CN205224070U CN201520908812.6U CN201520908812U CN205224070U CN 205224070 U CN205224070 U CN 205224070U CN 201520908812 U CN201520908812 U CN 201520908812U CN 205224070 U CN205224070 U CN 205224070U
Authority
CN
China
Prior art keywords
drill bit
pile
stabilization structure
reinforcing
basement rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520908812.6U
Other languages
Chinese (zh)
Inventor
姚裕春
徐骏
曾永红
袁碧玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201520908812.6U priority Critical patent/CN205224070U/en
Application granted granted Critical
Publication of CN205224070U publication Critical patent/CN205224070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Compound foundation stabilization structure of drill bit anchor pile to reinforcing pile can be set up steadily at the weak soil in situ, the reinforcement difficult problem that the basement rock coated the soft soil foundation is effectively solved. Include reinforcing pile vertical at the weak soil in situ, the lateral separation setting, each reinforcing pile's lower extreme and the drill bit fixed connection who is located the basement rock, the upper end flushes with weak soil layer surface, reinforcing pile, the outer cladding sack of drill bit lateral wall, weak soil layer surface with fill physically between be provided with the bed course.

Description

Drill bit anchor pile composite foundation stabilization structure
Technical field
The utility model relates to geotechnical engineering, particularly Rock covers the Base Consolidation Engineering of weak soil.
Background technology
There is the ground many basement rock covering weak soil in western mountainous areas, when building embankment engineering on this ground, needing to carry out consolidation process to weak soil.When basement rock covering weak soil condition and being poor, during as the weak soil more for muddy soft soil, Muddy Bottoms peat soil and organic content, traditional reinforcement of soft soil treatment measures such as cement mixing method, high-pressure rotary jet grouting pile, CFG stake etc. all can not be suitable for, and its bottom application work under cover basement rock time, basement rock can not be entered and stablize pile body; If adopt current bored pile, then construction investment is huge.Therefore, need that a kind of consolidation effect is good in the case, economy, easy construction special soft soil ground stabilization measure, and meet environmental requirement.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of drill bit anchor pile composite foundation stabilization structure, stably can arrange reinforcing pile in Soft Soil Layer, effectively solves reinforcing difficult problem basement rock covering soft foundation.
It is as follows that the utility model solves the technical scheme that its technical problem adopts:
Drill bit anchor pile composite foundation stabilization structure of the present utility model, is included in reinforcing pile that is longitudinal in Soft Soil Layer, that be horizontally arranged at interval, it is characterized in that: the lower end of described each reinforcing pile is fixedly connected with the drill bit being positioned at basement rock, and upper end flushes with Soft Soil Layer surface; Reinforcing pile, drill bit sidewall outer cladding cloth bag; Bed course is provided with between Soft Soil Layer surface and filling body.
The beneficial effects of the utility model are, utilize drill bit anchoring type pile body to reinforce on basement rock and cover weak soil, traditional ground reinforcement measure can be solved and in special soft soil, pile and reinforcing pile can not can not enter the problem in basement rock at the bottom of spud pile, simple, the good economy performance of this structure construction, has wide popularizing application prospect simultaneously.
Accompanying drawing explanation
This manual comprises following three width accompanying drawings:
Fig. 1 is the sectional schematic diagram of the utility model drill bit anchor pile composite foundation stabilization structure;
Fig. 2 is the construction schematic cross-section of the utility model drill bit anchor pile composite foundation stabilization structure;
Fig. 3 is the drill bit signal drawing of the utility model drill bit anchor pile composite foundation stabilization structure.
Component shown in figure, toponym and corresponding mark: drill bit 10, reinforcing bar 11, sleeve pipe 20, cloth bag 30, drilling rod 40, reinforcing pile body 50, bed course 60, basement rock A, weak soil B, filling body C.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
With reference to Fig. 1, drill bit anchor pile composite foundation stabilization structure of the present utility model, be included in the reinforcing pile 50 that Soft Soil Layer B is longitudinal, be horizontally arranged at interval, it is characterized in that: the lower end of described each reinforcing pile 50 is fixedly connected with the drill bit 10 being positioned at basement rock A, and upper end flushes with Soft Soil Layer B surface; Reinforcing pile 50, drill bit 10 sidewall outer cladding cloth bag 30; Bed course 60 is provided with between Soft Soil Layer B surface and filling body C.The degree of depth that described drill bit 10 enters basement rock is not less than 30cm usually, and its upper end is on basement rock A scar.With reference to Fig. 3, the top of described drill bit 10 is fixedly installed reinforcing bar 11, and this reinforcing bar 11 extends in reinforcing pile 50.
With reference to Fig. 2 and Fig. 3, the external wall of upper portion of described drill bit 10 has and forms with sleeve pipe 20 interface be threaded, and then has the interface forming cutting ferrule with drilling rod 40 and be connected in the middle part of its end.During construction, sleeve pipe 20 lower end is threaded with drill bit 10, and top flushes ground basal plane, and cloth bag 30 is arranged on sleeve pipe 20 inner, and lower end outsourcing drill bit 10 is also fixedly connected with it.Drilling rod 40 lower end adopts cutting ferrule to be connected with drill bit 10, and after drill bit 10 pierces down and covers basement rock A, drilling rod 40 pine cover takes out.Sleeve pipe 20 adopts PVC usually.Reinforcing pile 50, adopt concrete mixture to make, vibration pours in cloth bag 30 and forms stressed pile body.
The utility model utilizes drill bit 10 to pierce down to cover in basement rock A, as the fixed end of reinforcing pile 50, reinforcing pile 50 and drill bit 10 can be made to form a fixed connection by exposure reinforcing bar 11.Retaining wall before utilizing sleeve pipe 20 to construct in weak soil B as reinforcing pile body 50, and fixing cloth bag 30, it can take out recycling.Utilize cloth bag 30 as reinforcing pile body 50 pile bag, and be convenient to sleeve pipe 20 and extract out in the work progress of reinforcing pile 50 and do not affect pile.Bed course 60 is utilized to fill out the buffering cooperation layer of body C as the composite foundation and top of reinforcing pile body 50 formation.This structure effectively solves base reinforcement measure traditionally pile and reinforcing pile can not can not enter the problem in basement rock at the bottom of spud pile in special soft soil, and simple, the good economy performance of this structure construction, has wide popularizing application prospect simultaneously.
Sleeve pipe 20 internal diameter is determined according to design stake footpath, and its wall thickness can resist the soil pressure bottom Soft Soil Layer B, and it is connected rear easy disengagement with drill bit 10.Cloth bag 30 deployment diameter meets the diametric requirements of design reinforcement stake 50.Described reinforcing pile 50 setting space and diameter meet design requirement, and diameter is generally 0.4 ~ 0.6m, and setting space is generally 1.4 ~ 1.6m.
See figures.1.and.2, the construction sequence of drill bit anchor pile composite foundation stabilization structure of the present utility model is as follows:
Sleeve pipe 20 and cloth bag 30 are socketed;
Sleeve pipe 20 is connected with drill bit 10;
Drill bit 10 is connected with drilling rod 40
Vertical press-in connector makes it enter in Soft Soil Layer B to basement rock A end face;
Start drilling rod 40, drill bit 10 is pierced in basement rock A fixing;
Sleeve pipe 20 and drill bit 10 are thrown off;
Drilling rod 40 overlaps with drill bit 10 pine and takes out drilling rod 40;
Segmentation penetration concrete compound in cloth bag 30, concrete perfusion compound limit, limit promotes sleeve pipe 20;
Construction cushion coat 60 after reinforcing pile 50 is formed and reaches design strength;
Construction filling body C.
Some principles of the above the utility model drill bit anchor pile composite foundation stabilization structure that just explains through diagrams, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore every corresponding modify of being likely utilized and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (4)

1. drill bit anchor pile composite foundation stabilization structure, be included in the reinforcing pile (50) that Soft Soil Layer (B) is longitudinal, be horizontally arranged at interval, it is characterized in that: the lower end of described each reinforcing pile (50) is fixedly connected with the drill bit (10) being positioned at basement rock (A), and upper end flushes with Soft Soil Layer (B) surface; Reinforcing pile (50), drill bit (10) sidewall outer cladding cloth bag (30); Bed course (60) is provided with between Soft Soil Layer (B) surface and filling body (C).
2. drill bit anchor pile composite foundation stabilization structure as claimed in claim 1, it is characterized in that: the degree of depth that described drill bit (10) enters basement rock is not less than 30cm, its upper end is on basement rock (A) scar.
3. drill bit anchor pile composite foundation stabilization structure as claimed in claim 1, is characterized in that: the top of described drill bit (10) is fixedly installed reinforcing bar (11), and this reinforcing bar (11) extends in reinforcing pile (50).
4. drill bit anchor pile composite foundation stabilization structure as claimed in claim 3, it is characterized in that: the external wall of upper portion of described drill bit (10) has and forms with sleeve pipe (20) interface be threaded that then there is in the middle part of its end the interface forming cutting ferrule with drilling rod (40) and be connected.
CN201520908812.6U 2015-11-13 2015-11-13 Compound foundation stabilization structure of drill bit anchor pile Active CN205224070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520908812.6U CN205224070U (en) 2015-11-13 2015-11-13 Compound foundation stabilization structure of drill bit anchor pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520908812.6U CN205224070U (en) 2015-11-13 2015-11-13 Compound foundation stabilization structure of drill bit anchor pile

Publications (1)

Publication Number Publication Date
CN205224070U true CN205224070U (en) 2016-05-11

Family

ID=55899145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520908812.6U Active CN205224070U (en) 2015-11-13 2015-11-13 Compound foundation stabilization structure of drill bit anchor pile

Country Status (1)

Country Link
CN (1) CN205224070U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297760A (en) * 2015-11-13 2016-02-03 中铁二院工程集团有限责任公司 Drill bit anchoring pile composite foundation strengthening structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105297760A (en) * 2015-11-13 2016-02-03 中铁二院工程集团有限责任公司 Drill bit anchoring pile composite foundation strengthening structure
CN105297760B (en) * 2015-11-13 2018-01-05 中铁二院工程集团有限责任公司 Drill bit anchor pile composite foundation stabilization structure

Similar Documents

Publication Publication Date Title
CN102691296B (en) Pipe pile foundation for static-pressure grouting on pile side and rotary jet grouting at pile bottom and construction method thereof
CN107975375B (en) A kind of miniature steel pipe pile reinforced soft foundation construction method of city tunnel
CN104674809B (en) Anti-floating anchor rod structure and its construction method
CN104500082A (en) Mining-method tunnel inner shield receiving construction method
CN104278667A (en) Underground karst cave filling treatment method
CN204199335U (en) A kind of pressure release well reducing PHC tube pile construction soil compaction effect
CN106948340B (en) A kind of construction method of the Manual excavated pile structure of high polymer grouting protection
WO2021004007A1 (en) Foundation reinforcement method for conventional building
CN208136918U (en) A kind of tubular type Soil-Nailing Wall Structure
CN111364449A (en) Construction method and structure for penetrating karst cave of precast tubular pile
CN103526754A (en) Method for constructing head-expanded anchoring rod in sand-rich decomposed rock
CN105133641A (en) Thin-wall continuous-wall-type foundation reinforcing structure and method
CN208605162U (en) A kind of shield tunnel geological prospecting borehole hole sealing structure
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN204662433U (en) Anti-floating anchor rod structure
CN205224070U (en) Compound foundation stabilization structure of drill bit anchor pile
CN212052717U (en) Structure for penetrating karst cave of precast tubular pile
CN203613568U (en) Anti-floating cement soil pile and anti-floating anchor rod combined anti-floating system
CN205576957U (en) Stake end pilework
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN105297760B (en) Drill bit anchor pile composite foundation stabilization structure
CN208472716U (en) Crack geology mortar leakage prevention drill-pouring pilework
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN202787275U (en) Tubular soil nailing wall of novel pneumatic impact anchor
CN105040705A (en) Ground foundation treatment construction technology under multi-karst-cave geological conditions

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant