CN102071692A CN2010105709143A CN201010570914A CN102071692A CN 102071692 A CN102071692 A CN 102071692A CN 2010105709143 A CN2010105709143 A CN 2010105709143A CN 201010570914 A CN201010570914 A CN 201010570914A CN 102071692 A CN102071692 A CN 102071692A
Authority
CN
China
Prior art keywords
support
plate
construction
central area
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105709143A
Other languages
Chinese (zh)
Inventor
谷志旺
周晓莉
张铭
黄轶
顾靖
曹文根
王巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai City No4 Building Co Ltd
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai City No4 Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai City No4 Building Co Ltd filed Critical Shanghai City No4 Building Co Ltd
Priority to CN2010105709143A priority Critical patent/CN102071692A/en
Publication of CN102071692A publication Critical patent/CN102071692A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a construction method for performing bottom plate support replacement on a foundation pit by using an annular plate. The construction method comprises the following steps of: 1, constructing an enclosing structure and a support and excavating earth to the bottom surface of the foundation pit; 2, performing construction to pour concrete of the annular plate and a ring beam and basic joints of a central area steel structure; 3, when the concrete strength of the annular plate and the ring beam meet the requirement, detaching the support above the bottom plate; and 4, performing construction to pour the bottom plate of the central area and install a main body steel structure. By the method, a stable stressed structure formed by the annular plate and the annular beam is used for changing support of the bottom plate; and the bottom plate support can be changed when the bottom plates in the central area are not finished, so that the construction period of the central area is separated from the support change period of the bottom plates and the construction efficiency is improved.

Description

Adopt ring flat-plate to carry out the job practices of base plate of foundation pit support replacement
Technical field
The present invention relates to a kind of job practices that adopts ring flat-plate to carry out the base plate support replacement, be particularly useful for the job practices that center main body steel work base section is embedded in the base plate support replacement in the base plate.
Background technology
Conventional base plate support replacement method be base plate all build finish after, the coagulation of removing the base plate top again supports, its prerequisite is that the concrete of base plate must all have been constructed, whole base plate forms integral body.For conventional engineering, this method is given no cause for much criticism, but some engineering, its agent structure are steel work, and mainly concentrate on the central area, the base section of steel work bury underground with base plate within, before the base plate construction, must earlier the base section construction of steel work be finished, like this, before supporting removal, must finish the lifting of steel work base section, base plate construction two procedures, construction period extends greatly.If the lifting duration of steel work base section can be peeled off out from the construction period of base plate support replacement, the speed of construction can be accelerated greatly.
Summary of the invention
The present invention will solve in pre-buried section lifting of the steel work of base plate central area to take in a large number under the situation of support replacement duration, make the hoisting cycle of pre-buried section of steel work from the construction period of base plate support replacement, peel off out, improve speed of application, and a kind of job practices that adopts ring flat-plate to carry out the base plate of foundation pit support replacement is provided.
For solving technical problem of the present invention, the technical scheme that is adopted is as follows:
A kind of job practices that adopts ring flat-plate to carry out the base plate of foundation pit support replacement, its step is as follows:
1. construct space enclosing structure, support, and cut the earth to the foundation ditch bottom surface;
2. the base section of ring flat-plate, ring beam concrete and central area steel work is poured into a mould in construction;
3. after the concrete strength of ring flat-plate and ring beam reaches requirement, remove the support of base plate top;
4. construction is poured into a mould the base plate of central area and the main body steel work is installed.
The invention has the beneficial effects as follows: the present invention utilizes ring flat-plate and the formed stable force structure of ring beam to carry out the support replacement of base plate, still imperfect tense can carry out the support replacement of base plate at the central area base plate, make the construction period of central area peel off out the cycle, thereby improve efficiency of construction from the support replacement of base plate.
Description of drawings
Fig. 1 is the structural representation after the present invention constructs;
Fig. 2 to Fig. 5 is a job practices process schematic diagram of the present invention.
The specific embodiment
Below in conjunction with specific embodiment, further set forth embodiments of the present invention.Should be understood that these embodiment only to be used to the present invention is described and be not used in and limit the scope of the invention.Should be understood that in addition those skilled in the art can make various changes or modifications the present invention after the content of having read the present invention's instruction, these equivalent form of values fall within the application's appended claims institute restricted portion equally.
As shown in Figure 1, the present invention adopts ring flat-plate to carry out the job practices of base plate of foundation pit support replacement, utilize the formed stable force structure of ring flat-plate and ring beam to carry out the support replacement of base plate, still imperfect tense can carry out the support replacement of base plate at the central area base plate, make the construction period of central area peel off out the cycle, thereby improve efficiency of construction from the support replacement of base plate.
To shown in Figure 5, the present invention adopts ring flat-plate to carry out the job practices of base plate of foundation pit support replacement as Fig. 2, and key step is as follows:
1) space enclosing structure 2, support 1 and excavation and construction cut the earth 3 to foundation ditch bottom surface (Fig. 2).
2) base section 6 (Fig. 3) of construction ring flat-plate 4, ring beam 5 and central area steel work.
3) after the concrete strength of ring flat-plate and ring beam reaches requirement, remove the support 1 (Fig. 4) of base plate top.
4) base plate 7 and the main body steel work 8 (Fig. 5) of construction central area.

Claims (1)

1. job practices that adopts ring flat-plate to carry out the base plate of foundation pit support replacement, it is characterized in that: concrete steps are:
1) construct space enclosing structure (2), support (1), and cut the earth (3) is to the foundation ditch bottom surface;
2) base section (6) of construction cast ring flat-plate (4), ring beam (5) concrete and central area steel work;
3) after the concrete strength of ring flat-plate (4) and ring beam (5) reaches requirement, remove the support (1) of base plate top;
4) base plate (7) of construction cast central area and installation main body steel work (8).
CN2010105709143A 2010-12-02 2010-12-02 Construction method for performing bottom plate support replacement on foundation pit by using annular plate Pending CN102071692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105709143A CN102071692A (en) 2010-12-02 2010-12-02 Construction method for performing bottom plate support replacement on foundation pit by using annular plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105709143A CN102071692A (en) 2010-12-02 2010-12-02 Construction method for performing bottom plate support replacement on foundation pit by using annular plate

Publications (1)

Publication Number Publication Date
CN102071692A true CN102071692A (en) 2011-05-25

Family

ID=44030432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105709143A Pending CN102071692A (en) 2010-12-02 2010-12-02 Construction method for performing bottom plate support replacement on foundation pit by using annular plate

Country Status (1)

Country Link
CN (1) CN102071692A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015432A (en) * 2012-12-07 2013-04-03 天津住宅集团建设工程总承包有限公司 Construction method for changing steel pipe supports of ramp foundation pit
CN103243722A (en) * 2012-02-13 2013-08-14 郑鸿彰 Construction method of novel inner support of foundation trench
CN109505298A (en) * 2015-10-26 2019-03-22 张继红 A kind of self-balancing foundation pit enclosure method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《地下空间与工程学报》 20091231 翁其平 上海世博演艺中心基坑工程设计与实践 第05卷, 2 *
《建筑施工》 20090625 张铭 上海世博会演艺中心工程施工技术 第31卷, 第06期 2 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243722A (en) * 2012-02-13 2013-08-14 郑鸿彰 Construction method of novel inner support of foundation trench
CN103243722B (en) * 2012-02-13 2015-10-28 郑鸿彰 The construction method of novel inner support of foundation trench
CN103015432A (en) * 2012-12-07 2013-04-03 天津住宅集团建设工程总承包有限公司 Construction method for changing steel pipe supports of ramp foundation pit
CN109505298A (en) * 2015-10-26 2019-03-22 张继红 A kind of self-balancing foundation pit enclosure method

Similar Documents

Publication Publication Date Title
CN205839767U (en) A kind of deep foundation pit steel tube/concrete is combined inner supporting structure
CN201746839U (en) Low-environment-disturbance device for removing supports from foundation pit
CN101289866A (en) Construction method for precasting concrete moulding bed in local pit of base pit engineering under soft foundation
CN104652815A (en) Construction method for pouring water-stopping upstanding beams in kitchens and toilets
CN102644290A (en) Steel cofferdam construction method suitable for deep silt-layer bridge construction in shallow sea area
CN105155553A (en) Green dismantling construction method combining concrete support static crush and splitting method
CN105178330A (en) Underground structure post-cast strip support replacement method
CN102071692A (en) Construction method for performing bottom plate support replacement on foundation pit by using annular plate
CN213417842U (en) Assembled deep foundation pit supporting structure
CN201526052U (en) Temporary supporting wall for group pit construction
CN202247938U (en) Wedge-shaped foundation bolt preformed hole core formwork device
CN205188999U (en) Vertical supporting system of reverse construction method
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN201671104U (en) Combined tower type crane base
CN203049588U (en) Pit-in-pit cylindrical mould
CN201495548U (en) Manual hole digging filling pile protective wall concrete material receiving platform
CN204298845U (en) A kind of centrifuge ground based on existing terrace and spiral protecting wall
CN204679074U (en) A kind of novel surface observation pier structure
CN207808036U (en) Trapezoidal special prefabricated board makes shaping equipment
CN211229633U (en) Anti-punching pre-buried structure for large-aperture static crushing of reinforced concrete member
CN201151914Y (en) Large-sized equipment foundation pre-buried bolt structure
CN204780894U (en) Can dismantle steel protects wound packages and puts
CN203593526U (en) Movable type hoisting device
CN201786013U (en) Reusable anchor member for cantilever scaffold
CN205530400U (en) Batter pile test model steel reinforcement cage cushion inclines

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20110525