CN205242271U - Cast -in -place simple box girder removes and sprays maintenance canopy - Google Patents

Cast -in -place simple box girder removes and sprays maintenance canopy Download PDF

Info

Publication number
CN205242271U
CN205242271U CN201521084424.7U CN201521084424U CN205242271U CN 205242271 U CN205242271 U CN 205242271U CN 201521084424 U CN201521084424 U CN 201521084424U CN 205242271 U CN205242271 U CN 205242271U
Authority
CN
China
Prior art keywords
english truss
maintenance
cast
maintenance canopy
spray
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521084424.7U
Other languages
Chinese (zh)
Inventor
杨晓军
李宏飞
武明静
张隽
周海东
王爱琴
付高远
张卫霞
赵香萍
李晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201521084424.7U priority Critical patent/CN205242271U/en
Application granted granted Critical
Publication of CN205242271U publication Critical patent/CN205242271U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a bridge engineering builds the field, specifically is a cast -in -place simple box girder removes and sprays maintenance canopy device, solves the problem that there is above -mentioned a great deal of defect in the artifical watering maintenance of current roof beam body adoption, include the english truss of laying along the case liang liang body vertical orientation interval, even as an organic whole every english truss below both sides sets up the pole setting in order to constitute maintenance canopy main couple through the reinforcing bar respectively for the top of adjacent english truss and both sides, and spray set is laid by the walking wheel of driving motor control, english truss below interval to the installation of pole setting lower extreme, and case liangliang body surface parallel is provided with the track of mutually supporting with each walking wheel. Rational in infrastructure, novel structure is unique, and simple process is swift in the preparation, preparation low cost, and the flexible operation convenience, labour saving and time saving can carry out wet maintenance entirely to concrete beam, prevents effectively that shrinkage crack from appearing in the concrete, guarantees roof beam physique volume, not only saves the manual work, and maintenance effect is estimated in can also be better reach.

Description

Cast-in-place simple supported box beam moves spray maintenance canopy
Technical field
The utility model relates to bridge engineering construction field, is specially a kind of cast-in-place simple supported box beam and moves spray maintenance shed device.
Background technology
After bridge concrete pouring construction, all adopt the way of artificial watering maintenance to prevent concrete cracking at present. But the maintenance of manually sprinkling water usually can not meet its maintenance effect in curing age, and labor intensive extremely. While manually beam body being sprinkled water to maintenance, need water pipe to spray beam body, maintenance one hole beam is consuming time longer comprehensively, especially, in the time that simple supported box beam is produced continuously, tends to occur the poor situation of last hole He Houyi hole beam maintenance sparge pipe. Known, if beam body concrete can not be subject to good maintenance within curing period, very easily there is beam body concrete face checking, concrete strength rises slowly early stage, finally affects beam weight. Therefore in the urgent need to research and develop simple fast, the flexible and convenient operation of a kind of with low cost, technique, time saving and energy saving, can carry out complete wet-cured spray curing means continuously to beams of concrete.
Summary of the invention
The utility model adopts artificial watering maintenance to have the problem of above-mentioned many defects in order to solve existing beam body, provides a kind of cast-in-place simple supported box beam to move spray maintenance canopy.
The utility model is to adopt following technical scheme to realize: cast-in-place simple supported box beam moves spray maintenance canopy, comprise the English truss of laying along box girder body longitudinal direction interval, the top of adjacent English truss and both sides are connected as a single entity to form maintenance canopy main couple by reinforcing bar respectively, both sides, each English truss below arrange vertical rod, the road wheel by drive motors control is installed in vertical rod lower end, spray equipment is laid at interval, English truss below, and box girder body surface is arranged with the track cooperatively interacting with each road wheel in parallel.
Described maintenance canopy main couple outer surface is equipped with geotextiles, and geotextiles can be used to increase the stability of maintenance canopy main couple entirety, also can ensure the evaporation time delay of beam body curing period simultaneously.
In the drive motors control loop of described each road wheel, be serially connected with gauge tap, for controlling advancing of all road wheels, simple and convenient.
Described spray equipment forms by hanging on some spray heads of below, English truss inside and the shower being connected with spray head, on the supply channel of shower, is serially connected with gauge tap.
Adopt structural design of the present utility model, utilize the stable feature of triangular truss structure, multiple English trusses are connected as a single entity as maintenance canopy main couple with reinforcing bar, bottom arranges road wheel, improve travelling performance, and can realize porous maintenance by track advancing; Can regulate spray equipment interval, carry out full wet curing simultaneously.
Compared with prior art, the utility model project organization is reasonable, modern design uniqueness, manufacture craft simple and fast, cost of manufacture is cheap, flexible and convenient operation, time saving and energy saving, can carry out full wet curing to beams of concrete, effectively prevent that contraction crack from appearring in concrete, ensure beam weight, not only save manually, can also reach preferably expectation maintenance effect.
Brief description of the drawings
Fig. 1 is facade structures schematic diagram of the present utility model;
Fig. 2 planar structure schematic diagram of the present utility model;
In figure: 1-box girder body; 2-English truss; 3-reinforcing bar; 4-vertical rod; 5-road wheel; 6-drive motors; 7-track; 8-gauge tap; 9-spray head; 10-shower.
Detailed description of the invention
Cast-in-place simple supported box beam moves spray maintenance canopy, as shown in Figure 1, 2, comprise the English truss 2 of laying along box girder body 1 longitudinal direction interval, the top of adjacent English truss and both sides are connected as a single entity to form maintenance canopy main couple by reinforcing bar 3 respectively, maintenance canopy main couple outer surface is equipped with geotextiles, both sides, each English truss below arrange vertical rod 4, and the road wheel 5 of being controlled by drive motors 6 is installed in vertical rod lower end, in drive motors 6 control loops of each road wheel, is serially connected with gauge tap 8; Spray equipment is laid at interval, English truss below, box girder body surface is arranged with the track 7 cooperatively interacting with each road wheel in parallel, spray equipment forms by hanging on some spray heads 9 of below, English truss inside and the shower 10 being connected with spray head, on the supply channel of shower, is serially connected with gauge tap.
When concrete making, English truss is laid together along beam longitudinal pitch 4m ~ 5m, then by welding vertical rod, install road wheel and and the bottom track of locating in advance connect into entirety, looking for professional person's mounted motor and spray equipment, must lean on good integrity by firm body, and unification is being controlled respectively by gauge tap, take the circumstances into consideration to consider 3-5 shower nozzle of each English truss place installation according to simply supported beam deck-siding, finally above main couple, laying geotextiles at this increases the evaporation time delay of stability and curing period.
Above-mentioned material can utilize the steel such as reinforcing bar or channel-section steel, I-steel to arrange in pairs or groups voluntarily, and part can utilize construction waste material to process, and so both can make rational use of resources, and also can save material cost.

Claims (4)

1. a cast-in-place simple supported box beam moves spray maintenance canopy, it is characterized in that comprising the English truss (2) of laying along box girder body (1) longitudinal direction interval, the top of adjacent English truss and both sides are connected as a single entity to form maintenance canopy main couple by reinforcing bar (3) respectively, both sides, each English truss below arrange vertical rod (4), the road wheel (5) of being controlled by drive motors (6) is installed in vertical rod lower end, spray equipment is laid at interval, English truss below, and box girder body surface is arranged with the track (7) cooperatively interacting with each road wheel in parallel.
2. cast-in-place simple supported box beam according to claim 1 moves spray maintenance canopy, it is characterized in that maintenance canopy main couple outer surface is equipped with geotextiles.
3. cast-in-place simple supported box beam according to claim 1 and 2 moves spray maintenance canopy, it is characterized in that being serially connected with gauge tap (8) in drive motors (6) control loop of each road wheel.
4. cast-in-place simple supported box beam according to claim 1 and 2 moves spray maintenance canopy, it is characterized in that spray equipment is made up of the shower (10) that hangs on some spray heads (9) of below, English truss inside and be connected with spray head, is serially connected with gauge tap on the supply channel of shower.
CN201521084424.7U 2015-12-23 2015-12-23 Cast -in -place simple box girder removes and sprays maintenance canopy Expired - Fee Related CN205242271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521084424.7U CN205242271U (en) 2015-12-23 2015-12-23 Cast -in -place simple box girder removes and sprays maintenance canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521084424.7U CN205242271U (en) 2015-12-23 2015-12-23 Cast -in -place simple box girder removes and sprays maintenance canopy

Publications (1)

Publication Number Publication Date
CN205242271U true CN205242271U (en) 2016-05-18

Family

ID=55941351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521084424.7U Expired - Fee Related CN205242271U (en) 2015-12-23 2015-12-23 Cast -in -place simple box girder removes and sprays maintenance canopy

Country Status (1)

Country Link
CN (1) CN205242271U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107322775A (en) * 2017-08-08 2017-11-07 西安墙体材料研究设计院 A kind of reciprocating circulating maintenance device and maintaining process
CN111996912A (en) * 2020-06-29 2020-11-27 中铁广州工程局集团有限公司 Cast-in-place winter construction and maintenance method for box-shaped main beam segment of half-through type steel pipe concrete arch bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107322775A (en) * 2017-08-08 2017-11-07 西安墙体材料研究设计院 A kind of reciprocating circulating maintenance device and maintaining process
CN111996912A (en) * 2020-06-29 2020-11-27 中铁广州工程局集团有限公司 Cast-in-place winter construction and maintenance method for box-shaped main beam segment of half-through type steel pipe concrete arch bridge

Similar Documents

Publication Publication Date Title
CN103088750B (en) Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN103967050A (en) Construction system of subway station
CN102226402B (en) Auxiliary device and method used for laying tunnel waterproofing plates
CN201943045U (en) Automatic-moving hydraulic cantilever gantry concrete placement device for wave wall
CN104746435A (en) Wide-angle Y-shaped pier column construction method
CN108571071A (en) Prefabricated PC beams of concrete column connected node and construction method
CN104260199B (en) A kind of Wavelike steel webplate prestressed concrete I-beam prefabricating and constructing
CN203903834U (en) Internal-climbing tower crane
CN105648924A (en) Construction method of multi-span simply-supported steel truss girder bridge
CN102587282B (en) Large-section simply-supported box girder precasting and assembly process under conditions of strong wind and high altitude
CN205242271U (en) Cast -in -place simple box girder removes and sprays maintenance canopy
CN207538841U (en) A kind of hydraulic tunnel inverted arch cambered surface slip form construction device
CN204401650U (en) Square longitudinally connection prestressed assembly formula underground pipe gallery
CN203238948U (en) Hollow ultrahigh formwork profile steel platform
CN203125684U (en) Maintenance shed for concrete prefabricated component
CN105041339A (en) Clutch type formwork trolley, trolley assembly and underground passage concrete construction method
CN204080643U (en) The prefabricated constructing structure of a kind of Wavelike steel webplate prestressed concrete i beam
CN204491659U (en) Jack arch shape prestressed structure pin-connected panel underground pipe gallery
CN107311047B (en) The steel box-girder lift structure and method for improving of large span bondbeam
CN209603182U (en) A kind of adjustable die system of pipe gallery automatic control section
CN206554500U (en) Steel structure concrete, which is poured, uses adjustable transverse support bar
CN210589852U (en) Automatic spraying health preserving device of prefabricated box girder
CN104018427A (en) All-welded box girder combination section constructing method
CN204435675U (en) A kind of lattice salomonica structure
CN204238264U (en) A kind of sole plate post-poured strip structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20211223

CF01 Termination of patent right due to non-payment of annual fee