CN202804239U - Synchronous multi-drill-bit drilling equipment with counter weight - Google Patents
Synchronous multi-drill-bit drilling equipment with counter weight Download PDFInfo
- Publication number
- CN202804239U CN202804239U CN2012203589743U CN201220358974U CN202804239U CN 202804239 U CN202804239 U CN 202804239U CN 2012203589743 U CN2012203589743 U CN 2012203589743U CN 201220358974 U CN201220358974 U CN 201220358974U CN 202804239 U CN202804239 U CN 202804239U
- Authority
- CN
- China
- Prior art keywords
- servomotor
- drill
- fixed
- transverse axis
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses synchronous multi-drill-bit drilling equipment with a counter weight. The synchronous multi-drill-bit drilling equipment comprises a base, a guide post is fixed on the base and is slidably connected with a first servo motor which is fixedly connected with a cross shaft, a traction line penetrates through a pulley block fixed on the base, the counter weight is fixed at one end of the pulley block while the first servo motor or the cross shaft is fixed at the other end of the pulley block, and a plurality of drilling devices are fixed on the cross shaft. Each drilling device comprises a second servo motor fixed on the cross shaft, each second servo motor drives a drill bit, and a numerical control device is in control connection with the first servo motor and the second servo motors. Aiming at the problems in the prior art, the synchronous multi-drill-bit drilling equipment with the counter weight is capable of saving labor and energy and effectively improving processing efficiency.
Description
Technical field
The utility model relates to a kind of synchronous many bit bores equipment with counterweight.
Background technology
At mechanical processing industry, boring is one of the most basic mechanical processing tools.In the process that metal material is holed, often need in the face of such problem, because during boring, stop after need to getting into to a certain degree, so need a technical staff keep an eye on specially a machine, inadequate with the degree of depth dark or boring that prevents from holing, and technical staff's manual operation, and judge by naked eyes, not only its performance accuracy is difficult to guarantee, and can slattern a large amount of manpowers, simultaneously, the every processing of part once, reciprocal process will occur once, and year in year out, motor consumes a large amount of electric energy, efficient is not high, needs to be resolved hurrily.
The utility model content
For the problem that prior art exists, the purpose of this utility model is to propose a kind of synchronous many bit bores equipment with counterweight, the labor-saving while, can the Effective Raise working (machining) efficiency, and simultaneously more energy-conservation.
For reaching this purpose, the utility model by the following technical solutions:
A kind of synchronous many bit bores equipment with counterweight, comprise base, fixing guide pillar on the described base, described guide pillar first servomotor that is slidingly connected, described the first servomotor is fixedly connected with transverse axis, described draught line passes the assembly pulley of fixing described base, one end fixed weight, the other end secures the above the first servomotor or described transverse axis, fix some rigs on the described transverse axis, described rig all comprises the second servomotor that secures the above transverse axis, and described the second servomotor drives drill bit, described the first servomotor of numerical control device control connection and described the second servomotor.Also comprise the input equipment that connects described numerical control device, but the degree of depth of being bored by the described drill bit of described input equipment input control.Comprise that also many groups cooperate the anchor clamps of clamping part to be processed with described drill bit.
Based on disclosing of above technical scheme, the utility model possesses following beneficial effect:
The utility model is in actual mechanical process, the degree of depth that at first need to descend to bore by input equipment input drill bit, then numerical control device is controlled the first servomotor and is driven the second servomotor along the descending segment distance of guide pillar, then, numerical control device is controlled the second servomotor work, after drill bit creeps into certain depth, stop, owing to preset, make the work of drill bit not need the technical staff to follow the tracks of, relatively save manpower, make a technical staff can operate simultaneously many machines, thereby greatly raise the efficiency, simultaneously, native system can be processed a plurality of parts simultaneously, working (machining) efficiency improves greatly, because counterweight is offset a part of idle work, so that more energy-conservation.
Description of drawings
Fig. 1 is the overall structure schematic diagram of the utility model embodiment 1:
Fig. 2 is the principle schematic of the utility model embodiment 1:
Fig. 3 is the overall structure schematic diagram of the utility model embodiment 1:
Wherein: a1, rig; A2, rig; A3, rig; A4, rig; A5, rig; 1, guide pillar; 2, base; 3, the first servomotor; 4, the second servomotor; 5, anchor clamps; 6, drill bit; 7, transverse axis; 8, counterweight; 9, draught line; 10, assembly pulley; 11, numerical control device; 12, input equipment.
The specific embodiment
Further specify the technical solution of the utility model below in conjunction with accompanying drawing and by the specific embodiment:
A kind of synchronous many bit bores equipment with counterweight is proposed, comprise base 2, fixing guide pillar 1 on the base 2, guide pillar 1 first servomotor 3 that is slidingly connected, the first servomotor 3 is fixedly connected with transverse axis 7, draught line 9 passes the assembly pulley 10 of firm banking 2, one end fixed weight 8, the other end is fixed the first servomotor 3 or transverse axis 7, fix some rig a1 on the transverse axis 7, a2, a3, a4, a5, rig a1, a2, a3, a4, a5 all comprises the second servomotor 4, the second servomotors 4 of fixing transverse axis 7 and drives drill bit 6, numerical control device 11 control connections the first servomotor 3 and the second servomotor 4.Also comprise the input equipment 12 that connects numerical control device 11, but the degree of depth of being bored by input equipment 12 input control drill bits 6.Comprise that also many groups cooperate the anchor clamps 5 of clamping part to be processed with drill bit 6.
In actual mechanical process, at first, a plurality of parts to be processed can be fixed on the anchor clamps 5, need the lower degree of depth of boring by input equipment 12 input drill bits 6, then by numerical control device 11 controls 5 bench drill hole equipment a1, a2, a3, a4, a5 works simultaneously, process is as follows, numerical control device 11 controls the first servomotor 3 drives five group of second servomotor 4 along guide pillar 1 a descending segment distance by transverse axis 7, then, 4 work of numerical control device 11 controls the second servomotor stop after drill bit 6 creeps into certain depth, owing to preset, make the work of drill bit 6 not need the technical staff to follow the tracks of, relatively save manpower, make a technical staff can operate simultaneously many machines, thereby greatly raise the efficiency, and native system can be processed 5 parts simultaneously, and processing is synchronous, so that its working (machining) efficiency improves greatly.
Since counterweight 8 balances by the first servomotor 3, transverse axis 7 and a part of organizing the weight of the integral body that the second servomotor 4, drill bit 6 and relevant connection parts form more, so that the first servomotor 3 drive by the first servomotor 3, the second servomotor 4, drill bit 6 and relevant connection parts forms on the whole time identical apart from the time, the electric energy that consumes reduces, thereby accomplishes energy-conserving and environment-protective.
The above; it only is the better specific embodiment of the utility model; but protection domain of the present utility model is not limited to this; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; be equal to replacement or change according to the technical solution of the utility model and utility model design thereof, all should be encompassed within the protection domain of the present utility model.
Claims (3)
1. synchronous many bit bores equipment with counterweight, it is characterized in that, comprise base (2), the upper fixedly guide pillar (1) of described base (2), described guide pillar (1) the first servomotor (3) that is slidingly connected, described the first servomotor (3) is fixedly connected with transverse axis (7), described draught line (9) passes the assembly pulley (10) of fixing described base (2), one end fixed weight (8), the other end secures the above the first servomotor (3) or described transverse axis (7), the upper fixing some rig (a1 of described transverse axis (7), a2, a3, a4, a5), described rig (a1, a2, a3, a4, a5) all comprise the second servomotor (4) that secures the above transverse axis (7), described the second servomotor (4) drives drill bit (6), described the first servomotor of numerical control device (11) control connection (3) and described the second servomotor (4).
2. the synchronous many bit bores equipment with counterweight according to claim 1, it is characterized in that, also comprise the input equipment (12) that connects described numerical control device (11), by described input equipment (12) but the degree of depth that the described drill bit of input control (6) is bored.
3. the synchronous many bit bores equipment with counterweight according to claim 1 is characterized in that, comprises that also many groups cooperate the anchor clamps of clamping part to be processed (5) with described drill bit (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012203589743U CN202804239U (en) | 2012-07-23 | 2012-07-23 | Synchronous multi-drill-bit drilling equipment with counter weight |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012203589743U CN202804239U (en) | 2012-07-23 | 2012-07-23 | Synchronous multi-drill-bit drilling equipment with counter weight |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202804239U true CN202804239U (en) | 2013-03-20 |
Family
ID=47863183
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012203589743U Expired - Fee Related CN202804239U (en) | 2012-07-23 | 2012-07-23 | Synchronous multi-drill-bit drilling equipment with counter weight |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202804239U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102784940A (en) * | 2012-07-23 | 2012-11-21 | 安徽奇峰机械装备有限公司 | Synchronous multi-drill bit drilling equipment with counterweight |
CN107626948A (en) * | 2017-11-11 | 2018-01-26 | 成都海逸机电设备有限公司 | A kind of more drill bit steel pipe drilling equipments |
-
2012
- 2012-07-23 CN CN2012203589743U patent/CN202804239U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102784940A (en) * | 2012-07-23 | 2012-11-21 | 安徽奇峰机械装备有限公司 | Synchronous multi-drill bit drilling equipment with counterweight |
CN102784940B (en) * | 2012-07-23 | 2015-10-07 | 安徽奇峰机械装备有限公司 | A kind of synchronous many bit bores equipment with counterweight |
CN107626948A (en) * | 2017-11-11 | 2018-01-26 | 成都海逸机电设备有限公司 | A kind of more drill bit steel pipe drilling equipments |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202062093U (en) | Drilling machine with multiple drills | |
CN204353523U (en) | The compound porous drilling machine of a kind of disc | |
CN201922067U (en) | Multi-hole drilling device for camshaft | |
CN204018780U (en) | A kind of double-ended double-station holes pressure-plate boring device | |
CN205968179U (en) | Tooth lathe is attacked in multiaxis drilling | |
CN202804239U (en) | Synchronous multi-drill-bit drilling equipment with counter weight | |
CN202804235U (en) | Numerical control equipment with counterweight | |
CN202804236U (en) | Synchronous multi-bit drilling equipment | |
CN204171404U (en) | A kind of pinpoint forestry blade wearing plate boring grab | |
CN204248013U (en) | A kind of novel hydraulic multiple drill press | |
CN102773514A (en) | Digital controlled drilling equipment | |
CN203401097U (en) | Multi-hole drilling machine with adjustable distance | |
CN202963525U (en) | Multi-drill drilling equipment | |
CN204913520U (en) | Automatic burring device of automobile power generation machine rotor shaft | |
CN202804238U (en) | Multi-drill-bit drilling equipment with counter weights | |
CN202804237U (en) | Numerical-control drilling equipment | |
CN102784940B (en) | A kind of synchronous many bit bores equipment with counterweight | |
CN203541629U (en) | Novel drilling machine | |
CN209425031U (en) | A kind of non-equally porous lift hole drilling jig | |
CN202963518U (en) | Drilling equipment with counterweight | |
CN203621553U (en) | Novel automatic drilling machine for insertion sheets | |
CN102773515A (en) | Drilling equipment with synchronous multiple drills | |
CN102909407A (en) | Multi-bit drilling equipment with counter weights | |
CN203437923U (en) | Multi-hole drilling and tapping machine special for pump body | |
CN206065472U (en) | The automatic punching shedding mechanism of tubing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20130320 Termination date: 20140723 |
|
EXPY | Termination of patent right or utility model |