CN204753287U - Six motor vehicle lane crossroad on system of turning right individual layer bridge - Google Patents

Six motor vehicle lane crossroad on system of turning right individual layer bridge Download PDF

Info

Publication number
CN204753287U
CN204753287U CN201520047180.9U CN201520047180U CN204753287U CN 204753287 U CN204753287 U CN 204753287U CN 201520047180 U CN201520047180 U CN 201520047180U CN 204753287 U CN204753287 U CN 204753287U
Authority
CN
China
Prior art keywords
road
section
track
motor vehicle
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520047180.9U
Other languages
Chinese (zh)
Inventor
崔永奇
孙丽萍
王玉艳
王立国
鞠传明
张�浩
马来苹
李潇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Jiaotong University
Original Assignee
Dalian Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Jiaotong University filed Critical Dalian Jiaotong University
Priority to CN201520047180.9U priority Critical patent/CN204753287U/en
Application granted granted Critical
Publication of CN204753287U publication Critical patent/CN204753287U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The utility model provides a six motor vehicle lane crossroad on system of turning right individual layer bridge, includes pavement, non -motor way, car lane and road bridge, road bridge is including turn right bridge and be located all the people present's motor vehicle on the highway section of crossroad four corners of the world bridge later that turns left of the current central bridge in the north and south that is located crossroad center department, all the people present's motor vehicle of being located four angles departments of crossroad. The beneficial effects are that: the individual layer bridge construction, highly little, no underground structure turning left to dissolve for turning right, does not need traffic lights, does not need the underpass, separates motor vehicle and non -motor, pedestrian each other currently, does not have any common factor, can pass safely, improves the vehicle and passes through efficiency, reduces traffic congestion and traffic accident.

Description

A kind of crossroad, single layer bridge six motor vehicle track processed of turning right
Technical field
The utility model belongs to highway field, particularly relates to intersection form.
Background technology
In prior art, crossroad or have traffic lights, or have overpass bridge, otherwise there is subterranean tunnel below at the parting of the ways.
Traffic lights and traffic lights.Be widely used in cross-road, bend, bridge etc. have the Dangerous Area of potential safety hazard, conductor driver or pedestrian traffic, strengthen control of traffic and road, improve road occupation efficiency, promote to have a good transport and communication network, improve traffic, avoid traffic accident and contingency generation.
Overpass bridge: the upper lower leaf that important traffic joint is set up in city, multi-direction traveling, mutual modernization landbridge of not interfering with or disturb each other.
The deficiencies in the prior art are:
(1) traffic lights technology, peak period on and off duty increasing due to vehicle, can cause traffic congestion.
(2) overpass bridge technology, takes up room comparatively large, is not suitable for being used in building and the large city of density of personnel.
(3) subterranean tunnel technology, because of factors such as the underground pipeline in city and underground commercial centers, makes the engineering quantity of subterranean tunnel strengthen, thus cost increases.
(4) traffic accident incidence is more.
Summary of the invention
The purpose of this utility model is a kind of crossroad, single layer bridge six motor vehicle track processed of turning right of design, is passed through in crossroad unimpeded.
For achieving the above object, the technical scheme that the utility model is taked is: a kind of single layer bridge six processed crossroad, motor vehicle track of turning right, comprises pavement, bicycle lane, car lane and road and bridge, pavement comprises South Road section People's Bank of China right track, section People's Bank of China left lateral road, South Road, North Road section People's Bank of China right track, section People's Bank of China left lateral road, North Road, East Road section People's Bank of China right track, section People's Bank of China left lateral road, East Road, West Road section People's Bank of China right track and section People's Bank of China left lateral road, West Road, bicycle lane comprises South Road section bicycle right track, section bicycle left lateral road, South Road, North Road section bicycle right track, section bicycle left lateral road, North Road, East Road section bicycle right track, section bicycle left lateral road, East Road, West Road section bicycle right track and section bicycle left lateral road, West Road, car lane comprises section motor vehicle right track Article 1 track, South Road, section motor vehicle right track Article 2 track, South Road and section motor vehicle right track Article 3 track, South Road, Article 1 track, section motor vehicle left lateral road, South Road, Article 2 track, section motor vehicle left lateral road, South Road and Article 3 track, section motor vehicle left lateral road, South Road, section motor vehicle right track Article 1 track, North Road, section motor vehicle right track Article 2 track, North Road, section motor vehicle right track Article 3 track, North Road, Article 1 track, section motor vehicle left lateral road, North Road, Article 2 track, section motor vehicle left lateral road, North Road, Article 3 track, section motor vehicle left lateral road, North Road, section motor vehicle right track Article 1 track, East Road, section motor vehicle right track Article 2 track, East Road, section motor vehicle right track Article 3 track, East Road, Article 1 track, section motor vehicle left lateral road, East Road, Article 2 track, section motor vehicle left lateral road, East Road, Article 3 track, section motor vehicle left lateral road, East Road, section motor vehicle right track Article 1 track, West Road, section motor vehicle right track Article 2 track, West Road, section motor vehicle right track Article 3 track, West Road, Article 1 track, section motor vehicle left lateral road, West Road, Article 2 track, section motor vehicle left lateral road, West Road and Article 3 track, section motor vehicle left lateral road, West Road, is characterized in that: described road and bridge comprise 9, is respectively to be positioned at the current center bridge in the north and south of center, crossroad, the all the people present's motor vehicle right turn bridge that is positioned at Si Ge angle, crossroad place and the later bridge of all the people present's motor vehicle left-hand rotation being positioned on section, the four corners of the world, crossroad, center bridge is established bridge pier with pavement and bicycle lane junction on the car lane of thing road, bridge pier on car lane is located at respectively section motor vehicle right track Article 1 track, East Road and is connected section and section motor vehicle right track Article 1 track, West Road with Article 1 track, section motor vehicle left lateral road, East Road and is connected on section with Article 1 track, section motor vehicle left lateral road, West Road, pavement is located at respectively East Road section People's Bank of China right track with bicycle lane junction bridge pier and is connected with section People's Bank of China left lateral road, West Road on section and the left lateral Dao Yu of East Road section People's Bank of China West Road section People's Bank of China right track connection section, the two ends of center bridge are connected with bicycle lane and the car lane in section, north and south, the motor vehicle bridge opening of thing car lane is crossed in the middle of forming under center bridge, cross over motor vehicle bridge opening, center bridge South Africa and the motor vehicle bridge opening, center bridge north African of bicycle lane, cross over center bridge Beiren row bridge opening and the center bridge south People's Bank of China bridge opening on pavement, center bridge is established four bridge car lanes, a bridge bicycle Zuo Dao and the right road of bridge bicycle are established respectively in bridge car lane both sidesA Zuo Dao of Tiao Qiao People's Bank of China and the You Dao of bridge People's Bank of China are established respectively in bridge bicycle lane both sides, article four, bridge car lane two ends are connected with the car lane on North-South Road respectively, bridge bicycle Zuo Dao is connected with the bicycle lane on North-South Road respectively with the right road of bridge bicycle, the two ends in the right road of the Zuo Dao of bridge People's Bank of China and bridge People's Bank of China are respectively by the southwestern People's Bank of China zebra drawing lines being arranged on road surface, northwest People's Bank of China zebra drawing lines, southeast People's Bank of China zebra drawing lines, northeast People's Bank of China zebra stripes road, bicycle and People's Bank of China's Xi-Nan right-hand rotation road, bicycle and People's Bank of China north-Xi right-hand rotation road, bicycle is connected with the pavement on North-South Road with the people owner of a trading company or a workshop-northern right-hand rotation road with bicycle with People's Bank of China's Nan-Dong right-hand rotation road, all the people present's motor vehicle right turn bridge is respectively Xi-Nan right turn bridge, north-Xi right turn bridge, Nan-Dong right turn bridge and east-Bei Youzhuanxiangqiao, all the people present's right turn bridge all by the straight access bridge being located on section, the four corners of the world be connected Xi-Nan, north-Xi, the arc overpass bridge in Nan-Dong Hedong-north forms, two sections of straight access bridges of described Xi-Nan right turn bridge are located at respectively on section motor vehicle right track Article 1 track, West Road and Article 1 track, section motor vehicle left lateral road, South Road, circular arc overpass bridge is crossed over West Road section bicycle right track, West Road section People's Bank of China right track, two sections of straight access bridges are communicated with by southwest People's Bank of China's zebra drawing lines and section bicycle left lateral road, South Road, section right lateral thing bicycle bridge opening, West Road and West Road section right lateral thing People's Bank of China bridge opening is formed above West Road section bicycle right track and West Road section People's Bank of China right track, bicycle bridge opening, section left lateral north and south, South Road and section left lateral north and south, South Road People's Bank of China bridge opening is formed above section bicycle left lateral road, South Road and southwestern People's Bank of China zebra drawing lines, West Road section bicycle right track and West Road section People's Bank of China right track are communicated with section People's Bank of China left lateral road, section bicycle left lateral Dao He South Road, South Road respectively by ground detour, form bicycle and People's Bank of China's Xi-Nan right-hand rotation road, two sections of straight access bridges of north-Xi right turn bridge are located at respectively on section motor vehicle right track Article 1 track, North Road and Article 1 track, section motor vehicle left lateral road, West Road, circular arc overpass bridge is crossed over North Road section bicycle right track, northwest People's Bank of China zebra drawing lines, two sections of straight access bridges are communicated with by section bicycle left lateral road, the left lateral Dao He of West Road section People's Bank of China West Road, bicycle bridge opening, section right lateral north and south, North Road and section right lateral north and south, North Road People's Bank of China bridge opening is formed above North Road section bicycle right track and northwest People's Bank of China zebra drawing lines, section left lateral thing People's Bank of China bridge opening, West Road and section left lateral thing bicycle bridge opening, West Road is formed above section bicycle left lateral road, the left lateral Dao He of West Road section People's Bank of China West Road, North Road section bicycle right track and North Road section People's Bank of China right track are communicated with section People's Bank of China left lateral road, section bicycle left lateral Dao He West Road, West Road respectively by ground detour, form bicycle and People's Bank of China north-Xi right-hand rotation road, two sections of straight access bridges of Nan-Dong right turn bridge are located at respectively on section motor vehicle right track Article 1 track, South Road and Article 1 track, section motor vehicle left lateral road, East Road, circular arc overpass bridge is crossed over South Road section bicycle right track, southeast People's Bank of China zebra drawing lines, section bicycle left lateral road, the left lateral Dao He of East Road section People's Bank of China East Road by two sections of straight access bridges connections, bicycle bridge opening, section right lateral north and south, South Road and section right lateral north and south, South Road People's Bank of China bridge opening is formed above South Road section bicycle right track and southeast People's Bank of China zebra drawing linesSection left lateral thing People's Bank of China bridge opening, East Road and section left lateral thing bicycle bridge opening, East Road is formed above section bicycle left lateral road, the left lateral Dao He of East Road section People's Bank of China East Road, South Road section bicycle right track and South Road section People's Bank of China right track are communicated with section People's Bank of China left lateral road, section bicycle left lateral Dao He East Road, East Road respectively by ground detour, form bicycle and People's Bank of China's Nan-Dong right-hand rotation road, two sections of straight access bridges of east-Bei Youzhuanxiangqiao are located at respectively on section motor vehicle right track Article 1 track, East Road and Article 1 track, section motor vehicle left lateral road, North Road, circular arc overpass bridge is crossed over East Road section bicycle right track, East Road section People's Bank of China right track, two sections of straight access bridges are communicated with by section bicycle left lateral road, the zebra stripes Dao He of northeast People's Bank of China East Road, section right lateral thing bicycle bridge opening, East Road and East Road section right lateral thing People's Bank of China bridge opening is formed above East Road section bicycle right track and East Road section People's Bank of China right track, People's Bank of China zebra drawing lines and formation People's Bank of China bridge opening, section left lateral north and south, North Road, top, section bicycle left lateral road, North Road and bicycle bridge opening, section left lateral north and south, North Road northeastward, East Road section bicycle right track and East Road section People's Bank of China right track are communicated with section People's Bank of China left lateral road, section bicycle left lateral Dao He North Road, North Road respectively by ground detour, form bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road, all the people present's motor vehicle left-hand rotation later bridge is respectively later bridge of West Road section motor vehicle left-hand rotation, later bridge of North Road section motor vehicle left-hand rotation, later bridge of later Qiao He South Road section motor vehicle left-hand rotation of East Road section motor vehicle left-hand rotation, every base motor-car left-hand rotation later bridge is overlooked in H-shaped, the perpendicular two ends of length and short perpendicular one end of H-shaped are straight access bridges, one is probably connected to long perpendicular middle part and short perpendicular high-end overpass bridge, the section motor vehicle left-hand rotation of described West Road is perpendicular being located on section motor vehicle right track Article 1 track, West Road of length of bridge later, short perpendicular being located on Article 2 track, section motor vehicle left lateral road, West Road, one across motor vehicle right track Article 2 track, section, Yuexi, section motor vehicle right track Article 3 track, West Road and Article 3 track, section motor vehicle left lateral road, West Road, in section motor vehicle right track Article 2 track, West Road, section motor vehicle right track Article 3 track, West Road and Article 3 track, section motor vehicle left lateral road, West Road form later bridge bridge opening of section motor vehicle left-hand rotation, West Road, North Road section motor vehicle left-hand rotation is perpendicular being located on section motor vehicle right track Article 1 track, North Road of length of bridge later, short perpendicular being located on Article 2 track, section motor vehicle left lateral road, North Road, one across getting over section motor vehicle right track Article 2 track, North Road, section motor vehicle right track Article 3 track, North Road and Article 3 track, section motor vehicle left lateral road, North Road, forms later bridge bridge opening of section motor vehicle left-hand rotation, North Road above section motor vehicle right track Article 2 track, North Road, section motor vehicle right track Article 3 track, North Road and Article 3 track, section motor vehicle left lateral road, North Road, East Road section motor vehicle left-hand rotation is perpendicular being located on section motor vehicle right track Article 1 track, East Road of length of bridge later, short perpendicular being located on Article 2 track, section motor vehicle left lateral road, East Road, one across getting over section motor vehicle right track Article 2 track, East Road, section motor vehicle right track Article 3 track, East Road and Article 3 track, section motor vehicle left lateral road, East Road, forms later bridge bridge opening of section motor vehicle left-hand rotation, East Road above section motor vehicle right track Article 2 track, East Road, section motor vehicle right track Article 3 track, East Road and Article 3 track, section motor vehicle left lateral road, East Road,South Road section motor vehicle left-hand rotation is perpendicular being located on section motor vehicle right track Article 1 track, South Road of length of bridge later, short perpendicular being located on Article 2 track, section motor vehicle left lateral road, South Road, one across motor vehicle right track Article 2 track, Vietnam section, section motor vehicle right track Article 3 track, South Road and Article 3 track, section motor vehicle left lateral road, South Road, forms later bridge bridge opening of section motor vehicle left-hand rotation, South Road above section motor vehicle right track Article 2 track, South Road, section motor vehicle right track Article 3 track, South Road and Article 3 track, section motor vehicle left lateral road, South Road.
One right-hand rotation crossroad, single layer bridge six motor vehicle track processed described in the utility model, it is characterized in that: described motor vehicle bridge height of holes is 6 meters, the height in the bicycle bridge opening of described all the people present's motor vehicle right turn bridge is 4 meters, and the described all the people present's motor vehicle motor vehicle of later bridge later bridge bridge opening height that turns left that turns left is 6 meters.
One right-hand rotation crossroad, single layer bridge six motor vehicle track processed described in the utility model, is characterized in that: crossroad, described right-hand rotation single layer bridge six motor vehicle track processed is: do not establish bicycle track, but establish sidewalk
Six crossroads, motor vehicle track, or establish bicycle track, but do not establish the crossroad in the six motor vehicle tracks on sidewalk, or bicycle track and sidewalk are not all established, and only establish the crossroad in six motor vehicle tracks.
The utility model builds 9 bridges in the crossroad in existing 6 motor vehicle tracks, and realizing the motor vehicle when not needing traffic lights can unimpededly travel, and bicycle and pedestrian and motor vehicle do not occur simultaneously.
The beneficial effects of the utility model are:
1, motor vehicle and bicycle, pedestrian are spaced from each other current, make motor vehicle and bicycle, pedestrian without any common factor, ensure the safety of bicycle and pedestrian, improve vehicle by efficiency, reduce congested in traffic and traffic accident.
2, single layer bridge structure, the overall height of bridge is little, without underground structure, left-hand bend being dissolved as turning right, not needing traffic lights, not desirably lower channel, do not need two-layer and above overpass bridge, existing line carries out build the unblocked traveling that can realize motor vehicle.
3, reduce the traffic accident of crossroad, guarantee the safety of the people's lies and property.
4, fuel-efficient reduction of discharging, protection of the environment.
5, take leave of wait, save time.
Accompanying drawing explanation
Fig. 1 is the crossroad circuit number figure in single layer bridge six motor vehicle track processed that turns right;
Fig. 2 is turn right crossroad, single layer bridge six motor vehicle track processed bridge and the later bridge bridge opening numbering figure that turns left;
Fig. 3 is single layer bridge six motor vehicle track processed bridge opening, the crossroad numbering figure that turns right;
Fig. 4 is the single layer bridge six motor vehicle track processed crossroad guardrail numbering figure that turns right;
Fig. 5 is crossroad, single layer bridge six motor vehicle track processed structure three-dimensional schematic diagram of turning right;
Fig. 6 is crossroad, single layer bridge six motor vehicle track processed top view of turning right;
In figure: 1 section People's Bank of China left lateral road, East Road;
2 section bicycle left lateral road, East Roads;
3 Article 1 track, section motor vehicle left lateral road, East Roads;
4 Article 2 track, section motor vehicle left lateral road, East Roads;
5 Article 3 track, section motor vehicle left lateral road, East Roads;
6 section motor vehicle right track Article 3 track, East Roads;
7 section motor vehicle right track Article 2 track, East Roads;
8 section motor vehicle right track Article 1 track, East Roads;
9 East Road section bicycle right tracks;
10 East Road section People's Bank of China right tracks;
11 section People's Bank of China left lateral road, North Roads;
12 section bicycle left lateral road, North Roads;
13 Article 1 track, section motor vehicle left lateral road, North Roads;
14 Article 2 track, section motor vehicle left lateral road, North Roads;
15 Article 3 track, section motor vehicle left lateral road, North Roads;
16 section motor vehicle right track Article 3 track, North Roads;
17 section motor vehicle right track Article 2 track, North Roads;
18 section motor vehicle right track Article 1 track, North Roads;
19 North Road section bicycle right tracks;
20 North Road section People's Bank of China right tracks;
21 section People's Bank of China left lateral road, West Roads;
22 section bicycle left lateral road, West Roads;
23 Article 1 track, section motor vehicle left lateral road, West Roads;
24 Article 2 track, section motor vehicle left lateral road, West Roads;
25 Article 3 track, section motor vehicle left lateral road, West Roads;
26 section motor vehicle right track Article 3 track, West Roads;
27 section motor vehicle right track Article 2 track, West Roads;
28 section motor vehicle right track Article 1 track, West Roads;
29 West Road section bicycle right tracks;
30 West Road section People's Bank of China right tracks;
31 section People's Bank of China left lateral road, South Roads;
32 section bicycle left lateral road, South Roads;
33 Article 1 track, section motor vehicle left lateral road, South Roads;
34 Article 2 track, section motor vehicle left lateral road, South Roads;
35 Article 3 track, section motor vehicle left lateral road, South Roads;
36 section motor vehicle right track Article 3 track, South Roads;
37 section motor vehicle right track Article 2 track, South Roads;
38 section motor vehicle right track Article 1 track, South Roads;
39 South Road section bicycle right tracks;
40 South Road section People's Bank of China right tracks;
41 bicycles and the people owner of a trading company or a workshop-northern right-hand rotation road.
42 bicycles and-Xi right-hand rotation road, People's Bank of China north;
43 bicycles and People's Bank of China's Xi-Nan right-hand rotation road;
44 bicycles and People's Bank of China's Nan-Dong right-hand rotation road;
45 northeast People's Bank of China zebra stripes roads;
46 northwest People's Bank of China zebra drawing lines;
47 southwestern People's Bank of China zebra drawing lines;
48 southeast People's Bank of China zebra drawing lines;
49 bridge People's Bank of China You Dao;
50 bridge People's Bank of China Zuo Dao;
The 51 left roads of bridge bicycle;
The 52 right roads of bridge bicycle;
53 east-Bei Youzhuanxiangqiao;
54 north-Xi right turn bridges;
55 Xi-Nan right turn bridges;
56 Nan-Dong right turn bridges;
57 East Road section motor vehicles left-hand rotations later bridge;
58 North Road section motor vehicles left-hand rotations later bridge;
59 West Road section motor vehicles left-hand rotations later bridge;
60 South Road section motor vehicles left-hand rotations later bridge;
61 section motor vehicles left-hand rotation later bridge bridge opening, East Roads;
62 section motor vehicles left-hand rotation later bridge bridge opening, North Roads;
63 section motor vehicles left-hand rotation later bridge bridge opening, West Roads
64 section motor vehicles left-hand rotation later bridge bridge opening, South Roads;
65 center bridge;
66 section right lateral thing bicycle bridge opening, East Roads;
67 East Road section right lateral thing People's Bank of China bridge openings;
68 section left lateral north and south, North Road People's Bank of China bridge openings;
69 bicycle bridge opening, section left lateral north and south, North Roads;
70 section left lateral thing bicycle bridge opening, West Roads;
71 West Road section left lateral thing People's Bank of China bridge openings;
72 section right lateral north and south, North Road People's Bank of China bridge openings;
73 bicycle bridge opening, section right lateral north and south, North Roads;
74 bicycle bridge opening, section left lateral north and south, South Roads;
75 section left lateral north and south, South Road People's Bank of China bridge openings;
76 West Road section right lateral thing People's Bank of China bridge openings;
77 section right lateral thing bicycle bridge opening, West Roads;
78 bicycle bridge opening, section right lateral north and south, South Roads;
79 section right lateral north and south, South Road People's Bank of China bridge openings;
80 East Road section left lateral thing People's Bank of China bridge openings;
81 section left lateral thing bicycle bridge opening, East Roads;
82 center bridge south People's Bank of China bridge openings;
83 motor vehicle bridge opening, center bridge South Africa;
84 center bridge motor vehicle bridge openings;
85 motor vehicle bridge opening, center bridge north African;
86 center bridge Beiren row bridge openings;
The left fence of 87 West Road section;
The right fence of 88 East Road section;
The left fence of 89 East Road section;
The right fence of 90 West Road section;
Detailed description of the invention
Below in conjunction with drawings and Examples, the invention will be further described.
Right six single bridge the conversion of the motor vehicle lanes crossroads, including sidewalks, non-motor vehicle driveways, roadway and bridge pavement including south road pedestrian right channel 40, south road pedestrian left channel 31, north road pedestrian right channel 20, north road, the pedestrian left doers of the word, east road pedestrian right series of 10, 11 east road pedestrian left channel 1, west road pedestrian right doers of the word 30 and west road pedestrian left channel 21, non-motor vehicle driveways including 39, south road south section of non-motorized vehicle right non-motor vehicles left channel 32, 19, north road, north road non-motorized vehicle right non-motor vehicles left channel 12, east section of non-motor vehicles right channel 9, east road non-motor vehicles left channel 2, west section of non-motor vehicles right doers of the word 29 and west sections of non-motor vehicles left 22 doers of the word, motor vehicles, including south road motor vehicle right doers of the word the first 38 lanes, south road motor vehicles in the second lane is 37 right doers of the word, south road motor vehicle right demonstrates the third lane is 36, south road motor vehicle left doers of the word first lanes 33、South road motor vehicle left doers of the word in the second lane 34, south road motor vehicle left demonstrates the third lane is 35, north road motor vehicle right doers of the word the first lane 18, north road motor vehicles in the second lane 17 right doers of the word, lane 16 article 3 north road motor vehicle right doers of the word, north road motor vehicle lane left doers of the word's first 13, north road motor vehicle left doers of the word in the second lane 14, north road motor vehicle left doers of the word in the third lane 15, east road motor vehicle right doers of the word the first 8 lanes, east road motor vehicle right demonstrates the second lane 7, article 3 of the east road motor vehicle the right vehicle lane 6, east road motor vehicle lane left doers of the word's first 3, east road motor vehicle left doers of the word in the second lane 4, east road motor vehicle lane 5, article 3 of the doers of the word from left west road motor vehicle right doers of the word the first lane 28, west road motor vehicle right demonstrates the second lane is 27, west road motor vehicle right demonstrates the third lane 26, west road 23, west road motor vehicle lane left doers of the word's first motor vehicle left 24 and demonstrates the second lane west road motor vehicle left demonstrates the third lane is 25, luqiao including nine, respectively is located at the center of the intersection of the center of the north-south traffic bridge 65, Located at the intersection of four Angle of four right turn motor vehicles and located at the intersection between the north and the south bridge road section of four vehicles left back bridge;65 center bridge on the road junction between the road and the pavement and the non-motor vehicle lanes a bridge pier, and the road bridge is located in the east road motor vehicle respectively the right doers of the word for the first 8 lanes and west road motor vehicle left doers of the word for the first 23 connected roads and lanes west road motor vehicle right doers of the word the first lane 28 and east road motor vehicle lane left doers of the word's first three connected sections, sidewalks and non-motor vehicle lane junction piers respectively located in the east road pedestrian right channel 10 connected to the west road pedestrian left channel 21 road and east road pedestrian routes 1 and left west road pedestrian right connect the doers of the word 30 sections, center the ends of the bridge 65 connected to the north and south road of non-motor vehicle lanes and roads, 65 center bridge formed under the things across the lanes in the middle of the little tunnel 84 motor vehicles, motor vehicle little tunnel is 6 meters high, 84 motor vehicle little tunnel across the center of the non-motor vehicle lanes bridge South Africa 83 little tunnel 85 motor vehicles in north Africa, and central bridge across the pavement at the center of the north bridge pedestrian little tunnel bridge south pedestrian little tunnel 82 86 and center, center 65 set four motor vehicle road bridge, the bridge bridge on both sides of roadway, respectively, set up a bridge of non-motor vehicles left the tao 51 non-motor vehicles and bridge right 52,Bridge non-motor vehicles left the tao 51 non-motor vehicles and bridge right 52 sides, respectively, set up a bridge pedestrian left 50 and bridge pedestrian right way 49, four bridge roadway ends respectively connected to the north-south road motor vehicle road, bridge non-motor vehicles left the tao 51 non-motor vehicles and bridge right 52 and non-motor vehicle lanes on the road in the north and south respectively 32, 39, 19, 12 connection, the pedestrian bridge left 50 and bridge pedestrian right way at both ends of the 49 respectively through setting in the southwest of the road the pedestrian zebra crossing southeast, northwest pedestrian crosswalk 46 and 47 48, northeast pedestrian zebra crossing pedestrian crosswalk tao 45, non-motor vehicles and pedestrian right turn west - south road 43, non-motor vehicles and pedestrian right turn north - west road 42, non-motor vehicles and pedestrian right turn south - east road 44, non-motor vehicles, and turn right owner - north road and north and south road pavement 31, 40, 41, 11 connection;Four bridge right turn motor vehicles are respectively on the west - south 55 right steering bridge, north - west right steering axle, 54, 56 and east - south - east right steering bridge north right steering axle 53, four right steering bridge were made by direct approach and the connection is located in the north and south, east and west road section west - south,North - west and south - east and east - arc across the bridge, north west - south two straight approach span of a right steering axle 55 respectively located in west road motor vehicle right doers of the word the first lane 28 and south road motor vehicle lanes 33 on top left doers of the word, the circular arc form crossing the bridge across the road 29, west road pedestrian non-motor vehicles right doers of the word right doers of the word 30, southwest pedestrian zebra crossing 47 and south section of non-motor vehicles left 32 will be doers of the word straight approach bridge connecting two pieces, right at the west section of non-motorized vehicle 29 and west road pedestrian right above the doers of the word 30 west road right things non-motor vehicles little tunnel right thing pedestrian little tunnel 76, 77 and west sections in south road pedestrian non-motor vehicles left channel 32 and southwest zebra crossing above 47 constitute, north and south, south road on the left a non-motor vehicle little tunnel in 74 and 75, north and south, south road on the left the pedestrian little tunnel West road 29 and west road pedestrian non-motor vehicles right doers of the word right doers of the word 30 respectively through the ground detours and south section of non-motor vehicles left channel 32 and south road pedestrian left 31 connected doers of the word, constitute a non-motor vehicle and pedestrian right turn west - south road 43;North - west two straight approach span of a right steering axle 54 respectively located in north road motor vehicle right doers of the word the first lane 18 and west road motor vehicle lanes 23 on top left doers of the word, the circular arc form crossing the bridge across the north section of non-motor vehicles right channel 19, northwest pedestrian crossings, 46, west road pedestrian left channel 21 and west sections of non-motor vehicles left 22 will be doers of the word two straight approach span connected, northwest of non-motor vehicles in north road right channel 19 and pedestrian zebra crossing, 46 form north and south, north road right above the non-motor vehicles little tunnel right north-south pedestrian little tunnel 72, 73 and north sections in west road pedestrian left channel 21 and west sections of non-motor vehicles left 22 above constitute the doers of the word west road pedestrian left things little tunnel 71 and west sections left little tunnel 70 motor vehicles owner west Africa, north section of non-motor vehicles right channel 19 and north road pedestrian right channel 20 respectively through the ground detours and west sections of non-motor vehicles left doers of the word 22 and west road pedestrian left 21 connected doers of the word, Constitute a non-motor vehicle and pedestrian right turn north - west road 42;South - east two straight approach span of a right steering axle 56 respectively located in south road motor vehicle right profession first lanes to 38 and east road motor vehicle left doers of the word on the first lane 3, circular cross sections of a non-motor vehicle bridge across Vietnam right doers of the word, 39, southeast of the pedestrian zebra crossing road 48, east road pedestrian routes 1 and left east section of non-motor vehicles left 2 will be two straight approach bridge connecting doers of the word, in the south section of non-motor vehicles right channel 39 and southeast of the pedestrian zebra crossing way above 48 south road right the non-motor vehicles little tunnel right north-south pedestrian little tunnel 79, 78 and south sections in the left channel 1 and east east road pedestrian road non-motor vehicles left channel 2 above constitute the east road pedestrian left things little tunnel 80 left little tunnel 81 motor vehicles owner west Africa and east section, the south section of non-motor vehicles right channel 39 and south road pedestrian right channel 40 respectively through the ground detours and east section of non-motor vehicles left channel 2, and 1 connected east road pedestrian left doers of the word, constitute a non-motor vehicle and pedestrian right turn south - east road 44; East - north right turn two straight approach span of a bridge and 53 respectively located in the east road motor vehicle right doers of the word the first lane 8 and north road motor vehicle left doers of the word on the first lane 13, circular arc across the bridge across the east section of non-motor vehicles right channel 9, east road pedestrian right doers of the word, northeast 10 pedestrian zebra crossing road and north road 45 non-motor vehicles left 12 will be doers of the word straight approach bridge connecting two pieces, right at the east section of non-motorized vehicle 9 and east road pedestrian right channel 10 above constitute the east road right things little tunnel 66 motor vehicles and pedestrian little tunnel 67 east road right things, in the northeast of the pedestrian zebra crossing road and north road 45 non-motor vehicles left 12 above constitute the doers of the word north road left line north-south pedestrian little tunnel 68 and north road left the non-motor vehicles little tunnel 69, east section of non-motor vehicles right channel 9 and east road pedestrian right channel 10 respectively through the ground with north road detours non-motor vehicles left channel 12 and 11 connecting north road pedestrian left doers of the word,Constitute a non-motor vehicle and pedestrian - 41 right turn north road, east four motor vehicle steering axle of a non-motor vehicle right little tunnel height of 4 meters;Four vehicles left back bridge west road motor vehicles are left back bridge and vehicle turn left back bridge north road 58, 59 57 and south east road motor vehicle turn left back bridge road motor vehicle turn left back bridge, 60 per vehicle turn left back bridge overlooking a h, h shape of long and short shaft end is straight approach span on both ends of the shaft, long a HengShi connected to the vertical central and short shaft high-end across the bridge, west road motor vehicle turn left back bridge 59 long shaft is located in the west road motor vehicle the right doers of the word on the first lane 28, short shaft is located in the west section of motor vehicles in the left demonstrates the second lane is 24, the second one right across the west section of the motor vehicle lanes, west road motor vehicle lanes 27 right doers of the word in the third lane 26 and west road motor vehicle left demonstrates the third lane is 25, 27 in the second lane west road motor vehicle right doers of the word,26 and west road motor vehicle right doers of the word in the third lane west road motor vehicle in the left demonstrates the third lane is 25 a little tunnel west road motor vehicle left back bridge 63;North road motor vehicle turn left back bridge 58 long shaft is located in the north of road motor vehicle right doers of the word on the first lane 18, short shaft is located in the north road vehicle on the left demonstrates the second lane 14, a second right across the north section of the motor vehicle lanes 17, north road motor vehicle lanes right demonstrates the third lane is 16 and north road motor vehicle left doers of the word the third lane 15, in the second lane 17 north road motor vehicle right doers of the word, article 3 of the north road motor vehicle the right vehicle lane 16 and north road motor vehicle left doers of the word 15 above constitute the third lane north road turn left back bridge little tunnel 62 motor vehicles;East road motor vehicle turn left back bridge 57 long shaft is located in the east road motor vehicle the right channel on the first 8 lanes, short shaft is located in the east road vehicle on the left demonstrates the second lane 4, the second one right across the east section of the motor vehicle lanes lane 7,Article 3 of the east road motor vehicle doers of the word right lane 6 and east road motor vehicle lane 5, article 3 of the doers of the word from left in the second lane east road motor vehicle doers of the word right 7, article 3 of the east road motor vehicle the right vehicle lane 6 and east road motor vehicle article 3 of the doers of the word from left lane 5 above constitute a little tunnel 61 east road motor vehicle turn left back bridge;South road motor vehicle turn left back bridge 60 long shaft is located in the south road motor vehicle the right profession first lanes to 38, short shaft is located in the south road on the left demonstrates the second lane 34 motor vehicles, a road vehicle right across Vietnam doers of the word a second article 37, south road motor vehicle lanes doers of the word right third lane 36 and south road motor vehicle lane 35, article 3 of the doers of the word from left in the second lane south road motor vehicle doers of the word right 37, south road motor vehicle right demonstrates the third lane is 36 and south road motor vehicle left doers of the word 35 above constitute the third lane is south road motor vehicle turn left little tunnel back bridge 64, four vehicles left little tunnel bridge vehicle turn left turn back bridge height is 6 meters.
The operational process of crossroad of the present utility model is as follows:
1, motor-driven vehicle going and turning to
(1), when motor vehicles are along section motor vehicle right track Article 1 track, South Road 38, section motor vehicle right track Article 2 track, South Road 37, when section motor vehicle right track Article 3 track, South Road 36 travels, if keep straight on by crossroad, keep straight on by South Road section motor vehicle left-hand rotation later bridge bridge opening 64 along section motor vehicle right track Article 3 track, South Road 36, center bridge 65, enter Article 3 track, section motor vehicle left lateral road, North Road 15 by North Road section motor vehicle left-hand rotation later bridge bridge opening 62, or in later bridge bridge opening 64 of being turned left by South Road section motor vehicle, center bridge 65 but do not arrive North Road section motor vehicle and turn left and later keep straight on along section motor vehicle right track Article 2 track, South Road 37 before bridge 58, then enter Article 1 track, section motor vehicle left lateral road, North Road 13 by Article 2 track, section motor vehicle left lateral road, North Road 14 to travel or enter Article 3 track, section motor vehicle left lateral road, North Road 15 and drive through North Road section motor vehicle and to turn left later bridge bridge opening 62, namely by crossroad.
(2), when motor vehicles are along section motor vehicle right track Article 1 track, South Road 38, section motor vehicle right track Article 2 track, South Road 37, when section motor vehicle right track Article 3 track, South Road 36 travels, turn left if want, then along section motor vehicle right track Article 2 track, South Road 37, section motor vehicle right track Article 3 track 36, South Road travels to be avoided South Road section motor vehicle and turns left later after bridge 60, North Road section motor vehicle left-hand rotation later bridge 58 is driven towards by entering Article 2 track, section motor vehicle left lateral road, North Road 14 after center bridge 65, then turn left along the North Road section motor vehicle later bridge 58 that turns left, north-Xi right turn bridge 54 is driven towards along section motor vehicle right track Article 1 track, North Road 18 after lower bridge, turn right along north-Xi right turn bridge 54 and enter the left-hand bend that Article 1 track, section motor vehicle left lateral road, West Road 23 completes crossroad.
(3), when motor vehicles are along section motor vehicle right track Article 1 track, South Road 38, section motor vehicle right track Article 2 track, South Road 37, when section motor vehicle right track Article 3 track, South Road 36 travels, turn around if want, then along section motor vehicle right track Article 2 track, South Road 37, section motor vehicle right track Article 3 track 36, South Road travels avoids South Road section motor vehicle left-hand rotation later bridge 60, North Road section motor vehicle left-hand rotation later bridge 58 is driven towards by entering Article 2 track, section motor vehicle left lateral road, North Road 14 after center bridge 65, then turn left along the North Road section motor vehicle later bridge 58 that turns left, section motor vehicle right track Article 2 track, North Road 17 or section motor vehicle right track Article 3 track 16, North Road is sailed into along section motor vehicle right track Article 1 track, North Road 18 by center bridge 65 after lower bridge, enter Article 1 track, section motor vehicle left lateral road, South Road 33 or enter Article 3 track, section motor vehicle left lateral road, South Road 35 and can complete turn around by South Road section motor vehicle later bridge bridge opening 64 of turning left.
(4), when motor vehicles along section motor vehicle right track Article 1 track, South Road 38, section motor vehicle right track Article 2 track, South Road 37, section motor vehicle right track Article 3 track, South Road 36 travel time, turn right if want, can drive towards Nan-Dong right turn bridge 56 along direction, section motor vehicle right track Article 1 track 38, South Road by the section motor vehicle later bridge 60 that turns left in above South Road at the vehicle of section motor vehicle right track Article 1 track 38, South Road lanes, the direction along Nan-Dong right turn bridge 56 enters Article 1 track, section motor vehicle left lateral road, East Road 3 and completes right-hand bend, in section motor vehicle right track Article 2 track, South Road 37, vehicle on the road of section motor vehicle right track Article 3 track 36, South Road should be carried out the preparation of right-hand bend in advance or enter South Road section motor vehicle left-hand rotation later bridge 60 on track, section motor vehicle right track Article 1 track 38, South Road, or enter track, section motor vehicle right track Article 1 track 38, South Road drive towards Nan-Dong right turn bridge 56 by the South Road section motor vehicle South Road section motor vehicle of later bridge 60 later bridge bridge opening 64 of turning left of turning left, direction along Nan-Dong right turn bridge 56 enters Article 1 track, section motor vehicle left lateral road, East Road 3 and completes right-hand bend.
(5), when motor vehicles are along section motor vehicle right track Article 1 track, North Road 18, section motor vehicle right track Article 2 track, North Road 17, during section motor vehicle right track Article 3 track 16 lanes of North Road, if keep straight on by crossroad, keep straight on by North Road section motor vehicle left-hand rotation later bridge bridge opening 62 along section motor vehicle right track Article 3 track, North Road 16, center bridge 65 enters Article 3 track, section motor vehicle left lateral road, South Road 35 by South Road section motor vehicle left-hand rotation later bridge bridge opening 64, or in later bridge bridge opening 62 of being turned left by North Road section motor vehicle, center bridge 65 but do not arrive South Road section motor vehicle and turn left and later keep straight on along section motor vehicle right track Article 2 track, North Road 17 before bridge 60, then enter Article 1 track, section motor vehicle left lateral road, South Road 33 again by Article 2 track, section motor vehicle left lateral road, South Road 34 to travel or enter Article 3 track, section motor vehicle left lateral road, South Road 35 and drive through South Road section motor vehicle and to turn left later bridge bridge opening 64, namely by crossroad.
(6), when motor vehicles are along section motor vehicle right track Article 1 track, North Road 18, section motor vehicle right track Article 2 track, North Road 17, during section motor vehicle right track Article 3 track 16 lanes of North Road, turn left if want, then along section motor vehicle right track Article 2 track, North Road 17, section motor vehicle right track Article 3 track, North Road 16 travels through after the left-hand rotation of North Road section motor vehicle later bridge bridge opening 62, South Road section motor vehicle left-hand rotation later bridge 60 is driven towards by entering Article 2 track, section motor vehicle left lateral road, South Road 34 after center bridge 65, then turn left along the South Road section motor vehicle later bridge 60 that turns left, Nan-Dong right turn bridge 56 is driven towards along section motor vehicle right track Article 1 track, South Road 38 after lower bridge, turn right along Nan-Dong right turn bridge 56 and enter the left-hand bend that Article 1 track, section motor vehicle left lateral road, East Road 3 completes crossroad.
(7), when motor vehicles are along section motor vehicle right track Article 1 track, North Road 18, section motor vehicle right track Article 2 track, North Road 17, during section motor vehicle right track Article 3 track 16 lanes of North Road, turn around if want, then along section motor vehicle right track Article 2 track, North Road 17, section motor vehicle right track Article 3 track, North Road 16 travels through after the left-hand rotation of North Road section motor vehicle later bridge bridge opening 62, South Road section motor vehicle left-hand rotation later bridge 60 is driven towards by entering Article 2 track, section motor vehicle left lateral road, South Road 34 after center bridge 65, then turn left along the South Road section motor vehicle later bridge 60 that turns left, section motor vehicle right track Article 2 track, South Road 37 or section motor vehicle right track Article 3 track 36, South Road is sailed into along section motor vehicle right track Article 1 track, South Road 38 by center bridge 65 after lower bridge, enter Article 1 track, section motor vehicle left lateral road, North Road 13 or enter Article 3 track, section motor vehicle left lateral road, North Road 15 and can complete turn around by North Road section motor vehicle later bridge bridge opening 62 of turning left.
(8), when motor vehicles along section motor vehicle right track Article 1 track, North Road 18, section motor vehicle right track Article 2 track, North Road 17, North Road section motor vehicle right track Article 3 track 16 lanes time, turn right if want, can drive towards north-Xi right turn bridge 54 along direction, section motor vehicle right track Article 1 track 18, North Road by the section motor vehicle later bridge 58 that turns left in above North Road at the vehicle of section motor vehicle right track Article 1 track 18, North Road lanes, the direction along north-Xi right turn bridge 54 enters Article 1 track, section motor vehicle left lateral road, West Road 23 and completes right-hand bend, in section motor vehicle right track Article 2 track, North Road 17, vehicle on the road of section motor vehicle right track Article 3 track 16, North Road should be carried out the preparation of right-hand bend in advance or enter North Road section motor vehicle left-hand rotation later bridge 58 on track, section motor vehicle right track Article 1 track 18, North Road, or turn left later to enter track, section motor vehicle right track Article 1 track 18, North Road behind bridge bridge opening 62 and drive towards north-Xi right turn bridge 54 by the turn left North Road section motor vehicle of later bridge 58 of North Road section motor vehicle, direction along north-Xi right turn bridge 54 enters Article 1 track, section motor vehicle left lateral road, West Road 23 and completes right-hand bend.
(9), when motor vehicles are along section motor vehicle right track Article 1 track, East Road 8, section motor vehicle right track Article 2 track, East Road 7, when section motor vehicle right track Article 3 track, East Road 6 travels, if keep straight on by crossroad, keep straight on by East Road section motor vehicle left-hand rotation later bridge bridge opening 61 along section motor vehicle right track Article 3 track, East Road 6, center bridge motor vehicle bridge opening 84, enter Article 3 track, section motor vehicle left lateral road, West Road 25 again by West Road section motor vehicle left-hand rotation later bridge bridge opening 63, or keep straight on by East Road section motor vehicle left-hand rotation later bridge bridge opening 61 along section motor vehicle right track Article 2 track, East Road 7, center bridge motor vehicle bridge opening 84 but do not arrive West Road section motor vehicle turn left later bridge 59 time, enter Article 3 track, section motor vehicle left lateral road, West Road 25 by Article 2 track, section motor vehicle left lateral road, West Road 24 to drive through West Road section motor vehicle and to turn left later bridge bridge opening 63 or enter Article 1 track, section motor vehicle left lateral road, West Road 23 by Article 2 track, section motor vehicle left lateral road, West Road 24 and travel, can keep straight on and pass through crossroad.
(10), when motor vehicles are along section motor vehicle right track Article 1 track, East Road 8, section motor vehicle right track Article 2 track, East Road 7, when section motor vehicle right track Article 3 track, East Road 6 travels, turn left if want, then along section motor vehicle right track Article 2 track, East Road 7, section motor vehicle right track Article 3 track, East Road 6 travels through East Road section motor vehicle left-hand rotation later bridge bridge opening 61, West Road section motor vehicle left-hand rotation later bridge 59 is driven towards by entering Article 2 track, section motor vehicle left lateral road, West Road 24 behind center bridge motor vehicle bridge opening 84, then turn left along the West Road section motor vehicle later bridge 59 that turns left, Xi-Nan right turn bridge 55 is driven towards along section motor vehicle right track Article 1 track, West Road 28 after lower bridge, turn right along Xi-Nan right turn bridge 55 and enter the left-hand bend that Article 1 track, section motor vehicle left lateral road, South Road 33 completes crossroad.
(11), when motor vehicles are along section motor vehicle right track Article 1 track, East Road 8, section motor vehicle right track Article 2 track, East Road 7, during section motor vehicle right track Article 3 track 6 lanes of East Road, turn around if want, then along section motor vehicle right track Article 2 track, East Road 7, section motor vehicle right track Article 3 track, East Road 6 travels through East Road section motor vehicle left-hand rotation later bridge bridge opening 61, West Road section motor vehicle left-hand rotation later bridge 59 is driven towards by entering Article 2 track, section motor vehicle left lateral road, West Road 24 behind center bridge motor vehicle bridge opening 84, then turn left along the West Road section motor vehicle later bridge 59 that turns left, section motor vehicle right track Article 2 track, West Road 27 or section motor vehicle right track Article 3 track, West Road 26 is sailed into along section motor vehicle right track Article 1 track, West Road 28 by behind center bridge motor vehicle bridge opening 84 after lower bridge, enter Article 1 track, section motor vehicle left lateral road, East Road 3 or enter Article 3 track, section motor vehicle left lateral road, East Road 5 and can complete turn around by East Road section motor vehicle later bridge bridge opening 61 of turning left.
(12), when motor vehicles along section motor vehicle right track Article 1 track, East Road 8, section motor vehicle right track Article 2 track, East Road 7, East Road section motor vehicle right track Article 3 track 6 lanes time, turn right if want, can drive towards east-northern right turn bridge 53 along direction, section motor vehicle right track Article 1 track 8, East Road by above Xi-Nan right turn bridge 55 at the vehicle of section motor vehicle right track Article 1 track 8, East Road lanes, the direction along east-northern right turn bridge 53 enters Article 1 track, section motor vehicle left lateral road, North Road 13 and completes right-hand bend, in section motor vehicle right track Article 2 track, East Road 7, vehicle on the road of section motor vehicle right track Article 3 track 6, East Road should be carried out the preparation of right-hand bend in advance or enter East Road section motor vehicle left-hand rotation later bridge 57 on track, section motor vehicle right track Article 1 track 8, East Road, or turn left later to enter track, section motor vehicle right track Article 1 track 8, East Road behind bridge bridge opening 61 and drive towards east-northern right turn bridge 53 by the turn left East Road section motor vehicle of later bridge 57 of East Road section motor vehicle, direction along east-northern right turn bridge 53 enters Article 1 track, section motor vehicle left lateral road, North Road 13 and completes right-hand bend.
(13), when motor vehicles are along section motor vehicle right track Article 1 track, West Road 28, section motor vehicle right track Article 2 track, West Road 27, when section motor vehicle right track Article 3 track, West Road 26 travels, if keep straight on by crossroad, keep straight on by West Road section motor vehicle left-hand rotation later bridge bridge opening 63 along section motor vehicle right track Article 3 track, West Road 26, center bridge motor vehicle bridge opening 84, enter Article 3 track, section motor vehicle left lateral road, East Road 5 by East Road section motor vehicle left-hand rotation later bridge bridge opening 61, or keep straight on by West Road section motor vehicle left-hand rotation later bridge bridge opening 63 along section motor vehicle right track Article 2 track, West Road 27, center bridge motor vehicle bridge opening 84 but do not arrive East Road section motor vehicle turn left later bridge 57 time, enter Article 3 track, section motor vehicle left lateral road, East Road 5 by Article 2 track, section motor vehicle left lateral road, East Road 4 to drive through East Road section motor vehicle and to turn left later bridge bridge opening 61 or enter Article 1 track, section motor vehicle left lateral road, East Road 3 by Article 2 track, section motor vehicle left lateral road, East Road 4 and travel, can keep straight on and pass through crossroad.
(14), when motor vehicles are along section motor vehicle right track Article 1 track, West Road 28, section motor vehicle right track Article 2 track, West Road 27, when section motor vehicle right track Article 3 track, West Road 26 travels, turn left if want, then along section motor vehicle right track Article 2 track, West Road 27, section motor vehicle right track Article 3 track, West Road 26 drives through section motor vehicle left-hand rotation later bridge bridge opening 63, West Road, enter Article 2 track, section motor vehicle left lateral road, East Road 4 behind center bridge motor vehicle bridge opening 84 and drive towards East Road section motor vehicle left-hand rotation later bridge 57, then turn left along the East Road section motor vehicle later bridge 57 that turns left, east-northern right turn bridge 53 is driven towards along section motor vehicle right track Article 1 track, East Road 8 after lower bridge, turn right along eastern-northern right turn bridge 53 and enter the left-hand bend that Article 1 track, section motor vehicle left lateral road, North Road 13 completes crossroad.
(15), when motor vehicles are along section motor vehicle right track Article 1 track, West Road 28, section motor vehicle right track Article 2 track, West Road 27, during section motor vehicle right track Article 3 track 26 lanes of West Road, turn around if want, then along section motor vehicle right track Article 2 track, West Road 27, section motor vehicle right track Article 3 track, West Road 26 drives through section motor vehicle left-hand rotation later bridge bridge opening 63, West Road, enter Article 2 track, section motor vehicle left lateral road, East Road 4 behind center bridge motor vehicle bridge opening 84 and drive towards East Road section motor vehicle left-hand rotation later bridge 57, then turn left along the East Road section motor vehicle later bridge 57 that turns left, section motor vehicle right track Article 2 track, East Road 7 or section motor vehicle right track Article 3 track, East Road 6 is sailed into along section motor vehicle right track Article 1 track, East Road 8 by behind center bridge motor vehicle bridge opening 84 after lower bridge, enter Article 2 track, section motor vehicle left lateral road, West Road 24 or Article 3 track, section motor vehicle left lateral road, West Road 25, before arrival West Road section motor vehicle turns left to turn one's head bridge 59, car on track, Article 2 track 24, section motor vehicle left lateral road, West Road enters Article 1 track, section motor vehicle left lateral road, West Road 23 and travels or be incorporated to Article 3 track, section motor vehicle left lateral road, West Road 25 by West Road section motor vehicle left-hand rotation later bridge bridge opening 63, thus complete and turn around.
(16), when motor vehicles are along section motor vehicle right track Article 1 track, West Road 28, section motor vehicle right track Article 2 track, West Road 27, during section motor vehicle right track Article 3 track 26 lanes of West Road, turn right if want, can above West Road section motor vehicle to turn left later bridge 59 at the vehicle of section motor vehicle right track Article 1 track 28, West Road lanes, Xi-Nan right turn bridge 55 is driven towards along direction, section motor vehicle right track Article 1 track 28, West Road after lower bridge, direction right-hand bend along Xi-Nan right turn bridge 55 enters Article 1 track, section motor vehicle left lateral road, South Road 33 and completes right-hand bend, in section motor vehicle right track Article 2 track, West Road 27, vehicle on the road of section motor vehicle right track Article 3 track 26, West Road should be carried out the preparation of right-hand bend in advance or enter West Road section motor vehicle left-hand rotation later bridge 59 on track, section motor vehicle right track Article 1 track 28, West Road, or turn left later to enter track, section motor vehicle right track Article 1 track 28, West Road behind bridge bridge opening 63 and drive towards Xi-Nan right turn bridge 55 by the turn left West Road section motor vehicle of later bridge 59 of West Road section motor vehicle, direction along Xi-Nan right turn bridge 55 enters Article 1 track, section motor vehicle left lateral road, South Road 33 and completes right-hand bend.
2, non-automotive vehicle and turning to
(1) when, bicycle travels along South Road section bicycle right track 39, keep straight on if want, then bicycle bridge opening, section right lateral north and south, straight-line pass South Road 78, enter the right road 52 of bridge bicycle by center bridge 65, then can realize keeping straight on by bicycle bridge opening, section left lateral north and south, North Road 69 along section bicycle left lateral road, North Road 12.
(2) when, bicycle travels along South Road section bicycle right track 39, turn left if want, then bicycle bridge opening, section right lateral north and south, straight-line pass South Road 78, enter the right road 52 of bridge bicycle by center bridge 65, right-about is crossed northeast People's Bank of China zebra stripes road 45, East Road section People's Bank of China right track 10, is passed motor vehicle bridge opening, center bridge north African 85 along East Road section bicycle right track 9 again, enter section bicycle left lateral road, West Road 22 through section left lateral thing bicycle bridge opening, West Road 70, can realize.
(3) when, bicycle travels along South Road section bicycle right track 39, turn around if want, then through bicycle bridge opening, section right lateral north and south, South Road 78, cross southeast People's Bank of China zebra drawing lines 48, section People's Bank of China left lateral road, East Road 1, crossing West Road section People's Bank of China right track 30 and southwestern People's Bank of China zebra drawing lines 47 along section bicycle left lateral road, East Road 2 through turning after the rear left of motor vehicle bridge opening 83, center bridge South Africa, realizing turning around through bicycle bridge opening 74, section left lateral north and south, South Road along section bicycle left lateral road, South Road 32.
(4) when, bicycle travels along South Road section bicycle right track 39, turn right if want, then cross section People's Bank of China left lateral road, East Road 1 along bicycle and the right-hand bend of People's Bank of China's Nan-Dong right-hand rotation road 44 and enter section bicycle left lateral road, East Road 2, can realize turning right.
(5) when, bicycle travels along North Road section bicycle right track 19, keep straight on if want, then bicycle bridge opening, section right lateral north and south, straight-line pass North Road 73, enter the left road 51 of bridge bicycle by center bridge 65, then can realize keeping straight on by bicycle bridge opening, section left lateral north and south, South Road 74.
(6) when, bicycle travels along North Road section bicycle right track 19, turn left if want, then bicycle bridge opening, section right lateral north and south, straight-line pass North Road 73, enter the left road 51 of bridge bicycle by center bridge 65, right-about is crossed southwestern People's Bank of China zebra drawing lines 47, West Road section People's Bank of China right track 30, is passed motor vehicle bridge opening, center bridge South Africa 83 along West Road section bicycle right track 29 again, enter section bicycle left lateral road, East Road 2 through section left lateral thing bicycle bridge opening, East Road 81, can realize.
(7) when, bicycle travels along North Road section bicycle right track 19, turn around if want, then through bicycle bridge opening, section right lateral north and south, North Road 73, cross northwest People's Bank of China zebra drawing lines 46, section People's Bank of China left lateral road, West Road 21, along section bicycle left lateral road, West Road 22 through behind motor vehicle bridge opening, center bridge north African 85, East Road section People's Bank of China right track 10 is crossed in left back turning and section bicycle left lateral road, northeast People's Bank of China zebra stripes Dao45Yan North Road 12 realizes turning around through bicycle bridge opening 69, section left lateral north and south, North Road.
(8) when, bicycle travels along North Road section bicycle right track 19, turn right if want, then cross section People's Bank of China left lateral road, West Road 21 along bicycle and the right-hand bend of-Xi right-hand rotation road 42, People's Bank of China north and enter section bicycle left lateral road, West Road 22, can realize turning right.
(9) when, bicycle travels along East Road section bicycle right track 9, keep straight on if want, then straight-line pass East Road section right lateral thing bicycle bridge opening 66, motor vehicle bridge opening, center bridge north African 85, section left lateral thing bicycle bridge opening, West Road 70 successively, enters section bicycle left lateral road, West Road 22 and can realize keeping straight on.
(10) when, bicycle travels along East Road section bicycle right track 9, turn left if want, then turn right behind straight-line pass East Road section right lateral thing bicycle bridge opening 66, motor vehicle bridge opening, center bridge north African 85 and cross section People's Bank of China left lateral road, West Road 21, the left road 51 of bridge bicycle is entered by after center bridge 65 along North Road section bicycle right track 19 again by northwest People's Bank of China zebra drawing lines 46, enter section bicycle left lateral road, South Road 32 through bicycle bridge opening, section left lateral north and south, South Road 74, can realize.
(11), when bicycle travels along East Road section bicycle right track 9, turn around if want, then straight-line pass East Road section right lateral thing bicycle bridge opening 66, turn right behind motor vehicle bridge opening, center bridge north African 85 and cross section People's Bank of China left lateral road, West Road 21, enter the left road of bridge bicycle 51 by northwest People's Bank of China zebra drawing lines 46 along North Road section bicycle right track 19 again and to cross southwestern People's Bank of China zebra drawing lines 47 and West Road section People's Bank of China right track 30 by turning right after center bridge 65 along West Road section bicycle right track 29 through motor vehicle bridge opening, center bridge South Africa 83, enter section bicycle left lateral road, East Road 2 to realize turning around through section left lateral thing bicycle bridge opening 81, East Road.
(12) when, bicycle travels along East Road section bicycle right track 9, turn right if want, then cross East Road section People's Bank of China right track 10 to turn right along bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road 41, cross section People's Bank of China left lateral road, North Road 11 and enter section bicycle left lateral road, North Road 12, can realize turning right.
(13) when bicycle travels along West Road section bicycle right track 29, keep straight on if want, then straight-line pass West Road section right lateral thing bicycle bridge opening 77, motor vehicle bridge opening, center bridge South Africa 83, section left lateral thing bicycle bridge opening, East Road 81 successively, enters section bicycle left lateral road, East Road 2 and can realize keeping straight on.
(14) when, bicycle travels along West Road section bicycle right track 29, turn left if want, then turn right behind straight-line pass West Road section right lateral thing bicycle bridge opening 77, motor vehicle bridge opening, center bridge South Africa 83 and cross section People's Bank of China left lateral road, East Road 1, the right road 52 of bridge bicycle is entered by after center bridge 65 along South Road section bicycle right track 39 again by southeast People's Bank of China zebra drawing lines 48, enter section bicycle left lateral road, North Road 12 through bicycle bridge opening, section left lateral north and south, North Road 69, can realize.
(15), when bicycle travels along West Road section bicycle right track 29, turn around if want, then straight-line pass West Road section right lateral thing bicycle bridge opening 77, turn right behind motor vehicle bridge opening, center bridge South Africa 83 and cross section People's Bank of China left lateral road, East Road 1, enter the right road 52 of bridge bicycle by southeast People's Bank of China zebra drawing lines 48 along South Road section bicycle right track 39 again and cross northeast People's Bank of China zebra stripes Dao45He East Road section People's Bank of China right track 10 along East Road section bicycle right track 9 through motor vehicle bridge opening, center bridge north African 85 by turning right after center bridge 65, enter section bicycle left lateral road, West Road 22 to realize turning around through section left lateral thing bicycle bridge opening 70, West Road.
(16) when bicycle travels along West Road section bicycle right track 29, turn right if want, then cross West Road section People's Bank of China right track 30 to turn right along bicycle and People's Bank of China's Xi-Nan right-hand rotation road 43 and cross section People's Bank of China left lateral road, South Road 31 and enter section bicycle left lateral road, South Road 32, can realize turning right.
3, pedestrian traveling with turn to
(1) when, pedestrian travels along South Road section People's Bank of China right track 40, keep straight on if want, then through section right lateral north and south, South Road People's Bank of China bridge opening 79, entering the right road of bridge People's Bank of China 49 by entering bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road 41 along northeast People's Bank of China zebra stripes road 45 through section left lateral north and south, North Road People's Bank of China bridge opening 68 after center bridge 65 along southeast People's Bank of China zebra drawing lines 48, entering section People's Bank of China left lateral road 11, North Road along bicycle and People's Bank of China's Nan-Dong right-hand rotation road 44 and realizing keeping straight on.
(2) when, pedestrian travels along South Road section People's Bank of China right track 40, turn left if want, then through section right lateral north and south, South Road People's Bank of China bridge opening 79, along southeast People's Bank of China zebra drawing lines 48 enter the right road 49 of bridge People's Bank of China by after center bridge 65 northeastward People's Bank of China zebra drawing lines 45 place's right-about enter center bridge Beiren row bridge opening 86 along East Road section People's Bank of China right track 10 and keep straight on, enter section People's Bank of China left lateral road, West Road 21 through West Road section left lateral thing People's Bank of China bridge opening 71 and can realize; Or through section right lateral north and south, South Road People's Bank of China bridge opening 79, center bridge south, bridge opening People's Bank of China bridge opening 82 is entered along section People's Bank of China left lateral road, East Road 1 65 times to center bridge at zebra drawing lines 48 place of southeast People's Bank of China, keep straight on, then enter West Road section People's Bank of China right track 30 through West Road section right lateral thing People's Bank of China bridge opening 76.
(3) when, pedestrian travels along South Road section People's Bank of China right track 40, turn around if want, then through section right lateral north and south, South Road People's Bank of China bridge opening 79, turn left along southwestern People's Bank of China zebra drawing lines 47 through section left lateral north and south, South Road People's Bank of China bridge opening 75 through behind center bridge south People's Bank of China bridge opening 82 to center bridge 65 times along section People's Bank of China left lateral road, East Road 1 at zebra drawing lines 48 place of southeast People's Bank of China, then enter section People's Bank of China left lateral road 31, South Road along bicycle and People's Bank of China's Xi-Nan right-hand rotation road 43 and realize turning around.
(4), pedestrian is when travelling along South Road section People's Bank of China right track 40, turns right, then enter section People's Bank of China left lateral road, East Road 1 along bicycle and People's Bank of China's Nan-Dong right-hand rotation road 44 and complete right-hand bend if want.
(5) when, pedestrian travels along North Road section People's Bank of China right track 20, keep straight on if want, then through section right lateral north and south, North Road People's Bank of China bridge opening 72, entering the left road of bridge People's Bank of China 50 by entering bicycle and People's Bank of China's Xi-Nan right-hand rotation road 43 along southwestern People's Bank of China zebra drawing lines 47 through section left lateral north and south, South Road People's Bank of China bridge opening 75 after center bridge 65 along northwest People's Bank of China zebra drawing lines 46, entering section People's Bank of China left lateral road 31, South Road along bicycle and People's Bank of China's Xi-Nan right-hand rotation road 43 and realizing keeping straight on.
(6) when, pedestrian travels along North Road section People's Bank of China right track 20, turn left if want, then through section right lateral north and south, North Road People's Bank of China bridge opening 72, enter the left road of bridge People's Bank of China 50 along northwest People's Bank of China zebra drawing lines 46 to keep straight on by entering People's Bank of China bridge opening, center bridge south 82 in the zebra drawing lines 47 place's right-about of southwestern People's Bank of China along West Road section People's Bank of China right track 30 after center bridge 65, then enter section People's Bank of China left lateral road, East Road 1 through East Road section left lateral thing People's Bank of China bridge opening 80 and can realize; Or through section right lateral north and south, North Road People's Bank of China bridge opening 72, center bridge Beiren row bridge opening 86 is entered along section People's Bank of China left lateral road, West Road 21 65 times to center bridge at zebra drawing lines 46 place of northwest People's Bank of China, keep straight on, then enter East Road section People's Bank of China right track 10 through East Road section right lateral thing People's Bank of China bridge opening 67.
(7) when, pedestrian travels along North Road section People's Bank of China right track 20, turn around if want, then through section right lateral north and south, North Road People's Bank of China bridge opening 72, center bridge Beiren row bridge opening 86 is entered for 65 times to center bridge at zebra drawing lines 46 place of northwest People's Bank of China, turn left along northeast People's Bank of China zebra stripes road 45 through section left lateral north and south, North Road People's Bank of China bridge opening 68 through behind center bridge Beiren row bridge opening 86, then enter section People's Bank of China left lateral road 11, North Road along bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road 41 and realize turning around.
(8), pedestrian is when travelling along North Road section People's Bank of China right track 20, turns right, then enter section People's Bank of China left lateral road, West Road 21 along bicycle and-Xi right-hand rotation road, People's Bank of China north 42 and complete right-hand bend if want.
(9) when, pedestrian travels along East Road section People's Bank of China right track 10, keep straight on if want, then successively through East Road section right lateral thing People's Bank of China bridge opening 67, center bridge Beiren row bridge opening 86, West Road section left lateral thing People's Bank of China bridge opening 71, enter section People's Bank of China left lateral road 21, West Road and realize keeping straight on.
(10) when, pedestrian travels along East Road section People's Bank of China right track 10, turn left if want, then through behind East Road section right lateral thing People's Bank of China bridge opening 67, center bridge Beiren row bridge opening 86, turn right at zebra drawing lines 46 place of northwest People's Bank of China and enter the left road 50 of bridge People's Bank of China, by entering bicycle and People's Bank of China's Xi-Nan right-hand rotation road 43 along southwestern People's Bank of China zebra drawing lines 47 through section left lateral north and south, South Road People's Bank of China bridge opening 75 again after center bridge 65, enter section People's Bank of China left lateral road, South Road 31 along bicycle and People's Bank of China's Xi-Nan right-hand rotation road 43, realize.
(11) when, pedestrian travels along East Road section People's Bank of China right track 10, turn around if want, then through behind East Road section right lateral thing People's Bank of China bridge opening 67, center bridge Beiren row bridge opening 86, zebra drawing lines 46 place of northwest People's Bank of China turn right enter the left road of bridge People's Bank of China 50 by center bridge 65 after enter East Road section People's Bank of China left lateral road 1 along West Road section People's Bank of China right track 30 through center bridge south People's Bank of China bridge opening 82, East Road section left lateral thing People's Bank of China bridge opening 80 in the zebra drawing lines 47 place's right-about of southwestern People's Bank of China again, realize turning around.
(12), pedestrian is when travelling along East Road section People's Bank of China right track 10, turns right, then enter section People's Bank of China left lateral road, North Road 11 along bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road 41 and complete right-hand bend if want.
(13) when, pedestrian travels along West Road section People's Bank of China right track 30, keep straight on if want, then successively through West Road section right lateral thing People's Bank of China bridge opening 76, center bridge south People's Bank of China bridge opening 82, East Road section left lateral thing People's Bank of China bridge opening 80, enter section People's Bank of China left lateral road 1, East Road, sidewalk and realize keeping straight on.
(14) when, pedestrian travels along West Road section People's Bank of China right track 30, turn left if want, then through behind West Road section right lateral thing People's Bank of China bridge opening 76, center bridge south People's Bank of China bridge opening 82, turn right at zebra drawing lines 48 place of southeast People's Bank of China and enter the right road 49 of bridge People's Bank of China, by entering bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road 41 along northeast People's Bank of China zebra stripes road 45 through section left lateral north and south, North Road People's Bank of China bridge opening 68 again after center bridge 65, enter section People's Bank of China left lateral road, North Road 11 along bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road 41, realize.
(15) when, pedestrian travels along West Road section People's Bank of China right track 30, turn around if want, then through behind West Road section right lateral thing People's Bank of China bridge opening 76, center bridge south People's Bank of China bridge opening 82, turn right at zebra drawing lines 48 place of southeast People's Bank of China and enter the right road 49 of bridge People's Bank of China, by after center bridge 65 northeastward People's Bank of China zebra drawing lines 45 place turn right through center bridge Beiren row bridge opening 86, West Road section left lateral thing People's Bank of China bridge opening 71, enter section People's Bank of China left lateral road, West Road 21, realize turning around.
(16), pedestrian is when travelling along West Road section People's Bank of China right track 30, turns right, then enter section People's Bank of China left lateral road, South Road 31 along bicycle and People's Bank of China's Xi-Nan right-hand rotation road 43 and complete right-hand bend if want.

Claims (3)

1. a right-hand rotation single layer bridge six processed crossroad, motor vehicle track, comprises pavement, bicycle lane, car lane and road and bridge, pavement comprises South Road section People's Bank of China right track (40), section People's Bank of China left lateral road, South Road (31), North Road section People's Bank of China right track (20), section People's Bank of China left lateral road, North Road (11), East Road section People's Bank of China right track (10), section People's Bank of China left lateral road, East Road (1), West Road section People's Bank of China right track (30) and section People's Bank of China left lateral road, West Road (21), bicycle lane comprises South Road section bicycle right track (39), section bicycle left lateral road, South Road (32), North Road section bicycle right track (19), section bicycle left lateral road, North Road (12), East Road section bicycle right track (9), section bicycle left lateral road, East Road (2), West Road section bicycle right track (29) and section bicycle left lateral road, West Road (22), car lane comprises section motor vehicle right track Article 1 track, South Road (38), section motor vehicle right track Article 2 track, South Road (37), section motor vehicle right track Article 3 track, South Road (36), Article 1 track, section motor vehicle left lateral road, South Road (33), Article 2 track, section motor vehicle left lateral road, South Road (34), Article 3 track, section motor vehicle left lateral road, South Road (35), section motor vehicle right track Article 1 track, North Road (18), section motor vehicle right track Article 2 track, North Road (17), section motor vehicle right track Article 3 track, North Road (16), Article 1 track, section motor vehicle left lateral road, North Road (13), Article 2 track, section motor vehicle left lateral road, North Road (14), Article 3 track, section motor vehicle left lateral road, North Road (15), section motor vehicle right track Article 1 track, East Road (8), section motor vehicle right track Article 2 track, East Road (7), section motor vehicle right track Article 3 track, East Road (6), Article 1 track, section motor vehicle left lateral road, East Road (3), Article 2 track, section motor vehicle left lateral road, East Road (4), Article 3 track, section motor vehicle left lateral road, East Road (5), section motor vehicle right track Article 1 track, West Road (28), section motor vehicle right track Article 2 track, West Road (27), section motor vehicle right track Article 3 track, West Road (26), Article 1 track, section motor vehicle left lateral road, West Road (23), Article 2 track, section motor vehicle left lateral road, West Road (24) and Article 3 track, section motor vehicle left lateral road, West Road (25), it is characterized in that: described road and bridge comprise 9, is respectively to be positioned at the current center bridge (65) in the north and south of center, crossroad, be positioned at all the people present's motor vehicle right turn bridge (55 at Si Ge angle, crossroad place, 54, 56, 53) and be positioned at all the people present's motor vehicle on section, the four corners of the world, crossroad later bridge (59 that turns left, 58, 57, 60), center bridge (65) is established bridge pier with pavement and bicycle lane junction on the car lane of thing road, bridge pier on car lane is located at respectively section motor vehicle right track Article 1 track, East Road (8) and is connected section and section motor vehicle right track Article 1 track, West Road (28) with Article 1 track, section motor vehicle left lateral road, East Road (3) and is connected on section with Article 1 track, section motor vehicle left lateral road, West Road (23)Pavement and bicycle lane junction bridge pier are located at respectively East Road section People's Bank of China right track (10) and are connected section and section People's Bank of China left lateral road, East Road (1) with section People's Bank of China left lateral road, West Road (21) and are connected on section with West Road section People's Bank of China right track (30), the two ends of center bridge (65) are connected with bicycle lane and the car lane in section, north and south, the motor vehicle bridge opening (84) of thing car lane is crossed in the middle of the lower formation of center bridge (65), cross over motor vehicle bridge opening, center bridge South Africa (85) and the motor vehicle bridge opening, center bridge north African (83) of bicycle lane, cross over center bridge Beiren row bridge opening (82) and center bridge south People's Bank of China bridge opening (86) on pavement, center bridge (65) is established four bridge car lanes, a left road of bridge bicycle (51) and the right road of bridge bicycle (52) are established respectively in bridge car lane both sides, bridge bicycle lane (51, 52) Zuo Dao of Tiao Qiao People's Bank of China (50) and the You Dao of bridge People's Bank of China (49) are established respectively in both sides, article four, bridge car lane two ends are connected with the car lane on North-South Road respectively, the left road of bridge bicycle (51) and the right road of bridge bicycle (52) respectively with the bicycle lane on North-South Road (32, 39, 19, 12) connection, the two ends of the Zuo Dao of bridge People's Bank of China (50) and the You Dao of bridge People's Bank of China (49) are respectively by the southwestern People's Bank of China's zebra drawing lines (47) being arranged on road surface, northwest People's Bank of China zebra drawing lines (46), southeast People's Bank of China zebra drawing lines (48), northeast People's Bank of China zebra stripes road (45), bicycle and People's Bank of China's Xi-Nan right-hand rotation road (43), bicycle and People's Bank of China north-Xi right-hand rotation road (42), bicycle and People's Bank of China's Nan-Dong right-hand rotation road (44) and bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road (41) and the pavement (31 on North-South Road, 20, 40, 11) connection, all the people present's motor vehicle right turn bridge is respectively Xi-Nan right turn bridge (55), north-Xi right turn bridge (54), Nan-Dong right turn bridge (56) and east-Bei Youzhuanxiangqiao (53), all the people present's right turn bridge all by the straight access bridge being located on section, the four corners of the world be connected Xi-Nan, north-Xi, the arc overpass bridge in Nan-Dong Hedong-north forms, two sections of straight access bridges of described Xi-Nan right turn bridge (55) are located at respectively on section motor vehicle right track Article 1 track, West Road (28) and Article 1 track, section motor vehicle left lateral road, South Road (33), circular arc overpass bridge is crossed over West Road section bicycle right track (29), West Road section People's Bank of China right track (30), two sections of straight access bridges are communicated with by southwest People's Bank of China's zebra drawing lines (47) and section bicycle left lateral road, South Road (32), section right lateral thing bicycle bridge opening, West Road (77) and West Road section right lateral thing People's Bank of China bridge opening (76) is formed at West Road section bicycle right track (29) and West Road section People's Bank of China right track (30) top, bicycle bridge opening, section left lateral north and south, South Road (74) and section left lateral north and south, South Road People's Bank of China bridge opening (75) is formed in section bicycle left lateral road, South Road (32) and southwestern People's Bank of China's zebra drawing lines (47) top, West Road section bicycle right track (29) and West Road section People's Bank of China right track (30) are communicated with section bicycle left lateral road, South Road (32) and section People's Bank of China left lateral road, South Road (31) respectively by ground detourForm bicycle and People's Bank of China's Xi-Nan right-hand rotation road (43), two sections of straight access bridges of north-Xi right turn bridge (54) are located at respectively on section motor vehicle right track Article 1 track, North Road (18) and Article 1 track, section motor vehicle left lateral road, West Road (23), circular arc overpass bridge is crossed over North Road section bicycle right track (19), northwest People's Bank of China zebra drawing lines (46), two sections of straight access bridges are communicated with by section People's Bank of China left lateral road, West Road (21) and section bicycle left lateral road, West Road (22), bicycle bridge opening, section right lateral north and south, North Road (73) and section right lateral north and south, North Road People's Bank of China bridge opening (72) is formed at North Road section bicycle right track (19) and northwest People's Bank of China zebra drawing lines (46) top, West Road section left lateral thing People's Bank of China bridge opening (71) and section left lateral thing bicycle bridge opening, West Road (70) is formed in section People's Bank of China left lateral road, West Road (21) and top, section bicycle left lateral road, West Road (22), North Road section bicycle right track (19) and North Road section People's Bank of China right track (20) are communicated with section bicycle left lateral road, West Road (22) and section People's Bank of China left lateral road, West Road (21) respectively by ground detour, form bicycle and People's Bank of China north-Xi right-hand rotation road (42), two sections of straight access bridges of Nan-Dong right turn bridge (56) are located at respectively on section motor vehicle right track Article 1 track, South Road (38) and Article 1 track, section motor vehicle left lateral road, East Road (3), circular arc overpass bridge is crossed over South Road section bicycle right track (39), southeast People's Bank of China zebra drawing lines (48), two sections of straight access bridges are communicated with by section People's Bank of China left lateral road, East Road (1) and section bicycle left lateral road, East Road (2), bicycle bridge opening, section right lateral north and south, South Road (78) and section right lateral north and south, South Road People's Bank of China bridge opening (79) is formed at South Road section bicycle right track (39) and southeast People's Bank of China zebra drawing lines (48) top, East Road section left lateral thing People's Bank of China bridge opening (80) and section left lateral thing bicycle bridge opening, East Road (81) is formed in section People's Bank of China left lateral road, East Road (1) and top, section bicycle left lateral road, East Road (2), South Road section bicycle right track (39) and South Road section People's Bank of China right track (40) are communicated with section bicycle left lateral road, East Road (2) and section People's Bank of China left lateral road, East Road (1) respectively by ground detour, form bicycle and People's Bank of China's Nan-Dong right-hand rotation road (44), two sections of straight access bridges of east-Bei Youzhuanxiangqiao (53) are located at respectively on section motor vehicle right track Article 1 track, East Road (8) and Article 1 track, section motor vehicle left lateral road, North Road (13), circular arc overpass bridge is crossed over East Road section bicycle right track (9), East Road section People's Bank of China right track (10), two sections of straight access bridges are communicated with by northeast People's Bank of China zebra stripes road (45) and section bicycle left lateral road, East Road (12), section right lateral thing bicycle bridge opening, East Road (66) and East Road section right lateral thing People's Bank of China bridge opening (67) is formed at East Road section bicycle right track (9) and East Road section People's Bank of China right track (10) top, People's Bank of China zebra drawing lines (45) and section bicycle left lateral road, North Road (12) top formation section left lateral north and south, North Road People's Bank of China bridge opening (68) and bicycle bridge opening, section left lateral north and south, North Road (69) northeastward,East Road section bicycle right track (9) and East Road section People's Bank of China right track (10) are communicated with section bicycle left lateral road, North Road (12) and section People's Bank of China left lateral road, North Road (11) respectively by ground detour, form bicycle and the people owner of a trading company or a workshop-northern right-hand rotation road (41), all the people present's motor vehicle left-hand rotation later bridge is respectively later bridge (59) of West Road section motor vehicle left-hand rotation, later bridge (58) of North Road section motor vehicle left-hand rotation, East Road section motor vehicle left-hand rotation is bridge (57) and later bridge (60) of South Road section motor vehicle left-hand rotation later, every base motor-car left-hand rotation later bridge is overlooked in H-shaped, the perpendicular two ends of length and short perpendicular one end of H-shaped are straight access bridges, one is probably connected to long perpendicular middle part and short perpendicular high-end overpass bridge, the section motor vehicle left-hand rotation of described West Road is perpendicular being located on section motor vehicle right track Article 1 track, West Road (28) of length of bridge (59) later, short perpendicular being located on Article 2 track, section motor vehicle left lateral road, West Road (24), one across motor vehicle right track Article 2 track, section, Yuexi (27), section motor vehicle right track Article 3 track, West Road (26) and Article 3 track, section motor vehicle left lateral road, West Road (25), in section motor vehicle right track Article 2 track, West Road (27), later bridge bridge opening (63) of section motor vehicle left-hand rotation, section motor vehicle right track Article 3 track, West Road (26) and Article 3 track, section motor vehicle left lateral road, West Road (25) upper formation West Road, North Road section motor vehicle left-hand rotation is perpendicular being located on section motor vehicle right track Article 1 track, North Road (18) of length of bridge (58) later, short perpendicular being located on Article 2 track, section motor vehicle left lateral road, North Road (14), one across getting over section motor vehicle right track Article 2 track, North Road (17), section motor vehicle right track Article 3 track, North Road (16) and Article 3 track, section motor vehicle left lateral road, North Road (15), in section motor vehicle right track Article 2 track, North Road (17), section motor vehicle right track Article 3 track, North Road (16) and top, Article 3 track, section motor vehicle left lateral road, North Road (15) form later bridge bridge opening (62) of section motor vehicle left-hand rotation, North Road, East Road section motor vehicle left-hand rotation is perpendicular being located on section motor vehicle right track Article 1 track, East Road (8) of length of bridge (57) later, short perpendicular being located on Article 2 track, section motor vehicle left lateral road, East Road (4), one across getting over section motor vehicle right track Article 2 track, East Road (7), section motor vehicle right track Article 3 track, East Road (6) and Article 3 track, section motor vehicle left lateral road, East Road (5), in section motor vehicle right track Article 2 track, East Road (7), section motor vehicle right track Article 3 track, East Road (6) and top, Article 3 track, section motor vehicle left lateral road, East Road (5) form later bridge bridge opening (61) of section motor vehicle left-hand rotation, East Road, South Road section motor vehicle left-hand rotation is perpendicular being located on section motor vehicle right track Article 1 track, South Road (38) of length of bridge (60) later, short perpendicular being located on Article 2 track, section motor vehicle left lateral road, South Road (34), one across Vietnam motor vehicle right track Article 2 track, section (37), section motor vehicle right track Article 3 track, South Road (36) and Article 3 track, section motor vehicle left lateral road, South Road (35), in section motor vehicle right track Article 2 track, South Road (37),Section motor vehicle right track Article 3 track, South Road (36) and top, Article 3 track, section motor vehicle left lateral road, South Road (35) form later bridge bridge opening (64) of section motor vehicle left-hand rotation, South Road.
2. a kind of crossroad, single layer bridge six motor vehicle track processed of turning right according to claim 1, it is characterized in that: described motor vehicle bridge opening (84) is highly 6 meters, the height in the bicycle bridge opening of described all the people present's motor vehicle right turn bridge is 4 meters, and the described all the people present's motor vehicle motor vehicle of later bridge later bridge bridge opening height that turns left that turns left is 6 meters.
3. a kind of crossroad, single layer bridge six motor vehicle track processed of turning right according to claim 1, it is characterized in that: crossroad, described right-hand rotation single layer bridge six motor vehicle track processed is: do not establish bicycle track, but establish six crossroads, motor vehicle track on sidewalk, or establish bicycle track, but do not establish the crossroad in the six motor vehicle tracks on sidewalk, or bicycle track and sidewalk are not all established, and only establish the crossroad in six motor vehicle tracks.
CN201520047180.9U 2015-01-21 2015-01-21 Six motor vehicle lane crossroad on system of turning right individual layer bridge Expired - Fee Related CN204753287U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520047180.9U CN204753287U (en) 2015-01-21 2015-01-21 Six motor vehicle lane crossroad on system of turning right individual layer bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520047180.9U CN204753287U (en) 2015-01-21 2015-01-21 Six motor vehicle lane crossroad on system of turning right individual layer bridge

Publications (1)

Publication Number Publication Date
CN204753287U true CN204753287U (en) 2015-11-11

Family

ID=54468013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520047180.9U Expired - Fee Related CN204753287U (en) 2015-01-21 2015-01-21 Six motor vehicle lane crossroad on system of turning right individual layer bridge

Country Status (1)

Country Link
CN (1) CN204753287U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142801A (en) * 2017-07-17 2017-09-08 孙铭伟 Traffic cross-road people car separates accessible two layers of freely-moving bridge
CN108166344A (en) * 2018-01-31 2018-06-15 冯阳 Semi-submersible type viaduct

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107142801A (en) * 2017-07-17 2017-09-08 孙铭伟 Traffic cross-road people car separates accessible two layers of freely-moving bridge
CN108166344A (en) * 2018-01-31 2018-06-15 冯阳 Semi-submersible type viaduct

Similar Documents

Publication Publication Date Title
CN203487426U (en) Crisscross urban overpass
CN103161105A (en) Crossroad unblocked bridge
WO2006060950A1 (en) A road traffic facility and a construction method therefor
CN207073044U (en) Bridge tunnel composite cross crossing road
CN102747661B (en) Based on the structure and uses thereof of the torsional mode overpass bridge in urban road
CN204753287U (en) Six motor vehicle lane crossroad on system of turning right individual layer bridge
CN103161107A (en) Road intersection bridge
CN101387095B (en) Full interchange crossroad
CN101792994A (en) Multifunctional tunnel grade separation hub bridge
CN102392400A (en) Traffic system for crossroad without traffic light
CN100478519C (en) Bridge tunel combined crossing road on different level for crossroads
CN209602887U (en) A kind of no red light overpass at crossroads
CN204728155U (en) A kind of left-hand rotation crossroad, single layer bridge six motor vehicle track processed
CN103541285B (en) Conflict-free stereoscopic composite bridge
CN101487214A (en) Humanized multifunctional intersection for urban crossroad
CN108867217A (en) Four crossway fast passing viaduct
CN212357845U (en) Invisible flyover
CN201648900U (en) Multifunctional tunnel interchange hinge bridge
CN106065551A (en) A kind of without waiting for quickly through crossroad
CN203569402U (en) Conflict-free three-dimensional combined bridge
CN201268814Y (en) City multi-crossing double-layer non-obstacle crossroads
CN207498761U (en) Viaduct
CN202416105U (en) Unblocked bridge for crossroad
CN201047047Y (en) People-vehicle separated crossroad
CN201024365Y (en) Crossroads

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151111

Termination date: 20170121