CN104947628A - Ecological engineering method based on gabion fixed bags with lugs - Google Patents

Ecological engineering method based on gabion fixed bags with lugs Download PDF

Info

Publication number
CN104947628A
CN104947628A CN201510246725.3A CN201510246725A CN104947628A CN 104947628 A CN104947628 A CN 104947628A CN 201510246725 A CN201510246725 A CN 201510246725A CN 104947628 A CN104947628 A CN 104947628A
Authority
CN
China
Prior art keywords
cage
gabion
layer
gabion box
permeable fabric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510246725.3A
Other languages
Chinese (zh)
Other versions
CN104947628B (en
Inventor
赵宏祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Qunxiangxing New Material Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510246725.3A priority Critical patent/CN104947628B/en
Publication of CN104947628A publication Critical patent/CN104947628A/en
Application granted granted Critical
Publication of CN104947628B publication Critical patent/CN104947628B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses an ecological engineering method based on gabion fixed bags with lugs. The ecological engineering method based on the gabion fixed bags with the lugs is characterized by comprising the following steps that a sand layer is covered with a filter basement layer which is covered with a layer of the gabion fixed bags with the lugs, and the lugs of two adjacent gabion mesh frameworks are aligned to each other and prefixed through spikes; hemp coconut blanket layers are arranged on exposed parts in the gabion mesh frameworks, and water permeable fabric is filled with status soil; spikes are pulled out, penetrate through the lugs of gabion covers and gabion bodies again, and are fixedly nailed in the sand layer; a hemp coconut blanket layer is laid on the exposed area on the upper portion of each gabion mesh framework; a layer of gabion mesh framework is horizontally arranged on a first platform, and the previous operations are repeated till a complete top platform is formed; soil and grass seeds are spread on the exposed part of the top of each layer of the platform to form a vegetation layer. The ecological engineering method based on the gabion fixed bags with the lugs has the advantages that the structural design of levee slopes is reasonable and scientific, the hemp coconut blanket layers have a good vegetation effect, and cement jungle shock environments can be greatly reduced; the construction is easy, and the effect of slope protection is good and safe.

Description

Based on the ecotechnology having the solid bag of otolith cage
Technical field
The present invention relates to a kind of ecotechnology, being specifically related to a kind of ecotechnology based on there being the solid bag of otolith cage, belonging to ecological protection technical field.
Background technology
Common protective slope uses the material such as stone, cement to be built into, the protective slope of this structure is not only great in constructing amount, performance difficulty, and relatively easily inrushes after using a period of time, it can not be afforested etc. environment simultaneously, for a long time, effectively cannot realize protection.And common protective slope is more easily formed and inrushes, cause soil losses, be unfavorable for environmental protection, more heavy losses are caused to the people near levee slope.Especially in global climate transition and other region that rainfall is plentiful of China, the quality of protective slope directly affects local development.
Chinese patent ZL200910260112.X discloses a kind of ecotechnology of flexible strong structure, comprise: anti-filter basalis, galvanized wire cage, Ecotypic Stone Mesh-box bag, numb coconut palm blanket layer, sandy soils, plant generating layer and box cage body, multiple box cage body is parallel to each other, Heterogeneous Permutation forms trapezoidal levee slope, box cage body side is sandy soils, anti-filter basalis is laid between box cage body and sandy soils, box cage body is made up of multiple galvanized wire cage, places Ecotypic Stone Mesh-box bag in galvanized wire cage.Its operation is:
1, sandy soils tiles anti-filter basalis, and sandy soils is horizontal one deck box cage body on the anti-filter basalis of side, riverbed;
2, in galvanized wire cage internal fixtion Ecotypic Stone Mesh-box bag and the numb coconut palm blanket layer of box cage body;
3, horizontal one deck box cage body on bottom box cage body, and be connected and fixed with bottom box cage body, repeat step 2, form second layer box cage body;
4, step 3 is repeated, until top layer box cage body;
5, every one deck box cage body top exposed parts spreading earth and grass seeds are formed and plant generating layer.
Find through putting into practice us, existing ecotechnology is comparatively wasted time and energy in implementation process, is embodied in:
(1) in step 2, after galvanized wire cage internal fixtion Ecotypic Stone Mesh-box bag, need manually cage lid and the colligation of cage body to be fixed;
(2), in step 3, when top layer box cage body is connected with bottom box cage body, be also need manually to carry out colligation to fix.
Because the fixing of fixing, top layer box cage body and bottom box cage body of galvanized wire cage and Ecotypic Stone Mesh-box bag all needs manually to carry out colligation and fix, so not only waste time and energy in work progress, and once bind and shakyly easily bring potential safety hazard.
Summary of the invention
For solving the deficiencies in the prior art, the object of the present invention is to provide a kind of ecotechnology based on there being the solid bag of otolith cage, this engineering method is not only constructed easily, and protection effect is good, safety.
In order to realize above-mentioned target, the present invention adopts following technical scheme:
Based on the ecotechnology having the solid bag of otolith cage, it is characterized in that, comprise the following steps:
Step1: anti-filter that sandy soils tiles basalis, sandy soils horizontal one deck on the anti-filter basalis of side, riverbed has the solid bag of otolith cage, aforementionedly to be made up of at the permeable fabric of gabion box lower portion gabion box framework and lining the solid bag of otolith cage, the material of aforementioned permeable fabric is PET, aforementioned gabion box framework is primarily of cage lid and cage body composition, the body of rod in the horizontal direction of cage lid and cage body is all formed with the ear of outwardly convex, to align the ear of adjacent two gabion box frameworks, spike passed vertically through the ear of two cage bodies and follow closely in sandy soils;
Step2: permeable fabric and gabion box framework are fixed, the exposed parts in gabion box framework inserts numb coconut palm blanket layer, fills present situation soil, fills up and tamp, seal permeable fabric in permeable fabric;
Step3: extract spike, again passes vertically through the ear of cage lid and cage body and firmly follows closely in sandy soils by spike, fixing and sealing one step of gabion box framework completes;
Step4: one deck fiber crops coconut palm blanket layer is laid in the exposed area above gabion box framework, thus forms complete first floor platform;
Step5: horizontal one deck gabion box framework on first floor platform, to align the ear of adjacent two gabion box frameworks, spike passed vertically through the ear of two cage bodies and follow closely in sandy soils or in first floor platform, repeat Step2 to Step4, thus form complete second layer platform;
Step6: repeat Step5, until form complete top layer platform;
Step7: formed at the top exposed parts spreading earth of every one deck platform and grass seeds and plant generating layer.
The aforesaid ecotechnology based on there being the solid bag of otolith cage, is characterized in that, in Step2, permeable fabric is placed in the gap formed at adjacent gabion box framework, permeable fabric and gabion box framework are fixed, and fill crushed stone in permeable fabric, seal permeable fabric.
The aforesaid ecotechnology based on there being the solid bag of otolith cage, it is characterized in that, aforementioned spike is in " T " font or " η " font.
Usefulness of the present invention is:
(1) levee slope reasonable in design, science, it is a kind of ecotechnology, the numb coconut palm blanket layer of main body exposed parts parcel has good planting and comes into force really, thus form ecological, environmental protective, reinforcement greening, the promotion ecological homeostasis, the natural landscape formed and humanity interaction, significantly reduce cement jungle shock environment;
(2) body of rod in the cage lid of gabion box framework and the horizontal direction of cage body is all formed with the ear of outwardly convex, spike passed vertically through the ear of cage lid and cage body and firmly follow closely in sandy soils, fixing and sealing one step of gabion box framework completes, not only time saving and energy saving in work progress, and avoid because binding shaky and potential safety hazard that is that bring;
(3) material of permeable fabric is PET; substituted for the materials such as existing market general PP, PE; PET fabric not only has good mechanical property; bending strength and modulus of elasticity large; corrosion-resistant, high-low temperature resistant, there is self-extinguishment; rub resistance does not split silk; resistance to diluted alkaline acid resistance; excellent water preventing ability, has more standby high-tensile strength, the advantage such as anti-aging, and resistance to heat fusion joint high (240-260 DEG C) for a long time; freeze proof (subzero 100 DEG C of not creeps); simultaneously nonpoisonous and tasteless, the recyclable recycling of environmental protection, is beneficial to energy-saving and emission-reduction environmental protection.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the first structure of gabion box framework;
Fig. 2 is the schematic diagram of the second structure of gabion box framework;
Fig. 3 is the structural representation of ecotechnology of the present invention.
The implication of Reference numeral in figure: 1-anti-filter basalis, 2-sandy soils, 3-has the solid bag of otolith cage, and 4-fiber crops coconut palm blanket layer, 5-plants generating layer, 6-spike, 31-gabion box framework, the permeable fabric of 32-, 311-cage lid, 312-cage body, 313-ear.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, concrete introduction is done to the present invention.
First, the structure having the solid bag of otolith cage and usage is introduced.
Be made up of gabion box framework and permeable fabric the solid bag of otolith cage, wherein, gabion box framework is primarily of cage lid and cage body composition.
See figures.1.and.2, the body of rod in the horizontal direction of cage lid and cage body is all formed with the ear of outwardly convex; Permeable fabric lining is in the inside of gabion box framework, and its material is PET, and permeable fabric is used for splendid attire present situation soil.
Have the using method of the solid bag of otolith cage as follows:
(1) to align the ear of adjacent two gabion box frameworks, spike is passed vertically through ear's (now not through the ear of cage lid) of two cage bodies, and spike is followed closely in sandy soils, thus solid for otolith cage bag is fixed, owing to needing after a while to extract spike, so the degree of depth of nail does not need too dark;
(2) permeable fabric is placed in gabion box framework, and fixes with gabion box framework;
(3) in permeable fabric, fill present situation soil, fill up and tamp, seal permeable fabric;
(4) extract spike, spike passed vertically through again the ear of cage lid and cage body and firmly follow closely in sandy soils, fixing and sealing one step of gabion box framework completes.
The shape of spike is preferably in " T " font or " η " font.
Use there is this kind of structure have the solid bag of otolith cage, it is not only time saving and energy saving to make in work progress, and and avoid because binding the shaky potential safety hazard brought.
In the present invention, the material of permeable fabric is PET (PETG), substituted for the materials such as existing market general PP, PE.The fabric of PET material not only has good mechanical property; bending strength and modulus of elasticity are large, corrosion-resistant, high-low temperature resistant, have self-extinguishment, and rub resistance does not split silk; resistance to diluted alkaline acid resistance; excellent water preventing ability, has more standby high-tensile strength, the advantage such as anti-aging, and resistance to heat fusion joint high (240-260 DEG C) for a long time; freeze proof (subzero 100 DEG C of not creeps); simultaneously nonpoisonous and tasteless, the recyclable cycling and reutilization of environmental protection, is beneficial to energy-saving and emission-reduction and environmental protection.
Next, the ecotechnology based on there being the solid bag of otolith cage of the present invention is introduced.
With reference to Fig. 3, the ecotechnology based on there being the solid bag of otolith cage of the present invention, it comprises the following steps:
Step1: anti-filter that sandy soils tiles basalis, sandy soils horizontal one deck on the anti-filter basalis of side, riverbed has the solid bag of otolith cage, and the ear of adjacent two the gabion box frameworks that align, passes vertically through the ear of two cage bodies and follow closely in sandy soils by spike.
The shape of the solid bag of otolith cage is had to be preferably cuboid.When constructing, the all solid bags of otolith cage that has used all have identical height, to guarantee that the top of the every one deck platform building formation is all smooth, but the solid bag of otolith cage that has used can have different length and width, the otolith cage that has of this kind of shape uses when bag is applicable to the non-linear configuration such as arc admittedly, or uses when sandy soils side is smooth not.Such as: lower one deck platform have that the solid bag of otolith cage is curved waits non-linear configuration, the solid bag of otolith cage that has with appropriate length now just can be selected to build last layer platform, and ensure that upper and lowerly adjacently has the ear of the solid bag of otolith cage to align smoothly.Again such as: when sandy soils side is smooth not, the solid bag of otolith cage that has with suitable thickness now just can be selected to build last layer platform, ensure that having otolith cage to consolidate when sandy soils side is smooth not has minimum space between bag and sandy soils.
In addition, the shape of the solid bag of otolith cage is had to be preferably cube.When constructing, the solid bag of otolith cage all has identical length, width, highly, the otolith cage that has of this kind of shape uses when bag is applicable to arranged in a straight line admittedly in all the having used.
In engineering method of the present invention, the material of anti-filter basalis has water permeability, allows free drainage, but because of draining, soil can not be taken away, and foundation soil can not decline in depression, thus can not cause soil unstability.
Step2: permeable fabric and gabion box framework are fixed, the exposed parts in gabion box framework inserts numb coconut palm blanket layer, fills present situation soil, fills up and tamp, seal permeable fabric in permeable fabric.
In permeable fabric, fill building site present situation soil, draw materials conveniently, decrease the earthwork and transport outward the pollution caused, and river channel sedimentation of can releiving, improve water flowing section, increase the stream condition that current pass through.
Due to either large or small space can be formed between adjacent gabion box framework, so permeable fabric can be placed in larger gap, and permeable fabric and gabion box framework are fixed, then in permeable fabric, fill crushed stone, seal permeable fabric.
Step3: extract spike, again passes vertically through the ear of cage lid and cage body and firmly follows closely in sandy soils by spike, fixing and sealing one step of gabion box framework completes.
Step4: one deck fiber crops coconut palm blanket layer is laid in the exposed area above gabion box framework, thus forms complete first floor platform.
First floor platform can bear the external carbuncle that streamflow is impacted, and has long durability, assembling, maintenance and repair conveniently in the future.
Step5: horizontal one deck gabion box framework on first floor platform, to align the ear of adjacent two gabion box frameworks, spike passed vertically through the ear of two cage bodies and follow closely in sandy soils or in first floor platform, repeat Step2 to Step4, thus form complete second layer platform.
Step6: repeat Step5, until form complete top layer platform.
Step7: formed at the top exposed parts spreading earth of every one deck platform and grass seeds and plant generating layer.
Empirical tests, engineering method levee slope reasonable in design of the present invention, science, it is a kind of ecotechnology, the numb coconut palm blanket layer of main body exposed parts parcel has good planting and comes into force really, thus form ecological, environmental protective, reinforcement greening, the promotion ecological homeostasis, the natural landscape formed and humanity interaction, significantly reduce cement jungle shock environment.
In addition, engineering method of the present invention also has easy construction, simply, the duration is short, the advantage that safety is high, has good application value.
It should be noted that, above-described embodiment does not limit the present invention in any form, the technical scheme that the mode that all employings are equal to replacement or equivalent transformation obtains, and all drops in protection scope of the present invention.

Claims (3)

1., based on the ecotechnology having the solid bag of otolith cage, it is characterized in that, comprise the following steps:
Step1: anti-filter that sandy soils tiles basalis, sandy soils horizontal one deck on the anti-filter basalis of side, riverbed has the solid bag of otolith cage, describedly to be made up of at the permeable fabric of gabion box lower portion gabion box framework and lining the solid bag of otolith cage, the material of described permeable fabric is PET, described gabion box framework is primarily of cage lid and cage body composition, the body of rod in the horizontal direction of cage lid and cage body is all formed with the ear of outwardly convex, to align the ear of adjacent two gabion box frameworks, spike passed vertically through the ear of two cage bodies and follow closely in sandy soils;
Step2: permeable fabric and gabion box framework are fixed, the exposed parts in gabion box framework inserts numb coconut palm blanket layer, fills present situation soil, fills up and tamp, seal permeable fabric in permeable fabric;
Step3: extract spike, again passes vertically through the ear of cage lid and cage body and firmly follows closely in sandy soils by spike, fixing and sealing one step of gabion box framework completes;
Step4: one deck fiber crops coconut palm blanket layer is laid in the exposed area above gabion box framework, thus forms complete first floor platform;
Step5: horizontal one deck gabion box framework on first floor platform, to align the ear of adjacent two gabion box frameworks, spike passed vertically through the ear of two cage bodies and follow closely in sandy soils or in first floor platform, repeat Step2 to Step4, thus form complete second layer platform;
Step6: repeat Step5, until form complete top layer platform;
Step7: formed at the top exposed parts spreading earth of every one deck platform and grass seeds and plant generating layer.
2. the ecotechnology based on there being the solid bag of otolith cage according to claim 1, it is characterized in that, in Step2, permeable fabric is placed in the gap formed at adjacent gabion box framework, permeable fabric and gabion box framework are fixed, and crushed stone is filled in permeable fabric, seal permeable fabric.
3. the ecotechnology based on there being the solid bag of otolith cage according to claim 1, it is characterized in that, described spike is in " T " font or " η " font.
CN201510246725.3A 2015-05-14 2015-05-14 Based on the ecotechnology having the solid bag of otolith cage Active CN104947628B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510246725.3A CN104947628B (en) 2015-05-14 2015-05-14 Based on the ecotechnology having the solid bag of otolith cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510246725.3A CN104947628B (en) 2015-05-14 2015-05-14 Based on the ecotechnology having the solid bag of otolith cage

Publications (2)

Publication Number Publication Date
CN104947628A true CN104947628A (en) 2015-09-30
CN104947628B CN104947628B (en) 2016-09-07

Family

ID=54162651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510246725.3A Active CN104947628B (en) 2015-05-14 2015-05-14 Based on the ecotechnology having the solid bag of otolith cage

Country Status (1)

Country Link
CN (1) CN104947628B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484199A (en) * 2015-12-28 2016-04-13 陈桂腾 Dam structure and construction method thereof
CN105862671A (en) * 2016-04-08 2016-08-17 北京群祥兴科技有限公司 Construction method based on ecological organic sponge
CN106400819A (en) * 2016-11-30 2017-02-15 江苏省水利科学研究院 Soil slope collapsing treatment system and construction method thereof
TWI683941B (en) * 2018-09-12 2020-02-01 黃種玉 Stone cage fixing method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050115211A (en) * 2005-11-21 2005-12-07 솔라원 환경기술(주) Environmental vegetation mats and establishment method of environmental vegetation mats
CN101333817A (en) * 2008-08-06 2008-12-31 赵品畯 Natural hemp microorganism soil-fixing blanket and its manufacture method
CN101984192A (en) * 2009-12-25 2011-03-09 北京东霖广环保材料有限公司 Ecological engineering method of flexible strong structure
CN102383427A (en) * 2011-08-25 2012-03-21 重庆丹海实业有限公司 Ecological bag fixing device
CN202187343U (en) * 2011-08-25 2012-04-11 重庆丹海实业有限公司 Anchoring clasp nail
CN102677682A (en) * 2011-11-18 2012-09-19 浙江大地交通工程有限公司 Ecological slope protection structure and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050115211A (en) * 2005-11-21 2005-12-07 솔라원 환경기술(주) Environmental vegetation mats and establishment method of environmental vegetation mats
CN101333817A (en) * 2008-08-06 2008-12-31 赵品畯 Natural hemp microorganism soil-fixing blanket and its manufacture method
CN101984192A (en) * 2009-12-25 2011-03-09 北京东霖广环保材料有限公司 Ecological engineering method of flexible strong structure
CN102383427A (en) * 2011-08-25 2012-03-21 重庆丹海实业有限公司 Ecological bag fixing device
CN202187343U (en) * 2011-08-25 2012-04-11 重庆丹海实业有限公司 Anchoring clasp nail
CN102677682A (en) * 2011-11-18 2012-09-19 浙江大地交通工程有限公司 Ecological slope protection structure and construction method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105484199A (en) * 2015-12-28 2016-04-13 陈桂腾 Dam structure and construction method thereof
CN105484199B (en) * 2015-12-28 2017-09-22 陈桂腾 A kind of dam configuration and its construction method
CN105862671A (en) * 2016-04-08 2016-08-17 北京群祥兴科技有限公司 Construction method based on ecological organic sponge
CN106400819A (en) * 2016-11-30 2017-02-15 江苏省水利科学研究院 Soil slope collapsing treatment system and construction method thereof
TWI683941B (en) * 2018-09-12 2020-02-01 黃種玉 Stone cage fixing method

Also Published As

Publication number Publication date
CN104947628B (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN206722878U (en) A kind of mining light-duty filling counterfort
CN105297570B (en) Special soil subgrade structure and construction method thereof
CN102691306B (en) Environment-friendly and energy-saving slope protection bamboo-wood lattice beam for mountain highway
CN104947628A (en) Ecological engineering method based on gabion fixed bags with lugs
CN206784315U (en) Ecological riverway shore protection
CN106368238A (en) Honeycomb geocell earth retaining wall with ecological restoration function and construction method thereof
CN209669894U (en) A kind of side slope ecological protection structure suitable for swelled ground excavation cutting
CN203174615U (en) Step type reinforced earth embankment structure
CN203782721U (en) Sandy region bank slope protection structure
CN108343142A (en) A kind of flexible ecological roadbed side slope gutter and its construction method
CN113073656B (en) Soil protection structure between support piles and construction method thereof
CN2703793Y (en) Composite earthwork cellular chamber
CN206157760U (en) Honeycomb geotechnique check room retaining wall with ecological recovery function
CN106522244A (en) Combined embankment edge covering structure and construction method thereof
JP6370645B2 (en) Slope stabilization method for seismic and rainproof measures of earth structures by using pressure injection type rod-shaped reinforcements
CN104164884B (en) A kind of combined system bank protection dyke strengthening method
CN203602980U (en) Flake rubble stack reinforced soil composite embankment structure
CN203008104U (en) Plastic drainage blind ditch
CN104695454A (en) Steep slope reinforcement and protection device and paving method thereof
CN208996057U (en) Gear protection structure for soft base side slope near water
CN103195077A (en) Dam foundation reinforcement frame structure and dam foundation reinforcement method
CN204418192U (en) Bayonet type grass planting grid
CN203129163U (en) Reinforcing framework structure for dam foundation
CN102561368A (en) Flexible supporting construction of pre-compaction reinforced soil piece
CN207959198U (en) Cotton stalk supporting construction for cement mixing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20151019

Address after: 100080, No. 20, far main road, Haidian District, Beijing. E-15C2-2

Applicant after: Beijing Qunxiangxing Technology Co.,Ltd.

Address before: 100088 No. 1, building 138, No. 1203, Changhua Road, Beijing, Haidian District, 12

Applicant before: Zhao Hongxiang

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100080, No. 20, far main road, Haidian District, Beijing. E-15C2-2

Patentee after: Beijing Qunxiangxing New Material Technology Co., Ltd.

Address before: 100080, No. 20, far main road, Haidian District, Beijing. E-15C2-2

Patentee before: Beijing Qunxiangxing Technology Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Ecological engineering method based on gabion fixed bags with lugs

Effective date of registration: 20170412

Granted publication date: 20160907

Pledgee: China Co truction Bank Corp Beijing Zhongguancun branch

Pledgor: Beijing Qunxiangxing New Material Technology Co., Ltd.

Registration number: 2017990000307

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20180620

Granted publication date: 20160907

Pledgee: China Co truction Bank Corp Beijing Zhongguancun branch

Pledgor: Beijing Qunxiangxing New Material Technology Co., Ltd.

Registration number: 2017990000307