CN104328735B - Regeneration concrete Z-type pier stud - Google Patents

Regeneration concrete Z-type pier stud Download PDF

Info

Publication number
CN104328735B
CN104328735B CN201410557511.3A CN201410557511A CN104328735B CN 104328735 B CN104328735 B CN 104328735B CN 201410557511 A CN201410557511 A CN 201410557511A CN 104328735 B CN104328735 B CN 104328735B
Authority
CN
China
Prior art keywords
concrete
regeneration
aggregate
pier stud
regeneration concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410557511.3A
Other languages
Chinese (zh)
Other versions
CN104328735A (en
Inventor
应敬伟
杨雨厚
杨涛
马娴
周亭林
秦煜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Guangxi Transportation Research Institute
Original Assignee
Guangxi University
Guangxi Transportation Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University, Guangxi Transportation Research Institute filed Critical Guangxi University
Priority to CN201410557511.3A priority Critical patent/CN104328735B/en
Publication of CN104328735A publication Critical patent/CN104328735A/en
Application granted granted Critical
Publication of CN104328735B publication Critical patent/CN104328735B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/268Composite concrete-metal

Abstract

The invention discloses a kind of regeneration concrete Z-type pier stud, two round steel pipes by two block plates with U-shaped steel tank are welded to form, and in U-shaped steel tank and pour general aggregate concrete between two parallel block plates, pour regenerated aggregate concrete inside round steel pipe.Instant invention overcomes owing to intensity and endurance quality difference etc. cause regeneration concrete to use limited problem, be conducive to popularization and application in science of bridge building for the regeneration concrete and engineering garbage as resource, can be applicable to earthquake intensity larger area, construction material is difficult to the Skew Bridge in the region transported;For by the bridge after eaerthquake damage, immediately the bridge of destruction can be broken off regeneration aggregate, substitute natural aggregate by regeneration aggregate part and repair or rebuild bridge, decrease cost of transportation, be conducive to recovering post-disaster reconstruction.

