CN208733589U - A kind of bank tower intake being built in steep side slope - Google Patents

A kind of bank tower intake being built in steep side slope Download PDF

Info

Publication number
CN208733589U
CN208733589U CN201821189599.8U CN201821189599U CN208733589U CN 208733589 U CN208733589 U CN 208733589U CN 201821189599 U CN201821189599 U CN 201821189599U CN 208733589 U CN208733589 U CN 208733589U
Authority
CN
China
Prior art keywords
water inlet
bracket
base concrete
rock bench
bank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821189599.8U
Other languages
Chinese (zh)
Inventor
陆冬生
高永辉
黄海峰
邓毅国
仝壮信
谢红红
宋蕊香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Beijing Engineering Corp Ltd
Original Assignee
PowerChina Beijing Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Beijing Engineering Corp Ltd filed Critical PowerChina Beijing Engineering Corp Ltd
Priority to CN201821189599.8U priority Critical patent/CN208733589U/en
Application granted granted Critical
Publication of CN208733589U publication Critical patent/CN208733589U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a kind of bank tower intakes being built in steep side slope, including water inlet basis, trash rack for water inlet, water inlet tower body, water inlet basis includes excavating rock bench, base concrete and the bracket formed, base concrete leans against rock bench, base concrete upstream side pours bracket, and trash rack for water inlet and water inlet tower body are arranged on water inlet basis.Base concrete bottom is basic excavation face, leans against the rock bench for excavating and being formed, and rock bench figure is unlimited.Trash rack for water inlet is arranged at the top of bracket.Water inlet tower body is arranged at the top of base concrete and rock bench.It is basic as bank tower intake using the fill concrete with bracket figure, it is economical and practical, the fundamental importance of water inlet was not only met, but also reduce slope excavating height and difficulty of construction, and had saved project amount;It can be widely applied in the engineering for building bank tower intake in relatively steep side slope.

Description

A kind of bank tower intake being built in steep side slope
Technical field
The utility model relates to hydraulic and hydroelectric engineering water inlet structure, especially a kind of bank tower being built in steep side slope Formula water inlet.
Background technique
In power station or diversion, water diversion project, the pattern of water inlet is varied, wherein operating maintenance is convenient Bank tower intake it is most commonly seen, bank tower intake lean against bank slope arrangement, need to excavate out the base for meeting water inlet width Plinth platform especially arranges large-scale water inlet, often forms the high slope of hundred meter levels after excavation, apply when encountering high steep landform Work difficulty is big, and open cut and slope support engineering amount are big, and cost is high.
Utility model content
Technical problem to be solved by the utility model is to provide a kind of tower water inlets of the bank being built in steep side slope Mouthful, to solve to arrange foregoing problems existing for bank tower intake under steeper orographic condition.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is: one kind is built in steep side slope Bank tower intake, including water inlet basis, trash rack for water inlet, water inlet tower body, water inlet basis includes excavating to be formed Rock bench, base concrete and bracket, base concrete leans against rock bench, and base concrete upstream side pours bracket, and water inlet blocks Dirty grid and water inlet tower body are arranged on water inlet basis.
The base concrete bottom is basic excavation face, leans against the rock bench for excavating and being formed, and rock bench figure is unlimited.
The trash rack for water inlet is arranged at the top of bracket.
The water inlet tower body is arranged at the top of base concrete and rock bench.
The beneficial effects of the utility model are: using the fill concrete with bracket figure as bank tower intake base Plinth, it is economical and practical, the fundamental importance of water inlet was not only met, but also reduce slope excavating height and difficulty of construction, and had saved work Cheng Liang;It can be widely applied in the engineering for building bank tower intake in relatively steep side slope.
Detailed description of the invention
Fig. 1 is the diagrammatic cross-section of the utility model;
In figure, 1--- base concrete;2--- bracket;3--- rock bench;4--- water inlet tower body;5--- water inlet blocks dirt Grid;Direction shown in arrow is water inlet water (flow) direction.
Specific embodiment
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing, to this reality It is further elaborated with novel.It should be appreciated that the specific embodiments described herein are only used to explain that this is practical It is novel, it is not used to limit the utility model.
As shown in Figure 1, the bank tower intake being built in steep side slope of the utility model, including water inlet basis, Trash rack for water inlet, water inlet tower body, water inlet basis include excavating rock bench 3, base concrete 1 and the bracket 2 formed, basis Concrete 1 leans against rock bench 3, and 1 upstream side of base concrete pours bracket 2, and trash rack for water inlet 5 and water inlet tower body 4 are arranged in On water inlet basis.
1 bottom of base concrete is basic excavation face, leans against the rock bench 3 for excavating and being formed, and rock bench figure is unlimited.
The trash rack for water inlet 5 is arranged in 2 top of bracket.The water inlet tower body 4 is arranged in base concrete 1 and rock 3 top of platform.
Specifically, water inlet is arranged to far from bank slope direction as far as possible to avoid the formation of excavation high slope, due to landform compared with Suddenly, it is inadequate that water inlet part basis landform certainly will be will cause, the inadequate position of landform is returned using base concrete 1 at this time It fills out, base concrete 1 leans against the rock bench 3 for excavating and being formed, and to save project amount, basic figure is advanced optimized, by basic coagulation Native 1 upstream side, which is poured, builds up 2 pattern of bracket, at this point, base concrete, bracket and excavating be collectively formed at the top of the rock bench formed into Mouth of a river foundation plane.
The utility model replaces large amount of slope excavatings using the base concrete backfill with bracket, has both met into water The arrangement requirement of mouth, and slope excavating height and difficulty of construction are reduced, save project amount.
Below by use technical solutions of the utility model certain large hydropower station engineering in conjunction with attached drawing furtherly It is bright:
Certain large hydropower station engineering needs to arrange powerplant intakes on steep Channel slope, and water inlet position is original Grade of side slope is 60 °~70 °, is influenced by geological conditions, and by economic technology than choosing, final to determine that water inlet pattern is bank tower Formula, water inlet figure is larger, long 116m, wide 28.5m, high 35m, according to conventional arrangement, first excavates and meets in floor elevation The platform of water inlet width, then using 1:0.3 slope than carry out slope after, since landform is steeper, water inlet Permanent Slope height Up to 180m, slope retaining amount is huge, and it is also very big to excavate difficulty and construction risk, it is contemplated that factors above, by optimization, finally The water inlet foundation structure pattern of the utility model is selected, i.e. water inlet arranges that landform is inadequate to far from bank slope direction as far as possible Position backfilled using base concrete 1, base concrete 1 leans against the rock bench 3 for excavating and being formed, to save project amount, into 1 upstream side of base concrete is poured and builds up 2 pattern of bracket by one-step optimization basis figure, at this point, base concrete 1, bracket 2 with And excavate and water inlet foundation plane is collectively formed at the top of the rock bench 3 formed, trash rack for water inlet 5 is arranged in 2 top of bracket, water inlet Mouth tower body 4 is arranged in 3 at the top of base concrete 1 and rock bench.
The utility model is basic as water inlet using the fill concrete with bracket figure, economical and practical, both meets The arrangement requirement of water inlet, and effectively avoid in high gradient slope arrangement bank tower intake permanent high slope easy to form Problem.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without departing from the principle of this utility model, several improvements and modifications can also be made, these improve and Retouching should also regard the protection scope of the utility model.

Claims (4)

1. a kind of bank tower intake being built in steep side slope, including water inlet basis, trash rack for water inlet, water inlet tower Body, which is characterized in that water inlet basis includes excavating rock bench (3), base concrete (1) and the bracket (2) formed, basic coagulation Native (1) leans against rock bench (3), and base concrete (1) upstream side pours bracket (2), trash rack for water inlet (5) and water inlet tower body (4) it is arranged on water inlet basis.
2. the bank tower intake being built in steep side slope according to claim 1, which is characterized in that the basis coagulation Native (1) bottom is basic excavation face, leans against the rock bench (3) for excavating and being formed, and rock bench figure is unlimited.
3. the bank tower intake being built in steep side slope according to claim 1, which is characterized in that the water inlet blocks Dirty grid (5) are arranged at the top of bracket (2).
4. the bank tower intake being built in steep side slope according to claim 1, which is characterized in that the water inlet tower Body (4) is arranged at the top of base concrete (1) and rock bench (3).
CN201821189599.8U 2018-07-25 2018-07-25 A kind of bank tower intake being built in steep side slope Active CN208733589U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821189599.8U CN208733589U (en) 2018-07-25 2018-07-25 A kind of bank tower intake being built in steep side slope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821189599.8U CN208733589U (en) 2018-07-25 2018-07-25 A kind of bank tower intake being built in steep side slope

Publications (1)

Publication Number Publication Date
CN208733589U true CN208733589U (en) 2019-04-12

Family

ID=66026982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821189599.8U Active CN208733589U (en) 2018-07-25 2018-07-25 A kind of bank tower intake being built in steep side slope

Country Status (1)

Country Link
CN (1) CN208733589U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930257A (en) * 2018-07-25 2018-12-04 中国电建集团北京勘测设计研究院有限公司 A kind of bank tower intake being built in steep side slope

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108930257A (en) * 2018-07-25 2018-12-04 中国电建集团北京勘测设计研究院有限公司 A kind of bank tower intake being built in steep side slope

Similar Documents

Publication Publication Date Title
CN205077453U (en) Dam body structure combining concrete faced rockfill dam and upstream cofferdam
CN104805854A (en) Method for constructing deep-water ultra-long steel plate pile cofferdam in tide environment
CN204282308U (en) Gabion composite dam adapting to deep covering layer
CN104541643B (en) A kind of sinking land in coalmining areas land control method of region of no relief
CN208733589U (en) A kind of bank tower intake being built in steep side slope
CN208949902U (en) A kind of river channel bridge bearing platform foundation pit antiseepage cofferdam
CN203939036U (en) A kind of steel sheet pile cofferdam structure that is applicable to river course
CN204059460U (en) The interior river intake structure of electric power plant circulating water system
CN104074234B (en) The interior river intake structure of electric power plant circulating water system and construction method thereof
CN104120696B (en) Environment-friendly type slope sticking type trashrack structure and construction method thereof
CN207419417U (en) For the open type diversion system of Power Tunnels
CN203741782U (en) Multi-section face plate structure of high concrete faced rockfill dam
CN105421309A (en) Overlap joint device between water retaining curtains
CN214194751U (en) Intercepting drain structure suitable for steep rock slope
CN205116201U (en) Open caisson construction equipment
CN108930257A (en) A kind of bank tower intake being built in steep side slope
CN204570637U (en) A kind of mud-dumping yard overflow system
CN210151667U (en) A seepage prevention structure for city river course
CN104047273A (en) Energy dissipation anti-flushing wall for hydropower station and construction method thereof
CN202451974U (en) Anti-floating structure of buried pipeline
CN203846451U (en) Vertical type continuously-distributed hydraulic reclamation dam structure for water area
CN205134355U (en) A foundation structure for shallow overburden wind generating set
CN206438524U (en) A kind of geomembrane steel framework cofferdam structure
CN208899441U (en) Power plant building arragement construction for hydro-electric power project
CN206768738U (en) Suspension type impact-proof wall slope protection structure