CN205347916U - Sponge grass planting brick - Google Patents

Sponge grass planting brick Download PDF

Info

Publication number
CN205347916U
CN205347916U CN201521094507.4U CN201521094507U CN205347916U CN 205347916 U CN205347916 U CN 205347916U CN 201521094507 U CN201521094507 U CN 201521094507U CN 205347916 U CN205347916 U CN 205347916U
Authority
CN
China
Prior art keywords
grass
top layer
planting brick
sponge
guiding gutter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521094507.4U
Other languages
Chinese (zh)
Inventor
陆闻
陆洪兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN RENRENDA SCIENCE & TECHNOLOGY Co Ltd
Original Assignee
JIANGYIN RENRENDA SCIENCE & TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN RENRENDA SCIENCE & TECHNOLOGY Co Ltd filed Critical JIANGYIN RENRENDA SCIENCE & TECHNOLOGY Co Ltd
Priority to CN201521094507.4U priority Critical patent/CN205347916U/en
Application granted granted Critical
Publication of CN205347916U publication Critical patent/CN205347916U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a brick especially relates to a sponge grass planting brick, is provided with through -hole (2) that supply the grass to grow on its body (1), its characterized in that: body (1) including top layer (1.1) and bottom (1.2), top layer (1.1) and bottom (1.2) form by the waste rubber particle suppression, the granule mean diameter of top layer (1.1) is less than the granule mean diameter of bottom (1.2), bottom (1.2) are provided with bar guiding gutter (3) with the one side of ground contact. The utility model discloses sponge grass planting brick lays the back, and the top layer rapid permeability can be followed to the rainwater, and the instant dispersed of process bottom dredges, and the guiding gutter on the bottom surface plays the retaining effect when dredging fast. In addition, because the existence of guiding gutter for prevent that the displacement performance increases, in addition, the bottom surface is than the rubber materials of coarse grain, progressive with increased with the friction properties on ground, make the limit portion after laying also be difficult to free the displacement phenomenon, mustn't consolidate the processing.

Description

Sponge grass-planting brick
Technical field
This utility model relates to a kind of grass-planting brick, especially relates to a kind of sponge grass-planting brick.
Background technology
Along with the quickening of process of modernization, the greening in city and beautify the important topic becoming urban planning and construction.Making full use of the position can afforested each time and also become the emphasis of greening process, grass-planting brick arises at the historic moment.
Grass-planting brick effect: 1. greening completely: grass lattice provide more than 95% grass planting area, completely afforestation effect, it is possible to sound-absorbing, dust suction, hence it is evident that improve quality and the taste of environment. reference: concrete grass-planting brick only has 30% space)
2. investment reduction: grass-planting grid makes parking and greening function unite two into one, the city of an inch of land is an inch of gold, can save the precious investment of developer.
3. smooth completely: the horizontal plug-in type overlap joint that grass-planting grid is unique and firm makes whole paved surface be linked to be a smooth entirety, it is prevented that local crowning, and construction is extremely convenient.Reference: every piece of independence of concrete grass-planting brick, it is necessary to casting concrete bed course basis, side keeps smooth)
4. high intensity, short-lived life: grass-planting grid adopts the special data of patented technology, the highest 200 tons/square meter of anti-pressure ability, ascends a height the 32 tons/square meter in face more than the fire-fighting of code requirement.
5. stability, uvioresistant, acid-alkali-corrosive-resisting, wear-resistant pressure, weather-proof-40 DEG C-90 DEG C.Reference: concrete grass-planting brick is easy to the cracking failure when variations in temperature and frost)
6. excellent drainage: rubble supporting course provides good water function, facilitates the discharge of unnecessary precipitation.
7. safeguard lawn: rubble supporting course provides certain water storage function, favourable lawn growth, and grass roots can grow into metalling.Reference: concrete grass-planting brick only has only small space, and under summer sunlight temperature up to more than 50 degree)
8. environmental protection: grass-planting grid safety and stability, recyclable, definitely pollution-free, take good care of lawn comprehensively.The every square meter of light saving grass-planting grid 5 kilograms, extremely light, device is quick, saves artificial, shortens construction period, and therefore a lot of cities begin to use and build base grass-planting brick to improve urban afforestation problem.
Existing grass-planting brick is to have concrete, river sand, the quality materials such as pigment form through high brick machine pressure of shaking, completely non-burning brick, reach the requirement that environmental protection produces, maintenance through scientific system, grass-planting brick has very strong crushing resistance, lay and have good steadiness on the ground, green coverage is wide, it is amenable to pedestrian, the spreading of vehicle and be not damaged by, the root of greenweed is to be grown in below grass-planting brick simultaneously, therefore will not make and coming to harm to grass roots, therefore the grass-planting brick of Jian Ji cement products factory is widely used in a variety of applications, a lot of big small cities are also currently in use builds base grass-planting brick, such as Guangzhou, Changsha, Wuhan etc., thus building base grass-planting brick also obtain the accreditation of some aspects, it both can be convenient for people to trip, the green coverage in city can be increased again, thus the air improved.
But, conventional grass-planting brick seepage velocity is slow, the water yield that stores is few, it is impossible to meet sponge Process of Urbanization Construction needs.It addition, existing grass-planting brick bottom surface is smoother, after laying, the grass-planting brick of edge is susceptible to displacement, it is necessary to consolidation process.
Summary of the invention
The purpose of this utility model is in that to overcome above-mentioned deficiency, it is provided that a kind of seep water fast, reservoir storage big, is not susceptible to the sponge grass-planting brick of displacement.
The purpose of this utility model is achieved in that a kind of sponge grass-planting brick, its body is provided for the through hole of grass growth, described body includes top layer and bottom, described top layer and bottom form by waste and old rubber particle compacting, and the mean particle size on described top layer is less than the mean particle size of bottom;The one side of described bottom and earth surface is provided with bar shaped guiding gutter.
The mean diameter of the waste and old rubber particle of bottom is 2-10 times of top layer, it is preferred to 3-6 times.
The beneficial effects of the utility model are:
This utility model sponge grass-planting brick, after laying, rainwater can from top layer rapid osmotic, and the rapid dispersion through bottom is dredged, and the guiding gutter on bottom surface, while quickly dredging, plays Water storage.Further, since the existence of guiding gutter so that anti-displacement performance increases, it addition, the more coarse grained elastomeric material in bottom surface, improves and increases the frictional behaviour with ground so that the edge after laying is also not easy to free offset phenomena, mustn't consolidation process.
When heavy rain comes, can passing through this utility model sponge grass-planting brick, play rapid infiltrated effect, alleviate subdrainage pipe pressure, the sun shines again after the rain, the water-holding capacity of floor tile, can volatilize gradually, alleviates air dried pressure, and not easily plays dirt, can reduce haze phenomenon.
Accompanying drawing explanation
Fig. 1 is the section structure schematic diagram of this utility model sponge grass-planting brick.
Fig. 2 is the upward view of this utility model sponge grass-planting brick.
Wherein:
Body 1;
Through hole 2;
Top layer 1.1;
Bottom 1.2;
Guiding gutter 3.
Detailed description of the invention
Such as Fig. 1 and Fig. 2, this utility model relates to a kind of sponge grass-planting brick, its body 1 is provided for the through hole 2 of grass growth, it is characterized in that: described body 1 includes top layer 1.1 and bottom 1.2, described top layer 1.1 and bottom 1.2 form by waste and old rubber particle compacting, and the mean particle size on described top layer 1.1 is less than the mean particle size of bottom 1.2;The one side of described bottom 1.2 and earth surface is provided with bar shaped guiding gutter 3.
The mean diameter of the waste and old rubber particle of bottom is 2-10 times of top layer, it is preferred to 3-6 times.
After this utility model sponge grass-planting brick is laid, rainwater can from top layer rapid osmotic, and the rapid dispersion through bottom is dredged, and the guiding gutter 3 on bottom surface, while quickly dredging, plays Water storage.When heavy rain comes, can passing through this utility model sponge grass-planting brick, play rapid infiltrated effect, alleviate subdrainage pipe pressure, the sun shines again after the rain, the water-holding capacity of floor tile, can volatilize gradually, alleviates air dried pressure, and not easily plays dirt, can reduce haze phenomenon.Further, since the existence of guiding gutter 3 so that anti-displacement performance increases, it addition, the more coarse grained elastomeric material in bottom surface, improves and increases the frictional behaviour with ground so that the edge after laying is also not easy to free offset phenomena, mustn't consolidation process.

Claims (3)

1. a sponge grass-planting brick, its body (1) is provided for the through hole (2) of grass growth, it is characterized in that: described body (1) includes top layer (1.1) and bottom (1.2), described top layer (1.1) and bottom (1.2) form by waste and old rubber particle compacting, and the mean particle size of described top layer (1.1) is less than the mean particle size of bottom (1.2);The one side of described bottom (1.2) and earth surface is provided with bar shaped guiding gutter (3).
2. sponge grass-planting brick according to claim 1, it is characterised in that: the mean diameter of the waste and old rubber particle of bottom is 2-10 times of top layer.
3. sponge grass-planting brick according to claim 2, it is characterised in that: the mean diameter of the waste and old rubber particle of bottom is 3-6 times of top layer.
CN201521094507.4U 2015-12-26 2015-12-26 Sponge grass planting brick Expired - Fee Related CN205347916U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521094507.4U CN205347916U (en) 2015-12-26 2015-12-26 Sponge grass planting brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521094507.4U CN205347916U (en) 2015-12-26 2015-12-26 Sponge grass planting brick

Publications (1)

Publication Number Publication Date
CN205347916U true CN205347916U (en) 2016-06-29

Family

ID=56171515

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521094507.4U Expired - Fee Related CN205347916U (en) 2015-12-26 2015-12-26 Sponge grass planting brick

Country Status (1)

Country Link
CN (1) CN205347916U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568807A (en) * 2015-12-26 2016-05-11 江阴市人人达科技有限公司 Sponge grass-planting brick

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568807A (en) * 2015-12-26 2016-05-11 江阴市人人达科技有限公司 Sponge grass-planting brick

Similar Documents

Publication Publication Date Title
CN204475100U (en) A kind of permeable urban road
CN106758638A (en) A kind of city sponge brick and its construction technology
CN206289491U (en) A kind of pavement, greenery patches harvest water system
CN105926408A (en) Garden ecological rainwater feeding and draining system
CN105442406A (en) High-water penetration high-water storage sponge floor tile
CN204875425U (en) Ecological parking area of central authorities' grass planting check
CN108532406A (en) Can rapid construction high-bearing capacity pervious surface and laying method
CN207700330U (en) A kind of concave herbaceous field grass-planting ecological ditch
CN205347916U (en) Sponge grass planting brick
CN201080590Y (en) Water seepage floor tile
CN1685791A (en) Green grass protection frame grid board and its application
CN203890824U (en) Recycled aggregate based total pervious concrete pavement structure
CN207608782U (en) A kind of embedding careless brick paving structure of good ecology of drainage performance
CN207176431U (en) A kind of permeable pavement structure based on sponge the idea of the city
CN205347911U (en) Prevent contracting sponge ceramic tile
CN210826961U (en) Pavement structure suitable for building unit door in residential district
CN105525551B (en) To the remodeling method and grass planting pavement structure of Wind Power Stations temporary construction road
CN105568807A (en) Sponge grass-planting brick
CN105474942B (en) The construction method on ground parking lawn
CN205368930U (en) Tree encloses money formula sponge
CN205329449U (en) High retaining sponge ceramic tile of high infiltration
CN201952701U (en) Water-permeability paving board
CN106702841A (en) Environment-friendly greening suspended gridded sidewalk
CN208300421U (en) A kind of environmental and ecological wall construction of hydraulic engineering
CN208486146U (en) A kind of novel filter infiltration garden road step and sunk type square laying structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160629