CN106759526A - Purlin protection preprocess method is enclosed before a kind of Brace in Deep Footing Groove beam demolition blasting - Google Patents
Purlin protection preprocess method is enclosed before a kind of Brace in Deep Footing Groove beam demolition blasting Download PDFInfo
- Publication number
- CN106759526A CN106759526A CN201611168205.6A CN201611168205A CN106759526A CN 106759526 A CN106759526 A CN 106759526A CN 201611168205 A CN201611168205 A CN 201611168205A CN 106759526 A CN106759526 A CN 106759526A
- Authority
- CN
- China
- Prior art keywords
- pvc pipe
- buried pvc
- trough
- purlin
- buried
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0004—Synthetics
- E02D2300/0018—Cement used as binder
- E02D2300/002—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Purlin protection preprocess method is enclosed before the present invention relates to a kind of Brace in Deep Footing Groove beam demolition blasting.Its technical scheme is:Rectangle trough (3) is provided with purlin (2) upper surface is enclosed, the length B of trough (3) is the horizontal length for enclosing purlin (2) and horizontal shore (1) joint face, and trough (3) is long to be overlapped while with the connection for enclosing purlin (2) and horizontal shore (1).The pre-buried pvc pipe of 2 ~ 4 rows (4) are set in trough (3), array pitch a=200 ~ 250mm, pitch-row b=140 ~ 160mm is often arranged.It is in quincunx that the cloth of the pre-buried pvc pipe (3) buries mode, and pre-buried pvc pipe (4) is perpendicular to trough (3).Before foundation pit reinforced concrete support beam is poured, the pre-buried pvc pipe (4) is fixed in trough (3):The lower end of the pre-buried pvc pipe (4) is located at the template bottom for enclosing purlin (2), and the upper end of pre-buried pvc pipe (4) is higher by the 40 ~ 80mm of upper surface for enclosing purlin (2).The present invention has the characteristics of construction cost is low, security is good, the construction period is short, crushing effect good and economizes on resources.
Description
Technical field
The invention belongs to Brace in Deep Footing Groove beam Blasting Demolition Technology field.More particularly to a kind of Brace in Deep Footing Groove beam explosion is torn open
Except preceding encloses purlin protection preprocess method.
Background technology:
With continuing to develop for Process of Urbanization Construction, various large deep foundation pits also increase therewith, the reinforced concrete in deep basal pit
The dismounting amount of native support beam (abbreviation Brace in Deep Footing Groove beam) gradually increases.Deep basal pit inner support beam demolition blasting method has removes work
Phase is short, fast, the recyclable waste steel bar and the characteristics of economize on resources of slagging tap, it is domestic at present using demolition blasting method to deep basal pit strutbeam
Support is removed, and is most widely used.
Shotfiring safety is the problem of first concern in the construction of demolition blasting method, the part in Brace in Deep Footing Groove beam demolition blasting
Supporting construction is need to be to be protected, i.e., can not produce destruction to it in demolition blasting, and such as subterranean wall is needed in construction in later period
It is continuing with, therefore, have to consider the safety problem of subterranean wall before demolition blasting.In structure, due to enclosing purlin and underground
Wall is connected, and the explosion wave that Brace in Deep Footing Groove beam is produced in explosion will be directly passed to subterranean wall by enclosing purlin, when
When blast impulse intensity of wave is more than subterranean wall shock wave resistance intensity, subterranean wall will occur destruction and damage.
At present, it is to ensure that foundation pit supporting construction and surrounding are built when demolition blasting construction is carried out to Brace in Deep Footing Groove beam
The stability of thing is built, often using the method that explosive payload is reduced in blasting process, this method influences explosion and crushing effect, extension
Duration, improve dismounting cost.
The content of the invention
It is contemplated that overcoming prior art defect.Purpose is that a kind of construction cost of offer is low, security is good, construction work
The preprocess method of purlin is enclosed in the protection of the Brace in Deep Footing Groove beam demolition blasting that the phase is short, crushing effect is good and economizes on resources.
In order to solve the above technical problems, the technical solution adopted by the present invention is comprised the concrete steps that:
Step one, the determination of trough
The deep basal pit horizontal shore (1) to be torn open provided according to deep basal pit inner support beam design drawing and the structure for enclosing purlin (2)
And its size, it is provided with trough (3) purlin (2) upper surface is enclosed.
The trough (3) is rectangle, and the length B of trough (3) is to enclose purlin (2) with horizontal shore (1) joint face
Horizontal length, one of trough (3) long to overlap while with the connection for enclosing purlin (2) and horizontal shore (1), trough (3)
Width is A '
A '=0.3~0.5A (1)
In formula (1):A represents the width for enclosing purlin (2), mm.
The setting of step 2, pre-buried pvc pipe (4)
In the trough (3), pre-buried pvc pipe (4) is set;Pre-buried pvc pipe (4) is 2~4 rows, the pre-buried PVC of the row of outside two
The distance for closing on side long respective with trough is 80~100mm to pipe (4) respectively.The array pitch a=200 for often arranging~250mm, pitch-row
B=140~160mm.It is in quincunx that the cloth of the pre-buried pvc pipe (3) buries mode, and pre-buried pvc pipe (4) is perpendicular to trough (3).
The fixation of step 3, pre-buried pvc pipe (4)
Before foundation pit reinforced concrete support beam is poured, first as described in step 2 pre-buried pvc pipe (4) setting, will be described
Pre-buried pvc pipe (4) is fixed in the trough (3):The lower end of the pre-buried pvc pipe (4) is located at the template bottom for enclosing purlin (2)
Portion, the upper end of pre-buried pvc pipe (4) is higher by the upper surface for enclosing purlin (2);Block the upper port of pre-buried pvc pipe (4).
Step 4, casting concrete and the pre-buried pvc pipe (4) of cleaning
During casting concrete, artificial vibrated concrete will avoid pre-buried pvc pipe (4);In demolition blasting deep basal pit level branch
Before support beam (1), tamper in the pipe of pre-buried pvc pipe (4) is cleared up.
The specification of the pre-buried pvc pipe (4) is D40;The length of pre-buried pvc pipe (4) is L
L=h+ △ L (2)
In formula (2):H represents the height for enclosing purlin (2) cross section, mm;
△ L represent that pre-buried pvc pipe (4) is higher by the height for enclosing purlin (2), mm;
△ L=40~80mm.
There is following good effect compared with prior art due to using above-mentioned technical proposal, the present invention:
The present invention horizontal shore (1) and enclose purlin (2) junction enclose at purlin (2) upper surface set trough (3),
Before reinforced concrete brace is poured, mode is buried using quincunx cloth pre-buried pvc pipe (4) is arranged in the trough (3),
To form air curtain.The preparation method of pre-buried pvc pipe (4) is simple, and the construction period is short, easy construction, can not only effectively utilize
Explosive energy, reduces explosive specific charge, and can ensure that in explosion and crushing effect and protection foundation ditch and enclose purlin structure and diaphram wall
Stability, improves the security of surrounding enviroment.
In Brace in Deep Footing Groove girder construction, it is connected with deep basal pit horizontal shore (1) and subterranean wall due to enclosing purlin (2),
The explosion wave that deep basal pit horizontal shore (1) is produced in demolition blasting will be directly passed to underground by enclosing purlin (2)
Wall, when blast impulse intensity of wave is more than subterranean wall shock wave resistance intensity, subterranean wall will occur destruction and damage.And the air
The formation of curtain, can be such that the explosion wave produced during deep basal pit horizontal shore (1) explosion occurs at the air curtain
Reflection, so that the energy that blast is produced is fully used, deep basal pit horizontal shore (1) explosion and crushing effect is better
It is good;The air curtain effectively blocks the transmission of explosion wave, reduces explosion wave and connects to enclosing purlin (2) and underground
The harm of continuous wall, crushing effect is good and economizes on resources.
Therefore, the present invention has that construction cost is low, security is good, the construction period is short, crushing effect good and economizes on resources
Feature.The present invention is applicable not only to the demolition blasting of reinforced concrete brace in foundation ditch, is also widely used for frame structure building
The blasting and dismantling engineerings such as room, factory building.
Brief description of the drawings
Fig. 1 is one kind application schematic perspective view of the invention;
Fig. 2 is the top plan view of Fig. 1;
Fig. 3 is the C-C schematic cross-sectional views of Fig. 2.
Specific embodiment
With reference to specific embodiment, the invention will be further described, not to the limitation of its protection domain.
Embodiment 1
Purlin protection preprocess method is enclosed before a kind of Brace in Deep Footing Groove beam demolition blasting.In the present embodiment, deep basal pit level
Support beam (1) has heel brace and truss to support, and deep basal pit horizontal shore (1) and the joint face length for enclosing purlin (2) are 2200mm;Enclose purlin
(2) cross sectional dimensions is:Height h=1000mm, width A=1200mm.
The technical scheme that the present embodiment is used is comprised the concrete steps that:
Step one, the determination of trough
The deep basal pit horizontal shore (1) to be torn open provided according to deep basal pit inner support beam design drawing and the structure for enclosing purlin (2)
And its size, as depicted in figs. 1 and 2, trough (3) is provided with purlin (2) upper surface is enclosed.
As depicted in figs. 1 and 2, the trough (3) is rectangle, and the length B of trough (3) is to enclose purlin (2) and level branch
Support the horizontal length of beam (1) joint face, i.e. the length B=2200mm of trough (3);One side long of trough (3) with enclose purlin
(2) overlapped with the connection side of horizontal shore (1), the width of trough (3) is A '
A '=0.3~0.4A (1)
In formula (1):A represents the width for enclosing purlin (2), mm.
By:A=1200mm;
Then:A '=360~480mm.
The setting of step 2, pre-buried pvc pipe (4)
As depicted in figs. 1 and 2, pre-buried pvc pipe (4) is set in the trough (3);Pre-buried pvc pipe (4) is 2 rows, described
The distance for closing on side long respective with trough is 90~100mm to the pre-buried pvc pipe of two rows (4) respectively.The array pitch a=200 for often arranging
~230mm, pitch-row b=140~150mm.The cloth of the pre-buried pvc pipe (3) buries mode in quincunx, as shown in figure 3, pre-buried
Pvc pipe (4) is perpendicular to trough (3).
The fixation of step 3, pre-buried pvc pipe (4)
Before foundation pit reinforced concrete support beam is poured, the first setting of the pre-buried pvc pipe (4) as described in step 2, by institute
Pre-buried pvc pipe (4) is stated to be fixed in the trough (3):The lower end of the pre-buried pvc pipe (4) is located at the template bottom for enclosing purlin (2)
Portion, the upper end of pre-buried pvc pipe (4) is higher by the upper surface for enclosing purlin (2);Block the upper port of pre-buried pvc pipe (4).
Step 4, casting concrete and the pre-buried pvc pipe (4) of cleaning
During casting concrete, artificial vibrated concrete will avoid pre-buried pvc pipe (4);In demolition blasting deep basal pit level branch
Before support beam (1), tamper in the pipe of pre-buried pvc pipe (4) is cleared up.
The specification of the pre-buried pvc pipe (4) is D40;The length of pre-buried pvc pipe (4) is L
L=h+ △ L (2)
In formula (2):H represents the height for enclosing purlin (2) cross section, mm;
△ L represent that pre-buried pvc pipe (4) is higher by the height for enclosing purlin (2), mm;
In the present embodiment:△ L=40~60mm.
By:H=1000, △ L=40~60mm;
Then:L=1040~1060mm.
Embodiment 2
Purlin protection preprocess method is enclosed before a kind of Brace in Deep Footing Groove beam demolition blasting.The present embodiment removes following technical parameters
Outward, remaining is with embodiment 1:
In the present embodiment, deep basal pit horizontal shore (1) has heel brace and truss to support, and deep basal pit horizontal shore (1) and encloses
The joint face length of purlin (2) is 2500mm;Enclosing the cross sectional dimensions of purlin (2) is:Height h=1400mm, width A=1400mm.
The length B=2200mm of trough described in the present embodiment (3), the width of trough (3) is A '
A '=0.4~0.5A (1)
By:A=1400mm;
Then:A '=560~700mm.
Pre-buried pvc pipe (4) described in the present embodiment is 3~4 rows, and the pre-buried pvc pipe of the row of outside two (4) is respectively with trough each
The distance for closing on side long be 80~90mm.Array pitch a=220~the 250mm for often arranging, pitch-row b=150~160mm.
The specification of pre-buried pvc pipe (4) described in the present embodiment is D40;The length of pre-buried pvc pipe (4) is L
L=h+ △ L (2)
In formula (2):H is represented and is enclosed purlin (2) cross-sectional height, h=1400mm;
△ L represent that the upper end of pre-buried pvc pipe (4) is higher by the height for enclosing purlin (2) upper surface, mm;
In the present embodiment:△ L=60~80mm.
By:H=1400mm, △ L=60~80mm;
Then:L=2000~2200mm.
This specific embodiment has following good effect compared with prior art:
This specific embodiment is in horizontal shore (1) and encloses enclosing for purlin (2) junction and set at purlin (2) upper surface reserved
Area (3), before reinforced concrete brace is poured, buries mode and pre-buried pvc pipe (4) is arranged in into described reserving using quincunx cloth
In area (3), to form air curtain.The preparation method of pre-buried pvc pipe (4) is simple, and the construction period is short, easy construction, can not only
Effectively utilize explosive energy, reduce explosive specific charge, and can ensure that in explosion and crushing effect and protection foundation ditch and enclose purlin structure and underground
The stability of diaphragm wall, improves the security of surrounding enviroment.
In Brace in Deep Footing Groove girder construction, it is connected with deep basal pit horizontal shore (1) and subterranean wall due to enclosing purlin (2),
The explosion wave that deep basal pit horizontal shore (1) is produced in demolition blasting will be directly passed to underground by enclosing purlin (2)
Wall, when blast impulse intensity of wave is more than subterranean wall shock wave resistance intensity, subterranean wall will occur destruction and damage.And the air
The formation of curtain, can be such that the explosion wave produced during deep basal pit horizontal shore (1) explosion occurs at the air curtain
Reflection, so that the energy that blast is produced is fully used, deep basal pit horizontal shore (1) explosion and crushing effect is better
It is good;The air curtain effectively blocks the transmission of explosion wave, reduces explosion wave and connects to enclosing purlin (2) and underground
The harm of continuous wall, crushing effect is good and economizes on resources.
Therefore, this specific embodiment has that construction cost is low, security is good, the construction period is short, crushing effect good and section
About resource the characteristics of.This specific embodiment is applicable not only to the demolition blasting of reinforced concrete brace in foundation ditch, also extensive
It is applied to the blasting and dismantling engineerings such as frame construction building, factory building.
Claims (2)
1. purlin protection preprocess method is enclosed before a kind of Brace in Deep Footing Groove beam demolition blasting, it is characterised in that described to enclose purlin protection in advance
The step of processing method is:
Step one, the determination of trough
According to deep basal pit inner support beam design drawing provide deep basal pit horizontal shore (1) to be torn open and enclose purlin (2) structure and its
Size, trough (3) is provided with purlin (2) upper surface is enclosed;
The trough (3) is rectangle, and the length B of trough (3) is the level for enclosing purlin (2) and horizontal shore (1) joint face
Length, one of trough (3) long to overlap while with the connection for enclosing purlin (2) and horizontal shore (1), the width of trough (3)
It is A '
A '=0.3~0.5A (1)
In formula (1):A represents the width for enclosing purlin (2), mm;
The setting of step 2, pre-buried pvc pipe (4)
Pre-buried pvc pipe (4) is set in the trough (3), pre-buried pvc pipe (4) is 2~4 rows, the pre-buried pvc pipe of the row of outside two (4)
The distance for closing on side long respective with trough is 80~100mm respectively;Array pitch a=200~the 250mm for often arranging, pitch-row b=
140~160mm;It is in quincunx that the cloth of the pre-buried pvc pipe (3) buries mode, and pre-buried pvc pipe (4) is perpendicular to trough (3);
The fixation of step 3, pre-buried pvc pipe (4)
Before foundation pit reinforced concrete support beam is poured, first as described in step 2 pre-buried pvc pipe (4) setting, will be described pre-buried
Pvc pipe (4) is fixed in the trough (3):The lower end of the pre-buried pvc pipe (4) is located at the template bottom for enclosing purlin (2), in advance
The upper end for burying pvc pipe (4) is higher by the upper surface for enclosing purlin (2), blocks the upper port of pre-buried pvc pipe (4);
Step 4, casting concrete and the pre-buried pvc pipe (4) of cleaning
During casting concrete, artificial vibrated concrete will avoid pre-buried pvc pipe (4);In demolition blasting deep basal pit horizontal shore
(1) before, tamper in the pipe of pre-buried pvc pipe (4) is cleared up.
2. purlin protection preprocess method is enclosed before Brace in Deep Footing Groove beam demolition blasting according to claim 1, its feature exists
In the pre-buried pvc pipe (4) specification be D40;The length of pre-buried pvc pipe (4) is L
L=h+ △ L (2)
In formula (2):H represents the height for enclosing purlin (2) cross section, mm,
△ L represent that pre-buried pvc pipe (4) is higher by the height for enclosing purlin (2), mm,
△ L=40~80mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611168205.6A CN106759526B (en) | 2016-12-16 | 2016-12-16 | A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201611168205.6A CN106759526B (en) | 2016-12-16 | 2016-12-16 | A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106759526A true CN106759526A (en) | 2017-05-31 |
CN106759526B CN106759526B (en) | 2018-10-26 |
Family
ID=58892220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201611168205.6A Expired - Fee Related CN106759526B (en) | 2016-12-16 | 2016-12-16 | A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106759526B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295987A (en) * | 2018-10-12 | 2019-02-01 | 华汇工程设计集团股份有限公司 | A kind of internal support of foundation pit beam that can quickly remove |
CN110067581A (en) * | 2019-05-13 | 2019-07-30 | 湖北工业大学 | The arrangement and construction method of trouble or opening armored concrete branch sheath embedded hole are opened in tunnel or tunnel |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1193559A (en) * | 1997-09-17 | 1999-04-06 | Donsuu Shimu | Bedrock cutting method utilizing tensile breakage |
CN105155553A (en) * | 2015-09-09 | 2015-12-16 | 杭州江润科技有限公司 | Green dismantling construction method combining concrete support static crush and splitting method |
CN105823386A (en) * | 2016-06-03 | 2016-08-03 | 武汉科技大学 | Method for blasting demolition of reinforced concrete supporting beam in foundation pit |
CN105973082A (en) * | 2016-06-03 | 2016-09-28 | 武汉科技大学 | Hole distribution method for blasting demolition of reinforced concrete support beam in foundation pit |
CN106049503A (en) * | 2016-06-06 | 2016-10-26 | 武汉科技大学 | Pretreatment method for blasting demolition of reinforced concrete supporting beam in foundation pit |
-
2016
- 2016-12-16 CN CN201611168205.6A patent/CN106759526B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1193559A (en) * | 1997-09-17 | 1999-04-06 | Donsuu Shimu | Bedrock cutting method utilizing tensile breakage |
CN105155553A (en) * | 2015-09-09 | 2015-12-16 | 杭州江润科技有限公司 | Green dismantling construction method combining concrete support static crush and splitting method |
CN105823386A (en) * | 2016-06-03 | 2016-08-03 | 武汉科技大学 | Method for blasting demolition of reinforced concrete supporting beam in foundation pit |
CN105973082A (en) * | 2016-06-03 | 2016-09-28 | 武汉科技大学 | Hole distribution method for blasting demolition of reinforced concrete support beam in foundation pit |
CN106049503A (en) * | 2016-06-06 | 2016-10-26 | 武汉科技大学 | Pretreatment method for blasting demolition of reinforced concrete supporting beam in foundation pit |
Non-Patent Citations (1)
Title |
---|
马怀章等: "深基坑钢筋混凝土水平支撑爆破拆除施工技术", 《建筑施工》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109295987A (en) * | 2018-10-12 | 2019-02-01 | 华汇工程设计集团股份有限公司 | A kind of internal support of foundation pit beam that can quickly remove |
CN110067581A (en) * | 2019-05-13 | 2019-07-30 | 湖北工业大学 | The arrangement and construction method of trouble or opening armored concrete branch sheath embedded hole are opened in tunnel or tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN106759526B (en) | 2018-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203320532U (en) | Protection device of nearby pile foundation close to deep foundation pit | |
CN103882869A (en) | Inclined supporting pile structure for foundation pit support and construction method thereof | |
CN103114595A (en) | Support method and device of support pile preformed core-soil double-buttress inclined inner-strut foundation ditch | |
CN106351343A (en) | Basement outer wall waterproof protection structure capable of realizing synchronous crossing construction and construction method thereof | |
CN204825923U (en) | Relay formula underground structure | |
CN111456032A (en) | Foundation pit supporting system and construction method thereof | |
CN106759526A (en) | Purlin protection preprocess method is enclosed before a kind of Brace in Deep Footing Groove beam demolition blasting | |
CN113073656B (en) | Soil protection structure between support piles and construction method thereof | |
CN104131576A (en) | Waterproof curtain impervious structure and construction method thereof | |
CN212641468U (en) | Pit-in-pit rapid construction structure | |
CN205742290U (en) | A kind of bottom plate rear pouring tape force transferring structure | |
CN102425228A (en) | Multifunctional environment-friendly movable water tank | |
CN104131570A (en) | Steel box enclosure device for foundation pit construction and construction method thereof | |
CN208870053U (en) | A kind of deep-well retaining wall steel structure support | |
CN103866787B (en) | A kind of spacious reverse masonry method concrete cut that digs builds construction technology | |
CN206205166U (en) | It is a kind of can synchronous crossed construction outer wall of basement waterproofing protection structure | |
CN202247924U (en) | Assembled steel structure open caisson in pipe jacking construction | |
CN205502070U (en) | A dual -purpose underground gallery structure | |
CN209323527U (en) | A kind of frame-type double-row pile foundation pit enclosure structure | |
CN208633118U (en) | A kind of supporting construction that Subway Tunnel service channel pump house excavates | |
CN103774620B (en) | The vertical water-stopping structure fixture in a kind of concrete work shrinkage joint | |
CN208718674U (en) | A kind of tunnel Oil pipeline of largest doline or karst funnel | |
CN206801597U (en) | A kind of flood mine chamber waterproof construction | |
CN107304566B (en) | A kind of detachable soil nailing wall board structure | |
CN205530284U (en) | Can dismantle soil nail shingle nail structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181026 Termination date: 20201216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |