CN205289809U - Multi -head drill bed is restrainted to two longmen numerical control steel pipes - Google Patents

Multi -head drill bed is restrainted to two longmen numerical control steel pipes Download PDF

Info

Publication number
CN205289809U
CN205289809U CN201521011155.1U CN201521011155U CN205289809U CN 205289809 U CN205289809 U CN 205289809U CN 201521011155 U CN201521011155 U CN 201521011155U CN 205289809 U CN205289809 U CN 205289809U
Authority
CN
China
Prior art keywords
station
rollgang
main frame
hole drilling
drilling main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521011155.1U
Other languages
Chinese (zh)
Inventor
贾宝英
程凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hang Xiao Gang Gou Ltd Co
Original Assignee
Hang Xiao Gang Gou Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hang Xiao Gang Gou Ltd Co filed Critical Hang Xiao Gang Gou Ltd Co
Priority to CN201521011155.1U priority Critical patent/CN205289809U/en
Application granted granted Critical
Publication of CN205289809U publication Critical patent/CN205289809U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a multi -head drill bed is restrainted to two longmen numerical control steel pipes, including the base with set up on the base vertical guide device, first station rollgang and second station rollgang and be used for controlling vertical guide device, first station rollgang, second station rollgang, the host computer is cut to floor reinforcing bar dowelling jig and the electric control system of host computer operation is cut to construction mounting process dowelling jig, floor reinforcing bar dowelling jig is cut host computer and construction mounting process dowelling jig and is cut the host computer and be the drilling host computer on first station, the second station respectively, floor reinforcing bar dowelling jig cut the host computer cut the host computer with construction mounting process dowelling jig respectively can be at first station rollgang and second station rollgang back -and -forth movement, be provided with a plurality of on first station rollgang and the second station rollgang on vertical guide device's the length direction of edge respectively and be used for the locating clip tightly to wait to process the horizontal clamping device that the steel pipe was restrainted, be provided with lift positioner between first station rollgang and the second station rollgang.

Description

Double; two gantry numerically controlled steel pipe bundle multiple drill press
Technical field
This utility model relates to a kind of double; two gantry numerically controlled steel pipe bundle multiple drill press.
Background technology
Its own advantages of steel pipe bundle Residential Buildings obtains certain accreditation in work progress, have broad application prospects, but steel pipe bundle Residential Buildings reflects that in manufacturing process some must be accorded to the weak link paid much attention to: the boring of existing building I shaped steel tube bank. Owing to being all the machine drilling processing method that the artificial or semi-automatic degree of employing is not high at present, and the component logistics in production process is discontinuous manual operation handling method, there is the undesirable elements such as production efficiency is low, cost of labor is high, unstable product quality, these undesirable elements have become as the Main Bottleneck in steel pipe bundle Residential Buildings production process.
Summary of the invention
For the drawbacks described above overcoming the boring that existing building I shaped steel is restrained to exist, this utility model provides a kind of double; two gantry numerically controlled steel pipe bundle multiple drill press.
The technical solution adopted in the utility model is:
Double, two gantry numerically controlled steel pipe bundle multiple drill press, it is characterized in that: include pedestal and the longitudinal guiding rail device for longitudinally guiding and support floor reinforced hole drilling main frame and installation technology hole drilling main frame being arranged on pedestal, for the first station rollgang and the second station rollgang that support with carry steel pipe bundle to be processed, floor reinforced hole drilling main frame, installation technology hole drilling main frame and be used for controlling longitudinal guiding rail device, first station rollgang, second station rollgang, the electric control system that floor reinforced hole drilling main frame and installation technology hole drilling main frame run, described floor reinforced hole drilling main frame is the drilling main frame on the first station, described installation technology hole drilling main frame is the drilling main frame on the second station, and described floor reinforced hole drilling main frame and installation technology hole drilling main frame can move forward and backward at the first described station rollgang and the second station rollgang respectively,The first described station rollgang and the second station rollgang are respectively arranged with several for positioning the transverse clamping device clamping steel pipe bundle to be processed on the length direction of longitudinally track-type facilities, and are provided with lifting-positioning device between the first described station rollgang and the second station rollgang.
Described floor reinforced hole drilling main frame and installation technology hole drilling main frame all include some drilling power heads being arranged side by side, drilling power head on each floor reinforced hole drilling main frame can drive two drill bits to carry out Drilling operation, and the drilling power head on each installation technology hole drilling main frame adopts the mode of single drill bit to carry out drilling.
Described transverse clamping device is made up of multiple independent clamping units, and each described clamping unit is removable by sprocket wheel chain-driving and has the pinch wheels of guide function; The sprocket wheel of each described clamping unit is connected by multiple shaft couplings.
Also including chip receiving hopper, described chip receiving hopper is arranged on the lower section of steel pipe bundle bore position to be processed, the cutting produced during in order to receive equipment work.
Described longitudinal guiding rail device is also equipped with automatic lubricating system.
The work process of this utility model double; two gantry numerically controlled steel pipe bundle multiple drill press describes as follows:
Utilizing driving to be hung in by one steel pipe bundle to be processed to wait on first station, boring procedure is undertaken by below scheme step:
(1) operative employee's Job readiness: running parameter is set, by in the part specifications (cross-sectional width, thickness and gap length and quantity etc.) of this lots processed and the parameter input operation system such as permutation and combination and pitch-row, confirm on each unit head, whether drill bit specification is suitable for, and each operating mechanism adjusts corresponding work starting position;
(2) start the rollgang of the first station, workpiece is transported to lifting positioning datum place and paste jail benchmark, start transverse clamping device clamping and workpiece pressing, make steel pipe bundle ajust, straight, be fixed on this station firmly;
(3) operative employee's starting device operating instruction, the unit head on each moving body is accurately positioned, downward rapid feed while of then;
(4) first drill bit rapid feed is to when pressing close to upper strata machined surface, and servo feed is automatically converted to boring work speed, starts boring;
(5), after workpiece ground floor machined surface drills through, drill bit rapid feed again is to lower floor's work surface, then again with work speed feed drilling second layer hole;
(6) after second layer hole drill is logical, drill bit rapid return, to workpiece surface, is then pressed said procedure and is repeated other hole of drilling, until all of floor hole drilling is complete;
(7) meanwhile, the drilling main frame of drilling installing technological hole, under not premise with another host intervention, also carry out the drilling of installing technological hole according to above-mentioned bore mode;
(8) after above-mentioned floor hole machines completely, unclamp clamping and hold down gag, start rollgang, this steel pipe bundle is delivered on the second station;
(9) then proceed on the second station, reorientate this steel pipe bundle, and compress and clamping, by the drilling main frame of drilling installing technological hole, the installing technological hole of residue one end is continued drilling, until after completion of processing, driving left under order the second station roller-way to subsequent processing;
(10) meanwhile, the first station can carry out again the work such as the next lifting of steel pipe bundle, location, drilling, go round and begin again, cyclic process.
The beneficial effects of the utility model are embodied in: production efficiency is high, cost of labor is low, constant product quality.
Accompanying drawing explanation
Fig. 1 is this utility model overall structure schematic diagram.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the side view of Fig. 1.
Detailed description of the invention
Referring to figs. 1 through Fig. 3, double, two gantry numerically controlled steel pipe bundle multiple drill press, including pedestal and the longitudinal guiding rail device 7 for longitudinally guiding and support floor reinforced hole drilling main frame 1 and installation technology hole drilling main frame 2 being arranged on pedestal, for the first station rollgang 3 and the second station rollgang 4 supported with carry steel pipe bundle to be processed, floor reinforced hole drilling main frame 1, installation technology hole drilling main frame 2 and be used for controlling longitudinal guiding rail device, first station rollgang, second station rollgang, the electric control system 10 that floor reinforced hole drilling main frame and installation technology hole drilling main frame run, described floor reinforced hole drilling main frame 1 is the drilling main frame on the first station, described installation technology hole drilling main frame 2 is the drilling main frame on the second station, and described floor reinforced hole drilling main frame 1 and installation technology hole drilling main frame 2 can move forward and backward at the first described station rollgang 3 and the second station rollgang 4 respectively, the first described station rollgang 3 and the second station rollgang 4 are respectively arranged with several for positioning the transverse clamping device 5 clamping steel pipe bundle to be processed on the length direction of longitudinally track-type facilities, and are provided with lifting-positioning device 6 between described the first station rollgang 3 and the second station rollgang 4.
Described floor reinforced hole drilling main frame 1 all includes some drilling power heads 9 being arranged side by side with installation technology hole drilling main frame 2, drilling power head on each floor reinforced hole drilling main frame can drive two drill bits to carry out Drilling operation, and the drilling power head on each installation technology hole drilling main frame adopts the mode of single drill bit to carry out drilling.
Described transverse clamping device 5 is made up of multiple independent clamping units, and each described clamping unit is removable by sprocket wheel chain-driving and has the pinch wheels of guide function; The sprocket wheel of each described clamping unit is connected by multiple shaft couplings.
Also including chip receiving hopper 8, described chip receiving hopper is arranged on the lower section of steel pipe bundle bore position to be processed, the cutting produced during in order to receive equipment work.
Described longitudinal guiding rail device 7 is also equipped with automatic lubricating system.
The work process of this utility model double; two gantry numerically controlled steel pipe bundle multiple drill press describes as follows:
Utilizing driving to be hung in by one steel pipe bundle to be processed to wait on first station, boring procedure is undertaken by below scheme step:
(1) operative employee's Job readiness: running parameter is set, by in the part specifications (cross-sectional width, thickness and gap length and quantity etc.) of this lots processed and the parameter input operation system such as permutation and combination and pitch-row, confirm on each unit head, whether drill bit specification is suitable for, and each operating mechanism adjusts corresponding work starting position;
(2) start the rollgang of the first station, workpiece is transported to lifting positioning datum place and paste jail benchmark, start transverse clamping device clamping and workpiece pressing, make steel pipe bundle ajust, straight, be fixed on this station firmly;
(3) operative employee's starting device operating instruction, the unit head on each moving body is accurately positioned, downward rapid feed while of then;
(4) first drill bit rapid feed is to when pressing close to upper strata machined surface, and servo feed is automatically converted to boring work speed, starts boring;
(5), after workpiece ground floor machined surface drills through, drill bit rapid feed again is to lower floor's work surface, then again with work speed feed drilling second layer hole;
(6) after second layer hole drill is logical, drill bit rapid return, to workpiece surface, is then pressed said procedure and is repeated other hole of drilling, until all of floor hole drilling is complete;
(7) meanwhile, the drilling main frame of drilling installing technological hole, under not premise with another host intervention, also carry out the drilling of installing technological hole according to above-mentioned bore mode;
(8) after above-mentioned floor hole machines completely, unclamp clamping and hold down gag, start rollgang, this steel pipe bundle is delivered on the second station;
(9) then proceed on the second station, reorientate this steel pipe bundle, and compress and clamping, by the drilling main frame of drilling installing technological hole, the installing technological hole of residue one end is continued drilling, until after completion of processing, driving left under order the second station roller-way to subsequent processing;
(10) meanwhile, the first station can carry out again the work such as the next lifting of steel pipe bundle, location, drilling, go round and begin again, cyclic process.
Content described in this specification embodiment is only enumerating of the way of realization to inventive concept; protection domain of the present utility model is not construed as being only limitted to the concrete form that embodiment is stated, protection domain of the present utility model also and in those skilled in the art according to this utility model design it is conceivable that equivalent technologies means.

Claims (5)

1. pair gantry numerically controlled steel pipe bundle multiple drill press, it is characterized in that: include pedestal and the longitudinal guiding rail device for longitudinally guiding and support floor reinforced hole drilling main frame and installation technology hole drilling main frame being arranged on pedestal, for the first station rollgang and the second station rollgang that support with carry steel pipe bundle to be processed, floor reinforced hole drilling main frame, installation technology hole drilling main frame and be used for controlling longitudinal guiding rail device, first station rollgang, second station rollgang, the electric control system that floor reinforced hole drilling main frame and installation technology hole drilling main frame run, described floor reinforced hole drilling main frame is the drilling main frame on the first station, described installation technology hole drilling main frame is the drilling main frame on the second station, and described floor reinforced hole drilling main frame and installation technology hole drilling main frame can move forward and backward at the first described station rollgang and the second station rollgang respectively, the first described station rollgang and the second station rollgang are respectively arranged with several for positioning the transverse clamping device clamping steel pipe bundle to be processed on the length direction of longitudinally track-type facilities, and are provided with lifting-positioning device between the first described station rollgang and the second station rollgang.
2. double; two gantry as claimed in claim 1 numerically controlled steel pipe bundle multiple drill press, it is characterized in that: described floor reinforced hole drilling main frame and installation technology hole drilling main frame all include some drilling power heads being arranged side by side, drilling power head on each floor reinforced hole drilling main frame can drive two drill bits to carry out Drilling operation, and the drilling power head on each installation technology hole drilling main frame adopts the mode of single drill bit to carry out drilling.
3. double; two gantry as claimed in claim 2 numerically controlled steel pipe bundle multiple drill press, it is characterized in that: described transverse clamping device is made up of multiple independent clamping units, each described clamping unit is removable by sprocket wheel chain-driving and has the pinch wheels of guide function; The sprocket wheel of each described clamping unit is connected by multiple shaft couplings.
4. double; two gantry as claimed in claim 3 numerically controlled steel pipe bundle multiple drill press, it is characterised in that: also including chip receiving hopper, described chip receiving hopper is arranged on the lower section of steel pipe bundle bore position to be processed, the cutting produced during in order to receive equipment work.
5. double; two gantry as claimed in claim 4 numerically controlled steel pipe bundle multiple drill press, it is characterised in that: described longitudinal guiding rail device is also equipped with automatic lubricating system.
CN201521011155.1U 2015-12-08 2015-12-08 Multi -head drill bed is restrainted to two longmen numerical control steel pipes Active CN205289809U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521011155.1U CN205289809U (en) 2015-12-08 2015-12-08 Multi -head drill bed is restrainted to two longmen numerical control steel pipes

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521011155.1U CN205289809U (en) 2015-12-08 2015-12-08 Multi -head drill bed is restrainted to two longmen numerical control steel pipes

Publications (1)

Publication Number Publication Date
CN205289809U true CN205289809U (en) 2016-06-08

Family

ID=56435310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521011155.1U Active CN205289809U (en) 2015-12-08 2015-12-08 Multi -head drill bed is restrainted to two longmen numerical control steel pipes

Country Status (1)

Country Link
CN (1) CN205289809U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106001682A (en) * 2016-07-27 2016-10-12 蔡文进 Automatic pneumatic-electric punching machine
CN107662112A (en) * 2017-09-21 2018-02-06 广东轻工职业技术学院 Reciprocating reinforcing fin heat exchanger tube processing and positioning device and method
CN109227151A (en) * 2018-09-25 2019-01-18 惠州市誉东沅智能设备有限公司 Multi-head high-efficiency Mechanical Processing Center
CN110893478A (en) * 2019-10-30 2020-03-20 宿州市亿家门窗工程有限公司 Gang drill machine for aluminum alloy plate processing

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106001682A (en) * 2016-07-27 2016-10-12 蔡文进 Automatic pneumatic-electric punching machine
CN107662112A (en) * 2017-09-21 2018-02-06 广东轻工职业技术学院 Reciprocating reinforcing fin heat exchanger tube processing and positioning device and method
CN109227151A (en) * 2018-09-25 2019-01-18 惠州市誉东沅智能设备有限公司 Multi-head high-efficiency Mechanical Processing Center
CN109227151B (en) * 2018-09-25 2021-03-30 惠州市誉东沅智能设备有限公司 Multi-head efficient machining center
CN110893478A (en) * 2019-10-30 2020-03-20 宿州市亿家门窗工程有限公司 Gang drill machine for aluminum alloy plate processing
CN110893478B (en) * 2019-10-30 2021-09-28 宿州市亿家门窗工程有限公司 Gang drill machine for aluminum alloy plate processing

Similar Documents

Publication Publication Date Title
CN205289809U (en) Multi -head drill bed is restrainted to two longmen numerical control steel pipes
CN104551302B (en) A kind of automatic welding table for PDC anchor bit
CN205343331U (en) Perch automatic drilling machine
CN203141090U (en) Top lock processing device
CN103128593A (en) Delivery method and delivery equipment of workpiece on production line for aluminum tube and aluminum bar
CN201922067U (en) Multi-hole drilling device for camshaft
CN205415889U (en) Drilling equipment of bamboo frame plate processing usefulness
CN202367438U (en) H-shaped steel numerical control punching and drilling production line
CN107433369B (en) Reinforcing bar mantle fiber-sleeve all-in-one and system of processing thereof
CN105772779A (en) Novel numerical control drilling machine
CN106270622B (en) A kind of Multifunctional perforation device
CN205888132U (en) Automatic control machine tool
CN205888134U (en) Hull steel fabrication lathe
CN105081389A (en) Full-automatic aluminum alloy casement window hinge drilling machine
CN206702591U (en) A kind of magnetic floats the automatic drilling and milling device of H type sleepers
CN206643387U (en) A kind of Multi-shaft drilling device
CN202199798U (en) Pipe drilling machine with sliding clamp
CN205342442U (en) Chamfer drilling equipment manages in side
CN202804236U (en) Synchronous multi-bit drilling equipment
CN204975395U (en) Can transversely have more drilling machines by automatic rotating workpiece
CN204912831U (en) A drilling machine that is used for simultaneous processing of ladder group of combined material cable testing bridge to go out six holes
CN202963525U (en) Multi-drill drilling equipment
CN208879747U (en) A kind of double-head drilling equipment
CN207088019U (en) The double location drilling machines of PVC fillers piece full-automatic tracking
CN202804239U (en) Synchronous multi-drill-bit drilling equipment with counter weight

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant