CN104294806B - Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit - Google Patents

Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit Download PDF

Info

Publication number
CN104294806B
CN104294806B CN201410475400.8A CN201410475400A CN104294806B CN 104294806 B CN104294806 B CN 104294806B CN 201410475400 A CN201410475400 A CN 201410475400A CN 104294806 B CN104294806 B CN 104294806B
Authority
CN
China
Prior art keywords
water
hose
stake
excavation
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410475400.8A
Other languages
Chinese (zh)
Other versions
CN104294806A (en
Inventor
王宗勇
武明静
雷军
赵香萍
毋海军
何继川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, Second Engineering Co Ltd of China Railway 12th Bureau Group Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN201410475400.8A priority Critical patent/CN104294806B/en
Publication of CN104294806A publication Critical patent/CN104294806A/en
Application granted granted Critical
Publication of CN104294806B publication Critical patent/CN104294806B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to foundation pit excavation construction, in particular to an excavation, diversion and drainage method for inter-pile water above a water-resisting layer of a deep foundation pit. The method aims at solving the problems that in an existing foundation pit excavation process, inter-pile gushing water above the water-resisting layer is high in treatment cost and large in risk and main construction water leakage hidden danger exists. The method includes the steps that firstly, after the foundation pit is excavated to the water-resisting layer, steel wire meshes are plugged in the positions of the inter-pile gushing water, and inter-pile sandy soil loss is avoided; then, water diversion hoses are inserted into the steel wire meshes, inter-pile gaps are plugged through brick walls and concrete inner walls, and water is drained from the water diversion hoses; eventually, steel wire meshes are hung between piles outside the water diversion hoses, concrete is sprayed, an inter-pile concrete outer wall is formed, and water is diverted to the bottom of the foundation pit through the water diversion hoses and then pumped away from a precipitation well outside the pit. The construction cost is greatly reduced, the construction work efficiency is improved, construction safety is guaranteed, waterproof hidden danger is eliminated, good economic benefits and social benefits are acquired, and it is proved that by practice that due to the adoption of the technical scheme, the method has the advantages of being simple in process, advanced in technology, high in practicality, good in promotion prospect and the like.

Description

A kind of water excavation ejectment method between square pile on deep basal pit water barrier
Technical field
The present invention and excavation, a kind of water excavation ejectment method between square pile on deep basal pit water barrier.
Background technology
China is in subway construction high-tide period, and most deep basal pit all can run into water barrier in excavation, even if using fall Water also cannot water above drainage water barrier, cause foundation ditch cannot continue excavation.Conventional construction method is to be formed in the outer slip casting of foundation ditch Curtain, simultaneously at the outer Dewatering well of curtain and filter well, not only construction cost is big, and there is construction safety risk, returns Main body is waterproof brings difficulty, the method that there is presently no not only economy but also can process the infiltration of foundation ditch water barrier.
Summary of the invention
The present invention is to solve in existing Excavation Process, on water barrier, between square pile, Tunnel gushing treatment cost is high, risk is big And the difficult problem such as main body construction leakage hidden trouble, it is provided that a kind of low cost, process convenient, do not leave the deep of leakage hidden trouble to main body is waterproof Water excavation ejectment method between square pile on foundation ditch water barrier.
The present invention adopts the following technical scheme that realization: on a kind of deep basal pit water barrier, between square pile, water excavates ejectment side Method, comprises the following steps:
Step one, draw on water barrier water between square pile
A, excavation of foundation pit remove, after water barrier, the fluffing of moulding sand flowed out between fender post;B, fill between adjacent fender post with steel wire At retention of excessive fluid;C, inserting in steel wire by hose, hose is in " 7 " type, and the upper traversing section of hose is embedded in steel wire In net;D, outside steel wire, build brick wall by laying bricks or stones, block gap between adjacent fender post, then gunite concrete shape outside each brick wall Concrete inner wall between pile, the upper traversing section of hose stretches out brick wall, and its vertical section is embedded between stake in concrete inner wall, draws The end of water tube hose downwardly extends with excavation of foundation pit, and between the stake above water barrier, water is discharged downwards from hose;
Water between square pile on step 2, pump drainage water barrier
A, between all piles the outer pendant bar-mat reinforcement of concrete inner wall, bar-mat reinforcement is tangent, then with all fender post lateral surface Gunite concrete, forms concrete exterior wall between one whole stake;B, foundation ditch continue excavation on earth, along with hose to downward Stretching, build between stake concrete exterior wall between concrete inner wall and stake in time by laying bricks or stones, hose finally extends in the french drain bottom foundation ditch; C, start and cheat outer dewatering well, make water penetration in french drain to below precipitation waterline at the bottom of foundation ditch so that between the stake above water barrier Water is drained from the bottom of foundation ditch.
First after excavation of foundation pit to water barrier, fill between stake at retention of excessive fluid with steel wire, prevent sand running-down between stake;Then Insert in steel wire with hose, block gap between stake with concrete inner wall between brick wall and stake, make water arrange from hose Go out;Last bar-mat reinforcement of hanging between hose stud, gunite concrete, concrete exterior wall between formation stake, utilize hose handle Water is taken away from the dewatering well in hole after guiding at the bottom of foundation ditch.
Compared with prior art, on deep basal pit water barrier of the present invention, between square pile, water excavation ejectment method has following Advantage:
(1) fill on water barrier between square pile at retention of excessive fluid with steel wire, water is filtered, stops abrasive band and walk, it is ensured that foundation ditch is steady Fixed;
(2) block between stake with concrete inner wall between brick wall and stake after during hose inserts steel wire, make water from drawing Discharging in water tube hose, it is not necessary to slip casting just can continue excavation pit, construction is flexibly;
(3) during linked network, hose is stuck between stake between stake, makes hose that water is guided at the bottom of foundation ditch after spray anchor, from hole Dewatering well is taken away, solves a waterproof difficult problem for main body construction;
In a word, the present invention makes full use of steel wire and filters sand, it is ensured that filter excavation of foundation pit safety;Water is blocked with brick wall Source makes water get rid of from flexible pipe, a difficult problem for grouting for water plugging between square pile on solution water barrier;Hose is sprayed on a chien shih water draw Discharge from the dewatering well in hole after at the bottom of foundation ditch, eliminate main body water leakage hidden danger, greatly reduce construction cost, improve construction work Effect, it is ensured that construction safety, eliminates waterproof hidden danger, achieves good economic benefit and social benefit, in practice it has proved that, this technical side Case has that technique is simple, advanced technology, the advantage such as practical, and promotion prospect is good.
Use this technology to have successfully completed No. 9 lines 7 of Shenyang Metro and mark the row of backwater above interval wind deep basal pit water barrier Go out, filled up China's deep basal pit blank of water ejectment technology every between stake, achieved good economic benefit and social benefit.This Bright it is particularly suited for water barrier deep excavation project.
Accompanying drawing explanation
Fig. 1 is ejectment water-bound flat cutting schematic diagram of the present invention;
Fig. 2 is ejectment water-bound A-A generalized section of the present invention;
In figure: 1-fender post;2-water barrier;Water between 3-stake;4-steel wire;5-hose;6-brick wall;7-bar-mat reinforcement; Concrete inner wall between 8-stake;At the bottom of 9-foundation ditch;10-french drain;11-cheats outer dewatering well;Precipitation waterline at the bottom of 12-foundation ditch;Mix between 13-stake Solidifying soil exterior wall.
Detailed description of the invention
A kind of water excavation ejectment method between square pile on deep basal pit water barrier, as shown in Figure 1, 2, comprises the following steps:
Step one, draw on water barrier water between square pile
A, excavation of foundation pit remove, after water barrier 2, the fluffing of moulding sand flowed out between fender post 1;B, fill in adjacent fender post with steel wire Between at retention of excessive fluid;C, inserting in steel wire 4 by hose 5, hose is in " 7 " type, and the upper traversing section of hose is embedded in In steel wire;D, outside steel wire, build brick wall 6 by laying bricks or stones, block gap between adjacent fender post, then injection is mixed outside each brick wall Solidifying soil forms concrete inner wall 8 between stake, and the upper traversing section of hose stretches out brick wall, and its vertical section is embedded between stake in concrete Within the walls, the end of hose downwardly extends with excavation of foundation pit, and between the stake above water barrier, water is discharged downwards from hose;
Water between square pile on step 2, pump drainage water barrier
A, between all piles the outer pendant bar-mat reinforcement 7 of concrete inner wall, bar-mat reinforcement is tangent, so with all fender post lateral surface Rear gunite concrete, forms concrete exterior wall 13 between one whole stake;B, foundation ditch continuation excavation is at the bottom of foundation ditch 9, along with hose Downwardly extend, build between stake concrete exterior wall between concrete inner wall and stake in time by laying bricks or stones, hose finally extends to bottom foundation ditch French drain 10 in;Outer dewatering well 11 is cheated in C, startup, makes the water penetration in french drain to precipitation waterline less than 12 at the bottom of foundation ditch so that every Between the stake above water layer, water is drained from the bottom of foundation ditch.
Case history
On this deep basal pit water barrier, between square pile, water excavation ejectment method marks interval ventilating shaft foundation ditch for No. 9 lines 7 of Shenyang Metro On water barrier between square pile in water ejectment construction, ventilating shaft excavates deep 30 meters, has 2 meters of thick clay water barriers, on water barrier at 23 meters Under be water-rich sand layer, hole is outer uses dewatering well precipitation, and water level drops to below at the bottom of excavation pit 3 meters, but excavation to water barrier time, In the middle part of two dewatering wells, between fender post, retention of excessive fluid is relatively big, uses steel wire to fill between stake after at retention of excessive fluid and inserts steel wire with hose In.Then water is made to discharge from hose with gap between brick wall and quick grout off stake.Last between hose stud Hang bar-mat reinforcement, gunite concrete, form concrete exterior wall between stake, from cheating precipitation after utilizing hose that water is guided at the bottom of foundation ditch Well is taken away.Both ensured that foundation ditch continued excavation safety, ensured again main body construction waterproof requirement.Prove this advanced technology, methodological science Rationally.
This invention has been generalized to my company, and other have in water barrier excavation of foundation pit, greatly reduce construction cost, improve and execute Work work efficiency, it is ensured that construction safety, eliminates waterproof hidden danger, achieves good economic benefit and social benefit, in practice it has proved that, this skill Art scheme is practical, and promotion prospect is good.

Claims (1)

1. on deep basal pit water barrier, between square pile, water excavates an ejectment method, it is characterized in that comprising the following steps:
Step one, draw on water barrier water (3) between square pile
A, excavation of foundation pit remove the fluffing of moulding sand flowed out between fender post (1) afterwards to water barrier (2);B, fill in adjacent fender post with steel wire Between at retention of excessive fluid;C, being inserted in steel wire (4) by hose (5), hose is in " 7 " type, and the upper traversing section of hose buries It is located in steel wire;D, outside steel wire, build brick wall (6) by laying bricks or stones, block gap between adjacent fender post, then outside each brick wall Gunite concrete forms concrete inner wall (8) between stake, and the upper traversing section of hose stretches out brick wall, and its vertical section is embedded between stake In concrete inner wall, the end of hose downwardly extends with excavation of foundation pit, and between the stake above water barrier, water is from hose Discharge downwards;
Water between square pile on step 2, pump drainage water barrier
A, between all piles the outer pendant bar-mat reinforcement (7) of concrete inner wall, bar-mat reinforcement is tangent, then with all fender post lateral surface Gunite concrete, forms concrete exterior wall (13) between one whole stake;B, foundation ditch continue excavation and arrive at the bottom of foundation ditch (9), along with diversion is soft Downwardly extending of pipe, builds between stake concrete exterior wall between concrete inner wall and stake in time by laying bricks or stones, and hose finally extends at the bottom of foundation ditch In the french drain (10) in portion;C, start and cheat outer dewatering well (11), make water penetration in french drain to precipitation waterline (12) at the bottom of foundation ditch with Under so that between the stake above water barrier, water is drained from the bottom of foundation ditch.
CN201410475400.8A 2014-09-18 2014-09-18 Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit Active CN104294806B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410475400.8A CN104294806B (en) 2014-09-18 2014-09-18 Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410475400.8A CN104294806B (en) 2014-09-18 2014-09-18 Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit

Publications (2)

Publication Number Publication Date
CN104294806A CN104294806A (en) 2015-01-21
CN104294806B true CN104294806B (en) 2017-01-11

Family

ID=52314736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410475400.8A Active CN104294806B (en) 2014-09-18 2014-09-18 Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit

Country Status (1)

Country Link
CN (1) CN104294806B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107178020A (en) * 2017-05-24 2017-09-19 浙江明通建设工程有限公司 A kind of road drainage construction method
CN108222043B (en) * 2018-01-19 2020-05-05 青岛业高建设工程有限公司 Curtain sand gushing treatment method and curtain sand gushing treatment pipe
CN110965567A (en) * 2019-12-06 2020-04-07 广东省重工建筑设计院有限公司 Foundation pit water burst treatment device
CN111764397A (en) * 2020-05-28 2020-10-13 浙江土工岩土科技有限公司 Underground diaphragm wall plugging device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101070704A (en) * 2007-06-04 2007-11-14 上海地矿工程勘察有限公司 Controllable one-well lamina precipitation construction method
CN101363228A (en) * 2008-05-23 2009-02-11 上海广联建设发展有限公司 Tube well for simultaneously dewatering and decompressing and technology thereof
CN201593204U (en) * 2010-02-02 2010-09-29 中国建筑第四工程局有限公司 Water-proof drainage structure of basement external wall water back face
CN102418347A (en) * 2011-09-27 2012-04-18 天津住宅集团建设工程总承包有限公司 Drainage construction method for blind drain and sump wells in deep foundation pit
CN102787607A (en) * 2012-08-28 2012-11-21 大元建业集团股份有限公司 Deep foundation pit precipitation support construction method applicable to coastal region

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3424006B2 (en) * 2000-04-11 2003-07-07 独立行政法人農業技術研究機構 Field groundwater level control method.

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101070704A (en) * 2007-06-04 2007-11-14 上海地矿工程勘察有限公司 Controllable one-well lamina precipitation construction method
CN101363228A (en) * 2008-05-23 2009-02-11 上海广联建设发展有限公司 Tube well for simultaneously dewatering and decompressing and technology thereof
CN201593204U (en) * 2010-02-02 2010-09-29 中国建筑第四工程局有限公司 Water-proof drainage structure of basement external wall water back face
CN102418347A (en) * 2011-09-27 2012-04-18 天津住宅集团建设工程总承包有限公司 Drainage construction method for blind drain and sump wells in deep foundation pit
CN102787607A (en) * 2012-08-28 2012-11-21 大元建业集团股份有限公司 Deep foundation pit precipitation support construction method applicable to coastal region

Also Published As

Publication number Publication date
CN104294806A (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN104196034B (en) A kind of utilize steel sheet pile as the foundation ditch construction method in supporting cofferdam
CN104294806B (en) Excavation, diversion and drainage method for inter-pile water above water-resisting layer of deep foundation pit
WO2008061415A1 (en) A hydraulic sliding insertion panel and its using method
CN107130633A (en) A kind of steel tube concrete clay model bag stake is combined soil-baffling structure construction technology
CN107700511A (en) Open caisson and its construction method under the conditions of a kind of phreatic high
CN202323973U (en) Grouting sleeve valve tube structure for seepage insulation, closure and interception for building foundation
CN108331000A (en) Caisson sinking construction method
CN104612179A (en) Construction method for underground diaphragm wall penetrating through super-thick silt layer
CN108661073A (en) A kind of barrier wall structure and its construction method
CN110778328A (en) Loess tunnel entrance section construction method for passing through landslide body
CN103343690B (en) Construction method of shaft antiseep structure used when large section of inclined shaft passes through aquifer
CN203441498U (en) Anti-seepage structure for large-section water-bearing layer passing shaft of inclined shaft
CN102995647B (en) Underground water control method used for grouting and seepage insulation of pile hole
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN111411639B (en) Shallow foundation pit dewatering construction method for water-rich pebble layer
CN110821512B (en) Loess tunnel entrance opening section pre-reinforcing and excavating construction method passing through landslide body
CN109736337B (en) Precipitation device and method for guaranteeing integrity of cushion layer through sediment flowing treatment of foundation elevator shaft sump
CN210151748U (en) Foundation pit water collection surface drainage dewatering system
CN106801427A (en) Foundation ditch horizontal precipitation device and its application method
CN206220104U (en) A kind of Frozen Soil Cylinder Foundation Supported with Composite Soil Nailing system
CN106592514A (en) Construction method of old city riverway piling wall integrated vertical type retaining wall
CN110185051A (en) Deep narrow excavation water discharge method
CN105350544A (en) Waterproof curtain used for stone-contained area and construction method thereof
CN204326089U (en) A kind of structure for foundation ditch Yield rainfall relation
CN104947636B (en) Stilling pool bottom plate reinforcing composition

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant