CN205474700U - Synthetic track - Google Patents
Synthetic track Download PDFInfo
- Publication number
- CN205474700U CN205474700U CN201620204747.3U CN201620204747U CN205474700U CN 205474700 U CN205474700 U CN 205474700U CN 201620204747 U CN201620204747 U CN 201620204747U CN 205474700 U CN205474700 U CN 205474700U
- Authority
- CN
- China
- Prior art keywords
- layer
- plastic cement
- race track
- geotechnique
- cloth
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a simple structure, construction convenience and low cost's synthetic track. A synthetic track, includes basic processing layer, sticky stone layer and synthetic track layer, and basic processing lays on the layer on plain soil layer, and mat formation on the basic processing layer in sticky stone layer, and synthetic track mats formation on the layer on sticky stone layer. The utility model discloses utilize basic processing layer and sticky stone layer to substitute concrete foundation and pitch basis, the cost is low, and the construction is simple, and curing time is short, can carry out synthetic track after 24 hours and mat formation, but about 10 days reductions of erection time, economic value and time value is obvious.
Description
Technical field
This utility model relates to a kind of runway, is specifically related to a kind of plastic cement race track.
Background technology
Along with carrying out of nationwide fitness programs, the demand in stadium is also got more and more.Polyurethane spreading material has excellent wear-resistance and oil-resistance ageing-resistant, hardness range width anti-skidding, fire-retardant, elastic suitable, the feature such as shock-absorbing performance is excellent, color is attractive in appearance, is widely used in laying large, medium and small and kindergarten place.
Lay polyurethane runway and typically require good basis, basis generally concrete foundation and Colophonium basis, concrete foundation construction has the shortcomings such as material usage is big, the amount of labour is big, and curing cycle is long, generally 7-14 days, typically require that ground construction just can start plastic cement race track construction after complete 28 days.Although and Colophonium basis speed of application is fast, needing large-scale spreading machine, the compacted machine and professional and technical personnel, new Colophonium basis natural curing is no less than 28 days, makes high boiling point volatile matter volatilization in Colophonium complete, long construction period.
Utility model content
This utility model purpose is to provide a kind of simple in construction, easy construction and plastic cement race track with low cost.
To achieve these goals, this utility model is by the following technical solutions:
A kind of plastic cement race track, including based process layer, gluing rock layers and plastic cement race track layer, based process layer is laid on element soil layer, and gluing rock layers is mated formation on based process layer, and plastic cement race track layer is mated formation in gluing rock layers.
Above-mentioned plastic cement race track, gluing rock layers includes filled stone and adhesive, is mutually close to bonding by adhesive between filled stone, and adhesive includes epoxyn, polyurethane adhesive, single-component adhesive, two-component adhesive or resinae adhesive.
Above-mentioned plastic cement race track, based process layer is waterproof polymer thin layer or/and more than one layer geotechnique's layer of cloth.
Above-mentioned plastic cement race track, based process layer includes first geotechnique's layer of cloth, waterproof polymer thin layer and second geotechnique's layer of cloth, first geotechnique's layer of cloth is laid on element soil layer, and waterproof polymer thin layer is laid on first geotechnique's layer of cloth, and second geotechnique's layer of cloth is laid on waterproof polymer thin layer.
Above-mentioned plastic cement race track, gluing rock layers thickness is 0.5-10cm.
Above-mentioned plastic cement race track, gluing rock layers thickness is 2-3cm.
The beneficial effects of the utility model are:
Utilizing based process layer and gluing rock layers to substitute concrete foundation and Colophonium basis, cost is low, and construction is simple, and hardening time is short, can carry out plastic cement race track and mat formation after 24 hours, can about 10 days reduction of erection time, economic worth and the time value are obvious.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings for plastic cement race track is described further:
Fig. 1 is plastic cement race track structural representation.
In figure: 1. element soil layer, 2. first geotechnique's layer of cloth, 3. waterproof polymer thin layer, 4. second geotechnique's layer of cloth, the most gluing rock layers, 6. plastic cement race track layer.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, develop simultaneously embodiment referring to the drawings, further describes this utility model.
A kind of plastic cement race track, including first geotechnique's layer of cloth 2, waterproof polymer thin layer the 3, second geotechnique layer of cloth 4, gluing rock layers 5 and plastic cement race track layer 6, first geotechnique's layer of cloth 2 is laid on element soil layer 1, waterproof polymer thin layer 3 is laid on first geotechnique's layer of cloth 2, second geotechnique's layer of cloth 4 is laid on waterproof polymer thin layer 3, gluing rock layers 5 is mated formation on second geotechnique's layer of cloth 4, and plastic cement race track layer 6 is mated formation in gluing rock layers 5.
The present embodiment, gluing rock layers 5 includes filled stone and adhesive, is mutually close to bonding by adhesive between filled stone, and adhesive includes epoxyn, polyurethane adhesive, single-component adhesive, two-component adhesive or resinae adhesive.
The present embodiment, gluing rock layers 5 thickness is 0.5-10cm, preferred version, and gluing rock layers 5 thickness is 2-3cm.
This utility model method for paving comprises the steps: after element soil layer 1 flattens, is compacted, lay first geotechnique's layer of cloth 2, then waterproof polymer thin layer 3 is laid, the waterproof polymer thin layer 3 that first geotechnique's layer of cloth 2 is laid above for fixing soil and protection, re-lay second geotechnique's layer of cloth 4, second geotechnique's layer of cloth 4 for protecting waterproof polymer thin layer 3 from upside, after laying completes, lay gluing rock layers 5, gluing rock layers 5 be stirred common stone by high-strength structureal adhesives after mat formation and form, can go up people after 24 hours and equipment is mated formation plastic cement race track layer 6.The runway type utilizing this utility model structure to lay includes mixed type runway, compound runway or vapor-permeable type runway etc..
Above-mentioned detailed description of the invention is only concrete case of the present utility model, being not the restriction that this utility model is made other form, any those skilled in the art are changed possibly also with the technology contents of the disclosure above or are modified as the equivalent implementations of equivalent variations.But every without departing from this utility model know-why on the premise of, any simple modification, equivalent variations and remodeling embodiment of above made according to technical spirit of the present utility model, all should fall into scope of patent protection of the present utility model.
Claims (6)
1. a plastic cement race track, it is characterised in that: including based process layer, gluing rock layers and plastic cement race track layer, based process layer is laid on element soil layer, and gluing rock layers is mated formation on based process layer, and plastic cement race track layer is mated formation in gluing rock layers.
Plastic cement race track the most according to claim 1, it is characterized in that: gluing rock layers includes filled stone and adhesive, mutually being close to bonding by adhesive between filled stone, adhesive includes epoxyn, polyurethane adhesive, single-component adhesive, two-component adhesive or resinae adhesive.
Plastic cement race track the most according to claim 1, it is characterised in that: based process layer is waterproof polymer thin layer or/and more than one layer geotechnique's layer of cloth.
Plastic cement race track the most according to claim 3, it is characterized in that: based process layer includes first geotechnique's layer of cloth, waterproof polymer thin layer and second geotechnique's layer of cloth, first geotechnique's layer of cloth is laid on element soil layer, waterproof polymer thin layer is laid on first geotechnique's layer of cloth, and second geotechnique's layer of cloth is laid on waterproof polymer thin layer.
5. according to plastic cement race track described in any one of Claims 1-4, it is characterised in that: gluing rock layers thickness is 0.5-10cm.
Plastic cement race track the most according to claim 5, it is characterised in that: gluing rock layers thickness is 2-3cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620204747.3U CN205474700U (en) | 2016-03-17 | 2016-03-17 | Synthetic track |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620204747.3U CN205474700U (en) | 2016-03-17 | 2016-03-17 | Synthetic track |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205474700U true CN205474700U (en) | 2016-08-17 |
Family
ID=56653469
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620204747.3U Active CN205474700U (en) | 2016-03-17 | 2016-03-17 | Synthetic track |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205474700U (en) |
-
2016
- 2016-03-17 CN CN201620204747.3U patent/CN205474700U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101680202B (en) | Earth-supported structure with fasteners | |
CN104264692A (en) | Ecological restoration method of slope | |
CN205474700U (en) | Synthetic track | |
CN205474705U (en) | Artificial lawn | |
CN205474701U (en) | Silicon PU court | |
CN206529667U (en) | A kind of novel tree pond | |
CN105230308B (en) | Raw soil underground cave dwelling roof vegetation plantation base structure and construction technology thereof | |
CN207143630U (en) | A kind of permeable, anti-settling pavement bricks | |
CN206266987U (en) | A kind of IPU plastic cement race tracks | |
CN203890837U (en) | Artificial turf of football field | |
CN205082273U (en) | Basic unit's structure is planted to immature soil pit kiln kiln crown vegetation | |
CN206721606U (en) | A kind of carbon fiber plastic cement race track | |
FR2315570A1 (en) | Acrylic resin based top dressings for tennis courts - for a smooth sealed surface of controlled roughness | |
CN201305809Y (en) | Pervious brick for rapidly permeable stopping pad | |
CN206971030U (en) | A kind of multifunctional ecological permeable terrace | |
CN201685646U (en) | Novel artificial hill | |
CN203373628U (en) | Novel floor tile and pin lock type floor tile formed by same | |
CN110145107A (en) | The method for paving of stone floor | |
CN206279716U (en) | A kind of parian glass moulds floor | |
CN205804070U (en) | A kind of red sand rock road structure | |
CN104674980A (en) | Recycled-concrete composite moisturizing brick mortise-tenon string pipe wall body constructing method | |
CN201071574Y (en) | Cement surface compound glass fiber reinforced plastics protection layer | |
CN205295833U (en) | Brick permeates water in gap convenient to drainage | |
CN109853327A (en) | A kind of production method of the natural Football pitch based on permanent line of demarcation | |
CN218643112U (en) | Landscape footpath |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |