CN205475065U - Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank - Google Patents

Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank Download PDF

Info

Publication number
CN205475065U
CN205475065U CN201620252697.6U CN201620252697U CN205475065U CN 205475065 U CN205475065 U CN 205475065U CN 201620252697 U CN201620252697 U CN 201620252697U CN 205475065 U CN205475065 U CN 205475065U
Authority
CN
China
Prior art keywords
water inlet
side slope
slope
many holes
layout structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620252697.6U
Other languages
Chinese (zh)
Inventor
游湘
周钟
秦永涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201620252697.6U priority Critical patent/CN205475065U/en
Application granted granted Critical
Publication of CN205475065U publication Critical patent/CN205475065U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a water and electricity hydraulic engineering technical field especially relates to a tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank. The utility model discloses a tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank, play sloping line including power station water inlet, flood discharge hole water inlet and approach channel side slope, the power station water inlet is arranged with flood discharge hole water inlet in succession, the approach channel side slope is played sloping line and is leaned on the tower end to set up the straightway, smooth -going linking curve segment behind the straightway. Power station water inlet and flood discharge hole water inlet are arranged in succession, set up the water inlet saving more alone and open the amount of excavation, the approach channel side slope is played sloping line and is adopted " preceding straightway + back curve segment " design, has imported under the hydraulics condition minimize to the excavation and the disturbance of side slope satisfying.