Description

Regeneration concrete Z-type pier stud
Technical field
The invention belongs to the technical field of bridge engineering of steel performance, relate to bridge pier column, especially one is again Growing concrete Z-type pier stud.
Background technology
Now, China is the maximum construction market in the whole world, and huge concrete demand causes sandstone gradually to show confession The trend should not asked, the high-quality natural aggregate in the many areas of China has become exhausted, and substantial amounts of quarrying activity is to ecological environment Cause irreversible destruction.Meanwhile, the discharge capacity of waste material of buildings also increases day by day, and discarded concrete is carried out again Utilize, be i.e. processed into regeneration aggregate for producing regeneration concrete it is considered to be solve the most effective way of discarded concrete problem Footpath.On the one hand the application of recycled concrete can solve the problem that discarded concrete difficult treatment is brought, on the other hand The consumption to natural aggregate, the ecological environment in the protection aggregate place of production can be reduced, meet the requirement of sustainable development.
But, damage with its adsorption one layer of old mortar due to the inherence of regeneration aggregate and caused water absorption rate big, cause it Recycled concrete strength, shrinkage and the endurance qualities etc. being made into are compared with normal concrete difference, and this is that restriction regeneration aggregate mixes One of major reason of solidifying soil popularization and application.
Content of the invention
The technical problem to be solved in the present invention is to provide that a kind of bearing capacity is high, anti-seismic performance is good, cheap, easy construction Regeneration concrete Z-type pier stud, to meet the requirement of science of bridge building application, expands the range of regeneration concrete.
For solving above-mentioned technical problem, the present invention by the following technical solutions: regeneration concrete Z-type pier stud, including Z-type cuts Face pier shaft, two round steel pipes by two block plates with U-shaped steel tank for the Z-type cross section pier shaft are welded to form, two blocks of parallel steel Plate is as the stage casing of Z-type cross section pier shaft, and two steel pipes are respectively welded at two ends, stage casing, and two round steel pipes respectively carry two U-shapeds Steel tank as parallel two limb up and down of Z-type cross section pier shaft, upper and lower two limbs be arranged in bridge longitudinally on;U-shaped steel tank is interior and parallel Two block plates between pour general aggregate concrete, pour regenerated aggregate concrete inside round steel pipe.
U-shaped steel tank is welded by encased steel plate.
U-shaped steel tank width B1 and round steel pipe diameter D ratio are in the range of 0.2185-0.7071.
U-shaped steel tank width B1 and round steel pipe diameter D ratio preferably take near 0.4815.
U-shaped steel tank length H and round steel pipe diameter D ratio are preferably in the range of 0-1 and be not equal to 0, when being taken as 0, i.e. Cancel U-shaped steel tank effect, become diagonally disposed dumbbell shape pier stud.
Between steel plate, width B2 preferably takes 40cm-60cm scope.
General aggregate strength grade of concrete is not less than C50, and strength of recycled aggregate concrete grade is not less than C35, and commonly The strength grade of aggregate concrete is more than regenerated aggregate concrete.
The aggregate size of regeneration concrete is in 5mm-30mm scope, and grating is reasonable.
The problem existing for regenerated aggregate concrete application, inventor devises a kind of regeneration concrete Z-type pier stud, by two Block plate and two round steel pipes with U-shaped steel tank are welded to form, and U-shaped steel tank is interior and pours general between two parallel block plates Logical aggregate concrete, pours regenerated aggregate concrete inside round steel pipe.Due to large diameter steel pipe constraint regeneration concrete " cuff " acts on, and is combined together steel with concrete, and under axial compressive force effect, the expansion of concrete will be by steel Pipe retrains, and concrete is in three dimension stress state, will be greatly improved the bearing capacity of concrete;In addition, be filled with common coagulation The U-shaped steel tank of soil and cross wall can be effectively prevented again steel pipe generation cripling, and the ductile performance of component is obviously improved, Energy dissipation capacity is greatly improved, and has superior anti-seismic performance.Additionally, encased steel plate and steel pipe can use simultaneously as template, Therefore construct in need not carry out form work engineering, can accelerating construction progress, increase economic efficiency.Instant invention overcomes due to intensity And endurance quality difference etc. causes regeneration concrete to use limited problem, beneficially popularization in science of bridge building for the regeneration concrete Application and engineering garbage as resource, can be applicable to earthquake intensity larger area, construction material is difficult to the skew bridge in the region transported Beam;For by the bridge after eaerthquake damage, immediately the bridge of destruction can be broken off regeneration aggregate, use regeneration aggregate part Substitute natural aggregate repair or rebuild bridge, decrease cost of transportation, be conducive to recovering post-disaster reconstruction.
Brief description
Fig. 1 is the structural representation of regeneration concrete Z-type pier stud of the present invention.
In figure: 1 round steel pipe, 2U shape steel tank, 3 steel plates, 4 regenerated aggregate concretes, 5 general aggregate concrete.
Detailed description of the invention
As it is shown in figure 1, the regeneration concrete Z-type pier stud of the present invention includes Z-type cross section pier shaft, Z-type cross section pier shaft is by two pieces Steel plate 3 and two round steel pipes 1 with U-shaped steel tank 2 are welded to form, and two parallel block plates are as Z-type cross section pier shaft Stage casing, two steel pipes are respectively welded at two ends, stage casing, and two round steel pipes respectively carry two U-shaped steel tanks as Z-type cross section pier shaft Parallel two limb up and down, upper and lower two limbs are arranged in bridge longitudinal direction;In U-shaped steel tank and pour general between two parallel block plates Logical aggregate concrete 5, pours regenerated aggregate concrete 4 inside round steel pipe.
Manufacturing process
First encased steel plate is formed U-shaped steel tank by welding group, then U-shaped steel tank is welded on round steel pipe, finally leads to Cross two block plates two round steel pipes with U rib are welded together, ultimately form Z-shaped pier stud, subsequently in round steel pipe Portion pours regenerated aggregate concrete (, in 5mm-30mm scope, grating is reasonable for aggregate size), inside U-shaped steel tank and steel plate Pour general aggregate concrete.Wherein, general aggregate strength grade of concrete is not less than C50, strength of recycled aggregate concrete Grade is not less than C35, and the strength grade of normal concrete must not be less than regenerated aggregate concrete.
Wherein, steel plate length L uses according to actual conditions, and steel plate and U-shaped steel tank center line angle of cut α are actual according to bridge Oblique angles value.U-shaped steel tank width B1 and round steel pipe diameter D ratio are in the range of 0.2185-0.7071, according to list The principle that position volume concrete obtains maximum load capacity preferably takes near 0.4815;U-shaped steel tank length H and round steel pipe diameter D Ratio is preferably in the range of 0-1, when taking 0, i.e. cancels U-shaped steel tank effect, becomes diagonally disposed dumbbell shape pier stud;Steel Between plate, width B2 is preferably taken at 40cm-60cm scope.
Design principle
The Z-shaped pier stud of regeneration concrete of the present invention both can meet requirement for bearing capacity, has again good anti-seismic performance, and can show Write and improve regeneration concrete durability, expand regeneration concrete range of application, additionally, this pier stud easy construction, cheap.
Bearing power increase is because: when axial force increases, and concrete can occur transversely deforming, when transversely deforming is by about In the case of bundle, the development of concrete microcrack can be restricted, and deformation performance also can strengthen, thus improves bearing capacity.Anti- Shock stability raising is because: be on the one hand filled with the U-lag steel of normal concrete and cross wall can be effectively prevented steel pipe and send out Raw cripling, the ductile performance of component is obviously improved, and energy dissipation capacity is greatly improved;On the other hand owing to core concrete is subject to To constraint, when geological process, the micro-crack of inside concrete is also not easy extension, thus shock resistance is improved.Resistance to Long performance raising is because: encased steel plate makes regeneration concrete be isolated with atmospheric environment, stops the infiltration of moisture, so that The endurance quality of regeneration concrete is improved.Easy construction, the reason that cheap be: on the one hand use discarded regeneration Concrete, turns waste into wealth;On the other hand steel pipe and steel plate directly serve as template, need not set up template in pier stud work progress, Thus the material-saving that saves time.

Claims (8)

1. a regeneration concrete Z-type pier stud, including Z-type cross section pier shaft, it is characterised in that: described Z-type cross section pier shaft is by two Block plate and two round steel pipes with U-shaped steel tank are welded to form, and two parallel block plates are as Z-type cross section pier shaft Stage casing, two steel pipes are respectively welded at two ends, stage casing, and two round steel pipes respectively carry two U-shaped steel tanks as Z-type cross section Parallel two limb up and down of pier shaft, upper and lower two limbs are arranged in bridge longitudinal direction;In described U-shaped steel tank and two blocks of parallel steel Pour general aggregate concrete between plate, inside round steel pipe, pour regenerated aggregate concrete.
2. regeneration concrete Z-type pier stud according to claim 1, it is characterised in that: described U-shaped steel tank is by encased steel plate It is welded.
3. regeneration concrete Z-type pier stud according to claim 2, it is characterised in that: described U-shaped steel tank width B1 and circle Shape diameter of steel tube D ratio is in the range of 0.2185-0.7071.
4. regeneration concrete Z-type pier stud according to claim 3, it is characterised in that: described U-shaped steel tank width B1 and circle Shape diameter of steel tube D ratio is 0.4815.
5. regeneration concrete Z-type pier stud according to claim 4, it is characterised in that: described U-shaped steel tank length H and circle Shape diameter of steel tube D ratio and is not equal to 0 in the range of 0-1.
6. regeneration concrete Z-type pier stud according to claim 5, it is characterised in that: wide between described two parallel block plates Degree B2 is in 40cm-60cm scope.
7. regeneration concrete Z-type pier stud according to claim 6, it is characterised in that: described general aggregate concrete strength Grade is not less than C50, and strength of recycled aggregate concrete grade is not less than C35, and the strength grade of general aggregate concrete More than regenerated aggregate concrete.
8. regeneration concrete Z-type pier stud according to claim 7, it is characterised in that: the aggregate grain of described regeneration concrete Footpath is in 5mm-30mm scope.
CN201410557511.3A 2014-10-20 2014-10-20 Regeneration concrete Z-type pier stud Active CN104328735B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410557511.3A CN104328735B (en) 2014-10-20 2014-10-20 Regeneration concrete Z-type pier stud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410557511.3A CN104328735B (en) 2014-10-20 2014-10-20 Regeneration concrete Z-type pier stud

Publications (2)

Publication Number Publication Date
CN104328735A CN104328735A (en) 2015-02-04
CN104328735B true CN104328735B (en) 2016-11-09

Family

ID=52403535

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410557511.3A Active CN104328735B (en) 2014-10-20 2014-10-20 Regeneration concrete Z-type pier stud

Country Status (1)

Country Link
CN (1) CN104328735B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106946527B (en) * 2017-03-31 2019-06-28 中冶南方城市建设工程技术有限公司 A kind of U-shaped abutment of regeneration concrete gravity type and preparation method thereof
CN107190635B (en) * 2017-06-26 2022-10-04 天津大学 Dumbbell type steel pipe concrete combined bridge pier and connecting structure and method of dumbbell type steel pipe concrete combined bridge pier and bearing platform

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2170258A (en) * 1985-01-25 1986-07-30 John Michael Dyson Repairing PRC houses
CN1032691A (en) * 1988-09-02 1989-05-03 宋德印 Special-shaped hollow column
JPH0978763A (en) * 1995-09-18 1997-03-25 Maeda Corp Work execution method for concrete structure and precast form
CN200992774Y (en) * 2006-12-08 2007-12-19 北京工业大学 Section steel concrete special-shaped column
CN202787661U (en) * 2011-12-26 2013-03-13 北京工业大学 Latticed single-row reinforced concrete column with Z-shaped cross section
CN103216039A (en) * 2013-05-02 2013-07-24 广西大学 Combined type steel pipe concrete special-shaped column with honeycomb-hole partition plate
CN103967208A (en) * 2014-04-14 2014-08-06 北京工业大学 Light steel-small diameter wood composite load-bearing column with Z-shaped cross section and preparation method thereof
CN104060763A (en) * 2014-07-03 2014-09-24 沈阳建筑大学 Z-shaped steel pipe-steel framework recycled concrete combined pillar
CN204370300U (en) * 2014-10-20 2015-06-03 广西交通科学研究院 Regeneration concrete Z-type pier stud

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2170258A (en) * 1985-01-25 1986-07-30 John Michael Dyson Repairing PRC houses
CN1032691A (en) * 1988-09-02 1989-05-03 宋德印 Special-shaped hollow column
JPH0978763A (en) * 1995-09-18 1997-03-25 Maeda Corp Work execution method for concrete structure and precast form
CN200992774Y (en) * 2006-12-08 2007-12-19 北京工业大学 Section steel concrete special-shaped column
CN202787661U (en) * 2011-12-26 2013-03-13 北京工业大学 Latticed single-row reinforced concrete column with Z-shaped cross section
CN103216039A (en) * 2013-05-02 2013-07-24 广西大学 Combined type steel pipe concrete special-shaped column with honeycomb-hole partition plate
CN103967208A (en) * 2014-04-14 2014-08-06 北京工业大学 Light steel-small diameter wood composite load-bearing column with Z-shaped cross section and preparation method thereof
CN104060763A (en) * 2014-07-03 2014-09-24 沈阳建筑大学 Z-shaped steel pipe-steel framework recycled concrete combined pillar
CN204370300U (en) * 2014-10-20 2015-06-03 广西交通科学研究院 Regeneration concrete Z-type pier stud

Also Published As

Publication number Publication date
CN104328735A (en) 2015-02-04

Similar Documents

Publication Publication Date Title
CN202017302U (en) Engineering fiber reinforced cementitious composites (ECC) connecting beam
CN104295002B (en) Inside set height strengthening regenerative mixed steel pipe concrete Column under Axial Load and the construction technology of local restriction
CN103967205A (en) FRP (Fiber Reinforced Polymer) pipe-recycled concrete-steel pipe double-walled hollow combined member
CN103541504A (en) Special-shaped section steel tube recycled concrete core column
CN105777020A (en) Iron tailing sand PVA fiber-reinforced-cement-based composite
CN103541501A (en) Special-shaped section steel rib recycled concrete column
CN104328735B (en) Regeneration concrete Z-type pier stud
CN209872797U (en) Composite shock insulation layer structure for shield tunnel
CN203080744U (en) Steel plate and high-strength concrete combination shear wall
CN204266439U (en) Based on the novel compositions girder construction of steel-ultra-high performance concrete
CN104314001B (en) Regeneration concrete band U rib dumbbell shape columnar piers
CN102828578A (en) Bolt-connected assembling anti-cracking anti-seepage permanent cylinder shuttering
CN108590035A (en) High-strength recycled concrete superposed column and preparation method thereof
CN204370300U (en) Regeneration concrete Z-type pier stud
CN204139052U (en) Regeneration concrete band U rib dumbbell shape columnar pier
CN204571341U (en) A kind of FRP pipe constraint cement-base composite material reinforces pillarwork
CN103541503A (en) Steel rib-steel tube recycled concrete combined column
CN207647212U (en) The prefabricated small-bore FRP pipes reinforced steel concrete rod structure of concrete filled
CN204238123U (en) A kind of triangular form section steel pipe regeneration concrete pier stud
CN204703351U (en) A kind of concrete combined beam structure
CN210134332U (en) UHPC steel pipe concrete superposed lattice column structure
CN204163282U (en) Regeneration concrete L-type steel pipe hetermorphiscal column
CN104294754B (en) T-shaped section steel pipe regeneration concrete pier shaft
CN204139051U (en) Regeneration concrete ten shape steel tube hetermorphiscal column bridge pier
CN104264580B (en) A kind of triangular form section steel pipe regeneration concrete pier stud

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Ying Jingwei

Inventor after: Yang Yuhou

Inventor after: Yang Tao

Inventor after: Ma Xian

Inventor after: Zhou Tinglin

Inventor after: Qin Yu

Inventor before: Ying Jingwei

Inventor before: Qin Yu

Inventor before: Yang Tao

Inventor before: Ma Xian

Inventor before: Zhou Tinglin

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160912

Address after: 530007 Nanning high tech Zone, the Guangxi Zhuang Autonomous Region hi tech Road, No. two, No. 6

Applicant after: Guangxi Transportation Research Institute

Applicant after: Guangxi University

Address before: 530007 Nanning high tech Zone, the Guangxi Zhuang Autonomous Region hi tech Road, No. two, No. 6

Applicant before: Guangxi Transportation Research Institute

C14 Grant of patent or utility model
GR01 Patent grant