CN208763669U - Tunnel widened section construction assembly type trolley - Google Patents

Tunnel widened section construction assembly type trolley Download PDF

Info

Publication number
CN208763669U
CN208763669U CN201821461558.XU CN201821461558U CN208763669U CN 208763669 U CN208763669 U CN 208763669U CN 201821461558 U CN201821461558 U CN 201821461558U CN 208763669 U CN208763669 U CN 208763669U
Authority
CN
China
Prior art keywords
bogie frame
main bogie
main
top template
upper beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821461558.XU
Other languages
Chinese (zh)
Inventor
江俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wound Power Tunnel Machine Equipment Co Ltd Of Sichuan Province
Original Assignee
Wound Power Tunnel Machine Equipment Co Ltd Of Sichuan Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wound Power Tunnel Machine Equipment Co Ltd Of Sichuan Province filed Critical Wound Power Tunnel Machine Equipment Co Ltd Of Sichuan Province
Priority to CN201821461558.XU priority Critical patent/CN208763669U/en
Application granted granted Critical
Publication of CN208763669U publication Critical patent/CN208763669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of tunnel widened section construction assembly type trolleys, main bogie frame includes the first main bogie frame and the second main bogie frame, between first main beam of the first main bogie frame and the second main beam of the second main bogie frame, between first upper beam of the first main bogie frame and the second upper beam of the second main bogie frame, it is bolted respectively between first top template of the first main bogie frame and the second top template of the second main bogie frame, the outside of first main bogie frame and the outside of the second main bogie frame are from top to bottom successively arranged fixed form interconnected respectively, cheek board and end template.The utility model can complete the efficient construction of tunnel widened section, significantly save human and material resources and working hour, finally saved construction cost, avoid the delay of construction period by combining two main bogie frames;Meanwhile being connected by the way of assembled between two main bogie frames, it can easily realize the transfer of entire trolley.

Description

Tunnel widened section construction assembly type trolley
Technical field
The utility model relates to a kind of tunnel lining trolley more particularly to a kind of tunnel widened section construction assembly type platforms Vehicle.
Background technique
Tunnel lining trolley is the special equipment that must be used in constructing tunnel process secondary lining, for tunnel inner wall Concrete- liner construction.Concrete- liner trolley is the nonstandard product that secondary lining is indispensable during constructing tunnel, is mainly had simple Lining trolley, full hydraulic automatic walking lining trolley and net frame lining trolley.
Traditional tunnel lining trolley is mainly used for the conventional section of two linings of construction, for being typically provided compared with long tunnel The widened section of Emergency Stop Area, there is presently no the special construction apparatus for widening section for two linings of constructing, so usually It constructs with the following method: meeting the section of widened section in the unilateral welding steel structure of ordinary car, then slab, then construct; After the completion of widened section construction, and the steelframe of welding must be cut off, remove panel, repeat the above work again when to next widened section Industry.The traditional construction trolley and form of construction work of this widened section for two linings of constructing, waste a large amount of human and material resources, And working efficiency is low, seriously delays the construction period.
Utility model content
The purpose of this utility model, which is that provide one kind to solve the above-mentioned problems and can efficiently complete tunnel, widens The tunnel widened section construction assembly type trolley of section construction.
The utility model achieves the above object through the following technical schemes:
A kind of tunnel widened section construction assembly type trolley, including main bogie frame, the main bogie frame include active column And the running gear set on the active column lower part, the main beam set on the active column top, be set to the main beam The upper beam of top, the top template above the upper beam, the main bogie frame include the first main bogie frame and second Car owner's frame, the of the second main beam of the first end of the first main beam of first main bogie frame and second main bogie frame It is bolted between one end, the first end of the first upper beam of first main bogie frame and second main bogie frame Between the first end of second upper beam be equipped with upper beam connecting plate, the both ends of the upper beam connecting plate respectively with the First The first end of first upper beam of car owner's frame and the first end of the second upper beam of second main bogie frame are bolted, The first end of second top template of the first end of the first top template of first main bogie frame and second main bogie frame it Between be bolted and the second top template of the first top template of first main bogie frame and second main bogie frame is total Isomorphism whole top template in the arc-shaped, the outside of first main bogie frame are from top to bottom successively arranged interconnected first Fixed form, the first cheek board and the first end template, first fixed form are connect with first top template, and described second The outside of main bogie frame is from top to bottom successively arranged the second fixed form, the second cheek board and the second end template interconnected, Second fixed form is connect with second top template.
Second top template of the first end of the first top template of first main bogie frame and second main bogie frame Joint face between first end is that the angle between inclined-plane and the inclined-plane and vertical direction is 10-30 °.
The utility model has the beneficial effects that:
The utility model is by combining two main bogie frames, the function that entire main bogie frame is widened in realization, So as to complete the efficient construction of tunnel widened section, human and material resources and working hour are significantly saved, has finally saved and has been constructed into This, avoids the delay of construction period;Meanwhile being connected by the way of assembled between two main bogie frames, it can after the completion of construction With quick separating and successively by the main hole in tunnel, entire trolley can be easily realized without being transformed to original conventional tunnel Transfer, the efficient construction for realizing next widened section can be quickly assembled after being transferred to next widened section, have it is extremely strong Exploitativeness;Joint face between the first end of first top template and the first end of the second top template is designed as inclined-plane and this is oblique Angle between face and vertical direction is 10-30 °, has while convenient for being located by connecting between two top templates and avoids as far as possible Cement slurry is from the function of flowing down between gap.
Detailed description of the invention
Fig. 1 is the schematic view of the front view of tunnel widened section construction assembly type trolley described in the utility model, is shown in figure Two linings after having gone out construction.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing:
As shown in Figure 1, tunnel widened section construction assembly type trolley described in the utility model includes main bogie frame, described Car owner's frame includes active column and the running gear set on the active column lower part, the main cross set on the active column top Beam, the upper beam above the main beam, the top template above the upper beam, the active column of this trolley include First active column 10 of the first main bogie frame 8 and the second active column 30 of the second main bogie frame 28, the Running System of this trolley System includes the second row positioned at the first walking system 11 of 10 lower section of the first active column and positioned at 30 lower section of the second active column Walking system 31;The main bogie frame includes the first main bogie frame 8 and the second main bogie frame 28, and the first of the first main bogie frame 8 is main Between the first end (left end in figure) of second main beam 32 of the first end (right end in figure) and the second main bogie frame 28 of crossbeam 12 Pass through bolt (in figure unmarked) connection, the first end (right end in figure) and second of the first upper beam 14 of the first main bogie frame 8 Left end in second upper beam 34(figure of main bogie frame 28) first end between be equipped with upper beam connecting plate 16, upper beam connecting plate 16 both ends the second upper beam with the first end of the first upper beam 14 of the first main bogie frame 8 and the second main bogie frame 28 respectively 34 first end is bolted, the first end (right end in figure) and the second trolley of the first top template 1 of the first main bogie frame 8 It is bolted between the first end (left end in figure) of second top template 21 of body frame 28 and the first of the first main bogie frame 8 pushes up Second top template 21 of template 1 and the second main bogie frame 28 collectively forms arc-shaped whole top template, the first main bogie frame 8 Joint face between the first end of second top template 21 of the first end of the first top template 1 and the second main bogie frame 28 be inclined-plane and Angle between the inclined-plane and vertical direction is 10-30 °, the outside of the first main bogie frame 8 (left side in figure) from top to bottom successively Equipped with the first fixed form 15 interconnected, the first cheek board 4 and the first end template 7, the first fixed form 15 and the first top Template 1 connects, and the outside (right side in figure) of the second main bogie frame 28 is from top to bottom successively arranged the second stent interconnected Plate 35, the second cheek board 24 and the second end template 27, the second fixed form 35 are connect with the second top template 21.
The first post 2 for being used to support the first top template 1 is also shown in Fig. 1, is used to support the second top template 21 Second post 22, for moving the first top template oil cylinder 13 of the first top template 1, for moving the second of the second top template 21 Top template oil cylinder 33, for moving the first translation oil cylinder 3 of the first upper beam 14, second for moving the second upper beam 34 is flat Oil cylinder 23 is moved, the first support screw 5 of the first cheek board 4 is used to support, is used to support the second supporting wire of the second cheek board 24 Bar 25, for moving the first cheek board oil cylinder 6 of the first cheek board 4, for moving the second side mode leaf fat of the second cheek board 24 Cylinder 26, the first lifting cylinder 9 of the height for making to change the first active column 10 change the second active column 30 for making Second lifting cylinder 29 of height;These structures are similar with traditional trolley structure, and details are not described herein.For the ease of movement, Two casings of the second active column 30 are all made of round tube, so that the second active column 30 be made to have rotation function.
The working principle of tunnel widened section construction assembly type trolley described in the utility model is as follows:
After the completion of widened section construction, following steps need to be completed by trolley and be moved to next widened section construction location:
A, the first post 2 of the first main bogie frame 8 and the second post 22 of the second main bogie frame 28 are removed, receipts are passed through The first top template oil cylinder 13 and the first cheek board oil cylinder 6 are returned, the template of the first main bogie frame 8 is withdrawn.
B, the connection bolt between the first main bogie frame 8 and the second main bogie frame 28 is removed, is dropped by the first lifting cylinder 9 The height of low first main bogie frame 8 can pass through in the main hole in tunnel, and be moved by the first walking system 11 of trackless To next widened section construction location.
C, the second top template 21 and the second cheek board 24 of the second main bogie frame 28, rotation second are withdrawn in the same way Second running gear 31 of script radial direction is become laterally, driving the second running gear 31, making second by running gear 31 Car owner's frame 28 is moved to main hole position from fragment position is widened, and guarantees to pass through in main hole.
D, the second running gear 31 of transverse direction is become radial, the second running gear 31 is driven, by the second trolley master Frame 28 is moved to next widened section construction location.
E, when the first main bogie frame 8 and the second main bogie frame 28 all reach next widened section construction location, then by First Car owner's frame 8 and the second main bogie frame 28 connect, and prop up first by the first top template oil cylinder 13 and the first cheek board oil cylinder 6 Top template 1 and the first cheek board 4 prop up 21 He of the second top template by the second top template oil cylinder 33 and the second cheek board oil cylinder 26 Second cheek board 24, then the first post 2, the second post 22, the first support screw 5 and the second support screw 25 are installed, And after the completion of being positioned by corresponding oil cylinder, slip casting operation can be started;Slip casting is completed and forms two linings 36 after solidifying.
Above-described embodiment is the preferred embodiment of the utility model, is not the limit to technical solutions of the utility model System, as long as being regarded as falling into without the technical solution that creative work can be realized on the basis of the above embodiments In the rights protection scope of the utility model patent.

Claims (2)

1. a kind of tunnel widened section construction assembly type trolley, including main bogie frame, the main bogie frame include active column and Running gear set on the active column lower part, is set on the main beam main beam set on the active column top Upper beam, the top template above the upper beam of side, it is characterised in that: the main bogie frame includes the first main bogie frame With the second main bogie frame, the second master of the first end of the first main beam of first main bogie frame and second main bogie frame Be bolted between the first end of crossbeam, the first end of the first upper beam of first main bogie frame with described second Between the first end of second upper beam of car owner's frame be equipped with upper beam connecting plate, the both ends of the upper beam connecting plate respectively with institute The first end of the first end and the second upper beam of second main bogie frame of stating the first upper beam of the first main bogie frame passes through It is bolted, the second top template of the first end of the first top template of first main bogie frame and second main bogie frame Be bolted between first end and the first top template of first main bogie frame and second main bogie frame second Top template collectively forms arc-shaped whole top template, and the outside of first main bogie frame, which is from top to bottom successively arranged, mutually to be interconnected The first fixed form, the first cheek board and the first end template connect, first fixed form are connect with first top template, The outside of second main bogie frame is from top to bottom successively arranged the second fixed form interconnected, the second cheek board and second End template, second fixed form are connect with second top template.
2. tunnel widened section construction assembly type trolley according to claim 1, it is characterised in that: the First car owner Joint face between the first end of second top template of the first end of the first top template of frame and second main bogie frame is oblique Angle between face and the inclined-plane and vertical direction is 10-30 °.
CN201821461558.XU 2018-09-07 2018-09-07 Tunnel widened section construction assembly type trolley Active CN208763669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821461558.XU CN208763669U (en) 2018-09-07 2018-09-07 Tunnel widened section construction assembly type trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821461558.XU CN208763669U (en) 2018-09-07 2018-09-07 Tunnel widened section construction assembly type trolley

Publications (1)

Publication Number Publication Date
CN208763669U true CN208763669U (en) 2019-04-19

Family

ID=66135448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821461558.XU Active CN208763669U (en) 2018-09-07 2018-09-07 Tunnel widened section construction assembly type trolley

Country Status (1)

Country Link
CN (1) CN208763669U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979672A (en) * 2018-09-07 2018-12-11 四川省创力隧道机械设备有限公司 Tunnel widened section construction assembly type trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108979672A (en) * 2018-09-07 2018-12-11 四川省创力隧道机械设备有限公司 Tunnel widened section construction assembly type trolley

Similar Documents

Publication Publication Date Title
CN201908664U (en) Movable trestle bridge invert form board trolley
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN105735141B (en) A kind of box beam side form slide device and its construction method
CN104564102B (en) A kind of tunnel lining concrete grouting device
CN204715774U (en) Multi-functional revolution transport vehicle
CN107761571A (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system and its application
CN106194216A (en) A kind of Rectangular Box Culvert and constructing tunnel chassis
CN209408814U (en) A kind of PC track beam form system
CN201400500Y (en) Multifunctional lifter with platform for abnormal high building construction
CN107599132A (en) A kind of side mold device and side form opening/closing method
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN202991063U (en) Large-section tunnel hydraulic trolley
CN208763669U (en) Tunnel widened section construction assembly type trolley
CN101967798B (en) Highway double-guide-beam bridge erecting machine and turning method
CN105736012B (en) A kind of tunnel lining concrete grouting device
CN205936645U (en) A full liquid die plate system for culvert is pour
CN111365025A (en) Variable-section adjustable arch mould device for lining trolley
CN205636503U (en) Case beam side displacement device
CN203199913U (en) Assembling and disassembling type hoisting truss
CN207498835U (en) Needle beam combined steel plate beam bridge panel cast-in-place construction sliding form frame system
CN109317911A (en) A kind of cross column welding production line
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN108979672A (en) Tunnel widened section construction assembly type trolley
CN113356268A (en) Integrated movable type formwork system for comprehensive pipe rack
CN208777179U (en) A kind of base-supporting Hanging Basket closure segment traveling and retreat Demolition Construction device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant