CN205178381U - Erect off -load fixer of tower crane and dysprosium lamp cable perpendicularly - Google Patents
Erect off -load fixer of tower crane and dysprosium lamp cable perpendicularly Download PDFInfo
- Publication number
- CN205178381U CN205178381U CN201520893740.2U CN201520893740U CN205178381U CN 205178381 U CN205178381 U CN 205178381U CN 201520893740 U CN201520893740 U CN 201520893740U CN 205178381 U CN205178381 U CN 205178381U
- Authority
- CN
- China
- Prior art keywords
- component
- tower crane
- cable
- socket joint
- dysprosium lamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910052692 Dysprosium Inorganic materials 0.000 title claims abstract description 16
- KBQHZAAAGSGFKK-UHFFFAOYSA-N dysprosium atom Chemical compound [Dy] KBQHZAAAGSGFKK-UHFFFAOYSA-N 0.000 title claims abstract description 16
- 229910000831 Steel Inorganic materials 0.000 claims description 26
- 239000010959 steel Substances 0.000 claims description 26
- 239000011248 coating agent Substances 0.000 claims description 4
- 238000000576 coating method Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 5
- 238000009434 installation Methods 0.000 description 4
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses an erect off -load fixer of tower crane and dysprosium lamp cable perpendicularly, including first component, second component and split pin, be equipped with corresponding pinhole on first component and the second component respectively, the split pin is passed through the pinhole will first component and second component are fixed in the tower crane both sides, and the outer downside of second component is equipped with the fixation clamp that is used for fixed cable. The utility model discloses a split pin replaces screw and nut to fasten first member and second member, avoided screw and nut to get rusty after not quick detachable problem, lightened the intensity of labour when installing simultaneously. The utility model discloses simple structure is through the fixed cable of firm ground of the fixation clamp centre gripping on the second component to through -hole on the accessible fixation clamp further with the cable ligature on the fixation clamp, the off -load stable performance makes the cable reliably be connected with the consumer, the assurance consumer is normally worked, has ensured construction safety, and repeatedly usable.
Description
Technical field
The utility model relates to the off-load fixture of a kind of vertical erection tower crane and dysprosium lamp cable.
Background technology
A lot of power consumption equipment is installed on the tower crane of construction, comprise hoisting equipment, as bridge motor, and lighting apparatus, as dysprosium lamp, these power consumption equipments need the power supply unit being connected to ground by cable, because cable exists larger deadweight, if be not fixed, long-time use is easy afterwards to come off from the power consumption equipment such as motor and dysprosium lamp.For this reason, need to adopt to be fixed cable by some way, removal cable, from heavy load, makes cable reliably be connected on power consumption equipment all the time.
At present, cable generally adopts screw and nut to be fixed on standard section of tower crane, and on the one hand, the time one is long, and through wind and weather, screw and nut corrosion seriously, are difficult to disassemble, can not recycle; On the other hand, its installation difficulty is also larger, and owing to being work high above the ground, the labour intensity of installation and danger are all very high.What is more, cable by means of only band or rope colligation on tower crane structural member, fixing very insecure, very easily come off from power consumption equipment under wind and weather and motor oscillating effect, cause the unexpected power-off of power consumption equipment, thus lighting apparatus has a power failure when causing the material of lifting from falling from high altitude or carry on construction work at night, potential safety hazard is huge, has a strong impact on normally carrying out of construction.
Utility model content
The purpose of this utility model adopts screw and nut to fix for solving current tower crane power consumption equipment cable, and installation difficulty is large, and easy corrosion causes difficult dismounting and can not reuse, or adopts simple side to prick fixing poor reliability, the technical problem that potential safety hazard is large.
In order to solve the problems of the technologies described above, the utility model provides the off-load fixture of a kind of vertical erection tower crane and dysprosium lamp cable, comprise the first component, second component and split pin, described first component and second component are respectively equipped with corresponding pin-and-hole, and described first component and second component are fixed on tower crane both sides by described pin-and-hole by described split pin.
Further, the outer downside of described second component is provided with the geometrical clamp for attached cable.
Further, described first component comprises an angle steel and two socket joint components, and one end of described two socket joint components is welded in angle steel both sides perpendicular to described angle steel respectively, and the pin-and-hole of described first component has two, lays respectively in the middle part of two socket joint components.
Further, described second component comprises a long angle steel, two socket joint components and two angle clips, one end of described two socket joint components is welded in long angle steel both sides perpendicular to described long angle steel respectively, the other end of described two socket joint components also welds together with described angle clip respectively perpendicular to described two angle clips respectively, the pin-and-hole of described second component has two, lays respectively at two socket joint member upper.
Further, described socket joint component is square tube or coating steel pipe.
Further, the outer downside of described long angle steel is provided with the geometrical clamp for attached cable.
Further, describedly fixedly accompany many, and evenly arrange.
Further, the through hole for banded cable is provided with in the middle part of described geometrical clamp.
Further, described pin-and-hole is circular, and diameter is 4mm.
The utility model adopts split pin to replace screw and nut to carry out fastening to the first component and second component, avoid screw and nut get rusty after not easily detachable problem, alleviate labour intensity during installation simultaneously.The utility model structure is simple, cable is gripped securely by the geometrical clamp on second component, and by the through hole on geometrical clamp further by cable tie on geometrical clamp, unloading performance is stablized, cable reliably can be connected with power consumption equipment, ensure that power consumption equipment normally works, ensured construction safety, and reusable.
Accompanying drawing explanation
Fig. 1 is the first element structure schematic diagram;
Fig. 2 is second component structural representation;
Fig. 3 is the structural representation that the first component and second component are assembled by split pin.
In figure: the first component 1; Angle steel 101; First component socket joint component 102; First component pin-and-hole 1021; Second component 2; Angle clip 201; Second component socket joint component 202; Second component pin-and-hole 2021; Long angle steel 203; Geometrical clamp 204; Geometrical clamp through hole 2041; Split pin 3.
Embodiment
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
As shown in Figure 1, the angle steel 101 of the first component 1 by level and two socket joint components 102 perpendicular to angle steel 101 are welded, two socket joint components 102 are welded on the two ends of angle steel 101 respectively, and the middle part of two socket joint components 102 is provided with the circular pin hole 1021 of diameter 4mm.Preferably, socket joint component 102 is square tube or coating steel pipe.
As shown in Figure 2, second component 2 by two levels angle clip 201, be welded perpendicular to two socket joint components 202 of two angle clips 201 and the long angle steel 203 of level respectively, one end of two socket joint components 202 is welded on one end of two angle clips 201 respectively, the other end of two socket joint components 202 is welded on the two ends of long angle steel 203 respectively, and the top of two socket joint components 202 is provided with the circular pin hole 2021 of diameter 4mm.The outer downside of long angle steel 203 is welded with three geometrical clamps 204 equably, is provided with through hole 2041 in the middle part of geometrical clamp 204.Preferably, socket joint component 202 is square tube or coating steel pipe.
As shown in Figure 3, first component 1 and second component 2 are fixed on the both sides of standard section of tower crane by pulling open afterbody after split pin 3 is each passed through pin-and-hole 1021 and 2021, length by adjustment split pin 3 adjusts the relative distance between the first component 1 and second component 2, thus the clamping degree of adjustment first component 1 and second component 2 pairs of standard section of tower cranes, the length of split pin 3 is shorter, holds tighter.After first component 1 is fixed on tower crane with second component 2, just cable clamping can be fixed in geometrical clamp 204, for strengthening the constant intensity of cable, thus removal cable deadweight further, also cable is helped on geometrical clamp 204 through the through hole 2041 on geometrical clamp 204 by available band.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on specification, must determine its technical scope according to right.
Claims (9)
1. the off-load fixture of vertical erection tower crane and dysprosium lamp cable, it is characterized in that, comprise the first component, second component and split pin, described first component and second component are respectively equipped with corresponding pin-and-hole, and described first component and second component are fixed on tower crane both sides by described pin-and-hole by described split pin.
2. the off-load fixture of vertical erection tower crane according to claim 1 and dysprosium lamp cable, is characterized in that, the outer downside of described second component is provided with the geometrical clamp for attached cable.
3. the off-load fixture of vertical erection tower crane according to claim 1 and dysprosium lamp cable, it is characterized in that, described first component comprises an angle steel and two socket joint components, one end of described two socket joint components is welded in angle steel both sides perpendicular to described angle steel respectively, the pin-and-hole of described first component has two, lays respectively in the middle part of two socket joint components.
4. the off-load fixture of vertical erection tower crane according to claim 1 and dysprosium lamp cable, it is characterized in that, described second component comprises a long angle steel, two socket joint components and two angle clips, one end of described two socket joint components is welded in long angle steel both sides perpendicular to described long angle steel respectively, the other end of described two socket joint components also welds together with described angle clip respectively perpendicular to described two angle clips respectively, the pin-and-hole of described second component has two, lays respectively at two socket joint member upper.
5. the vertical erection tower crane according to claim 3 or 4 and the off-load fixture of dysprosium lamp cable, it is characterized in that, described socket joint component is square tube or coating steel pipe.
6. the off-load fixture of vertical erection tower crane according to claim 4 and dysprosium lamp cable, is characterized in that, the outer downside of described long angle steel is provided with the geometrical clamp for attached cable.
7. the vertical erection tower crane according to claim 2 or 6 and the off-load fixture of dysprosium lamp cable, is characterized in that, describedly fixedly accompanies many, and evenly arrange.
8. the off-load fixture of vertical erection tower crane according to claim 7 and dysprosium lamp cable, is characterized in that, is provided with the through hole for banded cable in the middle part of described geometrical clamp.
9. the off-load fixture of vertical erection tower crane according to claim 1 and dysprosium lamp cable, is characterized in that, described pin-and-hole is circular, and diameter is 4mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520893740.2U CN205178381U (en) | 2015-11-11 | 2015-11-11 | Erect off -load fixer of tower crane and dysprosium lamp cable perpendicularly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520893740.2U CN205178381U (en) | 2015-11-11 | 2015-11-11 | Erect off -load fixer of tower crane and dysprosium lamp cable perpendicularly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205178381U true CN205178381U (en) | 2016-04-20 |
Family
ID=55742319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520893740.2U Expired - Fee Related CN205178381U (en) | 2015-11-11 | 2015-11-11 | Erect off -load fixer of tower crane and dysprosium lamp cable perpendicularly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205178381U (en) |
-
2015
- 2015-11-11 CN CN201520893740.2U patent/CN205178381U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205123185U (en) | Non -maintaining insulator wire fixation clamp | |
CN102856838B (en) | Tubular bus support insulator changing tool and method | |
CN104242152A (en) | Lifting device for lifting overhead ground wire on straight concrete pole | |
CN105275253A (en) | Equal-diameter rod erecting device and application method thereof | |
CN106499201A (en) | A kind of dismountable safety rope tool-type holding clamp and its using method | |
CN202808179U (en) | Hoisting clamp and hoisting clamp assembly | |
CN205178381U (en) | Erect off -load fixer of tower crane and dysprosium lamp cable perpendicularly | |
CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
CN204299162U (en) | To encorbelment steel I-beam anchor structure | |
CN104098016A (en) | Easy lifting bracket of transformer | |
CN204156436U (en) | A kind of tower crane cable line fixture | |
CN203466505U (en) | Device for vertically pulling cable | |
CN214755189U (en) | Cable laying device suitable for trapezoidal crane span structure | |
CN203582268U (en) | Clamp for unloading front-section column of steel structure on site | |
CN203699652U (en) | Fastening-type steel wire rope sling | |
CN204609430U (en) | Emergent repairing tower tractive hangs connection box | |
CN204096924U (en) | Concrete pumping pipe connector anchor fitting | |
CN209868519U (en) | Driving maintenance auxiliary device | |
CN203514921U (en) | Electricity approaching stay wire replacing tool | |
CN202259718U (en) | Movable-type grounding pile | |
CN203939815U (en) | Be used in the suspension centre fixing device on emergency first-aid repair tower | |
CN203989576U (en) | The high point of portable secured band suspension | |
CN216142439U (en) | Steel construction box girder high altitude construction safety rope fixing device | |
CN216207615U (en) | Lifting test platform for automatic device of distribution live working robot | |
CN205304104U (en) | A anchor clamps for cable laying |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160420 |