CN207419452U - A kind of concrete-pile suitable for basement process - Google Patents

A kind of concrete-pile suitable for basement process Download PDF

Info

Publication number
CN207419452U
CN207419452U CN201721561778.5U CN201721561778U CN207419452U CN 207419452 U CN207419452 U CN 207419452U CN 201721561778 U CN201721561778 U CN 201721561778U CN 207419452 U CN207419452 U CN 207419452U
Authority
CN
China
Prior art keywords
pile
expanding position
concrete
expanding
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721561778.5U
Other languages
Chinese (zh)
Inventor
许国林
严天龙
舒佳明
袁海峰
张日红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Zhong Chun hi tech Limited by Share Ltd
Original Assignee
ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd filed Critical ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd
Priority to CN201721561778.5U priority Critical patent/CN207419452U/en
Application granted granted Critical
Publication of CN207419452U publication Critical patent/CN207419452U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of concrete-piles suitable for basement process, include pile body, the variable section structure that pile body is integrally formed, expanding position is arranged at intervals on pile body, undergauge position is formed between adjacent expanding position, passes through necking down structure reinforcement by connection between undergauge position and expanding position;Expanding position is close ring or to offer the non-closed annulus that notch is formed, undergauge position and difference≤60mm of the radial width at the expanding position.It the advantage is that:Practicability is stronger, and applicability is wider, and pile body is directly contacted with original soil body in work progress, and there is no weak links, by extruding and vibration of the expanding position to the soil body, are obviously improved base soil bearing capacity;After the soil body cures, base soil upper load is uniformly distributed into Ji Tuzhong by the load-bearing face of expanding position and necking down structure, and an entirety is built into soil around pile, significantly improves settlement of foundation problem, improves ground general stability;It manufactures at low cost, good in economic efficiency.

Description

A kind of concrete-pile suitable for basement process
Technical field
The utility model is related to foundation treatment engineering technical fields, refer specifically to vertical reinforcement in foundation treatment engineering The improvement of structure, more particularly to a kind of concrete-pile suitable for basement process.
Background technology
It is all kinds of to build with the proposition of the Major Strategics target such as " building ocean power ", " green building and building industrialization " If engineering is rapidly developed, and constantly reduced available for the soil built, thus improved by basement process it is all kinds of special The engineering substantial increase of geology.Weak soil has the special physico mechanical characteristics such as intensity is low, stability is poor, deformation is big, so as to Its distinctive engineering problem is resulted in, if water content of soil is high, water penetration is excessively poor, and after bearing strong load, pore water pressure can be anxious Play rises, and the compacting consolidation performance of ground can significantly reduce, and poor geological conditions proposes bigger challenge to Soft Ground, It is not good at if processing is reinforced, the sinking of ground large area, foundation uneven settlement, the component considerable safeties such as collapse will be often caused to be asked Topic.
At present, improve soft layer geology frequently with vertical reinforcement be mainly cement mixing method and common prestressing force Concrete tubular pile, but Cement Mixing Pile Construction Technology is backward, resource consumption is big, more seriously the technique mud emission It is more, it causes serious pollution to the environment, and some heavy metals (such as hexavalent chromium) may be released in boring procedure because of bit wear Out, polluted underground water matter;And common prestressed concrete pipe pile can not interact with soil because pile body is smooth and form one It is whole, often there are matrix sedimentation or local settlement issues, when especially weak intercalated layer is thicker, it is easier to basic stress occur not , phenomena such as generating differential settlement, lateral displacement or vertical protuberance, at the same in construction due to instantaneous discharging consolidation effect not Significantly, volume compression deformation is small, easily causes Super-void Water Pressure problem.
The patent of invention of Patent No. 201410653595.0 is directed to Soft Ground, discloses a kind of back-up sand bamboo joint pile And its construction method, although the super quiet pore pressure generated during energy rapid dispersion construction, accelerates foundation soil body consolidation, improves soil around pile side Frictional force.But the working procedure of this back-up sand bamboo joint pile is complicated, and quality controllability is poor, while in order to meet back-up sand in work progress The requirement of draining, the height at least 100mm of pile body ring protrusion, ring are excessive not only in the easy shape between the soil body of work progress It into gap, can also increase the spacing between two, the bearing capacity of ground unit area be reduced instead, in unit area bearing capacity More demanding foundation treatment engineering can not be applicable in;Secondly, institute's back-up sand and soil layer intersection be there are weak link, herein frictional force Smaller, bearing capacity suffered by pile body can not uniformly be effectively transmitted to soil around pile by ring position, it is impossible to form stake soil therewith altogether It is androgynous.Therefore, the structure of the vertical reinforcement used in foundation treatment engineering need to be improved.
The content of the invention
Technical problem to be solved in the utility model is the present situation for the prior art, provides rational in infrastructure, and quality can It leans on, a kind of manufacture concrete-pile suitable for basement process at low cost, good in economic efficiency, highly practical.
Technical solution is used by the utility model solves above-mentioned technical problem:
A kind of concrete-pile suitable for basement process includes pile body, the variable section structure that pile body is integrally formed, stake Be arranged at intervals with expanding position with it, be formed with undergauge position between adjacent expanding position, undergauge position and expanding position it Between pass through necking down structure reinforcement by connection;Expanding position is close ring or to offer the non-closed annulus that notch is formed, Undergauge position and difference≤60mm of the radial width at the expanding position.
The technical measures of optimization further include:
Above-mentioned expanding position spaced set.
The clear spacing at above-mentioned adjacent expanding position is 1.5 times to 3 times of expanding position diameter.
The axial length at above-mentioned expanding position is 60mm to 100mm.
The angle value of the load-bearing face of above-mentioned necking down structure and the angle α of horizontal plane is:90 ° of 30 °≤α <
The load-bearing face of above-mentioned necking down structure is equipped with rounded corner R1 with the junction at undergauge position, and the radius of rounded corner R1 is 10mm to 25mm.
The junction at the load-bearing face of above-mentioned necking down structure and the expanding position is equipped with rounded corner R2, and the half of rounded corner R2 Footpath is 20mm to 45mm.
When above-mentioned expanding position is non-closed annulus, the position of the notch at two neighboring expanding position radially plane around The center of circle at expanding position rotates 180 ° of stagger settings.
The one or both ends of above-mentioned pile body are provided with an end wide diameter portion, and stake end wide diameter portion is close ring or non-closed Annulus, the axial length of stake end wide diameter portion is 350mm to 650mm.
A kind of concrete-pile suitable for foundation treatment engineering of the utility model, pile body have variable section structure, are by more The undergauge position and the integrally formed overall structure of wide diameter portion position composition that a consecutive intervals are set, in Soft Ground process In, this concrete-pile by the relatively low static pressure of construction cost, hammering construction, construct into Soft Soil Layer, construction Simply, at low cost, extruding and vibration of the expanding position of work progress pile to the soil body make foundation soil further closely knit, so as to Base soil bearing capacity and compression modulus can be effectively improved;Pile body is directly contacted with original soil body, and there is no weak links, contract simultaneously Neck structure also increases the contact area of pile body and the soil body, applies in addition to further reinforcement by connection undergauge position and expanding position After the completion of work, ground upper load is directly uniformly distributed into the base after curing by the load-bearing face at expanding position and necking down structure In soil, a underground entirety, shared ground (road surface) load, so as to significantly change finally are built into base soil interaction Kind settlement of foundation or local settlement issues improve the stability of ground entirety.
The sectional area at undergauge position reduces, and not only reduces pile concrete dosage, while in the item of identical compressive pre-stress Under part, the dosage of deformed bar is decreased, reduces the manufacture cost of concrete-pile, improves its sexual valence when economic effect Benefit;In addition, setting notch at expanding position, it can solve the problems, such as the generated super quiet pore pressure of the soil body in work progress, construct In journey and after the completion of construction, the underground water that is precipitated in weak soil, along the notch at expanding position and undergauge position outer wall institute group Into passage gush out to ground, effectively alleviate the excess pore water pressure of the soil body, while accelerate the discharging consolidation of stake week weak soil, carry The bearing capacity and stability of high base soil promote pile body to form an entirety with stake week solidified earth.
Therefore, a kind of concrete-pile suitable for basement process of the utility model, more reasonable structure, practicability are stronger, system Cause that this is lower, economic benefit is more preferable.
Description of the drawings
Fig. 1 is the structure diagram of the utility model embodiment one;
Fig. 2 is enlarged drawing at A in Fig. 1;
Fig. 3 is the structure diagram of the utility model embodiment two;
Fig. 4 is the structure diagram of the utility model embodiment three;
Fig. 5 is the structure diagram of the utility model embodiment four.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing embodiment.
It is the structure diagram of the utility model as shown in Figures 1 to 5,
Reference numeral therein is:Angle α, rounded corner R1, rounded corner R2, pile body 1, undergauge position 11, expanding position 12, Necking down structure 13, stake end wide diameter portion 14, notch 2,.
Embodiment one, as shown in Figure 1 to Figure 2,
A kind of concrete-pile suitable for basement process, includes pile body 1, the variable section structure that pile body 1 is integrally formed, Expanding position 12 is arranged at intervals on pile body 1, is formed with undergauge position 11 between adjacent expanding position 12, undergauge position 11 with Pass through 13 reinforcement by connection of necking down structure between expanding position 12;Expanding position 12 is close ring, undergauge position 11 and the expansion Difference≤60mm of the radial width at footpath position 12.
In embodiment, expanding 12 spaced set of position.
The concrete-pile of the present embodiment is primarily adapted for use in when thickness of soft soil is less big or Soft Soil Layer is containing more thin flour sand folder In the Soft Ground engineering of situations such as layer, by the relatively low static pressure of construction cost, hammering construction, by concrete Pile driving construction is into Soft Soil Layer, and extruding and vibration of the expanding position 12 to the soil body, make foundation soil further closely knit in work progress, from And effectively improve base soil bearing capacity and compression modulus;Pile body 1 is directly contacted with original soil body, and there is no weak links, contract simultaneously Neck structure 13 also increases pile body and soil body contact surface in addition to further reinforcement by connection undergauge position 11 and expanding position 12 Product, after the completion of construction, ground upper load is directly uniformly distributed by the load-bearing face at expanding position 12 and necking down position 13 In base soil after curing, a underground entirety is finally built into base soil interaction, shared ground (road surface) load, greatly Amplitude improves settlement of foundation or local settlement issues, improves ground general stability.
Undergauge position 11 and difference≤60mm of the radial width at the expanding position 12.This means with undergauge position 11 It compares, the height of 12 protrusion of expanding position is no more than 30mm, and existing correlation prestressing force shaped pile with ribbing, pile body surface bulge portion The height at least 50mm of position, therefore relatively low quiet of construction cost can be selected in construction in the concrete-pile of the utility model Pressure, hammering construction, working procedure is simpler, while it is convex also to improve generated soil compaction effect, ring in work progress It is small to play position, it is more closely knit to the extruding of the soil body, it avoids because ring boss is excessive, is easy to soil body generation in extrusion process Gap;The sectional area at expanding position 12 is consistent with the common prestressed concrete pipe pile of same model, is only cutting for undergauge position 11 Area reduces, and reduces pile concrete dosage, while under conditions of identical compressive pre-stress, decreases deformed bar Dosage significantly reduces the manufacture cost of concrete-pile, improves its sexual valence when economic benefit;Furthermore it presses《Architecture foundation pile technology Specification》Spacing between middle regulation two not less than 4 times of stake footpaths, therefore between need not increasing by two in use between Away from pile foundation quantity is constant in unit area, so that it is guaranteed that the bearing capacity of base soil unit area, more demanding to case unit capacity Ground can improve the bearing capacity of unit area by way of increasing unit area foundation pile quantity, and practicability is stronger, and applicability is more Extensively.
In embodiment, the clear spacing at adjacent expanding position 12 is 1.5 times to 3 times of expanding 12 diameter of position.
In embodiment, the axial length at expanding position 12 is 60mm to 100mm.
It is so designed that, economic benefit is more preferable, and the clear spacing at expanding position 12 is long or too short, is difficult to obtain preferable property Valency ratio.
In embodiment, the angle value of the load-bearing face of necking down structure 13 and the angle α of horizontal plane is:90 ° of 30 °≤α <.
In embodiment, the load-bearing face of necking down structure 13 is equipped with rounded corner R1, rounded corner R1 with the junction at undergauge position 11 Radius be 10mm to 25mm.
In embodiment, the junction at the load-bearing face of necking down structure 13 and the expanding position 12 is equipped with rounded corner R2, and circle falls The radius of angle R2 is 20mm to 45mm.
The setting of rounded corner R1 and rounded corner R2, it is expanding when can not only avoid demoulding in the manufacturing process of concrete-pile Position 12 generates larger stress concentration, it is ensured that foundation pile is complete, while also reduces demoulding difficulty and the manufacture difficulty of pile die And cost.
Embodiment two, as shown in figure 3,
Concrete-pile in the present embodiment is similar to the concrete pile structure in embodiment one, the difference is that this implementation In example, expanding position 12 is offers the non-closed annulus that notch 2 is formed.
In embodiment, when expanding position 12 is non-closed annulus, the position of the notch 2 at two neighboring expanding position 12 is along footpath To plane 180 ° of stagger settings are rotated around the center of circle at expanding position 12;Such setting can drop in the manufacturing process of concrete-pile Low demoulding difficulty.
The ground for situations such as concrete-pile in the present embodiment is primarily adapted for use in ground containing deep soft clay, muck soil Base handles engineering, in work progress and after the completion of construction, the underground water that is precipitated in weak soil, along the notch at expanding position 12 2 and the passage that is formed of 11 outer wall of undergauge position gush out to ground, solve the generated super quiet pore pressure of the soil body in work progress Problem, effectively alleviates the excess pore water pressure of the soil body, while accelerates the discharging consolidation of stake week weak soil, improves the bearing capacity of base soil And stability, pile body is promoted to form an entirety with stake week solidified earth.
Embodiment three, as shown in figure 4,
Concrete-pile is similar to the concrete pile structure in embodiment two in the present embodiment, the difference is that the present embodiment In, an end wide diameter portion 14 is added in one end of concrete-pile, and the axial length of this end wide diameter portion 14 is 350mm to 650mm;It is local It is upper for crust layer or hard stickiness soil layer in base, it is lower be deep & thick silt or soft modeling clay (or be crust layer or hard stickiness soil layer down, on For deep & thick silt or soft modeling clay) situation when, increase that stake is long cannot significantly improve base soil bearing capacity, the present embodiment can be used at this time In concrete-pile, according to Practical Project situation, the expanding position 12 that stake end is added is placed in crust layer or hard stickiness soil layer, Expanding position 12 is made to be close to as rivet in soil layer, the contact area at end and the periphery soil body is increased, further improves Bearing capacity of pile tip.
Example IV, as shown in figure 5,
Concrete-pile is similar to the concrete pile structure in embodiment three in the present embodiment, the difference is that the present embodiment In, the both ends of pile body 1 are both provided with an end wide diameter portion 14, the axial length of both ends stake end wide diameter portion 14 be 350mm extremely 650mm;The both ends of concrete-pile increase the contact area with the periphery soil body in the present embodiment, can further improve an end and hold Carry power.
Concrete-pile in embodiment three and example IV, an end wide diameter portion 14, which employs, offers the non-of notch 2 Close ring structure, identical with expanding position 12, close ring structure similarly may be employed in stake end wide diameter portion 14, can specifically answer The construction requirement makes choice.
The most preferred embodiment of the utility model has illustrated, the various change or remodeling made by those of ordinary skill in the art All without departing from the scope of the utility model.

Claims (9)

1. a kind of concrete-pile suitable for basement process includes pile body (1), it is characterized in that:The pile body (1) is integrated Molding variable section structure, is arranged at intervals with expanding position (12) on the pile body (1), between adjacent expanding position (12) Undergauge position (11) is formed with, is connected and added by necking down structure (13) between the undergauge position (11) and expanding position (12) Gu;The expanding position (12) is close ring or to offer the non-closed annulus that notch (2) is formed, described Undergauge position (11) and difference≤60mm of the radial width of the expanding position (12).
2. a kind of concrete-pile suitable for basement process according to claim 1, it is characterized in that:The expanding position (12) spaced set.
3. a kind of concrete-pile suitable for basement process according to claim 2, it is characterized in that:The adjacent expansion The clear spacing at footpath position (12) is 1.5 times to 3 times of expanding position (12) diameter.
4. a kind of concrete-pile suitable for basement process according to claim 2, it is characterized in that:The expanding position (12) axial length is 60mm to 100mm.
5. a kind of concrete-pile suitable for basement process according to claim 2, it is characterized in that:The necking down structure (13) load-bearing face and the angle value of the angle α of horizontal plane is:90 ° of 30 °≤α <.
6. a kind of concrete-pile suitable for basement process according to claim 2, it is characterized in that:The necking down structure (13) radius of the junction equipped with rounded corner R1, the rounded corner R1 at load-bearing face and undergauge position (11) for 10mm extremely 25mm。
7. a kind of concrete-pile suitable for basement process according to claim 2, it is characterized in that:The necking down structure (13) load-bearing face and radius of the junction equipped with rounded corner R2, the rounded corner R2 of the expanding position (12) are 20mm To 45mm.
8. a kind of concrete-pile suitable for basement process according to claim 2, it is characterized in that:The expanding position (12) when being non-closed annulus, the position of the notch (2) of two neighboring expanding position (12) radially plane around expanding position (12) the center of circle rotates 180 ° of stagger settings.
9. a kind of concrete-pile suitable for basement process according to claim 1 to 8 any claim, feature It is:The one or both ends of the pile body (1) are provided with an end wide diameter portion (14), and the stake end wide diameter portion (14) is closed circle Ring or non-closed annulus, the axial length of the stake end wide diameter portion (14) is 350mm to 650mm.
CN201721561778.5U 2017-11-21 2017-11-21 A kind of concrete-pile suitable for basement process Active CN207419452U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721561778.5U CN207419452U (en) 2017-11-21 2017-11-21 A kind of concrete-pile suitable for basement process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721561778.5U CN207419452U (en) 2017-11-21 2017-11-21 A kind of concrete-pile suitable for basement process

Publications (1)

Publication Number Publication Date
CN207419452U true CN207419452U (en) 2018-05-29

Family

ID=62303774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721561778.5U Active CN207419452U (en) 2017-11-21 2017-11-21 A kind of concrete-pile suitable for basement process

Country Status (1)

Country Link
CN (1) CN207419452U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700480A (en) * 2017-11-21 2018-02-16 中淳高科桩业股份有限公司 A kind of concrete-pile suitable for basement process
CN113279419A (en) * 2021-07-14 2021-08-20 四川藏区高速公路有限责任公司 Anti-slide pile and tunnel portal anti-slide pile simulation test device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107700480A (en) * 2017-11-21 2018-02-16 中淳高科桩业股份有限公司 A kind of concrete-pile suitable for basement process
CN107700480B (en) * 2017-11-21 2023-08-18 宁波中淳高科股份有限公司 Concrete pile suitable for foundation treatment
CN113279419A (en) * 2021-07-14 2021-08-20 四川藏区高速公路有限责任公司 Anti-slide pile and tunnel portal anti-slide pile simulation test device

Similar Documents

Publication Publication Date Title
CN107700480A (en) A kind of concrete-pile suitable for basement process
CN106592585B (en) A kind of expansion body compaction pile and construction method for eliminating pile foundation negative friction force
CN105625294A (en) Composite foundation and construction method thereof
CN207376616U (en) A kind of draining bamboo joint pile and its composite foundation system
CN104988907A (en) Construction method of concrete pile
CN1928251A (en) Pipe pile hole maker with concrete bottom sealing, pipe cover and wings and construction process thereof
CN207419452U (en) A kind of concrete-pile suitable for basement process
CN106245643A (en) A kind of compound pile-type structure being applicable to the process of coastal deep reclaimed ground and construction method
CN206052722U (en) A kind of device of prestressed pipe post-pressure grouting
CN102251514A (en) Multi-section type variable cross-section dynamic compaction method
WO2017133373A1 (en) Small-diameter pile cluster used for pile foundation, and method for construction thereof
CN203270559U (en) Roadbed structure of screw pile network structure composite foundation
CN106958176A (en) Quick prefabricated pin-connected panel soft base processing method
CN110424384A (en) A kind of major diameter prefabricated tubular pile and its construction method
CN102116024B (en) Static pressure multilayer radial enlarging grouting pile and construction method thereof
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
CN206157726U (en) Composite pile type structure suitable for coast deep dredger fill soil foundation handle
CN102900075B (en) A kind of helix concrete tubular pile device and preparation method thereof
CN204570676U (en) A kind of convex tooth pile tube
CN205420939U (en) Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw
CN201857608U (en) Synthetic pile
CN106592586A (en) Prefabricated pile with external hoops and filled with sand-gravel aggregates, and construction method thereof
CN210086215U (en) Grouting pile for reinforcing soft soil foundation
CN102888841A (en) End part thread five-pointed-star-shaped variable-section prefabricated pipe pile and construction method thereof
CN206319314U (en) A kind of additional cuff back-up sand building stones prefabricated pile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180919

Address after: 315145 No. 166 Linjiang Road, Yinzhou Economic Development Zone, Ningbo, Zhejiang

Patentee after: Ningbo Zhong Chun hi tech Limited by Share Ltd

Address before: 315145 Zhong Chun Gao Ke pile Limited by Share Ltd, No. 166 Linjiang Road, Yinzhou Economic Development Zone, Ningbo, Zhejiang

Patentee before: Zhongchun Gaoke Pile Industry Co., Ltd.