CN205062818U - 一种深基坑内支撑梁式换撑结构 - Google Patents
一种深基坑内支撑梁式换撑结构 Download PDFInfo
- Publication number
- CN205062818U CN205062818U CN201520703822.6U CN201520703822U CN205062818U CN 205062818 U CN205062818 U CN 205062818U CN 201520703822 U CN201520703822 U CN 201520703822U CN 205062818 U CN205062818 U CN 205062818U
- Authority
- CN
- China
- Prior art keywords
- supporting beam
- support
- utility
- model
- main muscle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
本实用新型公开了一种深基坑内支撑梁式换撑结构,包括换撑梁、设置在换撑梁上的施工用模板和设置在换撑梁下的脚手架;所述换撑梁设置在地下室侧壁与支护桩之间,所述换撑梁内设置主筋和箍筋,主筋的一端锚固在地下室侧壁上,主筋的另一端锚固在支护桩的钻孔内;所述换撑梁用早强混凝土浇筑。本实用新型的深基坑内支撑梁式换撑结构既保证了地下室施工期间的深基坑一直处于稳定、安全的状态,又极大地节约了工期,避免了窝工带来成本增加。本实用新型的深基坑内支撑梁式换撑结构具有结构简单、整体性好、受压性能强、质量可靠、布置灵活、施工操作简易、成本低等特点,使得其具有很强的实用性以及极大的推广应用价值。
Description
技术领域
本实用新型涉及深基坑换撑结构,尤其涉及一种深基坑内支撑梁式换撑结构。
背景技术
现代建筑地下室层数多,基坑开挖深度大,深基坑内支撑式围护结构使用安全性高,深基坑支护选用此类结构十分普遍。内支撑梁作为临时性、过渡性支撑体系,随着地下结构从下往上做,需要分层拆除内支撑梁,造成支护桩下部处于无支撑状态,基坑监测数据变化速率和变化累计值发生很大变化,为保证内支撑梁拆除后围护结构的稳定,拆除内支撑梁前,必须采取措施将围护结构作用在内支撑梁上的作用力进行转移。通常做法是完成下层地下室侧壁后进行土方回填,并在地下室侧壁外侧设置一道素混凝土换撑带,将内支撑梁拆除后的作用力转移到地下结构。该施工方法施工简单、可靠度高,但要等到下层侧壁拆模,防水层和防水保护层施工完成后,方可进行土方回填和浇筑混凝土换撑带,换撑带混凝土达到80%抗压强度后方可进行内支撑梁的拆除工作。从侧壁模板拆除到混凝土换撑达到80%的抗压强度等多个工序均在地下室施工的关键线路上,不可避免的造成大面积的窝工现象,严重影响工程整体施工进度,而且增加了施工成本。
实用新型内容
为了克服现有技术中存在的缺点和不足,本实用新型提供了一种深基坑内支撑梁式换撑结构。
本实用新型是通过以下技术方案实现的:一种深基坑内支撑梁式换撑结构,包括换撑梁、设置在换撑梁上的施工用模板和设置在换撑梁下的脚手架;所述换撑梁设置在地下室侧壁与支护桩之间,所述换撑梁内设置主筋和箍筋,主筋的一端锚固在地下室侧壁上,主筋的另一端锚固在支护桩的钻孔内;所述换撑梁用早强混凝土浇筑。
进一步地,还包括固定在换撑梁两侧的侧模及底部的底模。
进一步地,所述换撑梁的横截面规格为200X200mm。
进一步地,所述主筋的配筋规格分别是:底筋为2φ14,面筋为2φ14;箍筋为Φ8200。
相对于现有技术,本实用新型的深基坑内支撑梁式换撑结构利用换撑梁将支护桩原本施加在内支撑梁上的应力传递到换撑梁上,使深基坑支护体系在拆除内支撑梁前后均处于稳定状态,避免了支护桩下部处于竖向悬臂状态,深基坑支护监测数据变化速率和变化累计值基本不变。本实用新型的深基坑内支撑梁式换撑结构既保证了地下室施工期间的深基坑一直处于稳定、安全的状态,又极大地节约了工期,避免了窝工带来成本增加。本实用新型的深基坑内支撑梁式换撑结构具有结构简单、整体性好、受压性能强、质量可靠、布置灵活、施工操作简易、成本低等特点,使得其具有很强的实用性以及极大的推广应用价值。
为了更好地理解和实施,下面结合附图详细说明本实用新型。
附图说明
图1是本实用新型的深基坑内支撑梁式换撑结构的剖面示意图。
图2是本实用新型的深基坑内支撑梁式换撑结构的平面布置图。
具体实施方式
请参阅图1和图2。图1是本实用新型的深基坑内支撑梁式换撑结构的剖面示意图。图2是本实用新型的深基坑内支撑梁式换撑结构的平面布置图。本实用新型的深基坑内支撑梁式换撑结构,包括换撑梁2、设置在换撑梁2上的施工用模板和设置在换撑梁2下的脚手架1;换撑梁2设置在地下室侧壁3与支护桩4之间,换撑梁2内设置主筋和箍筋,主筋的一端锚固在地下室侧壁3上,主筋的另一端锚固在支护桩4的钻孔内;换撑梁2用早强混凝土浇筑。
具体地,本实施例还安装了固定在换撑梁2两侧的侧模及底部的底模(图中未示)。换撑梁2的横截面规格为200X200mm。主筋的配筋规格分别是:底筋为2φ14,面筋为2φ14;箍筋为Φ8200。换撑梁2的标高与地下室楼板B标高相同,换撑梁2上的早强混凝土与地下室楼板B的早强混凝土同等级且同时整体浇注、养护和拆模,换撑梁2跨度根据地下室外侧壁3与支护桩4之间距离确定,主筋根据支护4桩的桩距均匀布置。换撑梁2的截面尺寸、配筋、砼强度等参数需经受力计算满足要求后确定。
将本实用新型的深基坑内支撑梁式换撑结构与楼板B同时、同强度施工,在整个地下室C的施工过程中,每拆除一道内支撑梁前,本实用新型的深基坑内支撑梁式换撑结构作为可靠的传力构件,将支护桩原本施加在内支撑梁上的应力传递到换撑梁2上,之后再拆除内支撑梁时,对深基坑的影响很小,深基坑监测数据基本不发生变化,深基坑一直处于稳定、安全的状态,并且本实用新型的深基坑内支撑梁式换撑结构的施工不在地下结构分步工程的关键线路上,无需等地下室侧壁3防水层及其保护层施工完成后并完成土方回填后再进行施工,不影响整个地下室C的施工组织安排,大大节约了工期,在深基坑的使用期限内,使得施工组织方面的安排更加合理。
相对于现有技术,本实用新型的深基坑内支撑梁式换撑结构利用换撑梁将支护桩原本施加在内支撑梁上的应力传递到换撑梁上,使深基坑支护体系在拆除内支撑梁前后均处于稳定状态,避免了支护桩下部处于竖向悬臂状态,深基坑支护监测数据变化速率和变化累计值基本不变。本实用新型的深基坑内支撑梁式换撑结构既保证了地下室施工期间的深基坑一直处于稳定、安全的状态,又极大地节约了工期,避免了窝工带来成本增加。本实用新型的深基坑内支撑梁式换撑结构具有结构简单、整体性好、受压性能强、质量可靠、布置灵活、施工操作简易、成本低等特点,使得其具有很强的实用性以及极大的推广应用价值。
本实用新型并不局限于上述实施方式,如果对本实用新型的各种改动或变形不脱离本实用新型的精神和范围,倘若这些改动和变形属于本实用新型的权利要求和等同技术范围之内,则本实用新型也意图包含这些改动和变形。
Claims (4)
1.一种深基坑内支撑梁式换撑结构,其特征在于:包括换撑梁、设置在换撑梁上的施工用模板和设置在换撑梁下的脚手架;所述换撑梁设置在地下室侧壁与支护桩之间,所述换撑梁内设置主筋和箍筋,主筋的一端锚固在地下室侧壁上,主筋的另一端锚固在支护桩的钻孔内;所述换撑梁用早强混凝土浇筑。
2.根据权利要求1所述的深基坑内支撑梁式换撑结构,其特征在于:还包括固定在换撑梁两侧的侧模及底部的底模。
3.根据权利要求1所述的深基坑内支撑梁式换撑结构,其特征在于:所述换撑梁的横截面规格为200X200mm。
4.根据权利要求1所述的深基坑内支撑梁式换撑结构,其特征在于:所述主筋的配筋规格分别是:底筋为2φ14,面筋为2φ14;箍筋为Φ8200。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520703822.6U CN205062818U (zh) | 2015-09-11 | 2015-09-11 | 一种深基坑内支撑梁式换撑结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520703822.6U CN205062818U (zh) | 2015-09-11 | 2015-09-11 | 一种深基坑内支撑梁式换撑结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205062818U true CN205062818U (zh) | 2016-03-02 |
Family
ID=55389393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520703822.6U Expired - Fee Related CN205062818U (zh) | 2015-09-11 | 2015-09-11 | 一种深基坑内支撑梁式换撑结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205062818U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004937A (zh) * | 2019-03-19 | 2019-07-12 | 上海申元岩土工程有限公司 | 一种基坑工程中立柱与支撑梁、板交接处节点结构 |
CN110080244A (zh) * | 2019-05-05 | 2019-08-02 | 上海建工一建集团有限公司 | 一种超大深基坑换撑回填结构及施工方法 |
CN112593560A (zh) * | 2020-11-23 | 2021-04-02 | 上海建工二建集团有限公司 | 支护桩与地下室外墙之间换撑梁结构及其施工方法 |
-
2015
- 2015-09-11 CN CN201520703822.6U patent/CN205062818U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004937A (zh) * | 2019-03-19 | 2019-07-12 | 上海申元岩土工程有限公司 | 一种基坑工程中立柱与支撑梁、板交接处节点结构 |
CN110004937B (zh) * | 2019-03-19 | 2023-12-29 | 上海申元岩土工程有限公司 | 一种基坑工程中立柱与支撑梁、板交接处节点结构 |
CN110080244A (zh) * | 2019-05-05 | 2019-08-02 | 上海建工一建集团有限公司 | 一种超大深基坑换撑回填结构及施工方法 |
CN112593560A (zh) * | 2020-11-23 | 2021-04-02 | 上海建工二建集团有限公司 | 支护桩与地下室外墙之间换撑梁结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103195450B (zh) | 液压隧道仰拱作业台车及仰拱施工方法 | |
CN205062818U (zh) | 一种深基坑内支撑梁式换撑结构 | |
CN101418571B (zh) | 宽大基坑逆作法施工的中板施工方法 | |
CN203923924U (zh) | 0号段托架预压装置 | |
CN203891087U (zh) | 一种重力式挡土墙加固结构 | |
CN107989620B (zh) | 一种三洞小间距隧道的施工方法 | |
CN102561271A (zh) | 一种高聚物注浆土石坝及其施工方法 | |
CN201901879U (zh) | 一种用于塔吊固定的非标基础 | |
CN105178330A (zh) | 地下结构后浇带换撑方法 | |
CN104196035B (zh) | 管道基坑预变形支护方法 | |
CN103628898B (zh) | 一种用于防止巷道底鼓的连续墙支护方法 | |
CN205502025U (zh) | 一种基坑围护止水桩与型钢围檩之间的连接结构 | |
CN204436407U (zh) | 一种大断面软弱围岩隧道双层初期支护预防地质灾害发生的结构 | |
CN103122642A (zh) | 一种竖向支柱换撑的施工方法 | |
CN101117801A (zh) | 工程改造用叠合桩及其成桩方法 | |
CN201671104U (zh) | 一种组合式塔式起重机基础 | |
CN107964975A (zh) | 钢管复合桩与承台的pbl剪力键连接结构及其施工方法 | |
CN104047273B (zh) | 水电站消能防冲墙及其施工方法 | |
CN204679074U (zh) | 一种新型表面观测墩结构 | |
CN103603360A (zh) | 基坑围护方法 | |
CN204282371U (zh) | 一种用于基坑的预应力支撑 | |
CN203866783U (zh) | 加固土石坝的重力式混凝土水坝 | |
CN208251111U (zh) | 可克服基坑局部松软土质的双排桩支护体系 | |
CN205712076U (zh) | 施工桩体结构 | |
CN206289633U (zh) | 一种基坑柔性支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 510075, Guangdong, Guangzhou Yuexiu District Ring East Road, No. 476, 10-17 layers Patentee after: Guangzhou Pearl River Construction Development Co.,Ltd. Address before: 510075, Guangdong, Guangzhou Yuexiu District Ring East Road, No. 476, 10-17 layers Patentee before: GUANGZHOU RESIDENTIAL CONSTRUCTION DEVELOPMENT Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160302 |
|
CF01 | Termination of patent right due to non-payment of annual fee |