CN106759526B CN201611168205.6A CN201611168205A CN106759526B CN 106759526 B CN106759526 B CN 106759526B CN 201611168205 A CN201611168205 A CN 201611168205A CN 106759526 B CN106759526 B CN 106759526B
Authority
CN
China
Prior art keywords
pvc pipe
purlin
buried pvc
trough
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201611168205.6A
Other languages
Chinese (zh)
Other versions
CN106759526A (en
Inventor
钟冬望
涂圣武
李琳娜
何理
司剑峰
陈晨
黄雄
卢哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201611168205.6A priority Critical patent/CN106759526B/en
Publication of CN106759526A publication Critical patent/CN106759526A/en
Application granted granted Critical
Publication of CN106759526B publication Critical patent/CN106759526B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Abstract

The present invention relates to the purlins before a kind of Brace in Deep Footing Groove beam demolition blasting to protect preprocess method.Its technical solution is:It is equipped with rectangle trough (3) in purlin (2) upper surface, the length B of trough (3) is the horizontal length of purlin (2) and horizontal shore (1) joint face, and the long side of trough (3) one is overlapped with the connection side of purlin (2) and horizontal shore (1).In trough (3) the setting pre-buried pvc pipe of 2~4 rows (4), array pitch a=200~250mm, pitch-row b=140~160mm are often arranged.It is in quincunx that the cloth of the pre-buried pvc pipe (4), which buries mode, and pre-buried pvc pipe (4) is perpendicular to trough (3).Before foundation pit reinforced concrete supporting beam pours, the pre-buried pvc pipe (4) is fixed in trough (3):The lower end of the pre-buried pvc pipe (4) is located at the template bottom of purlin (2), and the upper end of pre-buried pvc pipe (4) is higher by 40~80mm of upper surface of purlin (2).The present invention has the characteristics that construction cost is low, safety is good, the construction period is short, crushing effect is good and economizes on resources.

Description

A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method
Technical field
The invention belongs to Brace in Deep Footing Groove beam Blasting Demolition Technology fields.More particularly to a kind of Brace in Deep Footing Groove beam explosion is torn open Purlin before removing protects preprocess method.
Background technology:
With the continuous development of Process of Urbanization Construction, various large deep foundation pits also increase therewith, the reinforced concrete in deep basal pit The dismounting amount of native supporting beam (abbreviation Brace in Deep Footing Groove beam) gradually increases.Deep basal pit inner support beam demolition blasting method, which has, removes work Phase is short, fast, the recyclable waste steel bar and the characteristics of economize on resources of slagging tap, it is domestic at present using demolition blasting method to Brace in Deep Footing Groove Beam is removed, and is most widely used.
The problem of shotfiring safety is first concern in the construction of demolition blasting method, the part in Brace in Deep Footing Groove beam demolition blasting Supporting construction is need to be to be protected, i.e., cannot generate destruction to it in demolition blasting, as subterranean wall needs in construction in later period It is continuing with, therefore, the safety problem for considering subterranean wall is had to before demolition blasting.In structure, due to purlin and underground Wall is connected, and the explosion wave that Brace in Deep Footing Groove beam is generated in explosion will be directly passed to subterranean wall by purlin, when When blast impulse intensity of wave is more than subterranean wall shock wave resistance intensity, subterranean wall will occur to destroy damage.
Currently, when carrying out demolition blasting construction to Brace in Deep Footing Groove beam, to ensure that foundation pit supporting construction and surrounding are built The stability of object is built, often uses the method for reducing explosive payload in blasting process, this method to influence explosion and crushing effect, extends Duration, improve dismounting cost.
Invention content
The present invention is directed to overcome prior art defect.Be designed to provide a kind of construction cost is low, safety is good, construction work The preprocess method of the protection purlin for the Brace in Deep Footing Groove beam demolition blasting that phase is short, crushing effect is good and economizes on resources.
In order to solve the above technical problems, the technical solution adopted by the present invention comprises the concrete steps that:
Step 1: the determination of trough
According to the structure and its ruler of deep basal pit horizontal shore to be torn open and purlin that deep basal pit inner support beam design drawing provides It is very little, it is equipped with trough in purlin upper surface.
The trough is rectangle, and the length B of trough is the horizontal length of purlin and horizontal shore joint face, is reserved One long side in area is overlapped with the connection side of purlin and horizontal shore, and the width of trough is A '
'=0.3 A~0.5A (1)
In formula (1):A indicates the width of purlin, mm.
Step 2: the setting of pre-buried pvc pipe
In the trough, pre-buried pvc pipe is set;Pre-buried pvc pipe is 2~4 rows, the two rows of pre-buried pvc pipes in outside respectively in advance It is 80~100mm to stay the respective distance for closing on long side in area.Array pitch a=200~the 250mm often arranged, pitch-row b=140~ 160mm.It is in quincunx that the cloth of the pre-buried pvc pipe, which buries mode, and pre-buried pvc pipe is perpendicular to trough.
Step 3: the fixation of pre-buried pvc pipe
Before foundation pit reinforced concrete supporting beam pours, the setting of pre-buried pvc pipe described in step 2 is first pressed, it will be described pre-buried Pvc pipe is fixed in the trough:The lower end of the pre-buried pvc pipe is located at the template bottom of purlin, the upper end of pre-buried pvc pipe It is higher by the upper surface of purlin;Block the upper port of pre-buried pvc pipe.
Step 4: casting concrete and the pre-buried pvc pipe of cleaning
When casting concrete, artificial vibrated concrete will avoid pre-buried pvc pipe;In demolition blasting deep basal pit horizontal shore Before, clear up tamper in the pipe of pre-buried pvc pipe.
The specification of the pre-buried pvc pipe is D40;The length of pre-buried pvc pipe is L
L=h+ Δs L (2)
In formula (2):H indicates the height of purlin cross section, mm;
Δ L indicates that pre-buried pvc pipe is higher by the height of purlin, mm;
Δ L=40~80mm.
Due to the adoption of the above technical scheme, the present invention has following good effect compared with prior art:
Trough is arranged in the present invention at the purlin upper surface of horizontal shore and purlin junction, in armored concrete branch Before support beam pours, mode is buried using quincunx cloth, pre-buried pvc pipe is arranged in the trough, to form air curtain.In advance The production method for burying pvc pipe is simple, and the construction period is short, easy for construction, can not only efficiently use explosive energy, reduces explosive list Consumption, and can ensure that purlin structure and the stability of diaphram wall in explosion and crushing effect and protection foundation pit, improve peripheral ring The safety in border.
In Brace in Deep Footing Groove girder construction, since purlin is connected with deep basal pit horizontal shore and subterranean wall, deep basal pit The explosion wave that horizontal shore is generated in demolition blasting will be directly passed to subterranean wall by purlin, work as blast impulse When intensity of wave is more than subterranean wall shock wave resistance intensity, subterranean wall will occur to destroy damage.And the formation of the air curtain, meeting The explosion wave generated when deep basal pit horizontal shore explosion is set to be reflected at the air curtain, to make explosion produce Raw energy is fully used, and deep basal pit horizontal shore explosion and crushing effect is better;The air curtain is effectively The transmission for blocking explosion wave, reduces harm of the explosion wave to purlin and diaphram wall, crushing effect it is good and It economizes on resources.
Therefore, the present invention has that construction cost is low, safety is good, the construction period is short, crushing effect is good and economizes on resources Feature.The present invention is applicable not only to the demolition blasting of reinforced concrete brace in foundation pit, is also widely used for frame structure building The blasting and dismantling engineerings such as room, workshop.
Description of the drawings
Fig. 1 is that a kind of of the present invention applies stereoscopic schematic diagram;
Fig. 2 is the top plan view of Fig. 1;
Fig. 3 is the C-C schematic cross-sectional views of Fig. 2.
Specific implementation mode
The invention will be further described With reference to embodiment, not to the limitation of its protection domain.
Embodiment 1
A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method.In the present embodiment, deep basal pit is horizontal Supporting beam 1 has heel brace and truss to support, and the joint face length of deep basal pit horizontal shore 1 and purlin 2 is 2200mm;The cross of purlin 2 Sectional dimension is:Height h=1000mm, width A=1200mm.
The technical solution that the present embodiment uses comprises the concrete steps that:
Step 1: the determination of trough
According to deep basal pit inner support beam design drawing provide deep basal pit horizontal shore 1 to be torn open and purlin 2 structure and its Size is equipped with trough 3 in 2 upper surface of purlin as depicted in figs. 1 and 2.
As depicted in figs. 1 and 2, the trough 3 is rectangle, and the length B of trough 3 is that purlin 2 connects with horizontal shore 1 The horizontal length of junction, i.e. the length B=2200mm of trough 3;One long side of trough 3 and purlin 2 and horizontal shore 1 Connection side overlap, the width of trough 3 is A '
'=0.3 A~0.4A (1)
In formula (1):A indicates the width of purlin 2, mm.
By:A=1200mm;
Then:'=360 A~480mm.
Step 2: the setting of pre-buried pvc pipe 4
As depicted in figs. 1 and 2, pre-buried pvc pipe 4 is set in the trough 3;Pre-buried pvc pipe 4 is 2 rows, described two rows of pre- It is respectively 90~100mm with respective close at a distance from long side in trough to bury pvc pipe 4.Array pitch a=200~the 230mm often arranged, Pitch-row b=140~150mm.The cloth of the pre-buried pvc pipe 4 buries mode in quincunx, as shown in figure 3, pre-buried pvc pipe 4 perpendicular to Trough 3.
Step 3: the fixation of pre-buried pvc pipe 4
Before foundation pit reinforced concrete supporting beam pours, the setting of the pre-buried pvc pipe 4 described in step 2 is first pressed, it will be described Pre-buried pvc pipe 4 is fixed in the trough 3:The lower end of the pre-buried pvc pipe 4 is located at the template bottom of purlin 2, pre-buried PVC The upper end of pipe 4 is higher by the upper surface of purlin 2;Block the upper port of pre-buried pvc pipe 4.
Step 4: casting concrete and clearing up pre-buried pvc pipe 4
When casting concrete, artificial vibrated concrete will avoid pre-buried pvc pipe 4;It is horizontally-supported in demolition blasting deep basal pit Before beam 1, tamper in the pipe of pre-buried pvc pipe 4 is cleared up.
The specification of the pre-buried pvc pipe 4 is D40;The length of pre-buried pvc pipe 4 is L
L=h+ Δs L (2)
In formula (2):H indicates the height of 2 cross section of purlin, mm;
Δ L indicates that pre-buried pvc pipe 4 is higher by the height of purlin 2, mm;
In the present embodiment:Δ L=40~60mm.
By:H=1000, Δ L=40~60mm;
Then:L=1040~1060mm.
Embodiment 2
A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method.The present embodiment removes following technical parameters Outside, remaining is the same as embodiment 1:
In the present embodiment, deep basal pit horizontal shore 1 has heel brace and truss support, deep basal pit horizontal shore 1 and purlin 2 Joint face length is 2500mm;The cross sectional dimensions of purlin 2 is:Height h=1400mm, width A=1400mm.
The width of the length B=2200mm of trough 3 described in the present embodiment, trough 3 are A '
'=0.4 A~0.5A (1)
By:A=1400mm;
Then:'=560 A~700mm.
Pre-buried pvc pipe 4 described in the present embodiment is 3~4 rows, the two rows of pre-buried pvc pipe in outside 4 respectively with trough is respective faces The distance of nearly long side is 80~90mm.Array pitch a=220~the 250mm often arranged, pitch-row b=150~160mm.
The specification of pre-buried pvc pipe 4 described in the present embodiment is D40;The length of pre-buried pvc pipe 4 is L
L=h+ Δs L (2)
In formula (2):H indicates 2 cross-sectional height of purlin, h=1400mm;
Δ L indicates that the upper end of pre-buried pvc pipe 4 is higher by the height of 2 upper surface of purlin, mm;
In the present embodiment:Δ L=60~80mm.
By:H=1400mm, Δ L=60~80mm;
Then:L=2000~2200mm.
Present embodiment has following good effect compared with prior art:
Trough 3 is arranged in present embodiment at 2 upper surface of purlin of 2 junction of horizontal shore 1 and purlin, Before reinforced concrete brace pours, mode is buried using quincunx cloth, pre-buried pvc pipe 4 is arranged in the trough 3, with shape At air curtain.The production method of pre-buried pvc pipe 4 is simple, and the construction period is short, easy for construction, can not only efficiently use explosive energy Amount reduces explosive specific charge, and can ensure that purlin structure and the stability of diaphram wall in explosion and crushing effect and protection foundation pit, Improve the safety of surrounding enviroment.
In Brace in Deep Footing Groove girder construction, since purlin 2 is connected with deep basal pit horizontal shore 1 and subterranean wall, deep base The explosion wave that hole horizontal shore 1 is generated in demolition blasting will be directly passed to subterranean wall by purlin 2, work as explosion When shock strength is more than subterranean wall shock wave resistance intensity, subterranean wall will occur to destroy damage.And the shape of the air curtain At the explosion wave generated when deep basal pit 1 explosion of horizontal shore being made to be reflected at the air curtain, to make The energy that explosion generates is fully used, and 1 explosion and crushing effect of deep basal pit horizontal shore is better;The air curtain The transmission for effectively blocking explosion wave reduces harm of the explosion wave to purlin 2 and diaphram wall, is crushed effect Fruit is good and economizes on resources.
Therefore, present embodiment is with construction cost is low, safety is good, the construction period is short, crushing effect is good and section About resource the characteristics of.Present embodiment is applicable not only to the demolition blasting of reinforced concrete brace in foundation pit, also extensive Applied to blasting and dismantling engineerings such as frame construction building, workshops.

Claims (2)

1. the purlin before a kind of Brace in Deep Footing Groove beam demolition blasting protects preprocess method, it is characterised in that the purlin protection is pre- The step of processing method is:
Step 1: the determination of trough
According to deep basal pit inner support beam design drawing provide deep basal pit horizontal shore (1) to be torn open and purlin (2) structure and its Size is equipped with trough (3) in purlin (2) upper surface;
The trough (3) is rectangle, and the length B of trough (3) is the level of purlin (2) and horizontal shore (1) joint face One long side of length, trough (3) is overlapped with the connection side of purlin (2) and horizontal shore (1), the width of trough (3) For A '
'=0.3 A~0.5A (1)
In formula (1):A indicates the width of purlin (2), mm;
Step 2: the setting of pre-buried pvc pipe (4)
Pre-buried pvc pipe (4) is set in the trough (3), pre-buried pvc pipe (4) is 2~4 rows, the two rows of pre-buried pvc pipes (4) in outside Respective close at a distance from long side is 80~100mm with trough respectively;Array pitch a=200~the 250mm often arranged, pitch-row b= 140~160mm;It is in quincunx that the cloth of the pre-buried pvc pipe (4), which buries mode, and pre-buried pvc pipe (4) is perpendicular to trough (3);
Step 3: the fixation of pre-buried pvc pipe (4)
Before foundation pit reinforced concrete supporting beam pours, the setting of pre-buried pvc pipe (4) described in step 2 is first pressed, it will be described pre-buried Pvc pipe (4) is fixed in the trough (3):The lower end of the pre-buried pvc pipe (4) is located at the template bottom of purlin (2), in advance The upper end for burying pvc pipe (4) is higher by the upper surface of purlin (2), blocks the upper port of pre-buried pvc pipe (4);
Step 4: casting concrete and the pre-buried pvc pipe (4) of cleaning
When casting concrete, artificial vibrated concrete will avoid pre-buried pvc pipe (4);In demolition blasting deep basal pit horizontal shore (1) before, tamper in the pipe of pre-buried pvc pipe (4) is cleared up.
2. the purlin before Brace in Deep Footing Groove beam demolition blasting according to claim 1 protects preprocess method, feature to exist In the pre-buried pvc pipe (4) specification be D40;The length of pre-buried pvc pipe (4) is L
L=h+ Δs L (2)
In formula (2):The height of h expressions purlin (2) cross section, mm,
Δ L indicates that pre-buried pvc pipe (4) is higher by the height of purlin (2), mm,
Δ L=40~80mm.
CN201611168205.6A 2016-12-16 2016-12-16 A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method Expired - Fee Related CN106759526B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611168205.6A CN106759526B (en) 2016-12-16 2016-12-16 A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611168205.6A CN106759526B (en) 2016-12-16 2016-12-16 A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method

Publications (2)

Publication Number Publication Date
CN106759526A CN106759526A (en) 2017-05-31
CN106759526B true CN106759526B (en) 2018-10-26

Family

ID=58892220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611168205.6A Expired - Fee Related CN106759526B (en) 2016-12-16 2016-12-16 A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method

Country Status (1)

Country Link
CN (1) CN106759526B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109295987A (en) * 2018-10-12 2019-02-01 华汇工程设计集团股份有限公司 A kind of internal support of foundation pit beam that can quickly remove
CN110067581B (en) * 2019-05-13 2020-10-02 湖北工业大学 Arrangement mode and construction method of reinforced concrete support layer pre-buried holes at turnout or opening of tunnel or roadway

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3062133B2 (en) * 1997-09-17 2000-07-10 ドンスー シム Rock cutting method using tensile fracture
CN105155553B (en) * 2015-09-09 2017-07-28 杭州江润科技有限公司 Concrete support Static crushing combines green Demolition Construction method with split the law
CN105823386B (en) * 2016-06-03 2017-06-09 武汉科技大学 The blasting demolishing method of reinforced concrete brace in a kind of foundation ditch
CN105973082B (en) * 2016-06-03 2017-10-03 武汉科技大学 The bore distribution method of reinforced concrete brace demolition blasting in a kind of foundation ditch
CN106049503B (en) * 2016-06-06 2017-11-10 武汉科技大学 The preprocess method of reinforced concrete brace demolition blasting in a kind of foundation ditch

Also Published As

Publication number Publication date
CN106759526A (en) 2017-05-31

Similar Documents

Publication Publication Date Title
CN204266220U (en) A kind of plugging device of precipitation well in foundation pit
CN106759526B (en) A kind of purlin before Brace in Deep Footing Groove beam demolition blasting protects preprocess method
CN106351343A (en) Basement outer wall waterproof protection structure capable of realizing synchronous crossing construction and construction method thereof
CN111456032A (en) Foundation pit supporting system and construction method thereof
CN105973082B (en) The bore distribution method of reinforced concrete brace demolition blasting in a kind of foundation ditch
CN106320529A (en) Recyclable latticed column and floor slab connecting system and construction method
CN102425228A (en) Multifunctional environment-friendly movable water tank
CN205654378U (en) Novel visual operation highway tunnel side wall foot of a wall drainage system
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN202401561U (en) Multifunctional environment-friendly movable water channel
CN209323526U (en) A kind of truss-like double-row pile foundation pit enclosure structure
CN204676533U (en) A kind of soil-nail wall support system based on the recyclable technique of assembling
CN103953358A (en) Clearing construction method for underground obstacle
CN106223351A (en) Self priming pump reduces local groundwater level construction method
CN202247924U (en) Assembled steel structure open caisson in pipe jacking construction
CN205975592U (en) Subway goes out to wear a waterline support structure under lambda line shield method
CN205421303U (en) High water level silt ground water treatment facilities falls
CN204021215U (en) A kind of job platform that is applicable to the excessive big vast tower of Tailings Dam
CN103088952B (en) Method and panel point structure preventing high-cross falling objects from damaging low-cross steel roof
CN103774620B (en) The vertical water-stopping structure fixture in a kind of concrete work shrinkage joint
CN206801597U (en) A kind of flood mine chamber waterproof construction
CN207484499U (en) A kind of Novel free clears up sump glass shell
CN202181554U (en) Underground water treatment device for local deepened areas in foundational building construction
CN102121252A (en) Method for constructing pile plate retaining wall
CN107304566B (en) A kind of detachable soil nailing wall board structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181026

Termination date: 20201216