设计院 Riverway truss type anchor pulling anti-floating device and construction method thereof
CN105568943B (en) * 2015-12-30 2018-06-29 浙江省水利水电勘测设计院 A kind of river truss-like draws anchor means for preventing driftage and its construction method

Similar Documents

Publication Publication Date Title
CN104806272B (en) Tunnel shunting combined type guarded drainage integrated system and construction method and using method
CN204572015U (en) A kind of tunnel shunting combined type waterproof and water drainage system
CN104480974B (en) Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond
CN108385627A (en) Power station diversion tunnel plugging construction method based on karst landform
CN103397614A (en) Stone cage check dam used for mountainous area erosion gully control
CN111305141B (en) Drainage method for underground comprehensive pipe gallery in dry season canal penetrating
CN208346836U (en) A kind of hidden drainage system
CN205475148U (en) River course truss -like draws anchor to prevent floating device
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN108755720A (en) The relatively narrow river water method of river diversion for crossing water river is worn under large-scale synthesis piping lane
CN105544559B (en) The structure and method of pattern foundation pit supporting structure are carried out using prefabricated components
CN105220612A (en) A kind of bridge rain water collecting system
CN108677891B (en) Spillway slide-resistant structure of rock-fill dam body
CN105568943B (en) A kind of river truss-like draws anchor means for preventing driftage and its construction method
CN205907658U (en) Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body
CN206220172U (en) Tubular type diversion pumping plant
CN106939580A (en) A kind of pipe laying type permeable spur that interlocks
CN205742221U (en) A kind of dark beam type anchor-pull brace structure being applicable to loosely-packed covering layer slope
CN205934864U (en) Induced seam grout platform structure of arch dam
CN209907423U (en) Ultra-deep dam foundation grouting curtain structure
CN210122706U (en) Check dam structure of hydraulic and hydroelectric engineering
CN208733589U (en) A kind of bank tower intake being built in steep side slope
CN206768738U (en) A kind of suspension type anti-scour wall protective slope structure
CN210151667U (en) A seepage prevention structure for city river course

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160817

Effective date of abandoning: 20180629