CN204753652U - Can clear up brush wall ware of underground continuous wall seam earth fast - Google Patents
Can clear up brush wall ware of underground continuous wall seam earth fast Download PDFInfo
- Publication number
- CN204753652U CN204753652U CN201520539082.7U CN201520539082U CN204753652U CN 204753652 U CN204753652 U CN 204753652U CN 201520539082 U CN201520539082 U CN 201520539082U CN 204753652 U CN204753652 U CN 204753652U
- Authority
- CN
- China
- Prior art keywords
- wall
- brush
- backplate
- backboard
- seam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a can clear up brush wall ware of underground continuous wall seam earth fast, including bottom plate, backplate, floor and scraper blade, at the both sides of bottom plate vertical backplate and the scraper blade adorned admittedly respectively, the scraper blade height is less than the backplate height, and a plurality of trapezoidal floors are adorned admittedly at even interval on the bottom plate between backplate and scraper blade, at the even interval in the back of backplate installation multiple hook, at grooving machine hydraulic grab's lateral wall and couple to the multiple hook hole of having write poetry or essays upon the emperor's order. The lateral wall at grooving machine hydraulic grab is installed to this brush wall ware, handles the underground continuous wall seam, has improved I -steel seam crossing construction quality, guarantees that the I -steel does not have the mud of adhering to skin and a foreign matter, and this method has that construction process is simple, fast, the expense low, effectual characteristics.
Description
Technical field
The utility model belongs to construction of diaphragm wall field, relates to the removing of diaphragm wall seam crossing earth, especially a kind of brush wall device can clearing up diaphragm wall seam earth fast.
Background technology
The seepage resistance demand of diaphragm wall is higher, because diaphragm wall itself adopts water-tight concrete under water to build, concrete self-waterproof effect is better, but forms due to the groove section of whole space enclosing structure by a width, and the connection therefore between groove section is exactly a weak link of waterproof.Therefore, for reaching the object of waterproofing and leakage-stopping, the measure of underground continuous wall seam process just seems particularly important.Answer the verticality that attentional manipulation wall stitches in construction, and adopt an effective measure avoid wall stitch folder mud.Otherwise after excavation of foundation pit, easily cause seam to leak, for subsequent construction brings inconvenience, have a strong impact on construction quality.
Brush wall is a vital link in construction of diaphragm wall, and the quality of brush wall goes along with sb. to guard him the effect of waterproof by directly having influence on diaphragm wall.
Utility model content
The purpose of this utility model is to overcome the deficiencies in the prior art part, provides a kind of brush wall device can clearing up diaphragm wall seam earth fast, improves i iron seam crossing construction quality, ensures that i iron is without attachment mud skin and foreign matter.
The technical scheme that the utility model technical solution problem adopts is:
A kind of brush wall device can clearing up diaphragm wall seam earth fast, comprise base plate, backboard, floor and scraper plate, backboard and scraper plate is vertically fixedly mounted with respectively in the both sides of base plate, blade height is lower than backboard height, on base plate between backboard and scraper plate, uniform intervals is fixedly mounted with multiple trapezoidal floor, at the back side uniform intervals of backboard, multiple hook is installed, corresponding is shaped with multiple hook hole at the sidewall of groover hydraulic grab with hook.
And be all shaped with a through hole on the top of each floor, multiple through holes of multiple floor are coaxial.
And, at the multiple vertical reinforcing bar of lateral surface uniform intervals welding of scraper plate.
Advantage of the present utility model and good effect are:
1, this brush wall device is arranged on the sidewall of groover hydraulic grab, diaphragm wall seam is processed, improve i iron seam crossing construction quality, ensure that i iron is without attachment mud skin and foreign matter, the method has the advantages that construction technology is simple, speed is fast, expense is low, effective.
2, this brush wall device hangs on the hydraulic grab of groover, significantly reduces machinery idle, and the lifting of groover brush wall and lowering velocity, higher than crawler crane, effectively improve brush wall effect, make procedure connection time shorten.
3, this brush wall device improves the construction quality of wall seam effectively, reduces the differential settlement of follow-up excavation construction wall seam percolating water and diaphragm wall, adds support system resistance to overturning.
Accompanying drawing explanation
Fig. 1 is the front view of embodiment 1 brush wall device;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the front view of embodiment 2 brush wall device;
Fig. 4 is the right view of Fig. 3;
Fig. 5 is using state figure of the present utility model.
Detailed description of the invention
Below in conjunction with accompanying drawing, also by specific embodiment, the utility model is described in further detail, and following examples are descriptive, are not determinate, can not limit protection domain of the present utility model with this.
Embodiment 1:
A kind of brush wall device can clearing up diaphragm wall seam earth fast, comprise base plate 6, backboard 3, floor 4 and scraper plate 5, backboard and scraper plate is vertically fixedly mounted with respectively in the both sides of base plate, blade height is lower than backboard height, on base plate between backboard and scraper plate, uniform intervals is fixedly mounted with multiple trapezoidal floor, is formed and contain bucket between two floors.
In order to make brush wall device can hang on the hydraulic grab 8 of groover, at the back side uniform intervals of backboard, multiple hook 1 being installed, being shaped with multiple hook hole the sidewall of groover hydraulic grab is corresponding with it.
For the ease of installing brush wall device, be all shaped with a through hole 2 on the top of each floor, multiple through holes of multiple floor are coaxial.During installation, in multiple through hole, install a support bar, take off on the hydraulic grab by support bar brush wall device being hung over groover or from hydraulic grab.
The brush wall device of this type is mainly used in cleaning mud skin and softer foreign matter.
Embodiment 2:
As different from Example 1, at the multiple vertical reinforcing bar 7 of lateral surface uniform intervals welding of scraper plate, for clearing up the harder foreign matter of small size.
The using method of this brush wall device is:
The I-shaped steel joint having completed subterranean wall after grooving completes at an adjacent width must there be the mud skin or foreign matter that stick, brush wall device is installed according to joint situation in scene on groover hydraulic grab, repeatedly clean with water in i iron inside (brush wall number of times is no less than 20 times), until brush wall device is without mud, guarantee clear joints, prevent the generation of follow-up excavation construction percolating water phenomenon.
In brush wall process, according to grab bucket deflection and the degree of being obstructed, groover driver can judge that I-shaped steel joint sticks foreign matter situation.The foreign matter that the process of brush wall device goes out by hand fit's groover clear up to groove section outward and use machinery to be transported to deposit Tu Chang.
Scene is sticked foreign matter situation replacing brush wall device according to i iron and is carried out the construction of brush wall, and also need again to change the brush wall device using and clear up mud skin and softer foreign matter after using the process of cleaning harder foreign matter brush wall device, butt joint i iron carries out benefit and brushes, and guarantees seam quality.
Above-described is only preferred embodiment of the present utility model; it should be pointed out that for the person of ordinary skill of the art, under the prerequisite not departing from utility model design; can also make some distortion and improvement, these all belong to protection domain of the present utility model.
Claims (3)
1. can clear up the brush wall device of diaphragm wall seam earth fast for one kind, it is characterized in that: comprise base plate, backboard, floor and scraper plate, backboard and scraper plate is vertically fixedly mounted with respectively in the both sides of base plate, blade height is lower than backboard height, on base plate between backboard and scraper plate, uniform intervals is fixedly mounted with multiple trapezoidal floor, at the back side uniform intervals of backboard, multiple hook is installed, corresponding is shaped with multiple hook hole at the sidewall of groover hydraulic grab with hook.
2. the brush wall device can clearing up diaphragm wall seam earth fast according to claim 1, it is characterized in that: be all shaped with a through hole on the top of each floor, multiple through holes of multiple floor are coaxial.
3. the brush wall device can clearing up diaphragm wall seam earth fast according to claim 1, is characterized in that: at the multiple vertical reinforcing bar of lateral surface uniform intervals welding of scraper plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520539082.7U CN204753652U (en) | 2015-07-23 | 2015-07-23 | Can clear up brush wall ware of underground continuous wall seam earth fast |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520539082.7U CN204753652U (en) | 2015-07-23 | 2015-07-23 | Can clear up brush wall ware of underground continuous wall seam earth fast |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204753652U true CN204753652U (en) | 2015-11-11 |
Family
ID=54468377
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520539082.7U Active CN204753652U (en) | 2015-07-23 | 2015-07-23 | Can clear up brush wall ware of underground continuous wall seam earth fast |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204753652U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080325A (en) * | 2019-05-09 | 2019-08-02 | 中国一冶集团有限公司 | A kind of brush wall device and its application method washing away diaphram wall second phase U-steel attachment soil using grab bucket |
-
2015
- 2015-07-23 CN CN201520539082.7U patent/CN204753652U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110080325A (en) * | 2019-05-09 | 2019-08-02 | 中国一冶集团有限公司 | A kind of brush wall device and its application method washing away diaphram wall second phase U-steel attachment soil using grab bucket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104806272A (en) | Tunnel diversion composite type waterproof and drainage system as well as construction method and use method thereof | |
CN110528501A (en) | A kind of high rich water borders on the sea regional ground continuous wall connector antipriming | |
CN206090598U (en) | Vertical system of oozing of jointly arranging of tailing fill dam level | |
CN204753652U (en) | Can clear up brush wall ware of underground continuous wall seam earth fast | |
CN101858090B (en) | Construction method for soft connection of diaphram wall rigid joints | |
CN104294806B (en) | Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit | |
CN205604020U (en) | Drainage type gardens ceramic tile | |
CN206052744U (en) | A kind of highway bridge construction cofferdam device | |
CN205421328U (en) | Soleplate post -cast strip structure convenient to later stage clearance | |
CN208105179U (en) | A kind of combination unit with drainage steel bar concrete guard wall and reinforced gabion | |
CN208870053U (en) | A kind of deep-well retaining wall steel structure support | |
CN203270646U (en) | Additional shovel blade device for trenching machine | |
CN107012872B (en) | Mud construction method of deep foundation ditch | |
CN214573883U (en) | Scraper suitable for underground continuous wall I-shaped steel joint | |
CN205308904U (en) | Cable pipeline dredging device | |
CN216689537U (en) | Improved shovel plate adaptive to grooving machine | |
CN205501985U (en) | Prevent blockking up side slope groundwater and draw row device | |
CN205530334U (en) | Moderate -low speed magnetic levitation is low to be put existing barricade perturbation of circuit and moves reinforced structure | |
CN102797264B (en) | Construction method for joints of underground continuous walls | |
CN204551494U (en) | Construction equipment is transferred in a kind of steel sheet-pile cofferdam inner support superposition | |
CN208884509U (en) | A kind of diaphram wall H profile steel connector cleaning tool | |
CN210636449U (en) | Prevention of seepage water structure of diaphragm wall seam crossing | |
CN106759526A (en) | Purlin protection preprocess method is enclosed before a kind of Brace in Deep Footing Groove beam demolition blasting | |
CN202969944U (en) | Concrete pouring blanking appliance | |
CN214993857U (en) | I-shaped steel suspension type joint processing device for underground diaphragm wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |