CN105040639B - For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel - Google Patents

For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel Download PDF

Info

Publication number
CN105040639B
CN105040639B CN201510539805.8A CN201510539805A CN105040639B CN 105040639 B CN105040639 B CN 105040639B CN 201510539805 A CN201510539805 A CN 201510539805A CN 105040639 B CN105040639 B CN 105040639B
Authority
CN
China
Prior art keywords
wall
bored concrete
barricade
tension
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510539805.8A
Other languages
Chinese (zh)
Other versions
CN105040639A (en
Inventor
马少波
王立成
王佩珏
陈艳慧
王晓辉
张淑鹏
李娅
张晓�
赵琳
孙小虎
吴剑疆
石评杨
朱松昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Water Resources Beifang Investigation Design and Research Co Ltd
Original Assignee
China Water Resources Beifang Investigation Design and Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Water Resources Beifang Investigation Design and Research Co Ltd filed Critical China Water Resources Beifang Investigation Design and Research Co Ltd
Priority to CN201510539805.8A priority Critical patent/CN105040639B/en
Publication of CN105040639A publication Critical patent/CN105040639A/en
Application granted granted Critical
Publication of CN105040639B publication Critical patent/CN105040639B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses the power plant tail water canal barricade and its construction method on the basis of a kind of sand gravel for intermediate gauge, multiple body of wall bored concrete piles including the polylith reinforced concrete wall as power plant tail water canal barricade and in reinforced concrete wall, between two adjacent body of wall bored concrete piles, the certain distance away from reinforced concrete wall back be provided with a tension bored concrete pile, straining beam of being related is set between tension bored concrete pile and two adjacent body of wall bored concrete piles, is also equipped with contacting straining beam between two adjacent tension bored concrete piles.The present invention forms power plant tail water canal new type of retaining structure using the perfusion in original state landform and replaces original tailwater channel barricade design, effectively solves the problems, such as that conventional barricade deep foundation is excavated on a large scale, energy consumption is big, construction costs is higher and affects environment.

Description

For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel
Technical field
The present invention relates to power plant tail water canal barricade and its construction method, the electricity being mainly used on the basis of intermediate gauge sand gravel Stand tailwater channel barricade and its construction method.
Background technology
Traditional power plant tail water canal barricade design is with gravity type, cantilevered and helps based on arm-type barricade, above routine barricade Form according to itself antiskid, it is anti-incline and anti-floating etc. is required, often require that design section is larger, quantities and earthwork evacuation amount It is corresponding very big, long construction period, and need to be excavated in original state landform on a large scale and backfilled, destroy natural landform ground Looks, cause certain destruction to environment.Additionally, after retaining wall foundation is excavated, generally forming deeper foundation ditch, it is to ensure dry ground Construction operation, it is necessary to while drainage of foundation pit is carried out, and the infiltration coefficient of sand gravel is larger, foundation ditch water percolating capacity is larger, causes foundation ditch During draining, segment length, costly, energy consumption are big.
The content of the invention
The technical problem to be solved be to provide a kind of simple and practical, easy construction for intermediate gauge sand Power plant tail water canal barricade and its construction method on gravel foundation, effectively solving extensive excavation affects environment, energy consumption big And the problem that construction costs is higher.
In order to solve above-mentioned technical problem, the technical solution used in the present invention is:It is a kind of to be used for intermediate gauge gravel ground mass Power plant tail water canal barricade on plinth, including the polylith reinforced concrete wall as power plant tail water canal barricade and positioned at reinforced concrete Multiple body of wall bored concrete piles in cob wall body, between two adjacent body of wall bored concrete piles, away from the one of reinforced concrete wall back Set a distance is provided with a tension bored concrete pile, and drawing of being related is arranged between tension bored concrete pile and two adjacent body of wall bored concrete piles Beam, is also equipped with contacting straining beam between two adjacent tension bored concrete piles.
Reinforcing bar is provided with the body of wall bored concrete pile, tension bored concrete pile and contact straining beam.
The above-mentioned construction method for the power plant tail water canal barricade on the basis of intermediate gauge sand gravel, including following step Suddenly:
(1) need to implement body of wall bored concrete pile, reinforced concrete wall, tension bored concrete pile and contact drawing in undisturbed soil earth's surface The barricade position of beam, pore-creating grooving;
(2) colligation body of wall bored concrete pile reinforcing bar together and reinforced concrete wall reinforcing bar are lifted into the slotted eye for being formed In, casting concrete;Then tension bored concrete pile pile body reinforcing bar is lifted, tension cast-in-place pile concrete is poured, while colligation contact is drawn Beam steel, pours straining beam concrete;
(3), after treating that concrete strength meets requirement, side undisturbed soil exposes body of wall extremely near water to excavate reinforced concrete wall Tailwater channel base plate foundation plane, Retaining wall are completed.
The invention has the beneficial effects as follows:The characteristics of avoiding big traditional barricade excavated volume and high construction costs, and the method To more environment-friendly.During practice, due to bored concrete pile and continuous wall technology comparative maturity, so construction matter Amount and construction speed have been ensured.
Description of the drawings
Fig. 1 is the present invention for the power plant tail water canal barricade planar structure layout drawing on the basis of intermediate gauge sand gravel.
Fig. 2 is cross-sectional configuration schematic diagram of the present invention.
Specific embodiment
With reference to the accompanying drawings and detailed description the present invention is described in further detail:
As shown in figure 1, the present invention for the power plant tail water canal barricade on the basis of intermediate gauge sand gravel, including as electricity Stand the polylith reinforced concrete wall 2 and the multiple body of wall bored concrete piles 1 in reinforced concrete wall of tailwater channel barricade, two Between individual adjacent body of wall bored concrete pile 1, the certain distance away from 2 back of reinforced concrete wall be provided with a tension bored concrete pile 3, Arrange between tension bored concrete pile 3 and two adjacent body of wall bored concrete piles 1 and be related straining beam 4, two adjacent tension bored concrete piles 3 it Between be also equipped with contact straining beam 4.
Reinforcing bar is provided with the body of wall bored concrete pile 1, tension bored concrete pile 3 and contact straining beam 4.
The above-mentioned construction method for the power plant tail water canal barricade on the basis of intermediate gauge sand gravel, including following step Suddenly:
(1) need to implement body of wall bored concrete pile, reinforced concrete wall, tension bored concrete pile and contact drawing in undisturbed soil earth's surface The barricade position of beam, pore-creating grooving;
(2) colligation body of wall bored concrete pile reinforcing bar together and reinforced concrete wall reinforcing bar are lifted into the slotted eye for being formed In, casting concrete;Then tension bored concrete pile pile body reinforcing bar is lifted, tension cast-in-place pile concrete is poured, while colligation contact is drawn Beam steel, pours straining beam concrete;
(3), after treating that concrete strength meets requirement, side undisturbed soil exposes body of wall extremely near water to excavate reinforced concrete wall Tailwater channel base plate foundation plane, Retaining wall are completed.
Specifically, between the present invention is excavated on the basis of pre-existing topography, the certain body of wall hole for grout pile of array pitch and tension are filled Note stake stake holes (bottom hole depth enters basement rock, meets the antidumping requirement of body of wall calculating into depth), and in body of wall bored concrete pile 1 Slot between hole (bottom land elevation enters basement rock >=1m, or can determine the 2m under the Bottom Altitude of tailwater channel base plate according to level of ground water, Base plate need to set draining), adjacent priming concrete pile hole is linked together with diaphragm wall.Every section of wall length is not preferably greater than 20m, can adopt Then colligation 1 reinforcing bar 5 of body of wall bored concrete pile together and reinforcing bar are mixed by the form of three face wall of three piles, two face wall or four piles 2 reinforcing bar 6 of solidifying cob wall body is lifted in the slotted eye to be formed, casting concrete;It is then carried out the tension bored concrete pile after wall 3 and contact is drawn Beam 4, lifting tension bored concrete pile pile body reinforcing bar 8, pours tension cast-in-place pile concrete, at the same can colligation contact straining beam reinforcing bar 7, pour Straining beam concrete, after treating concrete wall, bored concrete pile, straining beam completion acceptance, can excavate concrete wall side undisturbed soil near water, Carry out tailwater channel section bottom parts to excavate and pouring concrete construction, tailwater channel shapes substantially.
Example described above is merely to illustrate the technological thought and feature of the present invention, its object is to those skilled in the art Member is it will be appreciated that present disclosure implement according to this, it is impossible to limit the scope of the claims of the invention only with this example, i.e., all Equal change or modification that the disclosed spirit of invention is made, still fall within the scope of the present invention.

Claims (3)

1. the power plant tail water canal barricade on the basis of a kind of sand gravel for intermediate gauge, it is characterised in that include as power station tail The polylith reinforced concrete wall (2) of water channel barricade and the multiple body of wall bored concrete piles (1) in reinforced concrete wall, two Between individual adjacent body of wall bored concrete pile (1), the certain distance away from reinforced concrete wall (2) back be provided with the perfusion of tension Stake (3), arranges between tension bored concrete pile (3) and two adjacent body of wall bored concrete piles (1) and is related straining beam (4), and two adjacent It is also equipped with contacting straining beam (4) between tension bored concrete pile (3).
2. the power plant tail water canal barricade on the basis of the sand gravel for intermediate gauge according to claim 1, it is characterised in that Reinforcing bar is provided with the body of wall bored concrete pile (1), tension bored concrete pile (3) and contact straining beam (4).
3. a kind of construction party of the as claimed in claim 1 power plant tail water canal barricade being used on the basis of intermediate gauge sand gravel Method, it is characterised in that comprise the following steps:
(1) need to implement body of wall bored concrete pile, reinforced concrete wall, tension bored concrete pile and contact straining beam in undisturbed soil earth's surface Barricade position, pore-creating grooving;
(2) colligation body of wall bored concrete pile reinforcing bar together and reinforced concrete wall reinforcing bar are lifted in the slotted eye to be formed, Casting concrete;Then tension bored concrete pile pile body reinforcing bar is lifted, tension cast-in-place pile concrete is poured, while colligation contact straining beam steel Muscle, pours straining beam concrete;
(3), after treating that concrete strength meets requirement, side undisturbed soil exposes body of wall to tail water near water to excavate reinforced concrete wall Canal base plate foundation plane, Retaining wall are completed.
CN201510539805.8A 2015-08-28 2015-08-28 For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel Active CN105040639B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510539805.8A CN105040639B (en) 2015-08-28 2015-08-28 For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510539805.8A CN105040639B (en) 2015-08-28 2015-08-28 For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel

Publications (2)

Publication Number Publication Date
CN105040639A CN105040639A (en) 2015-11-11
CN105040639B true CN105040639B (en) 2017-03-29

Family

ID=54447588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510539805.8A Active CN105040639B (en) 2015-08-28 2015-08-28 For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel

Country Status (1)

Country Link
CN (1) CN105040639B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0988080A (en) * 1995-09-22 1997-03-31 Kensetsu Kiso Eng Co Ltd Sheathing structure
JP2001159140A (en) * 1999-12-03 2001-06-12 Sumitomo Metal Ind Ltd Landslide-countermeasure structure
CN1514068A (en) * 2003-05-28 2004-07-21 姜贤放 Dyke-dam structural body and its construction method
CN203583498U (en) * 2013-12-07 2014-05-07 兰州市政建设集团有限责任公司 Micropile combination wall supporting structure
CN204456180U (en) * 2015-02-27 2015-07-08 重庆大学 Folded plate pile retaining wall
CN204875665U (en) * 2015-08-28 2015-12-16 中水北方勘测设计研究有限责任公司 A power station tailrace barricade that is used for medium thickness sand gravel basis

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0988080A (en) * 1995-09-22 1997-03-31 Kensetsu Kiso Eng Co Ltd Sheathing structure
JP2001159140A (en) * 1999-12-03 2001-06-12 Sumitomo Metal Ind Ltd Landslide-countermeasure structure
CN1514068A (en) * 2003-05-28 2004-07-21 姜贤放 Dyke-dam structural body and its construction method
CN203583498U (en) * 2013-12-07 2014-05-07 兰州市政建设集团有限责任公司 Micropile combination wall supporting structure
CN204456180U (en) * 2015-02-27 2015-07-08 重庆大学 Folded plate pile retaining wall
CN204875665U (en) * 2015-08-28 2015-12-16 中水北方勘测设计研究有限责任公司 A power station tailrace barricade that is used for medium thickness sand gravel basis

Also Published As

Publication number Publication date
CN105040639A (en) 2015-11-11

Similar Documents

Publication Publication Date Title
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN1952273B (en) Digging foundation with baffle and its construction method
CN107059774A (en) A kind of assembled high-rise pile cap revetment structure and construction method
CN205314116U (en) Continuous type of combined type drilling cling compound structure
CN103122636A (en) Superficial layer groove wall reinforcing method of feeble stratum underground continuous wall
CN105201001B (en) Composite seepage preventing structure for large karst cave in karst region and construction method thereof
CN104846781A (en) Ecological interlocking block and ecological interlocking block type slope protection construction method
CN206204880U (en) A kind of side slope comprehensive regulation structure of prevention river channel erosion
CN208136652U (en) Shallow-layer solidifies Piled Embankments
CN106869138A (en) A kind of load retaining wall Retaining Structure with Double-row Piles and its foundation ditch excavation method
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN215669631U (en) Deep overburden foundation structure
CN208219694U (en) A kind of prefabricated barricade
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN203213131U (en) Open caisson combining water drainage sinking and water-drainage-free sinking
CN105040639B (en) For power plant tail water canal barricade and its construction method on the basis of intermediate gauge sand gravel
CN204875665U (en) A power station tailrace barricade that is used for medium thickness sand gravel basis
CN204080750U (en) Box-type suction foundation sluice structure
CN202055261U (en) Landslide-proofing retaining wall
CN206189447U (en) Partly strut formula retaining wall
CN214656775U (en) Existing stereoplasm shore protection ecological landscape is carried mark and is consolidated transformation structure
CN206052771U (en) Gravity Retaining Wall structure with culvert
CN207714258U (en) Dike structure suitable for muck foundation
CN102943454B (en) Mountain area cheuch waste dreg backfilling and land reclamation structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ma Shaobo

Inventor after: Sun Xiaohu

Inventor after: Wu Jianjiang

Inventor after: Shi Pingyang

Inventor after: Zhu Songchang

Inventor after: Wang Licheng

Inventor after: Wang Peijue

Inventor after: Chen Yanhui

Inventor after: Wang Xiaohui

Inventor after: Zhang Shupeng

Inventor after: Li Ya

Inventor after: Zhang Xiao

Inventor after: Zhao Lin

Inventor before: Ma Shaobo

Inventor before: Sun Xiaohu

Inventor before: Wang Licheng

Inventor before: Wang Peijue

Inventor before: Chen Yanhui

Inventor before: Wang Xiaohui

Inventor before: Zhang Shupeng

Inventor before: Li Ya

Inventor before: Zhang Xiao

Inventor before: Zhao Lin

COR Change of bibliographic data
GR01 Patent grant