- CN205444743U CN205444743U CN201620222857.2U CN201620222857U CN205444743U CN 205444743 U CN205444743 U CN 205444743U CN 201620222857 U CN201620222857 U CN 201620222857U CN 205444743 U CN205444743 U CN 205444743U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- bolt
- balustrade
- precast stair
- prefabricated staircase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The utility model discloses a novel joint construction of prefabricated staircase and stair railing pole setting, include steel pipe, iron sheet, bolt, nut, the steel pipe is cylindrical cavity, forms the tubbiness cylinder with steel pipe bottom and the welding of circular iron sheet, the round hole that supplies the bolt to run through is seted up at the iron sheet middle part, the head of bolt and the pre -buried one -tenth of prefabricated staircase are integrative, and this bolt afterbody runs through the iron sheet and closes with the nut spiral shell and be connected, make steel pipe and prefabricated staircase fastening connection. 1. Connecting piece processing is simple, assembles easily. 2. Solved and to have beaten complicated processes such as expansion bolts and electric welding when prefabricated staircase surface, installation can be destroyed to current connected mode. 3. Stair railing can take one's place together with stair, avoid secondary transportation and installation. 4. Save installation of interim handrail and freight, reduced stair railing installation time and labour cost.
Description
Technical field
This utility model relates to the connecting structure of prefabricated concrete structure, metal structure field, the most more convenient precast stair and balustrade vertical rod.
Background technology
Architectural industrialization is the inexorable trend of construction industry development, and mechanization production and the standardization of building supporting structure are installed and efficiency of construction can be greatly improved, and save construction cost.
Precast stair is a kind of version of assembled architecture.It produces simple, and easy for installation, beautiful appearance, is therefore expanded as the version of assembled architecture at first.Existing precast stair is to need to beat expansion bolt on surface after stair are installed with the connected mode of balustrade vertical rod, then balustrade vertical rod is attached with precast stair by welding.The method existence needs problems such as should not changing when playing the complicated procedures of forming such as expansion bolt and electric welding, stair damage when can destroy precast stair surface, installation.It would therefore be desirable to have a kind of novel precast stair and the connecting structure of balustrade vertical rod.
Summary of the invention
It is an object of the invention to provide the connecting structure of a kind of novel precast stair and balustrade vertical rod, need to beat expansion bolt on surface during for solving balustrade installation in building construction process, then problem balustrade vertical rod and precast stair being attached by welding, makes construction simplerization, economization, high efficiency.Meanwhile, balustrade maintenance change time simpler fast.
The technical solution of the utility model:
A kind of novel precast stair and the connecting structure of balustrade vertical rod, including, steel pipe, iron plate, bolt, nut;Described steel pipe is circular cylindrical cavity, will weld formation tubbiness cylinder with round iron plate bottom steel pipe;The circular hole for bolt-through is offered in the middle part of described iron plate;The head of described bolt is pre-buried with precast stair integral, and this bolt tail runs through iron plate and is screwed together with nut;Steel pipe is made to be fastenedly connected with precast stair.
Effect of the present utility model:
1. connector processing is simple, easily assembled.
2. solve when existing connected mode can destroy precast stair surface, installation and need to beat the complicated procedures of forming such as expansion bolt and electric welding.
3. balustrade can be in place together with stair, it is to avoid secondary conveying and installation.
4. save temporary armrest to install and freight, reduce balustrade set-up time and labour cost.
Accompanying drawing explanation
Fig. 1 is novel steel pipe schematic diagram.
Fig. 2 is novel iron plate schematic diagram.
Fig. 3 is novel bolt schematic diagram.
Fig. 4 is novel combination schematic diagram.
Fig. 5 is novel embodiment schematic diagram.
Detailed description of the invention
Below in conjunction with Figure of description and reference, this utility model is further described.
As Figure 1-5, a kind of novel precast stair and the connecting structure of balustrade vertical rod, including, steel pipe 1, iron plate 2, bolt 3, nut 4;Described steel pipe 1 is circular cylindrical cavity, will weld formation tubbiness cylinder 5 with round iron plate 2 bottom steel pipe 1;The circular hole run through for bolt 3 is offered in the middle part of described iron plate 2;The head of described bolt 3 is pre-buried with precast stair integral, and this bolt 3 afterbody runs through iron plate 2 and is screwed together with nut 4;Steel pipe 1 is made to be fastenedly connected with precast stair.
Described steel pipe 1 top is provided with the chamfering facilitating balustrade to insert.Described steel pipe 1 exterior side wall is provided with convex-concave drag ring.Steel pipe 1 diameter is 40mm.The thick 2mm of iron plate 2.Bolt 3 uses M16 screw, nut 4 to use M16 nut.
Embodiment
After precast stair is transported to job site, circular to diameter 40mm steel pipe 1 and 2mm thickness iron plate 2 with holes is welded together to form barreled cylinder 5.It is fixed as balustrade connector with M16 nut 4 after being connected by pre-buried to cylinder 5 and precast stair M16 screw and completes connector combination.
Before precast stair lifting, on ground, balustrade being inserted connector, then precast stair is installed in lifting.Complete also to complete while stair are installed the installation of balustrade.
Claims (5)
1. a novel precast stair and the connecting structure of balustrade vertical rod, it is characterised in that:
Including, steel pipe (1), iron plate (2), bolt (3), nut (4);Described steel pipe (1) is circular cylindrical cavity, and steel pipe (1) bottom is welded formation tubbiness cylinder (5) with iron plate (2);Described iron plate (2) middle part offers the circular hole run through for bolt (3);The head of described bolt (3) is pre-buried with precast stair integral, and this bolt (3) afterbody runs through iron plate (2) and is screwed together with nut (4);Steel pipe (1) is made to be fastenedly connected with precast stair.
A kind of novel precast stair the most according to claim 1 and the connecting structure of balustrade vertical rod, it is characterised in that:
Described steel pipe (1) top is provided with the chamfering facilitating balustrade to insert.
A kind of novel precast stair the most according to claim 1 and the connecting structure of balustrade vertical rod, it is characterised in that:
Described steel pipe (1) exterior side wall is provided with convex-concave drag ring.
A kind of novel precast stair the most according to claim 1 and the connecting structure of balustrade vertical rod, it is characterised in that:
Steel pipe (1) diameter is 40mm;The thick 2mm of iron plate (2).
A kind of novel precast stair the most according to claim 1 and the connecting structure of balustrade vertical rod, it is characterised in that:
Bolt (3) uses M16 screw, and nut (4) uses M16 nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620222857.2U CN205444743U (en) | 2016-03-22 | 2016-03-22 | Novel joint construction of prefabricated staircase and stair railing pole setting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620222857.2U CN205444743U (en) | 2016-03-22 | 2016-03-22 | Novel joint construction of prefabricated staircase and stair railing pole setting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205444743U true CN205444743U (en) | 2016-08-10 |
Family
ID=56573621
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620222857.2U Expired - Fee Related CN205444743U (en) | 2016-03-22 | 2016-03-22 | Novel joint construction of prefabricated staircase and stair railing pole setting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205444743U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469331A (en) * | 2018-10-25 | 2019-03-15 | 上海聚通装饰集团有限公司 | A kind of multipurpose construction safety goes along with sb. to guard him delicate execution installation method |
CN113944288A (en) * | 2021-11-19 | 2022-01-18 | 李霞 | Assembled concrete stair prefabricated component assembly structure |
-
2016
- 2016-03-22 CN CN201620222857.2U patent/CN205444743U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109469331A (en) * | 2018-10-25 | 2019-03-15 | 上海聚通装饰集团有限公司 | A kind of multipurpose construction safety goes along with sb. to guard him delicate execution installation method |
CN113944288A (en) * | 2021-11-19 | 2022-01-18 | 李霞 | Assembled concrete stair prefabricated component assembly structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106013517A (en) | Fabricated reinforced concrete shear wall and manufacturing method thereof | |
CN204899220U (en) | Shear force wall outer wall meet a batch connection structure | |
CN104895279B (en) | The cladding attachment structure and its construction method of precast wall panel and precast beam | |
CN206616862U (en) | Formwork root bracing means | |
CN103899044B (en) | Embedded pyramidal full grout sleeve | |
CN105952148A (en) | Easy-to-demount inner aluminum form support system for narrow deformation joint and construction method | |
CN205444743U (en) | Novel joint construction of prefabricated staircase and stair railing pole setting | |
CN107859058A (en) | A kind of cast-in-place concrete retaining wall anti-incline anti-floating large steel moulding plate device and installation method | |
CN205875736U (en) | Sectional type shear force wall is to drawing sealing screw | |
CN110863644A (en) | Novel turnover tool type beam side connecting wall piece fixing device and method | |
CN207240471U (en) | A kind of wallboard hanging piece device detachably reused | |
CN204626966U (en) | A kind of deformation joint formwork erection device | |
CN206157913U (en) | Assembled square steel tube concrete post and girder steel connected node | |
CN107571389A (en) | A kind of wallboard hanging piece device detachably reused | |
CN206428805U (en) | A kind of concrete prefabricated balcony of assembled steel | |
CN203905433U (en) | Detachable elevator shaft operating platform | |
CN110616737A (en) | Method for improving positioning qualification rate of pipe gallery embedded part | |
CN209244222U (en) | A kind of basket type builder's jack | |
CN204151835U (en) | The vertical piece structure of connection of the basement wall and cast-in-place buttress | |
CN204098487U (en) | Gear-like curved wall pilaster template | |
CN204510688U (en) | A kind of temporary fixing structure of precast wall panel | |
CN105317191A (en) | Temporary fixing method of prefabricated external wall panel and temporary fixing structure of prefabricated external wall panel | |
CN210658449U (en) | Remove aluminum alloy template structure | |
CN105756323A (en) | Civil building kitchen and toilet-based construction method for sunk suspended form mold | |
CN103114725A (en) | Chuck type split bolt formwork erecting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160810 Termination date: 20190322 |