CN204875665U - A power station tailrace barricade that is used for medium thickness sand gravel basis - Google Patents

A power station tailrace barricade that is used for medium thickness sand gravel basis Download PDF

Info

Publication number
CN204875665U
CN204875665U CN201520661493.3U CN201520661493U CN204875665U CN 204875665 U CN204875665 U CN 204875665U CN 201520661493 U CN201520661493 U CN 201520661493U CN 204875665 U CN204875665 U CN 204875665U
Authority
CN
China
Prior art keywords
wall
barricade
pile
castinplace
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520661493.3U
Other languages
Chinese (zh)
Inventor
马少波
王立成
王佩珏
陈艳慧
王晓辉
张淑鹏
李娅
张晓�
赵琳
孙小虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201520661493.3U priority Critical patent/CN204875665U/en
Application granted granted Critical
Publication of CN204875665U publication Critical patent/CN204875665U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a power station tailrace barricade that is used for medium thickness sand gravel basis, include as the polylith reinforced concrete wall of power station tailrace barricade and a plurality of wall body bored concrete piles of being arranged in reinforced concrete wall, be provided with a tensile bored concrete pile between two adjacent wall body bored concrete piles, apart from the certain distance at reinforced concrete wall back, be provided with the contact straining beam between tensile bored concrete pile and adjacent two the wall body bored concrete piles, also be provided with the contact straining beam between two adjacent tensile bored concrete piles. The utility model discloses a fill in the original state topography and form the novel retaining wall structure of power station tailrace and replace the design of original tailrace barricade, the effectual problem of having solved that conventional barricade deep foundation excavates on a large scale, the energy consumption is big, engineering cost is on the high side and having influenced the environment.

Description

Power plant tail water canal barricade on intermediate gauge sand gravel basis
Technical field
The utility model relates to power plant tail water canal barricade, is mainly used in the power plant tail water canal barricade on intermediate gauge sand gravel basis.
Background technology
Traditional power plant tail water canal barricade design is based on gravity, cantilevered and hold up arm-type barricade, above conventional barricade form according to self antiskid, anti-ly to incline and the requirement such as anti-floating, often require that design section is larger, engineering quantity and earthwork evacuation amount corresponding very large, long construction period, and need extensive excavation and backfill in original state landform, destroy natural topography and geomorphology, certain destruction is caused to environment.In addition, when after retaining wall foundation excavation, general form darker foundation ditch, be ensure dry work operation, must carry out drainage of foundation pit simultaneously, and the transmission coefficient of sand gravel is comparatively large, foundation ditch water percolating capacity is comparatively large, and segment length when causing drainage of foundation pit, costly, energy consumption is large.
Utility model content
Technical problem to be solved in the utility model is, there is provided a kind of power plant tail water canal barricade on intermediate gauge sand gravel basis of simple and practical, easy construction, effectively solving extensive excavation affects environment, energy consumption is large and construction costs is higher problem.
In order to solve the problems of the technologies described above, the technical solution adopted in the utility model is: a kind of power plant tail water canal barricade on intermediate gauge sand gravel basis, comprise the polylith reinforced concrete wall as power plant tail water canal barricade and the multiple body of wall castinplace piles being arranged in reinforced concrete wall, between two adjacent body of wall castinplace piles, certain distance apart from reinforced concrete wall back is provided with a tension castinplace pile, be provided with between tension castinplace pile and adjacent two body of wall castinplace piles and contact straining beam, also contact straining beam is provided with between two adjacent tension castinplace piles.
Reinforcing bar is provided with in described body of wall castinplace pile, tension castinplace pile and contact straining beam.
The construction method of the above-mentioned power plant tail water canal barricade on intermediate gauge sand gravel basis, comprises the following steps:
(1) the barricade position of implementing body of wall castinplace pile, reinforced concrete wall, tension castinplace pile and contact straining beam is needed on undisturbed soil earth's surface, pore-creating grooving;
(2) colligation body of wall castinplace pile reinforcing bar together and reinforced concrete wall reinforcing bar are lifted in the slotted eye of formation, concreting; Then lift tension castinplace pile pile body reinforcing bar, build tension cast-in-place pile concrete, the contact of colligation simultaneously straining beam reinforcing bar, builds straining beam concrete;
(3) after treating that concrete strength meets the demands, excavate reinforced concrete wall near water side undisturbed soil expose body of wall to tailwater channel base plate foundation plane, Retaining wall completes.
The beneficial effects of the utility model are: avoid the feature that traditional barricade excavated volume is large and construction costs is high, and the method is more friendly to environment.In practice process, due to castinplace pile and diaphragm wall technology comparative maturity, so construction quality and construction speed ensure to some extent.
Accompanying drawing explanation
Fig. 1 is the power plant tail water canal barricade plane structure arrangement diagram of the utility model on intermediate gauge sand gravel basis.
Fig. 2 is the utility model cross-sectional configuration schematic diagram.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail:
As shown in Figure 1, power plant tail water canal barricade on intermediate gauge sand gravel basis of the present utility model, comprise the polylith reinforced concrete wall 2 as power plant tail water canal barricade and the multiple body of wall castinplace piles 1 being arranged in reinforced concrete wall, a tension castinplace pile 3 is provided with between two adjacent body of wall castinplace piles 1, apart from the certain distance at reinforced concrete wall 2 back, be provided with between tension castinplace pile 3 and adjacent two body of wall castinplace piles 1 and contact straining beam 4, between two adjacent tension castinplace piles 3, be also provided with contact straining beam 4.
Reinforcing bar is provided with in described body of wall castinplace pile 1, tension castinplace pile 3 and contact straining beam 4.
The construction method of the above-mentioned power plant tail water canal barricade on intermediate gauge sand gravel basis, comprises the following steps:
(1) the barricade position of implementing body of wall castinplace pile, reinforced concrete wall, tension castinplace pile and contact straining beam is needed on undisturbed soil earth's surface, pore-creating grooving;
(2) colligation body of wall castinplace pile reinforcing bar together and reinforced concrete wall reinforcing bar are lifted in the slotted eye of formation, concreting; Then lift tension castinplace pile pile body reinforcing bar, build tension cast-in-place pile concrete, the contact of colligation simultaneously straining beam reinforcing bar, builds straining beam concrete;
(3) after treating that concrete strength meets the demands, excavate reinforced concrete wall near water side undisturbed soil expose body of wall to tailwater channel base plate foundation plane, Retaining wall completes.
Specifically, (at the bottom of hole, the degree of depth enters basement rock for the body of wall hole for grout pile that between the utility model excavates on pre-existing topography basis, array pitch is certain and tension hole for grout pile, the overturning or slip resistance analysis that penetration depth meets body of wall calculating requires), and between body of wall castinplace pile 1 stake holes fluting (bottom land elevation enters basement rock >=1m, or can determine to enter 2m under the Bottom Altitude of tailwater channel base plate according to groundwater table, base plate need establish draining), adjacent priming concrete pile hole diaphragm wall is linked together.Every section of wall length should not be greater than 20m, can adopt the form of three pile two face walls or four pile three face walls, then lifts in the slotted eye of formation by colligation body of wall castinplace pile 1 reinforcing bar 5 together and reinforced concrete wall 2 reinforcing bar 6, concreting; Then the tension castinplace pile 3 after wall and contact straining beam 4 is implemented, lifting tension castinplace pile pile body reinforcing bar 8, build tension cast-in-place pile concrete, colligation can contact straining beam reinforcing bar 7 simultaneously, build straining beam concrete, after treating concrete wall, castinplace pile, straining beam completion acceptance, concrete wall side undisturbed soil near water can be excavated, carry out tailwater channel section bottom parts excavation and pouring concrete construction, tailwater channel is shaped substantially.
The above example is only for illustration of technological thought of the present utility model and feature, its object is to those skilled in the art can understand content of the present utility model and implement according to this, only can not limit the scope of the claims of the present utility model with this example, namely the equal change that the spirit that all the utility model disclose is done or modification, still drop in scope of the present utility model.

Claims (2)

1. the power plant tail water canal barricade on intermediate gauge sand gravel basis, it is characterized in that, comprise as power plant tail water canal barricade polylith reinforced concrete wall (2) and be arranged in multiple body of wall castinplace piles (1) of reinforced concrete wall, between two adjacent body of wall castinplace piles (1), certain distance apart from reinforced concrete wall (2) back is provided with a tension castinplace pile (3), be provided with between tension castinplace pile (3) and adjacent two body of wall castinplace piles (1) and contact straining beam (4), also contact straining beam (4) is provided with between two adjacent tension castinplace piles (3).
2. the power plant tail water canal barricade on intermediate gauge sand gravel basis according to claim 1, it is characterized in that, in described body of wall castinplace pile (1), tension castinplace pile (3) and contact straining beam (4), be provided with reinforcing bar.
CN201520661493.3U 2015-08-28 2015-08-28 A power station tailrace barricade that is used for medium thickness sand gravel basis Withdrawn - After Issue CN204875665U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520661493.3U CN204875665U (en) 2015-08-28 2015-08-28 A power station tailrace barricade that is used for medium thickness sand gravel basis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520661493.3U CN204875665U (en) 2015-08-28 2015-08-28 A power station tailrace barricade that is used for medium thickness sand gravel basis

Publications (1)

Publication Number Publication Date
CN204875665U true CN204875665U (en) 2015-12-16

Family

ID=54820057

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520661493.3U Withdrawn - After Issue CN204875665U (en) 2015-08-28 2015-08-28 A power station tailrace barricade that is used for medium thickness sand gravel basis

Country Status (1)

Country Link
CN (1) CN204875665U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040639A (en) * 2015-08-28 2015-11-11 中水北方勘测设计研究有限责任公司 Power station tail water channel retaining wall used on medium-thickness sand gravel foundation and construction method of power station tail water channel retaining wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105040639A (en) * 2015-08-28 2015-11-11 中水北方勘测设计研究有限责任公司 Power station tail water channel retaining wall used on medium-thickness sand gravel foundation and construction method of power station tail water channel retaining wall
CN105040639B (en) * 2015-08-28 2017-03-29 中水北方勘测设计研究有限责任公司 For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel

Similar Documents

Publication Publication Date Title
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN205314116U (en) Continuous type of combined type drilling cling compound structure
CN203768912U (en) Double-row prestressing high-strength concrete rectangular pile foundation pit supporting structure
CN103122636A (en) Superficial layer groove wall reinforcing method of feeble stratum underground continuous wall
CN104846781A (en) Ecological interlocking block and ecological interlocking block type slope protection construction method
CN215669631U (en) Deep overburden foundation structure
CN208219694U (en) A kind of prefabricated barricade
CN203213131U (en) Open caisson combining water drainage sinking and water-drainage-free sinking
CN101285302B (en) Method for reinforcing caisson of concrete dam
CN204875665U (en) A power station tailrace barricade that is used for medium thickness sand gravel basis
CN106555399A (en) A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement and its construction method
CN108411934B (en) Floating tubular pile, dam retaining structure and construction method thereof
CN111042161A (en) Slope collapse high slope flexible processing structure and construction method thereof
CN214656775U (en) Existing stereoplasm shore protection ecological landscape is carried mark and is consolidated transformation structure
CN213233510U (en) Simple combined steel plate cofferdam structure for preventing and treating quicksand
CN212772402U (en) Hierarchical fender structure of huge wriggling accumulation body
CN210887256U (en) Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam
CN105040639B (en) For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel
CN204435321U (en) A kind of steam power station water intaking open channel
CN113863380A (en) Construction method for large-diameter pipe jacking to penetrate through seawall
CN202359565U (en) Steel sheet pile cofferdam structure
CN207714258U (en) Dike structure suitable for muck foundation
CN206448270U (en) A kind of carbonate rock area Pulling-Resistant Anchor Rod slip casting drainage arrangement
CN202124857U (en) Splitting pile
CN101608457B (en) Method for processing wharf foundation by geotextile granular material pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20151216

Effective date of abandoning: 20170329

AV01 Patent right actively abandoned