Description

Many holes, the narrow river valley of gradient slope bank tower import group's combination layout structure
Technical field
This utility model relates to water power hydraulic engineering technical field, particularly relates to a kind of many holes, the narrow river valley of gradient slope bank tower import group Combination layout structure.
Background technology
Entrenched valley area is high steep along with side slope, and the problems such as river valley is narrow, its slope problem is especially prominent, the stability of side slope Also change in multiformity, therefore in the hydroelectric station design of entrenched valley area, should try one's best during Duo Dongan tower import group's combined layout Reduce the excavation to side slope and disturbance.Along with the fast development of Waterpower Resources Development cause in recent years, numerous large-scale, especially big Type water power hydraulic engineering is positioned at China's Midwest high-mountain gorge areas more, and its power station intake tower is often arranged limited, the most multiplex On the way with greater need for well-designed during the tunnel such as intake tower such as flood discharging tunnel, diversion tunnel combined layout, at present according to the different spies of each engineering Point also needs constantly to explore.
Utility model content
Technical problem to be solved in the utility model is: provide a kind of excavation under meeting Inlet water mechanical condition, to side slope Few with disturbance, engineering operation safety, and many holes, the narrow river valley of gradient slope bank tower import group's combination layout structure that construction investment saves.
This utility model solves many holes, the narrow river valley of gradient slope bank tower import group's combination layout structure that its technical problem is used, bag Including powerplant intakes, flood discharging tunnel water inlet and approach channel side slope and play slope line, described powerplant intakes is arranged continuously with flood discharging tunnel water inlet, Described approach channel side slope plays slope line and arranges straightway by tower end, smooth-going linking curved section after straightway.
Further, flood discharging tunnel water inlet is positioned at the outside of powerplant intakes, and the input elevation of flood discharging tunnel water inlet is higher than power station Water inlet.
Further, arrange near abutment excavation groove inside powerplant intakes.
Further, powerplant intakes inner distance abutment excavation channel opening line 10~40m.
Further, the approach channel side slope before bank tower import group plays slope line and is positioned at powerplant intakes points outside.
Further, described straight line segment length 20~50m.
Further, packway is set at the column foot floor elevation of flood discharging tunnel water inlet, column foot of intaking outside packway with flood discharging tunnel Points outside is identical.
Further, set structural joint between each tower of powerplant intakes and flood discharging tunnel water inlet, between structural joint, set elastic insert.
Further, described powerplant intakes is consistent with the leading edge of flood discharging tunnel water inlet and trend is parallel to equal pitch contour and arranges.
The beneficial effects of the utility model are: elevation flood discharging tunnel water inlet is close to low elevation powerplant intakes and arranges continuously, fully Make use of discrepancy in elevation excavation space arranging tower bases, be relatively separately provided water inlet and save earthwork;Approach channel side slope plays slope line and uses " front Straightway+rear curved section " design, under meeting Inlet water mechanical condition, decrease the excavation to side slope and disturbance as far as possible;Power station is entered Arrange close proximity to abutment excavation groove inside the mouth of a river, the excavation on side slope can be reduced to greatest extent;Import group's leading edge in many holes is consistent, Can ensure that import flow-shape is good;Import leading edge trend is parallel to equal pitch contour and arranges, can guarantee that tunnel-face side slope height is minimum, excavation Measure minimum;This utility model not only ensures engineering operation safety, and cost saving.
Accompanying drawing explanation
Fig. 1 is the floor map of an embodiment of the present utility model;
Fig. 2 is the elevational schematic view of an embodiment of the present utility model;
Fig. 3 is to arrange comparison diagram before and after the import of an embodiment of the present utility model, approach channel and side slope optimize;
Fig. 4 is for velocity profile;
Parts, position and numbering in figure: powerplant intakes 1, flood discharging tunnel water inlet 2, abutment excavation channel opening line 3, approach channel Side slope plays slope line 4, straightway 41, curved section 42, packway 5, structural joint 6, tunnel-face side slope 8, side slope 9, approach channel side slope 40。
Detailed description of the invention
The utility model is described in further detail below in conjunction with the accompanying drawings.At this it should be noted that saying for these embodiments Bright being adapted to assist in understands this utility model, but is not intended that restriction of the present utility model.
As depicted in figs. 1 and 2, this utility model includes that powerplant intakes 1, flood discharging tunnel water inlet 2 and approach channel side slope play slope line 4, Described powerplant intakes 1 is arranged continuously with flood discharging tunnel water inlet 2, and described approach channel side slope plays slope line 4 and arranges straightway 41 by tower end, Smooth-going linking curved section 42 after straightway 41.Approach channel side slope before bank tower import group plays slope line 4 and is positioned at outside powerplant intakes 1 Side point.It is tunnel-face side slope 8 in water inlet downstream, is side slope 9 in water inlet outer side edges, in the party upstream of water inlet outer side edges To for approach channel side slope 40.Powerplant intakes 1 and flood discharging tunnel water inlet 2 are arranged continuously, are relatively separately provided water inlet saving excavation side Amount;Approach channel side slope plays slope line 4 and uses " front straightway+rear curved section " to design, it is possible to ensureing that influent stream is tried one's best on the premise of smooth and easy Reduce the excavation to side slope and disturbance reduces excavated volume, and ensure that influent stream is smooth and easy.Preferably, approach channel side slope plays slope line 4 by tower End arranges straightway 41 long 20~50m, smooth-going linking curved section 42 after straightway 41.
Specifically, in order to reduce excavated volume further, flood discharging tunnel water inlet 2 is positioned at the outside of powerplant intakes 1, and flood discharging tunnel is intake The input elevation of mouth 2 is higher than powerplant intakes 1.The flood discharging tunnel water inlet 2 of elevation is close to outside the powerplant intakes 1 of low elevation Side is arranged continuously, takes full advantage of discrepancy in elevation excavation space and arranges flood discharging tunnel water inlet 2 column foot, is relatively separately provided water inlet saving and opens Amount of excavation.
Specifically, in order to reduce excavated volume further, arrange near abutment excavation groove inside powerplant intakes 1.Powerplant intakes 1 Inner side is arranged close proximity to abutment excavation channel opening line 3, it is preferred that powerplant intakes 1 inner distance abutment excavation channel opening line 3 about 10~40m.So, the excavation on side slope 9 can be reduced on the premise of ensureing column foot foundation stably safety to greatest extent.
Specifically, smooth and easy in order to ensure flood discharging tunnel import flow-shape, packway 5, packway 5 are set at flood discharging tunnel water inlet 2 elevation Outside is identical with flood discharging tunnel water inlet column foot points outside.
Specifically, in order to make housing structure consolidate, arrange and set structural joint 6 between each tower of powerplant intakes 1 and flood discharging tunnel water inlet 2, Elastic insert is set between structural joint 6.This structural joint 6 is suitable for the sedimentation of the tower body of powerplant intakes 1 and flood discharging tunnel water inlet 2 Deformation or temperature deformation.
Specifically, in order to meet good influent stream condition and stability of slope, before described powerplant intakes 1 and flood discharging tunnel water inlet 2 Edge is consistent and trend is parallel to equal pitch contour and arranges.Many holes import group, powerplant intakes 1 is consistent with the leading edge of flood discharging tunnel water inlet 2, There is not convex body border, it is ensured that import flow-shape is good;Powerplant intakes 1 and flood discharging tunnel water inlet 2 leading edge trend are parallel to Equal pitch contour is arranged, can guarantee that tunnel-face side slope 8 excavation height is minimum, excavated volume is minimum.From tunnel-face side slope 8, side slope 9, approach channel Side slope 40 3 direction side slopes control to optimize its boundary conditions to be made it excavate optimum and can meet good influent stream condition and side slope is steady Fixed.
This utility model not only ensures engineering operation safety, and cost saving.It is particularly well-suited to the steep limit of high-mountain gorge areas Narrow river valley, slope bank tower intake is arranged in limited water power hydraulic engineering.
Embodiment
Some hydropower station import arrangement
1) overview
Flood discharging tunnel import uses pressure deep water type water inlet, for ensureing the HYDRODYNAMIC CONDITION RELATING TO of import and reducing approach channel slope height as far as possible, Makeup of the imports layout, approach channel and approach channel side slope are optimized design.First, under conditions of ensureing tower body basis, as far as possible Import is arranged and is close to side, riverbed, i.e. spandrel groove side.By Inlet water Mechanical Model Test, end elevation, the limit, slope to approach channel Boundary, horizontal layout have carried out multi-scheme comparative study.For this engineering entrenched valley, the feature of steep side slope, with " weak excavation, Strong supporting " design concept, optimize PSL ditch ditch left approach channel slope excavating design, use " front straightway+rear curved section " set Arrange to compare before and after meter import, approach channel and side slope optimization and see Fig. 3.
2) test
Power station import flow-shape and flow velocity
In saving excavation plan, power station and flood discharging tunnel import current lateral intake characteristic are obvious, i.e. exist in import forward position, power station Lateral current from left to right, then forms certain backflow, but flow velocity is the most little along excavation slope.
In model test, measure power station or the distribution of flood discharging tunnel inlet velocity under saving excavation plan difference water level conditions, see figure 4.From data of velocity distribution, power station inlet velocity is the least, inconspicuous on power station diversion impact.Therefore, from power station diversion Angle say, save excavation be feasible.
3) effect
After optimized design, slope height reduces about 100m, reduces difficulty of construction, shortens the construction period, and decreases work Cheng Liang, saves construction investment and reaches 50,000,000 yuan.Approach channel slope construction completion over 5 years Monitoring Result show that side slope is in stable shape State.
Former sight test shows that import flow-shape is good.

Claims (9)

1. many holes, the narrow river valley of gradient slope bank tower import group's combination layout structure, including powerplant intakes (1), flood discharging tunnel water inlet And approach channel side slope plays slope line (4) (2), it is characterised in that: described powerplant intakes (1) is continuous with flood discharging tunnel water inlet (2) Arranging, described approach channel side slope plays slope line (4) and arranges straightway (41) by tower end, and straightway (41) smoothes out linking curved section afterwards (42)。
The narrow river valley of gradient slope the most according to claim 1 many holes bank tower import group's combination layout structure, it is characterised in that: Flood discharging tunnel water inlet (2) is positioned at the outside of powerplant intakes (1), and the input elevation of flood discharging tunnel water inlet (2) enters higher than power station The mouth of a river (1).
The narrow river valley of gradient slope the most according to claim 2 many holes bank tower import group's combination layout structure, it is characterised in that: Powerplant intakes (1) inner side is arranged near abutment excavation groove.
The narrow river valley of gradient slope the most according to claim 3 many holes bank tower import group's combination layout structure, it is characterised in that: Powerplant intakes (1) inner distance abutment excavation channel opening line (3) 10~40m.
The narrow river valley of gradient slope the most according to claim 4 many holes bank tower import group's combination layout structure, it is characterised in that: Approach channel side slope before bank tower import group plays slope line (4) and is positioned at powerplant intakes (1) points outside.
The narrow river valley of gradient slope the most according to claim 5 many holes bank tower import group's combination layout structure, it is characterised in that: Described straightway (41) long 20~50m.
The narrow river valley of gradient slope the most according to claim 6 many holes bank tower import group's combination layout structure, it is characterised in that: Packway (5) is set at the column foot floor elevation of flood discharging tunnel water inlet (2), outside packway (5) outside is with flood discharging tunnel water inlet column foot Side point is identical.
8. according to many holes, the narrow river valley of the gradient slope bank tower import group's combined layout described in any claim in claim 1 to 7 Structure, it is characterised in that: set structural joint (6), structural joint between each tower of powerplant intakes (1) and flood discharging tunnel water inlet (2) (6) elastic insert is set between.
The narrow river valley of gradient slope the most according to claim 8 many holes bank tower import group's combination layout structure, it is characterised in that: Described powerplant intakes (1) is consistent with the leading edge of flood discharging tunnel water inlet (2) and trend is parallel to equal pitch contour and arranges.
CN201620252697.6U 2016-03-29 2016-03-29 Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank Active CN205475065U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620252697.6U CN205475065U (en) 2016-03-29 2016-03-29 Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620252697.6U CN205475065U (en) 2016-03-29 2016-03-29 Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank

Publications (1)

Publication Number Publication Date
CN205475065U true CN205475065U (en) 2016-08-17

Family

ID=56648986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620252697.6U Active CN205475065U (en) 2016-03-29 2016-03-29 Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank

Country Status (1)

Country Link
CN (1) CN205475065U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356097A (en) * 2018-11-29 2019-02-19 中国电建集团成都勘测设计研究院有限公司 The water discharge tunnel makeup of the imports for ditch water process
CN113073616A (en) * 2021-03-12 2021-07-06 中国电建集团华东勘测设计研究院有限公司 Cavitation erosion prevention design method for long-distance gentle slope non-pressure flood discharge tunnel
CN113216072A (en) * 2021-04-19 2021-08-06 中国电建集团华东勘测设计研究院有限公司 Super-large-flow bank slope type water inlet arrangement structure for space partition layered drainage
CN114150631A (en) * 2021-12-23 2022-03-08 中国电建集团华东勘测设计研究院有限公司 Flood discharge hub arrangement method based on river channel capacity

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356097A (en) * 2018-11-29 2019-02-19 中国电建集团成都勘测设计研究院有限公司 The water discharge tunnel makeup of the imports for ditch water process
CN109356097B (en) * 2018-11-29 2023-09-19 中国电建集团成都勘测设计研究院有限公司 A drainage tunnel import structure for ditch water treatment
CN113073616A (en) * 2021-03-12 2021-07-06 中国电建集团华东勘测设计研究院有限公司 Cavitation erosion prevention design method for long-distance gentle slope non-pressure flood discharge tunnel
CN113073616B (en) * 2021-03-12 2022-06-14 中国电建集团华东勘测设计研究院有限公司 Cavitation erosion prevention design method for long-distance gentle slope non-pressure flood discharge tunnel
CN113216072A (en) * 2021-04-19 2021-08-06 中国电建集团华东勘测设计研究院有限公司 Super-large-flow bank slope type water inlet arrangement structure for space partition layered drainage
CN114150631A (en) * 2021-12-23 2022-03-08 中国电建集团华东勘测设计研究院有限公司 Flood discharge hub arrangement method based on river channel capacity

Similar Documents

Publication Publication Date Title
CN205475065U (en) Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank
CN101761057A (en) Flood-discharging energy dissipater of hydroelectric project
CN204185835U (en) Power station free pressure flow tail water discharge
CN103966985B (en) A kind of side direction goes out to flow the absorption basin of rotary roll energy dissipating
CN206529752U (en) A kind of double down stream surge-chamber arrangements combined with diversion tunnel
CN108677892B (en) Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel
CN207314299U (en) A kind of arrangement of the narrow steep full tunnel-spillway in river valley bank
CN105257454A (en) Diversion type vortex flow power generation system
CN106930199A (en) Improve the fairing of arc Box-shaped Drainage Culvert water outlet fluidised form
CN106436660A (en) Water diversion type power station power house layout at different positions
CN203200711U (en) River way intersection zone rapid-slow flow smooth transition flow guiding structure
CN108316259A (en) Diversion tunnel sets up lock under interim plug joint gate and blocks arrangement and method
CN205134292U (en) High arch dam construction diversion hole structure
CN110593222A (en) Curve overflow weir structure of bank spillway
CN104234019B (en) Variable-section surge chamber
CN109356097A (en) The water discharge tunnel makeup of the imports for ditch water process
CN202626933U (en) Curve type water-binding and sand-dividing guide wall
CN208899441U (en) Power plant building arragement construction for hydro-electric power project
CN220953283U (en) High-low bank structure for diversion ecological flow of tail water of power station
CN209194485U (en) Diversion tunnel structure
CN105019414B (en) Composite lock chamber structure for narrow water intake of mountain hydropower project
CN211922550U (en) Improve power station tailrace tunnel open-full flow influence's adverse slope weir structure
CN208151985U (en) Sluice " L " type trash rack pier and its " zigzag " arragement construction
CN209603094U (en) Low-speed fluid energy dissipation runner structure
CN203874515U (en) Diclinic compound section sand desilting basin capable of desilting and discharging sand simultaneously

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant