CN205474705U - Artificial lawn - Google Patents
Artificial lawn Download PDFInfo
- Publication number
- CN205474705U CN205474705U CN201620204749.2U CN201620204749U CN205474705U CN 205474705 U CN205474705 U CN 205474705U CN 201620204749 U CN201620204749 U CN 201620204749U CN 205474705 U CN205474705 U CN 205474705U
- Authority
- CN
- China
- Prior art keywords
- layer
- chinampa
- geotechnique
- cloth
- adhesive
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a simple structure, construction convenience and low cost's artificial lawn. An artificial lawn, includes basic processing layer, sticky stone layer and artificial lawn layer, and basic processing lays on the layer on plain soil layer, and mat formation on the basic processing layer in sticky stone layer, and artificial lawn mats formation on the layer on sticky stone layer. The utility model discloses utilize basic processing layer and sticky stone layer to substitute concrete foundation, the cost is low, and the construction is simple, and curing time is short, can carry out artificial lawn after 24 hours and mat formation, but about 10 days reductions of erection time, economic value and time value is obvious.
Description
Technical field
This utility model relates to a kind of chinampa, it is adaptable to athletic ground, leisure place, Landscape Place etc..
Background technology
Chinampa the most natural lawn advantage in kinetic characteristic is that place homogeneity is outstanding, and flatness is the most far better, can fully avoid the field conditions harmful effect caused because of the factor such as weather, maintenance.Chinampa becomes the mode standard that school athletic ground is built together with plastic cement race track, instead of a large amount of athletic ground originally planting natural lawn.
Laying people is to need concrete foundation to isolate soil horizon, to reinforce on lawn, thering is provided high intensity base support for chinampa, concrete foundation construction has the shortcomings such as material usage is big, the amount of labour is big, and curing cycle is long, generally 7-14 days, have a strong impact on construction period and cost.
Utility model content
This utility model purpose is to provide a kind of simple in construction, easy construction and chinampa with low cost.
To achieve these goals, this utility model is by the following technical solutions:
A kind of chinampa, including based process layer, gluing rock layers and chinampa layer, based process layer is laid on element soil layer, and gluing rock layers is mated formation on based process layer, and chinampa layer is mated formation in gluing rock layers.
Above-mentioned chinampa, gluing rock layers includes filled stone and adhesive, is mutually close to bonding by adhesive between filled stone, and adhesive includes epoxyn, polyurethane adhesive, single-component adhesive, two-component adhesive or resinae adhesive.
Above-mentioned chinampa, based process layer is waterproof polymer thin layer or/and more than one layer geotechnique's layer of cloth.
Above-mentioned chinampa, based process layer includes first geotechnique's layer of cloth, waterproof polymer thin layer and second geotechnique's layer of cloth, first geotechnique's layer of cloth is laid on element soil layer, and waterproof polymer thin layer is laid on first geotechnique's layer of cloth, and second geotechnique's layer of cloth is laid on waterproof polymer thin layer.
Above-mentioned chinampa, gluing rock layers thickness is 0.5-10cm.
Above-mentioned chinampa, gluing rock layers thickness is 2-3cm.
The beneficial effects of the utility model are:
Utilizing based process layer and gluing rock layers to substitute concrete foundation, cost is low, and construction is simple, and hardening time is short, can carry out chinampa and mat formation after 24 hours, can about 10 days reduction of erection time, economic worth and the time value are obvious.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings for chinampa is described further:
Fig. 1 is chinampa structural representation.
In figure: 1. element soil layer, 2. first geotechnique's layer of cloth, 3. waterproof polymer thin layer, 4. second geotechnique's layer of cloth, the most gluing rock layers, 6. chinampa layer.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, develop simultaneously embodiment referring to the drawings, further describes this utility model.
A kind of chinampa, including first geotechnique's layer of cloth 2, waterproof polymer thin layer the 3, second geotechnique layer of cloth 4, gluing rock layers 5 and chinampa layer 6, first geotechnique's layer of cloth 2 is laid on element soil layer 1, waterproof polymer thin layer 3 is laid on first geotechnique's layer of cloth 2, second geotechnique's layer of cloth 4 is laid on waterproof polymer thin layer 3, gluing rock layers 5 is mated formation on second geotechnique's layer of cloth 4, and chinampa layer 6 is mated formation in gluing rock layers 5.
The present embodiment, gluing rock layers 5 includes filled stone and adhesive, is mutually close to bonding by adhesive between filled stone, and adhesive includes epoxyn, polyurethane adhesive, single-component adhesive, two-component adhesive or resinae adhesive.
The present embodiment, gluing rock layers 5 thickness is 0.5-10cm, preferred version, and gluing rock layers 5 thickness is 2-3cm.
This utility model method for paving comprises the steps: after element soil layer 1 flattens, is compacted, lay first geotechnique's layer of cloth 2, then waterproof polymer thin layer 3 is laid, the waterproof polymer thin layer 3 that first geotechnique's layer of cloth 2 is laid above for fixing soil and protection, re-lay second geotechnique's layer of cloth 4, second geotechnique's layer of cloth 4 for protecting waterproof polymer thin layer 3 from upside, after laying completes, lay gluing rock layers 5, gluing rock layers 5 be stirred common stone by high-strength structureal adhesives after mat formation and form, can go up people after 24 hours and equipment is mated formation chinampa layer 6.
Above-mentioned detailed description of the invention is only concrete case of the present utility model, being not the restriction that this utility model is made other form, any those skilled in the art are changed possibly also with the technology contents of the disclosure above or are modified as the equivalent implementations of equivalent variations.But every without departing from this utility model know-why on the premise of, any simple modification, equivalent variations and remodeling embodiment of above made according to technical spirit of the present utility model, all should fall into scope of patent protection of the present utility model.
Claims (6)
1. a chinampa, it is characterised in that: including based process layer, gluing rock layers and chinampa layer, based process layer is laid on element soil layer, and gluing rock layers is mated formation on based process layer, and chinampa layer is mated formation in gluing rock layers.
Chinampa the most according to claim 1, it is characterized in that: gluing rock layers includes filled stone and adhesive, mutually being close to bonding by adhesive between filled stone, adhesive includes epoxyn, polyurethane adhesive, single-component adhesive, two-component adhesive or resinae adhesive.
Chinampa the most according to claim 1, it is characterised in that: based process layer is waterproof polymer thin layer or/and more than one layer geotechnique's layer of cloth.
Chinampa the most according to claim 3, it is characterized in that: based process layer includes first geotechnique's layer of cloth, waterproof polymer thin layer and second geotechnique's layer of cloth, first geotechnique's layer of cloth is laid on element soil layer, waterproof polymer thin layer is laid on first geotechnique's layer of cloth, and second geotechnique's layer of cloth is laid on waterproof polymer thin layer.
5. according to chinampa described in any one of Claims 1-4, it is characterised in that: gluing rock layers thickness is 0.5-10cm.
Chinampa the most according to claim 5, it is characterised in that: gluing rock layers thickness is 2-3cm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620204749.2U CN205474705U (en) | 2016-03-17 | 2016-03-17 | Artificial lawn |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620204749.2U CN205474705U (en) | 2016-03-17 | 2016-03-17 | Artificial lawn |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205474705U true CN205474705U (en) | 2016-08-17 |
Family
ID=56654207
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620204749.2U Active CN205474705U (en) | 2016-03-17 | 2016-03-17 | Artificial lawn |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205474705U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112523032A (en) * | 2019-09-17 | 2021-03-19 | 都佰城集团有限公司 | Outdoor special artificial turf protective ground structure and construction method |
-
2016
- 2016-03-17 CN CN201620204749.2U patent/CN205474705U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112523032A (en) * | 2019-09-17 | 2021-03-19 | 都佰城集团有限公司 | Outdoor special artificial turf protective ground structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104264692B (en) | A kind of side slope ecological renovation method | |
CN104213564A (en) | Excavation slope supporting structure and construction method thereof | |
CN101403209B (en) | Fast water-permeable brick for stopping pad and laying method | |
CN205839508U (en) | Sponge city paved road structure | |
CN205474705U (en) | Artificial lawn | |
CN203360975U (en) | Spin lock type floor tile | |
CN204690780U (en) | A kind of inter-embedding type ecological block retaining wall | |
CN104947628A (en) | Ecological engineering method based on gabion fixed bags with lugs | |
CN102535512A (en) | Geogrid reinforcement lime soil retaining wall and construction method thereof | |
CN205474700U (en) | Synthetic track | |
CN104695454A (en) | Steep slope reinforcement and protection device and paving method thereof | |
CN205474701U (en) | Silicon PU court | |
CN206204983U (en) | A kind of built-in fitting | |
CN105230308A (en) | Raw soil underground cave dwelling roof vegetation plantation base structure and construction technology thereof | |
CN204509936U (en) | A kind of assembled turf | |
CN114000510A (en) | Construction method of greening concrete on wet soil soft slope | |
CN102808417A (en) | Side slope protection method for arid desert area | |
CN205082273U (en) | Basic unit's structure is planted to immature soil pit kiln kiln crown vegetation | |
CN208739683U (en) | A kind of flower pool structure for planted roof | |
CN207143630U (en) | A kind of permeable, anti-settling pavement bricks | |
CN205035851U (en) | Rail water collecting and recycling equipment | |
CN206267160U (en) | A kind of sandwich construction Ecological Slope protection system with diaphragm plate | |
RU172734U1 (en) | END STRUCTURE FOR PLANE STRUCTURE | |
CN205755796U (en) | A kind of slope greening planting unit | |
CN206189415U (en) | Novel ecological bank protection of highway device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |