Exempt from chisel hair template Download PDF

Info

Publication number
CN205400034U
CN205400034U CN201620143832.3U CN201620143832U CN205400034U CN 205400034 U CN205400034 U CN 205400034U CN 201620143832 U CN201620143832 U CN 201620143832U CN 205400034 U CN205400034 U CN 205400034U
Authority
CN
China
Prior art keywords
face
template
pyramid
height
exempt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620143832.3U
Other languages
Chinese (zh)
Inventor
周良
张中杰
吕培林
汤翔
张鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Design Research Institute Co ltd
Original Assignee
Shanghai Urban Construction Design Research Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Design Research Institute Co ltd filed Critical Shanghai Urban Construction Design Research Institute Co ltd
Priority to CN201620143832.3U priority Critical patent/CN205400034U/en
Application granted granted Critical
Publication of CN205400034U publication Critical patent/CN205400034U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses an exempt from chisel hair template, the template be by first terminal surface and second terminal surface and with the first side that first terminal surface and second terminal surface link to each other and the solid enclosed construction of second side constitution, first terminal surface with the second terminal surface is straight face, first side is straight face, the second side is the mat surface by the pyramid formation of array, the surface of mat surface is provided with a plurality of protrudingly, is the height of pyramid 2 8mm, is prominent height 0.4 1.2mm. The utility model discloses simple structure, implementation convenience just can effectively reduce the building site noise.

Description

Exempt from dabbing template
Technical field
The utility model relates to technical field of building construction, particularly relates to one and exempts from dabbing template.
Background technology
In recent years, the fast development built along with city development, substantial amounts of large-scale buildings or structures, including Large size city synthesis, residential building, office building, subway station, underground parking garage, lower cervical spine tunnel etc. are no Break and build in city, down town or resident residential area periphery.
During the civil engineering of new building, general employing monolithic reinforced concrete structure construction.In order to ensure Successively form effective overall structure between casting concrete, it is ensured that the security of engineering, cast-in-situ steel reinforced concrete The construction joint dabbing that first concrete in advance will be contacted, dabbing process is needed with later stage concrete during structure construction Not only the duration is long, and decibel is higher, and the life to the common people around brings interference greatly, causes around The common people's is discontented.
Therefore, those skilled in the art need a kind of simple in construction of research badly, implement convenient and can effectively reduce The structure of construction site noise.
Utility model content
Because the drawbacks described above of prior art, the utility model proposes a kind of simple in construction, implement conveniently And can effectively reduce construction site noise exempt from dabbing template.
For achieving the above object, the utility model provides one and exempts from dabbing template, and described template is by first End face and the second end face and the first side being connected with described first end face and the second end face and the second side The solid enclosed construction constituted;Described first end face and described second end face are flat face;Described first side For flat face, described second side is the matsurface formed by the pyramid of array, the table of described matsurface Face is provided with multiple projection;The height of described pyramid is 2-8mm, and the height of described projection is 0.4-1.2mm.
In some preferred embodiments, the height of described pyramid is 6mm, and the height of described projection is 1mm.
Inclination angle in some preferred embodiments, between pyramidal surface and the axis of pyramid of described pyramid For 30-60 °.
In some preferred embodiments, the inclination angle of the pyramidal surface of shown pyramid is 60 °.
The beneficial effects of the utility model:
Said structure of the present utility model designs, owing to being provided with by the pyramid of array at the one side of template Body formed matsurface, use this template, when pouring can be connected with the concrete in later stage in advance mix The edge of solidifying soil directly forms the face of rough hewing, it is not necessary to processed by artificial chiseling, noiselessness, dust or dregs Generation, and automaticity is high, short construction period, thick at construction joint when effectively prevent artificial chiseling The problem that rugosity construction quality is difficult to ensure that.
Below with reference to accompanying drawing, the technique effect of design of the present utility model, concrete structure and generation is made into one Step explanation, to be fully understood from the purpose of this utility model, feature and effect.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model one embodiment.
Fig. 2 a is the structural representation of the utility model construction procedure one.
Fig. 2 b is the structural representation of the utility model construction procedure two.
Fig. 2 c is the structural representation of the utility model construction procedure three.
Detailed description of the invention
As it is shown in figure 1, the present embodiment proposes one exempts from dabbing template 1, template 1 is by the first end face 11 With the second end face 12 and the first side 13 and the second side of being connected with the first end face 11 and the second end face 12 The solid enclosed construction that face 14 is constituted.
First end face 11 of template 1 and the second end face 12 are flat face, and the first side 13 of template 1 is Flat face, the second side 14 of template 1 is the matsurface formed by the pyramid of array, matsurface Surface configuration has multiple projection (not shown).
As preferably, the height of pyramid is 6mm, and the inclination angle between pyramidal surface and the axis of pyramid is 60 °, the height of projection is 1mm.
In other embodiments, the height of pyramid can be between 2-8mm, and the inclination angle of pyramidal surface can be 30-60 °, the height of projection can be 0.4-1.2mm, certainly, the height of pyramid, the inclination angle of pyramidal surface And the height of projection can also use other numerical value according to the thickness of template.
Above-mentioned template is customization steel form, and its height H can arrange some shelves by the thickness of conventional plate, as 100mm, 150mm, 200mm ... 1000mm etc.;Its width determines depending on requirement of engineering, generally press modulus 1m, 3m, 6m, 9m, 12m, during such as non-integer, available special width is spliced into entirety.The thickness of template is excellent Elect 8mm as.
Concrete applicable cases of the present utility model is as follows:
First, the surface in the second side 14 of template applies anti-friction agent, it is simple to the later stage demoulding.Then, As shown in Figure 2 a, before pouring the concrete 2 of Work sectors in advance, this template 1 is arranged at construction joint circle The side (when arranging, the second side is in the face for the treatment of pouring area) in face, then pours;Treat institute's casting concrete After reaching design strength, as shown in Figure 2 b, form removal 1, the side natural shape of the concrete constructed in advance Become to meet the matsurface of code requirement, it is not necessary to dabbing processes further;Finally, as shown in Figure 2 c, directly Carrying out the concreting work of next construction section 3, when pouring, the concrete 31 in next construction section 3 is with first Between the concrete 21 of phase Work sectors alternately, overall structure is formed, it is ensured that the intensity of construction.
In above-mentioned work progress, owing to the concrete after pouring need not be carried out dabbing process, therefore without The generation of noise, dust or dregs, and automaticity is high, short construction period, effectively prevent people The problem that during work dabbing, at construction joint, roughness construction quality is difficult to ensure that.
Preferred embodiment of the present utility model described in detail above.Should be appreciated that the common of this area Technical staff just can make many modifications and variations according to design of the present utility model without creative work. Therefore, all technical staff in the art pass through on the basis of existing technology according to design of the present utility model The available technical scheme of logical analysis, reasoning, or a limited experiment, all should be by claims institute In the protection domain determined.

Claims (4)

1. exempt from dabbing template for one kind, it is characterised in that described template be by the first end face and the second end face and with The first side and the solid closing of the second side composition that described first end face and the second end face are connected are tied Structure;Described first end face and described second end face are flat face;Described first side is flat face, institute Stating the second side is the matsurface formed by the pyramid of array, and the surface configuration of described matsurface has Multiple projections;The height of described pyramid is 2-8mm, and the height of described projection is 0.4-1.2mm.
Exempt from dabbing template the most as claimed in claim 1, it is characterised in that the height of described pyramid is 6mm, The height of described projection is 1mm.
Exempt from dabbing template the most as claimed in claim 2, it is characterised in that the pyramidal surface of described pyramid and rib Inclination angle between the axis of cone is 30-60 °.
Exempt from dabbing template the most as claimed in claim 3, it is characterised in that inclining of the pyramidal surface of shown pyramid Angle is 60 °.
CN201620143832.3U 2016-02-26 2016-02-26 Exempt from chisel hair template Active CN205400034U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620143832.3U CN205400034U (en) 2016-02-26 2016-02-26 Exempt from chisel hair template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620143832.3U CN205400034U (en) 2016-02-26 2016-02-26 Exempt from chisel hair template

Publications (1)

Publication Number Publication Date
CN205400034U true CN205400034U (en) 2016-07-27

Family

ID=56424065

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620143832.3U Active CN205400034U (en) 2016-02-26 2016-02-26 Exempt from chisel hair template

Country Status (1)

Country Link
CN (1) CN205400034U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107553697A (en) * 2017-10-16 2018-01-09 四川省建筑科学研究院 A kind of template and prefabricated components production method
CN114232990A (en) * 2021-12-09 2022-03-25 中国一冶集团有限公司 Stair step chiseling-free assembled aluminum template structure and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107553697A (en) * 2017-10-16 2018-01-09 四川省建筑科学研究院 A kind of template and prefabricated components production method
CN114232990A (en) * 2021-12-09 2022-03-25 中国一冶集团有限公司 Stair step chiseling-free assembled aluminum template structure and construction method

Similar Documents

Publication Publication Date Title
CN103924793B (en) Old house reinforcement structure and reinforcement means thereof
CN205400034U (en) Exempt from chisel hair template
CN104652839A (en) Method for reducing height of reinforced concrete frame structure
CN204266136U (en) Stone arch bridge cover arch rib shotcrete ruggedized construction
CN104594654B (en) A kind of concrete structure reinforcement scheme generation method
CN103696437B (en) A kind of construction method of cutting lattice column
CN102635230B (en) The formwork for placing of large methane tank body and casting method
CN205712151U (en) A kind of concrete foundation precoated plate
CN207959202U (en) A kind of CFG bracing means
CN106320373A (en) Supporting system at position of post-pouring belt of underground garage roof and construction method
CN207419452U (en) A kind of concrete-pile suitable for basement process
CN202849893U (en) Concrete slab pavement structure
CN104314001B (en) Regeneration concrete band U rib dumbbell shape columnar piers
CN204551531U (en) A kind of module check well
CN104328735B (en) Regeneration concrete Z-type pier stud
CN204139190U (en) A kind of Liftable preformed bricks fetal membrane
CN204112858U (en) The prefabricated enclosure wall of a kind of prestressed concrete
CN204139052U (en) Regeneration concrete band U rib dumbbell shape columnar pier
CN202899141U (en) Foundation pit supporting structure suitable for basin type excavation method
CN207919979U (en) Indoor super large-scale lithotome paving structure
CN204370300U (en) Regeneration concrete Z-type pier stud
CN204626399U (en) A kind of Contiuum type recoverable hollow anchor pole for pattern foundation pit supporting structure
CN103867210B (en) A kind of city underground list branch-cut bridge excavating construction method
CN205954643U (en) Concrete bank protection suppression instrument
CN204983238U (en) Assembled shaped steel restraint concrete shear force wall connected node

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant