CN205445632U - Hang commentaries on classics formula ditch cable groove built -up plate - Google Patents

Hang commentaries on classics formula ditch cable groove built -up plate Download PDF

Info

Publication number
CN205445632U
CN205445632U CN201620225797.XU CN201620225797U CN205445632U CN 205445632 U CN205445632 U CN 205445632U CN 201620225797 U CN201620225797 U CN 201620225797U CN 205445632 U CN205445632 U CN 205445632U
Authority
CN
China
Prior art keywords
side form
ditch
template
mould bases
cable trough
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620225797.XU
Other languages
Chinese (zh)
Inventor
胡必飞
戴斌
邵维赛
郑孝福
徐赞
王艳波
王超
向军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201620225797.XU priority Critical patent/CN205445632U/en
Application granted granted Critical
Publication of CN205445632U publication Critical patent/CN205445632U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a tunnel ditch cable groove construction equipment technical field, concretely relates to hang commentaries on classics formula ditch cable groove built -up plate. The utility model provides a hang commentaries on classics formula ditch cable groove built -up plate, , positioner, die carrier device and template device use after carrying out on -site Assembly. Adopting simple and easy loop wheel machine to lift by crane, transport and hang to put and take one's place when moving, utilizing the quick positioner of self to realize the template location, every group template all has the independent ditch cable groove ability of constructing fast among the built -up plate, and the exclusive use does not reduce the service function of this template, and many sets of template cooperations are used and more can be improved work efficiency. The utility model discloses fix on the cambered surface fixed block on the shaping secondary lining concrete the locating lever on die carrier positioning adjustment pole and the demoulding rod, can prevent that off normal or come -up from appearing in the template in concreting process. The utility model discloses the no independent capable system of walking reduces on height and width to some extent, satisfies at the current needs of construction transportation track.

Description

Hang rotatable ditch cable trench gang form
Technical field
This utility model relates to tunnel ditch cable trench equipment technical field, is specifically related to hang rotatable ditch cable trench gang form.
Background technology
In prior art, ditch cable trench is as the important component part that tunnel appurtenant work is modern tunnel, its construction quality directly affects the image of tunnel integral construction and molding, but owing to on-the-spot practice of construction needs, ditch cable trench typically just starts to perform at the middle and late stage of constructing tunnel, this results in, and cable trench construction period pressure in ditch is big, construction quality requirement is high, and due to the needs of subsequent construction transport in hole, ditch cable trench construction space suffers from strictly limiting.Construct as example with Lan Yu Railway WEST QINLING tunnel ditch cable trench, Lan Yu Railway WEST QINLING Tunnel Engineering total length 28.236km, it it is the second long tunnel in current domestic railway construction history, also it is the railway tunnel that domestic TBM construction section is maximum, distance is the longest, drilling and blasting method and TBM is used to tunnel associating construction, TBM driving section uses continuous belt conveyer mucking and secondary lining parallel operations, 25t diesel locomotive traction marshalling stores van transport construction material in column, four rail two-wire rail travel patterns.But, because early stage TBM is tunneled, synchronization lining construction task is heavier, and by hole 6 synchronization lining trolley travelings, the Over-size transport requirement to tunnel vertical clearance after machine is torn open in TBM hole, ditch cable trench is constructed until tearing machine open in TBM hole and completing, Second Lining Construction starts organizing construction after completing, get in touch with the follow-up works such as ground settlement and tunnel during this period in hole to synchronize to carry out, in hole, transport cannot be interrupted, cause duration pressure bigger, ditch cable trench construction must is fulfilled for the hole inner orbit transport requirement to current headroom, therefore ditch cable trench construction must have one-time-concreting molding, formwork location is fast, template turnover is fast, the features such as working space own is little.
Chinese patent CN204266233U discloses a kind of tunnel ditch cable trough construction template positioner, and including multiple locator cards laid from front to back, multiple described locator cards are all laid in above the forming panel of constructed ditch cable trench;Constructed ditch cable trench is to be laid in top, coagulation earthen platform and for draining or the groove of laying cable, the quantity of described groove is N number of, described coagulation earthen platform and multiple described groove are all laid along the longitudinal extension direction of constructed Railway Tunnel, and wherein N is positive integer and N >=2;Described forming panel includes that N number of Combined type sizing template that N number of described groove is shaped construction respectively and the lateral wall to coagulation earthen platform are shaped the lateral wall typified form of construction, and N number of described Combined type sizing template and lateral wall typified form are all laid along the longitudinal extension direction of constructed Railway Tunnel;The structure of multiple described locator cards is the most identical, described locator card includes the crossbeam that together positions described forming panel top and N number of respectively to the column positioned bottom N number of described Combined type sizing template, described crossbeam is laid along the transverse width direction of constructed Railway Tunnel, described crossbeam and N number of described column are all laid on same plane, and N number of described column is installed in bottom crossbeam;Being provided with multiple rows of the second screw mandrel installed for multiple described locator cards respectively on described forming panel, the crossbeam of each described locator card is all arranged on above described forming panel by the second screw mandrel described in a row;Often arrange the second screw mandrel that described second screw mandrel all includes that N group is separately mounted in N number of described Combined type sizing template, often organize described second screw mandrel and all include two the second screw mandrels being separately mounted to above the Combined type sizing template left and right sides;N number of in described locator card, described column inserts that N number of described Combined type sizing template is internal respectively and its bottom prop up respectively withstand on N number of, bottom described Combined type sizing template.This patent does not solve the problem that formwork location is slow, template turnover is slow in ditch cable trench is constructed, and can not meet hole inner orbit transport and have the requirement of one-time-concreting molding to the requirement of current headroom and ditch cable trench construction needs.
Utility model content
In order to overcome defect of the prior art, what this utility model provided hangs rotatable ditch cable trench gang form, when early stage TBM driving, synchronization lining construction task weight, 6 synchronization lining trolley travelings in hole, TBM hole can be met in tear the Over-size transport requirement to tunnel vertical clearance after machine open, during in ditch cable trench construction until machine of tearing open in TBM hole completes, Second Lining Construction starts organizing construction after completing, get in touch with ground settlement and tunnel and follow-up work in hole and Tong Bu carry out, in hole, transport need not be interrupted, and meets the hole inner orbit transport requirement to current headroom.
nullThis utility model is achieved by the following technical solution: hang rotatable ditch cable trench gang form,Including at least two longitudinally disposed mould bases longeron,Described mould bases longeron and the cable trough cover boards template of the most horizontally-parallel setting、First cable trough side form、Second cable trough side form、First ditch side form、Second ditch side form、Ditch lid template die plate is fixing with the side form being arranged on outside to be connected,Described cable trough cover boards template and the adjacent fixing connection of the first cable trough side form,Described second ditch side form and the adjacent fixing connection of ditch lid template die plate,The end of each described mould bases longeron is connected with the extensible canopy one end being provided with position fixing handle,The other end of described extensible canopy is connected with cambered surface fixed block,Described cambered surface fixed block is provided with extensible canopy fixed handle,It is provided with mould bases crossbeam between the first cable trough side form and the second cable trough side form and between the first ditch side form and the second ditch side form respectively on described mould bases longeron,Described first cable trough side form is provided with the first cable trough side form boom hole and slideway,Described mould bases longeron is provided with the second cable trough side form boom hole and slideway、First ditch side form boom hole and slideway、Second ditch side form boom hole and slideway and knockout pin abutment sleeve,Described ditch lid template die plate is provided with ditch lid template die plate boom hole and slideway,Described mould bases crossbeam is provided with several spacing compressor arm fixing holes.
Further, described mould bases longeron and mould bases crossbeam are arranged in a mutually vertical manner, several mould bases hangers on described mould bases crossbeam, and the spacing of adjacent described mould bases hanger is equal, are provided with location bar and knockout pin in described knockout pin abutment sleeve.
Further, it is set with spacing compression sliding hanger rod in the spacing compressor arm sliding sleeve arranged on described mould bases longeron, described spacing compression sliding hanger rod is provided with spacing compression wing plate, described spacing compression wing plate is connected with the side mould limiting otic placode on the first cable trough side form and the second cable trough side form by the spacing pin that compresses, template suspension rod on described first cable trough side form and the second cable trough side form is each passed through mould bases longeron and connects by clamp nut under clamp nut in template and template is fixing, the top of described spacing compressor arm sliding sleeve be provided with for adjust spacing compress operation the spacing of handle position be fixed nut.
Further, the end of described spacing compression sliding hanger rod is provided with anti-drop device.
Further, described template suspension rod is provided with the Template Location scale connected by Template Location pin.
Further, described side form is provided with side form chute with the end of mould bases crossbeam, and described side form chute is fixed bolt by side form and is connected with mould bases longeron.
Further, described side form is provided with side form boatswain chair and side form fixes otic placode, and described side form is fixed otic placode and is connected with construction abutment wall basis by expansion bolt.
Further, the junction of described first cable trough side form and the second cable trough side form is provided with anti-overflowing steel plate strip.
Further, described first cable trough side form, the second cable trough side form, the first ditch side form, the second ditch side form, ditch lid template die plate and be arranged on outside side form be provided with several longitudinally connected bolts hole of regularly arranged template connect.
Compared with prior art, superior effect is: this utility model simple in construction and fixation, the features such as energy one-time-concreting molding in ditch cable trench is constructed, formwork location is fast, template turnover working space fast, own is little, under the premise that security is guaranteed, improve lifting efficiency, shorten the construction period.
Accompanying drawing explanation
Fig. 1 is the top view hanging rotatable ditch cable trench gang form described in the utility model;
Fig. 2 be in Fig. 1 along A-A to structure sectional view;
Fig. 3 be in Fig. 1 along B-B to structure sectional view;
Fig. 4 is the schematic enlarged-scale view of the cable trough side form in Fig. 1;.
Fig. 5 is the schematic enlarged-scale view of the ditch side form in Fig. 1;
Fig. 6 is the schematic enlarged-scale view of the side form in Fig. 1.
Reference is as follows:
null1-cambered surface fixed block,2-extensible canopy fixed handle,3-extensible canopy,4-position fixing handle,5-Template Location scale,6-Template Location pin,7-location bar and knockout pin,8-side form chute,9-side form fixes bolt,10-spacing compressor arm sliding sleeve,11-anti-drop device,12-is spacing is fixed nut,13-is spacing compresses operation handle,14-spacing compression wing plate,15-is spacing compresses pin,16-side mould limiting otic placode,17-spacing compression sliding hanger rod,18-mould bases hanger,19-mould bases longeron,20-mould bases crossbeam,21-knockout pin abutment sleeve,Clamp nut in 22-template,Clamp nut under 23-template,24-template suspension rod,25-cable trough cover boards template,26-the first cable trough side form,27-anti-overflowing steel plate strip,28-the second cable trough side form,29-the first ditch side form,30-the second ditch side form,31-ditch lid template die plate,32-side form boatswain chair,33-side form,34-side form fixes otic placode,The longitudinally connected bolt hole of 35-template,36-expansion bolt,37-spacing compressor arm fixing hole,38-the first cable trough side form boom hole and slideway,39-the second cable trough side form boom hole and slideway,40-the first ditch side form boom hole and slideway,41-the second ditch side form boom hole and slideway,42-ditch lid template die plate boom hole and slideway.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model detailed description of the invention is described in further detail.
As shown in figures 1 to 6, what this utility model provided hangs rotatable ditch cable trench gang form, uses positioner, die set device and plate device including after carrying out Assembling.When mobile, use the lifting of simple loop wheel machine, transport and hang in place, utilize the fast-positioning device of self to realize Template Location.In the present embodiment, gang form includes the Combined formwork of some groups of Dan Zuwei 5m length, and often group template is respectively provided with independent ditch cable trench, energy rapid construction ability, do not reduce the use function of this template when being used alone, many set templates with the use of time, more can improve work efficiency.The rotatable ditch cable trench that hangs of the present utility model combines moving die plate, the mould bases being fixed on the cambered surface fixed block 1 on molded secondary lining concrete raises adjust a bar and the location bar on knockout pin 7, the quick location of overall mould bases is realized by Template Location scale 5, it is attached fixing by template suspension rod 24 between each side template and mould bases, in the hole of template suspension rod 24, outside semi-circular arc shape end face is respectively Template Location position and de-molding position, positioned by clamp nut after Template Location, and by Template Location scale 5, spacing compressor arm carries out cross form, vertical framework positions, prevent template from off normal or floating occurring in concreting process.Remove Template Location scale 5 after concrete curing 4h, unclamp spacing compressor arm;After unclamping clamp nut during the demoulding, tapping template suspension rod 24 backspin location bar realize fast demoulding with knockout pin 7 demoulding.The mode of turning of hanging owing to using overlaps moving die plate device without independent travel structure, and on design height and width, more conventional template has reduced, therefore, it is possible to meet in current being actually needed of construction period conveying track.nullWhat this utility model provided hangs rotatable ditch cable trench gang form,Including at least two longitudinally disposed mould bases longeron 19,Described mould bases longeron 19 and the cable trough cover boards template 25 of the most horizontally-parallel setting、First cable trough side form 26、Second cable trough side form 28、First ditch side form 29、Second ditch side form 30、Ditch lid template die plate 31 is fixing with the side form 33 being arranged on outside to be connected,Described cable trough cover boards template 25 and the adjacent fixing connection of the first cable trough side form 26,Described second ditch side form 30 and the adjacent fixing connection of ditch lid template die plate 31,The end of each described mould bases longeron 19 is connected with extensible canopy 3 one end being provided with position fixing handle 4,The other end of described extensible canopy 3 is connected with cambered surface fixed block 1,Described cambered surface fixed block 1 is provided with extensible canopy fixed handle 2,It is provided with mould bases crossbeam 20 between the first cable trough side form 26 and the second cable trough side form 28 and between the first ditch side form 29 and the second ditch side form 30 respectively on described mould bases longeron 19,Described first cable trough side form 26 is provided with the first cable trough side form boom hole and slideway 38,Described mould bases longeron 19 is provided with the second cable trough side form boom hole and slideway 39、First ditch side form boom hole and slideway 40、Second ditch side form boom hole and slideway 41 and knockout pin abutment sleeve 21,Described ditch lid template die plate 31 is provided with ditch lid template die plate boom hole and slideway 42,Described mould bases crossbeam 20 is provided with several spacing compressor arm fixing holes 37,Described mould bases longeron 19 and mould bases crossbeam 20 are arranged in a mutually vertical manner,Several mould bases hangers 18 on described mould bases crossbeam 20,The spacing of adjacent described mould bases hanger 18 is equal,Location bar and knockout pin 7 it is provided with in described knockout pin abutment sleeve 21,It is set with spacing compression sliding hanger rod 17 in the spacing compressor arm sliding sleeve 10 arranged on described mould bases longeron 19,Described spacing compression sliding hanger rod 17 is provided with spacing compression wing plate 14,Described spacing compression wing plate 14 is connected with the side mould limiting otic placode 16 on the first cable trough side form 26 and the second cable trough side form 28 by spacing compression pin 15,Template suspension rod 24 on described first cable trough side form 26 and the second cable trough side form 28 is each passed through mould bases longeron 19 and connects by clamp nut under clamp nut 22 in template and template 23 is fixing,The top of described spacing compressor arm sliding sleeve 10 be provided with for adjust spacing compress operation the spacing of handle 13 position be fixed nut 12,The end of described spacing compression sliding hanger rod 17 is provided with anti-drop device 11,Described template suspension rod 24 is provided with the Template Location scale 5 connected by Template Location pin 6.Described side form 33 is provided with side form chute 8 with the end of mould bases crossbeam 20, and described side form chute 8 is fixed bolt 9 by side form and is connected with mould bases longeron 19.Described side form 33 is provided with side form boatswain chair 32 and side form fixes otic placode 34, and described side form is fixed otic placode 34 and is connected with construction abutment wall basis by expansion bolt 36.The junction of described first cable trough side form 26 and the second cable trough side form 28 is provided with anti-overflowing steel plate strip 27.Described first cable trough side form the 26, second cable trough side form the 28, first ditch side form the 29, second ditch side form 30, ditch lid template die plate 31 and several the longitudinally connected bolts hole of regularly arranged template 35 that are provided with being arranged on the side form 33 in outside connect.
This utility model is not limited to above-mentioned embodiment, in the case of without departing substantially from flesh and blood of the present utility model, any deformation that it may occur to persons skilled in the art that, improves, replaces and each fall within protection domain of the present utility model.

Claims (9)

  1. null1. hang rotatable ditch cable trench gang form,It is characterized in that,Described gang form includes at least two longitudinally disposed mould bases longeron (19),Described mould bases longeron (19) and the cable trough cover boards template (25) of the most horizontally-parallel setting、First cable trough side form (26)、Second cable trough side form (28)、First ditch side form (29)、Second ditch side form (30)、Ditch lid template die plate (31) and be arranged on that the side form (33) in outside is fixing to be connected,Described cable trough cover boards template (25) and the first adjacent fixing connection of cable trough side form (26),Described second ditch side form (30) and the adjacent fixing connection of ditch lid template die plate (31),The end of each described mould bases longeron (19) is connected with extensible canopy (3) one end being provided with position fixing handle (4),The other end of described extensible canopy (3) is connected with cambered surface fixed block (1),Described cambered surface fixed block (1) is provided with extensible canopy fixed handle (2),It is provided with mould bases crossbeam (20) between the first cable trough side form (26) and the second cable trough side form (28) and between the first ditch side form (29) and the second ditch side form (30) respectively on described mould bases longeron (19),Described first cable trough side form (26) is provided with the first cable trough side form boom hole and slideway (38),Described mould bases longeron (19) is provided with the second cable trough side form boom hole and slideway (39)、First ditch side form boom hole and slideway (40)、Second ditch side form boom hole and slideway (41) and knockout pin abutment sleeve (21),Described ditch lid template die plate (31) is provided with ditch lid template die plate boom hole and slideway (42),Described mould bases crossbeam (20) is provided with several spacing compressor arm fixing holes (37).
  2. Hang rotatable ditch cable trench gang form the most according to claim 1, it is characterized in that, described mould bases longeron (19) and mould bases crossbeam (20) are arranged in a mutually vertical manner, described mould bases crossbeam (20) several mould bases hangers (18) upper, the spacing of adjacent described mould bases hanger (18) is equal, is provided with location bar and knockout pin (7) in described knockout pin abutment sleeve (21).
  3. nullHang rotatable ditch cable trench gang form the most according to claim 1,It is characterized in that,It is set with spacing compression sliding hanger rod (17) in the upper spacing compressor arm sliding sleeve (10) arranged of described mould bases longeron (19),Described spacing compression sliding hanger rod (17) is provided with spacing compression wing plate (14),Described spacing compression wing plate (14) is connected with the side mould limiting otic placode (16) on the first cable trough side form (26) and the second cable trough side form (28) by the spacing pin (15) that compresses,Template suspension rod (24) on described first cable trough side form (26) and the second cable trough side form (28) is each passed through mould bases longeron (19) and connects by clamp nut (23) under clamp nut (22) in template and template is fixing,The top of described spacing compressor arm sliding sleeve (10) be provided with for adjust spacing compress operation the spacing of handle (13) position be fixed nut (12).
  4. Hang rotatable ditch cable trench gang form the most according to claim 3, it is characterised in that the end of described spacing compression sliding hanger rod (17) is provided with anti-drop device (11).
  5. Hang rotatable ditch cable trench gang form the most according to claim 3, it is characterised in that described template suspension rod (24) is provided with the Template Location scale (5) connected by Template Location pin (6).
  6. Hang rotatable ditch cable trench gang form the most according to claim 1; it is characterized in that; described side form (33) is provided with side form chute (8) with the end of mould bases crossbeam (20), and described side form chute (8) is fixed bolt (9) by side form and is connected with mould bases longeron (19).
  7. Hang rotatable ditch cable trench gang form the most according to claim 1, it is characterized in that, described side form (33) is provided with side form boatswain chair (32) and side form fixes otic placode (34), and described side form is fixed otic placode (34) and is connected with construction abutment wall basis by expansion bolt (36).
  8. Hang rotatable ditch cable trench gang form the most according to claim 1, it is characterised in that the junction of described first cable trough side form (26) and the second cable trough side form (28) is provided with anti-overflowing steel plate strip (27).
  9. Hang rotatable ditch cable trench gang form the most according to claim 1, it is characterized in that, described first cable trough side form (26), the second cable trough side form (28), the first ditch side form (29), the second ditch side form (30), ditch lid template die plate (31) and be arranged on the side form (33) in outside and be provided with the longitudinally connected bolt hole of several regularly arranged templates (35) and be connected with template.
CN201620225797.XU 2016-03-23 2016-03-23 Hang commentaries on classics formula ditch cable groove built -up plate Expired - Fee Related CN205445632U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620225797.XU CN205445632U (en) 2016-03-23 2016-03-23 Hang commentaries on classics formula ditch cable groove built -up plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620225797.XU CN205445632U (en) 2016-03-23 2016-03-23 Hang commentaries on classics formula ditch cable groove built -up plate

Publications (1)

Publication Number Publication Date
CN205445632U true CN205445632U (en) 2016-08-10

Family

ID=56573901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620225797.XU Expired - Fee Related CN205445632U (en) 2016-03-23 2016-03-23 Hang commentaries on classics formula ditch cable groove built -up plate

Country Status (1)

Country Link
CN (1) CN205445632U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050271A (en) * 2016-08-23 2016-10-26 中铁十九局集团第七工程有限公司 Ditch formwork device for tunnel and construction method of ditch formwork device
CN106089256A (en) * 2016-08-23 2016-11-09 中铁十九局集团第七工程有限公司 Ditch cable trench construction trolley and construction method, tunnel cable die set device
CN106089257A (en) * 2016-08-23 2016-11-09 中铁十九局集团第七工程有限公司 A kind of tunnel ditch cable trough construction trolley
CN106223980A (en) * 2016-08-23 2016-12-14 中铁十九局集团第七工程有限公司 A kind of construction method of tunnel ditch cable trough construction trolley
CN111677528A (en) * 2020-06-01 2020-09-18 中铁隧道局集团建设有限公司 Tunnel ditch construction rack
CN117230738A (en) * 2023-11-14 2023-12-15 山西八建集团有限公司 Construction device and method for supporting-free disassembly-free formwork of trench cover plate

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050271A (en) * 2016-08-23 2016-10-26 中铁十九局集团第七工程有限公司 Ditch formwork device for tunnel and construction method of ditch formwork device
CN106089256A (en) * 2016-08-23 2016-11-09 中铁十九局集团第七工程有限公司 Ditch cable trench construction trolley and construction method, tunnel cable die set device
CN106089257A (en) * 2016-08-23 2016-11-09 中铁十九局集团第七工程有限公司 A kind of tunnel ditch cable trough construction trolley
CN106223980A (en) * 2016-08-23 2016-12-14 中铁十九局集团第七工程有限公司 A kind of construction method of tunnel ditch cable trough construction trolley
CN111677528A (en) * 2020-06-01 2020-09-18 中铁隧道局集团建设有限公司 Tunnel ditch construction rack
CN117230738A (en) * 2023-11-14 2023-12-15 山西八建集团有限公司 Construction device and method for supporting-free disassembly-free formwork of trench cover plate
CN117230738B (en) * 2023-11-14 2024-02-02 山西八建集团有限公司 Construction device and method for supporting-free disassembly-free formwork of trench cover plate

Similar Documents

Publication Publication Date Title
CN205445632U (en) Hang commentaries on classics formula ditch cable groove built -up plate
CN105604581B (en) Tunnel ditch cable trench gang form hangs rotatable installation equipment and its construction method
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN102146799B (en) Construction equipment for inverted arch of two-track tunnel of high-speed railway
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN106194216A (en) A kind of Rectangular Box Culvert and constructing tunnel chassis
CN109653771A (en) Tunnel arch two lined steel mould trolley integrated with cable duct side wall
CN205445633U (en) Tunnel ditch cable groove built -up plate hangs commentaries on classics formula erection equipment
CN103982200B (en) Slide rail Mobile steel mould trolley in tunneling boring
CN202417519U (en) Synchronous trolley
CN202017493U (en) Construction equipment for inverted arch of high-speed railway double-track tunnel
CN204877520U (en) Subway overlaps synchronous strutting arrangement in tunnel
CN204267046U (en) A kind of tunnel lining concrete grouting device
CN210151779U (en) Municipal administration utility tunnel hydraulic template platform truck
JP4559370B2 (en) Girder erection method by erection gutter from the side of bridge
CN101205702A (en) Beam-form unified movable mould frame
CN215666718U (en) Hoisting device for disassembling shield machine in existing station
CN214573768U (en) Self-climbing sliding formwork pouring system for second-stage concrete pouring of gate slot
CN202359511U (en) Subway tunnel ditch and track bed one-time pouring formwork structure
CN201132942Y (en) Bean- mold integrated moveable formwork
CN106586922B (en) A kind of lifting device being laid with monorail crane applied to coal mine tunneling machine
US11480054B2 (en) Rapid construction method for secondary lining of small-section tunnel
CN210975880U (en) Adjustable open cut tunnel is hydraulic pressure platform truck by oneself
CN209228386U (en) A kind of lining of tunneling Subway Tunnel big cross section stop line two new type formwork trolley
CN208763669U (en) Tunnel widened section construction assembly type trolley

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160810

Termination date: 20200323

CF01 Termination of patent right due to non-payment of annual fee